[go: up one dir, main page]

US2165437A - Floor and method of making the same - Google Patents

Floor and method of making the same Download PDF

Info

Publication number
US2165437A
US2165437A US130596A US13059637A US2165437A US 2165437 A US2165437 A US 2165437A US 130596 A US130596 A US 130596A US 13059637 A US13059637 A US 13059637A US 2165437 A US2165437 A US 2165437A
Authority
US
United States
Prior art keywords
covering
concrete
topping
layer
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US130596A
Inventor
Adam Robert
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US130596A priority Critical patent/US2165437A/en
Application granted granted Critical
Publication of US2165437A publication Critical patent/US2165437A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/10Coherent pavings made in situ made of road-metal and binders of road-metal and cement or like binders
    • E01C7/14Concrete paving

Definitions

  • This invention relates to improvements in floors andthe method of making the same, and its obs.
  • the view is a. diagrammatic perspective which illustratesthe various steps in carrying out the method, the thickness of the resulting layers merely being illustrative.
  • a foundation concrete slab I is laid down or constructed according to known methods.
  • Intermediate and upper toppings 2, 3, are applied to the base or foundation I.
  • the intermediate topping 2 comprises a wet concrete mixture which is screeded ofi evenly, and contains a sufiicient amount of water for the hydration of the combined amounts of cement used in both toppings 2 and 3.
  • the topping 3 comprises a dry concrete mixture which is spread upon the intermediate topping 2 and is screeded evenly as well.
  • dry is meant that the materials in the topping 3 are only moist enough to barely hold together, or completely devoid of moisture, as distinguished from the nature of the layer 2 1937, Serial No". 130,596
  • ch s ctu y a wet mixture.
  • the surface of. the dry mixture is slightly compacted by troweling. This assists in speeding up capillary attraction, by which the water travels from the wet layer 2 into the dry, or semi-dry, layer 3.
  • a flexible, absorbent and porous covering dis placedv upon the topping or uppermost layer 3.
  • Thisv covering may comprise burlap, cloth or any other suitable material of a similar naturehaving the qualities of flexibility, porosity and absorption. Mention has been made of the advantages of using'this covering. The purpose specifically set forth is that of interposinga guard, so tospeak, between the uppermost layer 3' and the tamping tool 5.
  • this covering 4 pre vents the concrete mixture from sticking to the tamping tool, whatever itsnature may be.
  • the tamping is done upon the covering, and theforce of the blows is imparted to the concrete structure underneath. This function is readily accomplished because the flexible nature of the covering does not deaden the force of the blows to any appreciable extent.
  • the flexible covering 4 Since the latter is porous, it permits the escape of air from the concrete mass while it is being compacted.
  • the absorptive quality of the covering insures taking up any excess water that may not be absorbed by the upper dry layer 3, thereby leaving a minimum amount of water in the concrete mass for the hydration of the cement in the mass.
  • the covering 4 being of a fine, porous nature Which permits the air to pass through it, prevents suction when said. covering is removed from the surface of the compacted concrete, thereby insuring a minimum amount of disturbance of the surface of the topping or layer 3.
  • the condition of the concrete surface is such without there being any danger of any of the concrete mass adhering to the toolshould further tamping and compacting be found necessary.
  • This step in the manufacture of the floor is illustrated at 6, the tamping tool 5a merely being a duplication of the tamping tool 5 already mentioned.
  • the final act is to finish the surface at 1 with a hand trowel 8.
  • covering 4 in this method is not to be confused'with the more or less common practice of covering concerete roadways with a textile material for the purpose of keeping the concrete mass wet. It has been emphasized herein that one of the main purposes of the covering 4 is to enable compacting the concrete mass without the possibility of the tool picking up any of the surface cement. It has been found by actual practice that it is unnecessary to float the surface before the final troweling, as is common practice.
  • a floor laid according to this method may be troweled immediately without waiting for hydration or for evaporation, before finishing by troweling. From the first placing of the mass of concrete to the finish by troweling there is a time lapse of hardly more than ten minutes.
  • foundation slab 1, intermediate layer 2, and top layer 3 may be constructed in one operation.
  • the object of using layer 2, which may be composed of finer aggregate and cement than used in slab l, is to make a more even surface to receive top layer 3. This makes a more even division between layer 2 and 3.
  • intermediate layer 2 may be omitted.
  • topping 3 is applied directly to the foundation slab l and then compacted by means of the tool 5, the covering 4 being interposed and finally smoothed off with the trowel 8.
  • topping 3 is slightly compacted by troweling as previously described, before the tamping takes place.
  • the herein described method consisting of laying a concrete foundation slab, spreading an intermediate topping of wet concrete mixture over said foundation slab, spreading an upper topping of dry concrete mixture over the intermediate topping, covering the upper topping with a flexible porous and absorbent covering and maintaining said covering in place for a predetermined period, and tamping upon said covering to induce the extraction of Water by percussion from the intermediate topping and promote its upward penetration into the upper topping.
  • the herein described method consisting of laying a concrete foundation slab, spreading an intermediate topping of wet concrete mixture over said foundation slab, spreading an upper topping of dry concrete mixture over the intermediate topping, covering the upper topping with a flexible porous and absorbent covering, and maintaining said covering in place for a protracted period, and traversing said covering with a percussion instrument to pound the superimposed layers therebeneath with a progressive step motion.
  • the herein described method consisting of laying a cementitious. concrete foundation slab, spreading a moist cementitious layer over said slab, covering said layer with a large, loose flexible porous and absorbent fabric sheet, and transversing the surface of said sheet with a percussion instrument to compact said layers into one solid mass.
  • the herein described method consisting of spreading a layer of wet concrete mixture upon a foundation, spreading a topping of dry concrete mixture over said layer, covering the topping With a flexible porous and absorbent covering and maintaining said covering in place for a protracted period, and tamping upon said covering to induce the extraction of water by percussion from said layer and promote its upward penetration into the topping.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

Jilly 11, 1939. ADAM FLOOR AND METHOD OF MAKING THE SAME Filed March 12, 1937 gjvwewbyo R dine r2 .fldam/ Patented July 11,1939
UNITE STATES PATENTYOF'FICE Application March 12, 4 Claims;
This invention relates to improvements in floors andthe method of making the same, and its obs.
to prevent the concrete mixture from sticking to' any tamping or vibrating mechanism that may be used to compact the mass of concrete.
Third, to use the foregoing covering for the additional and ultimate purpose of materially speeding up the laying ofthefloor, the several details whereby this object'is attained and re-- sulting from the use of said covering being reserved for the description which follows.
Fourth, to construct a concrete floor made with a minimum amount of water, thus automatically producing a most superior quality of concrete, as any excess amount of water beyond the necessary amount to properly compact the floor and hydrate the cement produces an inferior quality of concrete.
Fifth, to construct a concrete floor Without the process of floating the surface of same after it has been tamped inorder to prevent any disturbance in the location of the aggregate in which it has been placed and compacted, and further to prevent any loosening or uncompacting of the mass which does take place in floating.
Other objects and advantages will appear in the following specification, reference being had to the accompanying drawing, in which:
The view is a. diagrammatic perspective which illustratesthe various steps in carrying out the method, the thickness of the resulting layers merely being illustrative.
In carrying out the invention a foundation concrete slab I is laid down or constructed according to known methods. Intermediate and upper toppings 2, 3, are applied to the base or foundation I. The intermediate topping 2 comprises a wet concrete mixture which is screeded ofi evenly, and contains a sufiicient amount of water for the hydration of the combined amounts of cement used in both toppings 2 and 3.
The topping 3 comprises a dry concrete mixture which is spread upon the intermediate topping 2 and is screeded evenly as well. By the term dry is meant that the materials in the topping 3 are only moist enough to barely hold together, or completely devoid of moisture, as distinguished from the nature of the layer 2 1937, Serial No". 130,596
ch s ctu y a wet mixture. The surface of. the dry mixture is slightly compacted by troweling. This assists in speeding up capillary attraction, by which the water travels from the wet layer 2 into the dry, or semi-dry, layer 3. Before undertaking the steps of tamping, a flexible, absorbent and porous covering. dis placedv upon the topping or uppermost layer 3.
Thisv covering may comprise burlap, cloth or any other suitable material of a similar naturehaving the qualities of flexibility, porosity and absorption. Mention has been made of the advantages of using'this covering. The purpose specifically set forth is that of interposinga guard, so tospeak, between the uppermost layer 3' and the tamping tool 5.
' In its capacity as a guard this covering 4 pre vents the concrete mixture from sticking to the tamping tool, whatever itsnature may be. The tamping is done upon the covering, and theforce of the blows is imparted to the concrete structure underneath. This function is readily accomplished because the flexible nature of the covering does not deaden the force of the blows to any appreciable extent.
But there are other advantages arising from the use of the flexible covering 4. Since the latter is porous, it permits the escape of air from the concrete mass while it is being compacted. The absorptive quality of the covering insures taking up any excess water that may not be absorbed by the upper dry layer 3, thereby leaving a minimum amount of water in the concrete mass for the hydration of the cement in the mass.
Further, the covering 4 being of a fine, porous nature Which permits the air to pass through it, prevents suction when said. covering is removed from the surface of the compacted concrete, thereby insuring a minimum amount of disturbance of the surface of the topping or layer 3.
After the covering 4 is removed, the condition of the concrete surface is such without there being any danger of any of the concrete mass adhering to the toolshould further tamping and compacting be found necessary. This step in the manufacture of the floor is illustrated at 6, the tamping tool 5a merely being a duplication of the tamping tool 5 already mentioned. The final act is to finish the surface at 1 with a hand trowel 8.
The use of the covering 4 in this method is not to be confused'with the more or less common practice of covering concerete roadways with a textile material for the purpose of keeping the concrete mass wet. It has been emphasized herein that one of the main purposes of the covering 4 is to enable compacting the concrete mass without the possibility of the tool picking up any of the surface cement. It has been found by actual practice that it is unnecessary to float the surface before the final troweling, as is common practice.
It has been demonstrated further that a floor laid according to this method may be troweled immediately without waiting for hydration or for evaporation, before finishing by troweling. From the first placing of the mass of concrete to the finish by troweling there is a time lapse of hardly more than ten minutes.
It has been found that foundation slab 1, intermediate layer 2, and top layer 3 may be constructed in one operation. The object of using layer 2, which may be composed of finer aggregate and cement than used in slab l, is to make a more even surface to receive top layer 3. This makes a more even division between layer 2 and 3. It has been found also that in some cases that intermediate layer 2 may be omitted. Such a case would occur wherein the foundation slab and the topping 3 are constructed in one operation. In this case topping 3 is applied directly to the foundation slab l and then compacted by means of the tool 5, the covering 4 being interposed and finally smoothed off with the trowel 8. In this case topping 3 is slightly compacted by troweling as previously described, before the tamping takes place.
I claim:
1. The herein described method consisting of laying a concrete foundation slab, spreading an intermediate topping of wet concrete mixture over said foundation slab, spreading an upper topping of dry concrete mixture over the intermediate topping, covering the upper topping with a flexible porous and absorbent covering and maintaining said covering in place for a predetermined period, and tamping upon said covering to induce the extraction of Water by percussion from the intermediate topping and promote its upward penetration into the upper topping.
2. The herein described method consisting of laying a concrete foundation slab, spreading an intermediate topping of wet concrete mixture over said foundation slab, spreading an upper topping of dry concrete mixture over the intermediate topping, covering the upper topping with a flexible porous and absorbent covering, and maintaining said covering in place for a protracted period, and traversing said covering with a percussion instrument to pound the superimposed layers therebeneath with a progressive step motion.
3. The herein described method consisting of laying a cementitious. concrete foundation slab, spreading a moist cementitious layer over said slab, covering said layer with a large, loose flexible porous and absorbent fabric sheet, and transversing the surface of said sheet with a percussion instrument to compact said layers into one solid mass.
4. The herein described method consisting of spreading a layer of wet concrete mixture upon a foundation, spreading a topping of dry concrete mixture over said layer, covering the topping With a flexible porous and absorbent covering and maintaining said covering in place for a protracted period, and tamping upon said covering to induce the extraction of water by percussion from said layer and promote its upward penetration into the topping.
ROBERT ADAM.
US130596A 1937-03-12 1937-03-12 Floor and method of making the same Expired - Lifetime US2165437A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US130596A US2165437A (en) 1937-03-12 1937-03-12 Floor and method of making the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US130596A US2165437A (en) 1937-03-12 1937-03-12 Floor and method of making the same

Publications (1)

Publication Number Publication Date
US2165437A true US2165437A (en) 1939-07-11

Family

ID=22445427

Family Applications (1)

Application Number Title Priority Date Filing Date
US130596A Expired - Lifetime US2165437A (en) 1937-03-12 1937-03-12 Floor and method of making the same

Country Status (1)

Country Link
US (1) US2165437A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3500728A (en) * 1966-11-08 1970-03-17 Battelle Development Corp Concrete construction and roadways
US4054395A (en) * 1976-06-17 1977-10-18 Alexandr Dmitrievich Kozlov Method of erecting mass concrete structures
US4072786A (en) * 1974-09-03 1978-02-07 Bayer Aktiengesellschaft Production of floor toppings by flowing inorganic binder suspensions over porous open-cell underlays
US4167356A (en) * 1976-04-08 1979-09-11 Consiliul Popular Al Judetului Braila Roadway structures

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3500728A (en) * 1966-11-08 1970-03-17 Battelle Development Corp Concrete construction and roadways
US4072786A (en) * 1974-09-03 1978-02-07 Bayer Aktiengesellschaft Production of floor toppings by flowing inorganic binder suspensions over porous open-cell underlays
US4167356A (en) * 1976-04-08 1979-09-11 Consiliul Popular Al Judetului Braila Roadway structures
US4054395A (en) * 1976-06-17 1977-10-18 Alexandr Dmitrievich Kozlov Method of erecting mass concrete structures

Similar Documents

Publication Publication Date Title
US2289248A (en) Method of treating concrete
US3378617A (en) Method of facing building products with exposed mineral granules
US7572525B2 (en) Concrete curing blanket
US20100038818A1 (en) Concrete Curing Blanket
US2165437A (en) Floor and method of making the same
US1931650A (en) Floor covering
US2310391A (en) Absorptive mold lining
US2078289A (en) Cement flooring construction method and apparatus
JP2009518564A (en) Concrete floor equipment
US2432002A (en) Concrete form lining and method of manufacture
US4005954A (en) Production of plaster floors by the flooding process
JP7473111B2 (en) Method for promoting dehydration of concrete
US1682360A (en) Building block
US1887847A (en) Method of permanently securing linoleum to normally damp concrete surfaces
US2197431A (en) Method of laying concrete pavements
US1867797A (en) Insulating board
US3137100A (en) Roofing product
JPS6051263A (en) Ageing of mortar or concrete
US2033989A (en) Pad adapted for the curing of concrete roads and similar purposes
US1127957A (en) Process of laying concrete floors and the like.
KR102188187B1 (en) High-density wet color concrete floor construction method
US1664638A (en) Floor construction
SU637251A1 (en) Concrete making method
US1050946A (en) Art of manufacturing artificial monoliths.
US1314810A (en) Method of layincr concbete pavements