US3848927A US17273671A US3848927A US 3848927 A US3848927 A US 3848927A US 17273671 A US17273671 A US 17273671A US 3848927 A US3848927 A US 3848927A
Authority
US
United States
Prior art keywords
delta
charge
value
crater
burden
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
Inventor
C Livingston
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US17273671 priority Critical patent/US3848927A/en
Application granted granted Critical
Publication of US3848927A publication Critical patent/US3848927A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • E21C37/16Other methods or devices for dislodging with or without loading by fire-setting or by similar methods based on a heat effect
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/26Methods of surface mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/26Methods of surface mining; Layouts therefor
    • E21C41/31Methods of surface mining; Layouts therefor for oil-bearing deposits
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/32Reclamation of surface-mined areas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping

Definitions

  • ABSTRACT A mining method comprising:
  • step (c) tunneling through the cellular units parallel to the free face and at the same level as the tunneling in step (c);
  • step (d) placing charges in the tunnels formed in step (d) in the area of the cellular units;

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

A mining method comprising: A. PREPARING A BENCH FREE FACE BY CONDUCTING TEST BLASTS; B. ESTABLISHING A PATTERN OF CELLULAR UNITS SEPARATED BY PILLARS OF THE ORE BODY TO BE MINED; C. TUNNELING HORIZONTALLY THROUGH THE ORE BODY PERPENDICULAR TO THE FREE FACE IN THE PILLAR AREAS; D. TUNNELING THROUGH THE CELLULAR UNITS PARALLEL TO THE FREE FACE AND AT THE SAME LEVEL AS THE TUNNELING IN STEP (C); E. PLACING CHARGES IN THE TUNNELS FORMED IN STEP (D) IN THE AREA OF THE CELLULAR UNITS; AND F. DETONATING THE CHARGES. The concept of product control blasting, trajectory control blasting and/or stability control blasting are applicable to the mining method.

Description

i Hamil 0R St de/E3992"? i United States Patent Livingston MINING METHOD usING CONTROL BLASTING [76] Inventor: Clifton W. Livingston, 624
- Panorama Dr., Grand Junction,
Colo. 8150] [22] Filed: Aug. 18, 1971 [21] Appl. No.: 172,736
Related U.S. Application Data [62] Division of Ser. No. 14,166, Feb. 25, 1970.
[52] U.S. Cl...; 299/13, 299/18 [51] Int. Cl. E2lc 37/00 [58] Field of Search 299/2, ll, l3, 18, 19
[56] References Cited UNITED STATES PATENTS 3,301,599 1/1967 Heimaster 299/18 3,588,175 6/1971 Whiting 299/19 OTHER PUBLICATIONS L C. Lang, Mining Itabirite on the Bong Range In Liberia, reprint, Canadian Mining Journal, Nov., 1965.
L. C. Lang, Pit Slope Control by Controlled Blasting,
HIGH TERRACE TERRACE INTERMEDIATE TERRACE OPEN CELL WATER STORAGE RAM HIG INTERMEDIATE Nov. 19, 1974 Reprint, Canadian Mining Journal, Dec., 1965.
Primary ExaminerErnest R. Purser Attorney, Agent, or Firm-Sherman & Shalloway [57] ABSTRACT A mining method comprising:
a. preparing a bench free face by conducting test blasts;
b. establishing a pattern of cellular units separated by pillars of the ore body to be mined; c. tunneling horizontally through the ore body perpendicular to the free face in the pillar areas;
d. tunneling through the cellular units parallel to the free face and at the same level as the tunneling in step (c);
e. placing charges in the tunnels formed in step (d) in the area of the cellular units; and
f. detonating the charges.
The concept of product control blasting, trajectory control blasting and/or stability control blasting are applicable to the mining method.
30 Claims, 36 Drawing Figures HIGHWALL ACTIVE MINING CELLS TERRACE PArEmmnvlslsm 3,848,927
sum mar CRATER PATENIE HUV I 91974 saw an or 21 PATENH" 9 '9 3, 848.927
sum 05 or 21 LBS. 04, 1958 NOW SURFACE 10 LBS. c- 4, ICE I 0.8
10 I. as. A 60 TR ENCH SNOW I 02 CHURCHILL TILL 0.4
///' ATLA$ 6C, KEWEENAW SILT ENERGY UTILIZATION NUMBER, A
DEPTH RATIO A PATENIEL I 91974 3. 848.927
SHEET as or 21 'SCALED CHARGE DEPTH AB w- I I I /l 8 I I I I I 8 l I I I. I I I I I 7 I I I II 7 I I RADIAL I I CRACKS I l I 6 l I s I I l secono RING I I I ICRACKS I I I J! I l 5 I I I I 5 Io -INCREMENT I I fl QI I Lu i I LZ) I B 4 I CRATER I I 4 5; I QIMIT I I I Q B I '2 I C I I j I I I 3 y I I 3 o l I w I I .I g FRAGMENTATION RANGE. DOMING RANGE l 2 I I I 1 I 1 2 AB. 9 I S.R.' PR. I SH. UPLIFT REGION I J REG.,' i R. F I I I 1/ I l I AIRBLAST |e.s.o. w R. on. PRE-CONDITIONING I i I I I P S I 4 I I 4 I 3 I I j: 3 2 v I V I 2 AU B I V I X I l I I \l N I l O 1.1 17 v 0 O RAT ERING SCALED BURDEN d I I I 90 o I I 4 I W 0 I 2 3 4 5 I 6 LEGEND:
A.B. REG. Airblasi Region 8.8.0. Bond SIrengIh DesIrucIion SR. Secondary Region V/W R. V/W Region P. R. Primary Region C.R. Course Region SH.R. Shear Region AU. B Auiogenous Blasting P.SI ParIicle Size 0.8. Conventional Blasiing PATENIELHUV 1 9 14 3; 848.927 1 SHEET 09 UF 2! w; I 0 m Lataraloxtant of bond g y I/ strength dutruction '5 (gas bubble rodiuu) I 8 0.4- g z' .7 0 i 7 1 N SCALED CHARGE DEPTH l l o l I DEPTH RATIO A PATENTEL my 1 sum SHEET 10 0F 21 DIRECTION OF ADVANCE ORIENT PAFIALLEL t0 MAJOR JOINT SYSTEM END LINE A (PRIMACORD LOOP BURDEN CONTROL LINE B FACE DO NOT REDUCE MINIMUM l, SLIDING RESISTANCE REPLACE LINED WITH LINE C, ADD LINES B AND A ON OPENING SHOT PRIMACORD LOOP SHORT PERIOD BACK LINE E DELAY NO.
CODE V-1 V-Z V-3 B-1 8-2 8-3 8-4 8-5 8-6 8-7 8-8, sYM Q Q (h 69 6 0 I82 E Q DIA. IN. 9.875 9.875 9.875 9.875 9.875 9.875 9.875 9.875 9.875 6.525 5.625
SUB. FT 6.91 6.17 6.27 I 6.17 5.78 5.47 4.97 4.97 5.18 4.50 3.70 DEPTH ft. 40.91 40.17 40.27 40.17 39.78 39.74 38.97 38.97 39.18 38.50 37.70
LINE OF SYMMETRY D FOR COMPOSITE BLASTS PATENI rznv 1 91924 sum 13 or 1 PATENTEL HEY I 91974 snm 15 or 21 4 3 .Ewummm PREDOMINANT PARTICLE VOLUME, CU FT PATENTE HS! 1 91974 sum 18 or 21

Claims (30)

1. A mining method comprising: a. preparing a bench free face by conducting test blasts; b. establishing a pattern of cellular units separated by pillars of the ore body to be mined; c. tunneling horizontally though said ore body perpendicular to said free face in said pillar areas; d. tunneling through said cellular units parallel to said free face and at the same level as said tunneling in step (c); e. placing charges in the tunnels formed in step (d) in the area of said cellular units; and f. detonating said charges.
2. The method of claim 1, wherein overburden is removed from the ore body by trajectory control blasting.
3. The method of claim 2, wherein the trajectory control blasting is conducted by controlling the trajectory of material formed as bench geometry surrounding a blast charge in response to explosion of the charge by: i. placing a charge of weight W at a vertical depth Delta v wherein Delta v dv/N wherein dv is the vertical depth, N being the depth of placement of a charge of given weight which first begins to produce upon explosion of the charge fractures on the surface of the material in which the charge is placed; ii. positioning said charge of weight W along a rearward extension of a line perpendicular to the bench free face at a burden Delta b wherein Delta b db/N wherein db is the burden distance and Delta b Delta v + Delta diff wherein Delta diff is a predetermined positive value, the trajectory being substantially in a vertical direction when Delta v is less than Delta b and substantially in the horizontal face direction when Delta b is less than Delta v; and iii. detonating the charge.
4. The method of claim 2, wherein the overburden positioned above an unmined cellular unit is projected to the area defined by previously mined cellular units by trajectory control blasting.
5. The method of claim 4, including building terrace ponds over the filled cellular units, said ponds including dykes.
6. The method of claim 4, wherein the trajectory control blasting is conducted by controlling the trajectory of Material formed as bench geometry surrounding a blast charge in response to explosion of the charge by: i. placing a charge of weight W at a vertical depth Delta v wherein Delta v dv/N wherein dv is the vertical depth, N being the depth of placement of a charge of given weight which first begins to produce upon explosion of the charge fractures on the surface of the material in which the charge is placed; ii. positioning said charge of weight W along a rearward extension of a line perpendicular to the bench free face at a burden Delta b wherein Delta b db/N wherein db is the burden distance and Delta b Delta v + Delta diff wherein Delta diff is a predetermined positive value, the trajectory being substantially in a vertical direction when Delta v is less than Delta b and substantially in the horizontal face direction when Delta b is less than Delta v; and iii. detonating the charge.
7. The method of claim 1, wherein said tunnels communicate between said cellular units to permit drainage control, and the mining method further includes the step of providing valve means in said tunnels.
8. The method of claim 1 further including establishing a plant pillar and constructing an ore processing plant thereon, within the confines of the mine field.
9. The method of claim 1, wherein at least one cell is maintained free of any earthen material.
10. A mining method including: a. clearing overburden from an extended area of underlying ore by trajectory control blasting; b. excavating in a stepped fashion a grid of cellular units in the exposed ore body, said units being separated by barrier pillars; and c. forming ramps in the pillars as mining progresses downwardly for access to the ore.
11. The method of claim 10 further including progressively filling the mined-out cellular units with overburden and mill tailings.
12. The method of claim 11, further including placing water quality filter beds on the floor surface of said cellular units prior to filling with overburden and tailings.
13. The method of claim 10, wherein said excavating is performed by product control blasting.
14. The method of claim 13, wherein the product control blasting is conducted by: i. conducting test crater blasts at various depths to determine the breakage limits of the material in response to the blasts; ii. preparing a chart by plotting the slant distance to each of the types of fractures in the blasting failure process and to the doming limit from test crater blasts; iii. establishing a grid over the crater formed by each test blast and measuring the particle size of the broken material touched by the grid; iv. preparing a chart by plotting the variation of the predominant particle size with various charge depths at scaled depth ratios Delta ; v. determining in the range Delta d to Delta o from the chart of (iv) the value in the controlling burden direction at which the desired predominant particle size can be achieved, Delta d is the Delta value at which doming begins and Delta o is the value of do/N for the given charge weight, do being the depth of placement of a charge of the given weight which produces upon explosion of the charge maximum pressure rise within the material, and N being the depth of placement of a charge of the given weight which first begins to produce upon explosion of the charge fractures on the surface of the material in which the charge is placed; or in the range Delta o to Delta equals 0 the value at which the desired particle size can be achieved where predominant particle size from autogenous blasting ranges from near zero to that measured at Delta o of the crater tests; vi. decreasing the crater chart value (v) by subtracting for bench geometry a Delta increment adjustment ranging linearly from a maximum at Delta bo- Delta o for a controlling burden of magnitude Delta o to zero for a controlling burden Delta a or less or for a controlling burden Delta ss or greater, increment being Delta bo minus Delta o, Delta bo being the value of dbo/N for the given charge weight, dbo being the perpendicular distance from the vertical free face to the center of gravity of explosive charge which produces upon explosion of said charge maximum pressure rise within the material, Delta a is the Delta value at which the volume of the apparent crater is maximum, and Delta ss being the Delta value at which cratering begins; vii. placing the charge at a distance from the controlling burden toward the face of the bench corresponding to the adjusted Delta value; viii. placing the charge at a distance from the non-controlling free face at the crater test determined value; and ix. detonating the charge.
15. The method of claim 10 further including drilling drain holes through said barrier pillars to provide water control tunnels communication between said cellular units.
16. The method of claim 10 wherein the trajectory control blasting is conducted by controlling the trajectory of material formed as bench geometry surrounding a blast charge in responsive to explosion of the charge by: i. placing a charge of weight W at a vertical depth Delta v wherein Delta v dvN wherein dv is the vertical depth, N being the depth of placement of a charge of given weight which first begins to produce upon explosion of the charge fractures on the surface of the material in which the charge is placed; ii. positioning said charge of weight W along a rearward extension of a line perpendicular to the bench free face at a burden Delta b wherein Delta b db/N wherein db is the burden distance and Delta b Delta v + Delta diff wherein Delta diff is a predetermined positive value, the trajectory being substantially in a vertical direction when Delta v is less than Delta b and substantially in the horizontal face direction when Delta b is less than Delta v; and iii. detonating the charge.
17. A mining method including: a. removing overburden from an ore body by trajectory control blasting; b. establishing a cellular grid structure including planned ore body cells separated by barrier pillars perpendicular to entry pillars; c. driving entries in the ore body perpendicular to the free face in said entry pillars; d. driving cross-entries from said entries through said planned ore body cells perpendicular to said entries and at the same ore body level; e. placing explosive charges in said cross-entries within the area defined by said planned ore body cells; and f. detonating said explosive charges.
18. The method of claim 17, further including the step of progressively and continuously performing steps (a) - (f) with the overburden being blasted by trajectory control blasting from its in situ position to its final resting place within a previously mined-out cellular unit.
19. The method of claim 17, wherein the trajectory control blasting is conducted by controlling the trajectory of material formed as bench geometry surrounding a blast charge in response to explosion of the charge by: i. placing a charge of weight W at a vertical depth Delta v wherein Delta v dv/N wherein dv is the vertical depth, N being the depth of placement of a charge of given weight which first begins to produce upon explosion of the charge fractures on the surface of the material in which the charge is placed; ii. positioning said charge of weight W along a rearward extension of a line perpendicular to the bench free face at a burden b whereiN b db/N wherein db is the burden distance and Delta b Delta v + Delta diff wherein Delta diff is a predetermined positive value, the trajectory being substantially in a vertical direction when Delta v is less than Delta b and substantially in the horizontal face direction when Delta b is less than Delta v; and iii. detonating the charge.
20. The method of claim 17, wherein steps (e) and (f) are carried out by conducting product control blasting by: i. conducting test crater blasts at various depths to determine the breakage limits of the material in response to the blasts; ii. preparing a chart by plotting the slant distance to each of the types of fractures in the blasting failure process and to the doming limit from test crater blasts; iii. establishing a grid over the crater formed by each test blast and measuring the particle size of the broken material touched by the grid; iv. preparing a chart by plotting the variation of the predominant particle size with various charge depths at scaled depth ratios Delta ; v. determining in the range Delta d to Delta o from the chart of (iv) the value in the controlling burden direction at which the desired predominant particle size can be achieved, Delta d is the Delta value at which doming begins and Delta o is the value of do/N for the given charge weight, do being the depth of placement of a charge of the given weight which produces upon explosion of the charge maximum pressure rise within the material, and N being the depth of placement of a charge of the given weight which first begins to produce upon explosion of the charge fractures on the surface of the material in which the charge is placed; or in the range Delta o to Delta equals 0 the value at which the desired particle size can be achieved where predominant particle size from autogeneous blasting ranges from near zero to that measured at Delta o of the crater tests; vi. decreasing the crater chart value (v) by subtracting for bench geometry a Delta increment adjustment ranging linearly from a maximum at Delta bo - Delta o for a controlling burden of magnitude Delta o to zero fro a controlling burden Delta a or less or for a controlling burden Delta ss or greater, Delta increment being Delta bo minus Delta o, Delta bo being the value of dbo/N for the given charge weight, dbo being the perpendicular distance from the verticle free face to the center of gravity of explosive charge which produces upon explosion of said charge maximum pressure rise within the material, Delta a is the Delta value at which the volume of the apparent crater is maximum, and Delta ss being the Delta value at which cratering begins; vii. placing the charge at a distance from the controlling burden toward the face of the bench corresponding to the adjusted Delta value; viii. placing the charge at a distance from the noncontrolling free face at the crater test determined value; and ix. detonating the charge.
21. A method comprising: a. preparing a bench free face by conducting blast tests; b. establishing a pattern of cellular units separated by pillars of the ore body to be mined; c. excavating an outer peripheral portion in each cellular unit by stability control blasting so as to develop a buffer zone of broken ore between the central portion and pillars to be formed and to form ramps for access into each cellular unit; d. excavating an inner product control zone within each cellular unit; e. depositing water quality filter beds on the floor of one or more cellular units; f. drilling drain holes horizontally through at least one pillar; g. filling the cellular units with overburden, tailings or mixture thereof; h. constructing dikes above the filled cellular uniT and pillar structure so as to form terrace ponds and pillar pond; and i. filling said terrace ponds and pillar ponds with tailings.
22. The method of claim 21 wherein the stability control blasting is conducted by: i. conducting test crater blasts and preparing a chart by plotting the slant distances to limits of each of the types of fractures in the blasting failure process and to the doming limit, by plotting the slant distances to the crater lip against charge depth and the zone of bond strength destruction against charge depth, R cracks defining the limits of extreme rupture and by plotting the variation in predominant particle size against charge depth from the parameters determined from said blasts; ii. selecting a predetermined limit part which the material in which the blasts are conducted in not to be affected; iii. progressively setting and detonating explosive charges in the direction approaching said limit, each successive charge being decreased in Delta b value and increased in Delta v value so as to progressively increase the Delta v - Delta b difference approaching said limit, the Delta b value being determined from the cratering results using the relation b/N, where b is the bench burden in feet and N is the distance in feet at which cratering begins for the bench charge, the Delta v value being determined from the relation dc/N, where dc is the distance beneath the top of bench in feet to the bench charge; and iv. the placement of the charge being such that the limits of extreme rupture as defined in said chart do not for any given blast extend beyond the predetermined limit.
23. A method comprising: a. preparing a bench free face by conducting blast tests; b. establishing a pattern of cellular units separated by pillars of the ore body to be mined; c. clearing overburden from an extended area of the over-lying ore body using trajectory control blasting; d. tunneling horizontally through said ore body perpendicular to said free face in said pillar areas; e. tunneling through said cellular units parallel to said free face and at the same level as the tunneling in step (d); f. excavating an outer peripherical portion in each cellular unit using stability control blasting so as to develop a buffer zone of broken ore between the central portion and pillars to be formed and to form access ramps into the cellular unit; g. placing charges in the tunnels formed in step (e) and detonating said charges; h. removing the broken ore from within the cellular unit and filling the empty cellular units with overburden; i. constructing ramps above the level of the overburden filled cellular units using overburden; j. utilizing said ramps constructed in step (i) to dispose of excess broken overburden and to predetermine the height of a future reclaimed surface above the mined-out area based upon the volume of excavation and the swell volumes of materials to be disposed of; k. constructing terrace ponds and pillar ponds on top of the overburden; and l. selectively filling terrace ponds and pillar ponds with mill tailing slurry to a predetermined elevation.
24. The method of claim 23, wherein the trajectory control blasting is conducted by controlling the trajectory of material formed as bench geometry surrounding a blast charge in response to explosion of the charge by: i. placing a charge of weight W at a vertical depth Delta v wherein Delta v dv/N wherein dv is the vertical depth, N being the depth of placement of a charge of given weight which first begins to produce upon explosion of the charge fractures on the surface of the material in which the charge is placed; ii. positioning said charge of weight W along a rearward extension of a line perpendicular to the bench free face at a burden b wherein b db/N wherein db is the burden distance and Delta b Delta v + Delta diff wherein Delta diff is a predetermined positive value, the trajectory being substantially in a vertical direction when Delta v is less than Delta b and substantially in the horizontal face direction when Delta b is less than Delta v; and iii. detonating the charge.
25. The method of claim 23, wherein step (h) is carried out by conducting trajectory control blasting.
26. A method comprising: a. preparing a bench free face by conducting blast tests; b. establishing a pattern of cellular units separated by pillars of the ore body to be mined; c. clearing overburden from an extended area of the over-lying ore body using product control blasting; d. tunneling horizontally through said body perpendicular to said free face in said pillar areas; e. tunneling through said cellular units parallel to said free face and at the same level as the tunneling in step (d) f. excavating an outer peripherical portion in each cellular unit using stability control blasting so as to develop a buffer zone of broken ore between the central portion and pillars to be formed and to form access ramps into the cellular unit; g. placing charges in the tunnels formed in step (e) and detonating said charges; h. removing the broken ore from within the cellular unit and filling the empty cellular units with overburden; i. constructing ramps above the level of the overburden filled cellular units using overburden; j. utilizing said ramps constructed in step (i) to dispose of excess broken overburden and to predetermine the height of a future reclaimed surface above the mined-out area based upon the volume of excavation and the swell volumes of materials to be dispsosed of; k. constructing terrace ponds and pillar ponds on top of the overburden; and l. selectively filling terrace ponds and pillar ponds with mill tailing slurry to a predetermined elevation.
27. The method of claim 26, wherein the product control blasting is conducted by: i. conducting test crater blasts at various depths to determine the breakage limits of the material in response to the blasts; ii. preparing a chart by plotting the slant distance to each of the types of fractures in the blasting failure process and to the doming limit from test crater blasts; iii. establishing a grid over the crater formed by each test blast and measuring the particle size of the broken material touched by the grid; iv. preparing a chart by plotting the variation of the predominant particle size which various charge depths at scaled depth ratios Delta ; v. determining in the range Delta d to Delta o from the chart of (iv) the value in the controlling burden direction at which the desired predominant particle size can be achieved, Delta d is the Delta value at which doming begins and Delta o is the value of do/N for the given charge weight, do being the depth of placement of a charge of the given weight which produces upon explosion of the charge maximum pressure rise within the material, and N being the depth of placement of a charge of the given weight which first begins to produce upon explosion of the charge fractures on the surface of the material in which the charge is placed; or in the range Delta o to Delta equals 0 the value at which the desired particle size can be achieved where predominant particle size from autogenous blasting ranges from near zero to that measured at Delta 0 of the crater tests; vi. decreasing the crater chart value (v) by subtracting for bench geometry a Delta increment adjustment ranging linearly from a maximum at Delta bo - Delta o for a controlling burden of magnitude Delta o to zero for a controlling burden Delta a or less or for a controlling burden Delta ss or greater, Delta increment being Delta bo minus Delta o, Delta bo being the value of dbo/N for the given charge weight, dbo being the perpendicular distance from the vertical free face to the center of gravity of explosive charge which produces upon explosion of said charge maximum pressure rise within the material, Delta a is the Delta value at which the volume of the apparent crater is maximum, and Delta ss being the Delta value at which cratering begins; vii. placing the charge at a distance from the controlling burden toward the face of the bench corresponding to the adjusted Delta value; viii. placing the charge at a distance from the non-controlling free face at the crater test determined value; and ix. detonating the charge.
28. The method of claim 26, wherein step (h) is carried out by conducting trajectory control blasting.
29. A mining method including: a. clearing overburden from an extended area of underlying ore by product control blasting; b. excavating in a stepped fashion a grid of cellular units in the exposed ore body, said units being separated by barrier pillars; and c. forming ramps in the pillars as mining progresses downwardly for access to the ore.
30. The method of claim 29, wherein the product control blasting is conducted by: i. conducting test crater blasts at various depths to determine the breakage limits of the material in response to the blasts; ii. preparing a chart by plotting the slant distance to each of the types of fractures in the blasting failure process and to the doming limit from test crater blasts; iii. establishing a grid over the crater formed by each test blast and measuring the particle size of the broken material touched by the grid; iv. preparing a chart by plotting the variation of the predominant particle size with varius charge depths at scaled depth ratios Delta ; v. determining in the range Delta d to Delta o from the chart of (iv) the value in the controlling burden direction at which the desired predominant particle size can be achieved, Delta d is the Delta value at which doming begins and Delta o is the value of do/N for the given charge weight, do being the depth of placement of a charge of the given weight which produces upon explosion of the charge maximum pressure rise within the material, and N being the depth of placement of a charge of the given weight which first begins to produce upon explosion of the charge fractures on the surface of the material in which the charge is placed; or in the range Delta o to Delta equals 0 the value at which the desired particle size can be achieved where predominant particle size from autogenous blasting ranges from near zero to that measured at Delta o of the crater tests; vi. decreasing the crater chart value (v) by subtracting for bench geometry a Delta increment adjustment ranging linearly from a maximum at Delta bo - Delta o for a controlling burden of magnitude Delta o to zero for a controlling burden Delta a or less or for a controlling burden Delta ss or greater, Delta increment being Delta bo minus Delta o, Delta bo being the value of dbo/N for the given charge weight, dbo being the perpendicular distance from the vertical free face to the center of gravity of explosive charge which produces upon explosion of said charge maximum pressure rise within the material, Delta a is the Delta value at which the volume of the apparent crater is maximum, and Delta ss being the Delta value at which cratering begins; vii. placing the charge at a distance from the controlling burden toward the face of the bench corresponding to the adjusted Delta value; viii. placing the charge at a distance from the non-controlling free face at the crater test determined value; and ix. detonating the charge.
US17273671 1970-02-25 1971-08-18 Mining method using control blasting Expired - Lifetime US3848927A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US17273671 US3848927A (en) 1970-02-25 1971-08-18 Mining method using control blasting

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US1416670A 1970-02-25 1970-02-25
US17273671 US3848927A (en) 1970-02-25 1971-08-18 Mining method using control blasting

Publications (1)

Publication Number Publication Date
US3848927A true US3848927A (en) 1974-11-19

Family

ID=26685747

Family Applications (1)

Application Number Title Priority Date Filing Date
US17273671 Expired - Lifetime US3848927A (en) 1970-02-25 1971-08-18 Mining method using control blasting

Country Status (1)

Country Link
US (1) US3848927A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4007965A (en) * 1975-07-18 1977-02-15 Shuttle Jr Anthony J Method of recovering useful minerals from subterranean deposits thereof
US4143917A (en) * 1977-10-11 1979-03-13 Continental Oil Company In-situ retorting of oil shale with in-situ formed arches
US4300800A (en) * 1979-09-14 1981-11-17 Occidental Oil Shale, Inc. Method of rubbling a pillar
US4372615A (en) * 1979-09-14 1983-02-08 Occidental Oil Shale, Inc. Method of rubbling oil shale
US5098163A (en) * 1990-08-09 1992-03-24 Sunburst Recovery, Inc. Controlled fracture method and apparatus for breaking hard compact rock and concrete materials
US5308149A (en) * 1992-06-05 1994-05-03 Sunburst Excavation, Inc. Non-explosive drill hole pressurization method and apparatus for controlled fragmentation of hard compact rock and concrete
US5611605A (en) * 1995-09-15 1997-03-18 Mccarthy; Donald E. Method apparatus and cartridge for non-explosive rock fragmentation
US5803550A (en) * 1995-08-07 1998-09-08 Bolinas Technologies, Inc. Method for controlled fragmentation of hard rock and concrete by the combination use of impact hammers and small charge blasting
US6035784A (en) * 1995-08-04 2000-03-14 Rocktek Limited Method and apparatus for controlled small-charge blasting of hard rock and concrete by explosive pressurization of the bottom of a drill hole
US6321655B1 (en) 1999-03-11 2001-11-27 Rocktek Limited Method and apparatus for flyrock control in small charge blasting
US6772105B1 (en) 1999-09-08 2004-08-03 Live Oak Ministries Blasting method
US20040159258A1 (en) * 2001-01-19 2004-08-19 Brent Geoffrey Frederick Method of blasting
US20100211429A1 (en) * 2009-02-17 2010-08-19 Benson Ronald C System and method for managing and maintaining abrasive blasting machines
US20200089823A1 (en) * 2018-03-26 2020-03-19 OrePro Holdings LLC 3d block modelling of a resource boundary in a post-blast muckpile to optimize destination delineation
US20220267974A1 (en) * 2019-06-20 2022-08-25 China University Of Mining And Technology Method for constructing inner dump type strip mine pit bottom reservoirs section by section

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3301599A (en) * 1964-02-27 1967-01-31 Union Carbide Corp Method of continuous open-pit mining and apparatus therefor
US3588175A (en) * 1969-04-15 1971-06-28 Atlantic Richfield Co Methods for mining deep thick oil shale deposits

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3301599A (en) * 1964-02-27 1967-01-31 Union Carbide Corp Method of continuous open-pit mining and apparatus therefor
US3588175A (en) * 1969-04-15 1971-06-28 Atlantic Richfield Co Methods for mining deep thick oil shale deposits

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
L. C. Lang, Mining Itabirite on the Bong Range In Liberia, reprint, Canadian Mining Journal, Nov., 1965. *
L. C. Lang, Pit Slope Control by Controlled Blasting, Reprint, Canadian Mining Journal, Dec., 1965. *

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4007965A (en) * 1975-07-18 1977-02-15 Shuttle Jr Anthony J Method of recovering useful minerals from subterranean deposits thereof
US4143917A (en) * 1977-10-11 1979-03-13 Continental Oil Company In-situ retorting of oil shale with in-situ formed arches
US4300800A (en) * 1979-09-14 1981-11-17 Occidental Oil Shale, Inc. Method of rubbling a pillar
US4372615A (en) * 1979-09-14 1983-02-08 Occidental Oil Shale, Inc. Method of rubbling oil shale
US5098163A (en) * 1990-08-09 1992-03-24 Sunburst Recovery, Inc. Controlled fracture method and apparatus for breaking hard compact rock and concrete materials
US5308149A (en) * 1992-06-05 1994-05-03 Sunburst Excavation, Inc. Non-explosive drill hole pressurization method and apparatus for controlled fragmentation of hard compact rock and concrete
US6035784A (en) * 1995-08-04 2000-03-14 Rocktek Limited Method and apparatus for controlled small-charge blasting of hard rock and concrete by explosive pressurization of the bottom of a drill hole
US6148730A (en) * 1995-08-04 2000-11-21 Rocktek Limited Method and apparatus for controlled small-charge blasting by pressurization of the bottom of a drill hole
US6435096B1 (en) 1995-08-04 2002-08-20 Rocktek Limited Method and apparatus for controlled small-charge blasting by decoupled explosive
US5803550A (en) * 1995-08-07 1998-09-08 Bolinas Technologies, Inc. Method for controlled fragmentation of hard rock and concrete by the combination use of impact hammers and small charge blasting
US6145933A (en) * 1995-08-07 2000-11-14 Rocktek Limited Method for removing hard rock and concrete by the combination use of impact hammers and small charge blasting
US5803551A (en) * 1995-09-15 1998-09-08 First National Corporation Method apparatus and cartridge for non-explosive rock fragmentation
US5611605A (en) * 1995-09-15 1997-03-18 Mccarthy; Donald E. Method apparatus and cartridge for non-explosive rock fragmentation
US6321655B1 (en) 1999-03-11 2001-11-27 Rocktek Limited Method and apparatus for flyrock control in small charge blasting
US6332401B1 (en) 1999-03-11 2001-12-25 Rocktek Limited Method and apparatus for pressure wave suppression in small-charge blasting
US8099240B2 (en) * 1999-09-08 2012-01-17 Live Oak Ministries Blasting method
US6772105B1 (en) 1999-09-08 2004-08-03 Live Oak Ministries Blasting method
US20050010385A1 (en) * 1999-09-08 2005-01-13 Heck Jay Howard Blasting method
US8538698B2 (en) 1999-09-08 2013-09-17 Live Oak Ministries Blasting method
US8380436B2 (en) 1999-09-08 2013-02-19 Live Oak Ministries Blasting method
US7418373B2 (en) * 1999-09-08 2008-08-26 Live Oak Ministries Blasting method
US20090119078A1 (en) * 1999-09-08 2009-05-07 Live Oak Ministries Blasting Method
US20110010149A1 (en) * 1999-09-08 2011-01-13 Live Oak Ministries Blasting Method
US20040159258A1 (en) * 2001-01-19 2004-08-19 Brent Geoffrey Frederick Method of blasting
US7406918B2 (en) 2001-01-19 2008-08-05 Orica Explosives Technology Pty Ltd. Method of blasting
US20070199468A1 (en) * 2001-01-19 2007-08-30 Brent Geoffrey F Method of blasting
US20100211429A1 (en) * 2009-02-17 2010-08-19 Benson Ronald C System and method for managing and maintaining abrasive blasting machines
US9058707B2 (en) * 2009-02-17 2015-06-16 Ronald C. Benson System and method for managing and maintaining abrasive blasting machines
US10695891B2 (en) 2009-02-17 2020-06-30 Roto Grit, Llc System and method for managing and maintaining abrasive blasting machines
US20200089823A1 (en) * 2018-03-26 2020-03-19 OrePro Holdings LLC 3d block modelling of a resource boundary in a post-blast muckpile to optimize destination delineation
US11681837B2 (en) * 2018-03-26 2023-06-20 Orica Usa Inc. 3D block modelling of a resource boundary in a post-blast muckpile to optimize destination delineation
US20220267974A1 (en) * 2019-06-20 2022-08-25 China University Of Mining And Technology Method for constructing inner dump type strip mine pit bottom reservoirs section by section
US11795643B2 (en) * 2019-06-20 2023-10-24 China University Of Mining And Technology Method for constructing inner dump type strip mine pit bottom reservoirs section by section

Similar Documents

Publication Publication Date Title
US3848927A (en) Mining method using control blasting
Zhang et al. The application of short-wall block backfill mining to preserve surface water resources in northwest China
US20200408094A1 (en) Mine exploitation based on stoping, separation and filling control
CN110617069B (en) Full-circle excavation construction method
US3775984A (en) Mining method and method of land reclamation
CN104532818A (en) Treatment method for strip mine goaf
CN107387084A (en) A kind of gob side entry retaining reduces the construction method for cutting top depth
CN110080774A (en) Mine Dry-placed fill mining is fallen based on the vertical medium-length hole retrusive of high-dipping ore block
CN103470263A (en) New-level development method for open-pit metal mine
CN106968675A (en) Construction method of gas tunnel goaf
Liu et al. Characteristics analysis of roof overburden fracture in thick coal seam in deep mining and engineering application of super high water material in backfill mining
CN109899070B (en) Non-solid waste filling mining method for gently inclined medium-thick ore bodies based on ellipsoid drawing structure
Ren et al. Optimization and application of blasting parameters based on the “pushing-wall” mechanism
CN113187481B (en) Filling mining method for centralized grouting caving stoping of overburden rock
CN108952725A (en) A kind of low dilution mining methods suitable for slight slope and thin ore body
Kiersch et al. Investigations, areal and engineering geology; Folsom Dam Project, central California
CN110397439A (en) Retreating ore-falling dry-filling mining method based on steeply inclined ore body with vertical middle and deep holes
CN111852473B (en) Mining method of thin vein
US3762771A (en) Mine layout applicable to natural resources development
Herget et al. Utilization of salt tailings backfill at Denison-Potacan Potash Company
Pugliese Designing blast patterns using empirical formulas
Moser State of the art of backfill technology in underground mining excavations
Zhang et al. Study on the law and mechanism of strata movement induced by caving mining of slowly inclined large and thick orebody
Wang et al. Support strategy for tailgates below gob edge using split-level longwall panel layout for deep inclined coal seams
RU2067169C1 (en) Method for underground leaching of rocky ores in places of their occurrence