US20240368976A1 - Determination of unconfined compressive strength from drilling data and drill bit parameters - Google Patents
Determination of unconfined compressive strength from drilling data and drill bit parameters Download PDFInfo
- Publication number
- US20240368976A1 US20240368976A1 US18/634,392 US202418634392A US2024368976A1 US 20240368976 A1 US20240368976 A1 US 20240368976A1 US 202418634392 A US202418634392 A US 202418634392A US 2024368976 A1 US2024368976 A1 US 2024368976A1
- Authority
- US
- United States
- Prior art keywords
- drilling
- drill bit
- wellbore
- hypothetical
- doc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B10/00—Drill bits
- E21B10/46—Drill bits characterised by wear resisting parts, e.g. diamond inserts
- E21B10/56—Button-type inserts
- E21B10/567—Button-type inserts with preformed cutting elements mounted on a distinct support, e.g. polycrystalline inserts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/003—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by analysing drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/06—Deflecting the direction of boreholes
- E21B7/068—Deflecting the direction of boreholes drilled by a down-hole drilling motor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/20—Computer models or simulations, e.g. for reservoirs under production, drill bits
Definitions
- the present disclosure generally relates to determination of unconfined (aka uniaxial) compressive strength (UCS) from drilling data and drill bit parameters.
- UCS unconfined compressive strength
- U.S. Pat. No. 4,914,591 discloses a method for determining rock compressive strength of a subterranean formation penetrated by a wellbore.
- a mathematical model of a drill bit and an estimate of rock ductility of a particular subterranean formation in conjunction with weight-on-bit (WOB), bit rotational speed RPM, and rate of penetration (ROP) are used as inputs. From the above inputs, the rock compressive strength can be determined while the wellbore is being drilled or afterwards.
- a depth correlated log can be generated of rock compressive strength that can be compared to other logs obtained from adjacent wellbores to obtain a refined estimate of the depth of a particular subterranean formation feature.
- the above method can be utilized for obtaining an indication of bit wear or bit damage while the bit is drilling a wellbore by comparing a first rock compressive strength log of a wellbore to a rock compressive strength log being generated while the drill bit is actually drilling a second wellbore. Any significant deviation between the two logs provides an indication of bit wear or bit damage.
- U.S. Pat. No. 7,555,414 discloses a method for estimating the CCS for a rock in the depth of cut zone of a subterranean formation which is to be drilled using a drilling fluid is disclosed.
- An UCS is determined for a rock in the depth of cut zone.
- a change in the strength of the rock due to applied stresses imposed on the rock during drilling is calculated which includes estimating the ⁇ PP.
- the CCS for the rock in the depth of cut zone is calculated by adding the estimated change in strength to the UCS.
- the present invention calculates the ⁇ PP in accordance with Skempton theory where impermeable rock or soil has a change in pore volume due to applied loads or stresses while fluid flow into and out of the rock or soil is substantially non-existent.
- CCS may be calculated for deviated wellbores and to account for factors such as wellbore profile, stress raisers, bore diameter, and mud weight utilizing correction factors derived using computer modeling and using a baseline formula for determining an uncorrected value for CCS.
- U.S. Pat. No. 8,082,104 discloses a method of identifying one or more rock properties and/or one or more abnormalities occurring within a subterranean formation.
- the method includes obtaining a plurality of drilling parameters, which include at least the rate of penetration, the weight on bit, and the bit revolutions per minute, and then normalizing these plurality of drilling parameters by calculating a depth of cut and an intrinsic drilling impedance.
- the intrinsic drilling impedance is specific to the type of bit used to drill the wellbore and includes using a plurality of drill bit constants. From this intrinsic drilling impedance, the porosity and/or the rock strength may be determined which is then compared to the actual values to identify the specific type of the one or more abnormalities occurring. Additionally, the intrinsic drilling impedance may be compared to other logging parameters to also identify the specific type of the one or more abnormalities occurring.
- U.S. Pat. No. 9,556,728 discloses a method for analyzing a wellbore drilling operation includes acquiring sonic log data, gamma ray log data, and rate of penetration (ROP) data.
- the sonic log data, the gamma ray log data, and the ROP data are associated with depth intervals of a wellbore.
- the method further includes determining unconfined compressive strength (UCS) of a rock formation associated with the wellbore using well log data and drilling data.
- UCS unconfined compressive strength
- the well log data is limited to the sonic log data and the gamma ray log data
- the drilling data is limited to the ROP data.
- U.S. Pat. No. 10,094,210 discloses estimation of rock strength during drilling using a rate of penetration model or a modified mechanical specific energy model.
- the rock strength estimate can be used in conducting further drilling, for example by a drilling system.
- Drilling parameters may be altered as a result of determining rock strength, for example to avoid undesirable trending fractures, such as extensive vertical fractures.
- U.S. Pat. No. 10,963,600 discloses estimating in-situ stress of an interval having drilling response data is described. Estimating involves obtaining drilling response data of a data rich interval with available data. Estimating relative rock strength as a composite value that includes in-situ stress and rock strength. Estimating a Poisson's ratio from the relative rock strength. Generating a stress model that includes uniaxial strain model using the Poisson's ratio. Verifying the stress model with the available data. Applying the stress models in a non-data rich interval.
- U.S. Pat. No. 11,905,828 discloses a method and a system for a confined compressive strength (CCS) and an unconfined compressive strength (UCS) for one or more bedding layers.
- the method may include identifying a depth interval during a drilling operation as a distance between a first depth and a second depth, measuring one or more drill bit responses within the depth interval using a sensor package disposed on the drill bit, identifying one or more torsional bit vibrations, and identifying one or more bedding layers of the formation within the depth interval from the one or more torsional bit vibrations.
- the method may further include identifying the (CCS) and the (UCS) for each of the one or more bedding layers and identifying a bit wear of the drill bit within each of the one or more bedding layers using the one or more drill bit responses and the one or more torsional bit vibrations.
- the paper SPWLA-2022-0039 discloses that proper understanding of the strength of rocks, and its variability along the length of the well, is essential for efficient and economic drilling operation.
- the industry has used log-based strength estimates calibrated to strength measured on core samples.
- coring and core testing is costly and time consuming and downhole logs may also be left out of the program to manage costs.
- drilling data is almost always available as the well is drilled.
- An innovative and robust method is presented which capitalizes on availability of drilling tools, which measure key drilling data downhole. As the measurements are acquired downhole, uncertainties associated with surface-to-downhole conversions are reduced. Reliable results are available over the length of the wellbore, irrespective of complexity in well trajectory.
- the work also reviews the development of tools measuring downhole-drilling data.
- This method uses downhole weight-on-bit, rotational speed, downhole torque, and rate-of-penetration to characterize the downhole mechanical specific energy (MSEDownhole) consumed in the process.
- MSEDownhole downhole mechanical specific energy
- the bit diameter, mud-weight, and depth of drilling are also accounted for. If the task is to optimize drilling parameters for a new formation (e.g. drill-off-test), then the parameters with the “minimum” MSEDownhole are captured. However, if the task is for stage and cluster-wise hydraulic fracture design, then “instantaneous” MSEDownhole is used to infer confined compressive strength (CCS).
- CCS confined compressive strength
- the CCS together with internal friction angle (IFA) provides unconfined compressive strength (UCS) using Mohr-failure envelope inversion.
- IFA internal friction angle
- the MSEDownhole is compared to Drilling Strength over the same interval.
- Drilling Strength is defined as Weight on Bit/(Bit Diameter*Penetration per Revolution) and has been used to estimate rock strength.
- the comparison between MSEDownhole and Drilling Strength highlights the differences in the estimated strength from the two methods.
- Current work shows the results from 14 drilling simulator tests, in shale and limestone, under typical ‘drill-off-test.’
- the minimum-MSE obtained was transformed to CCS using user-defined ‘efficiency factor.’
- the CCS was translated to UCS using basic Mohr-failure envelope and compared with core test data.
- rock strength logs are used to conduct different types of analysis such as preventing wellbore failure, deciding on completion design methods and controlling sand production.
- One source of data which is often overlooked in calculating rock strength is drilling data.
- To utilize the drilling data in calculating strength correlations are developed from inverted rate of penetration models. From these models unconfined compressive rock strength can be calculated from drilling data.
- the rate of penetration models takes into account operational drilling parameters, bit types/designs and geological formation information. Results from various onshore and offshore fields verify that drilling based rock strength compares to other methods of estimating rock strength.
- the big advantage using drilling data is that rock strength can be calculated for all hole sections, less expensive onshore wells and from old wells, where electrical logs or preserved core samples do not exist.
- the paper titled “Relationship between rock uniaxial compressive strength and digital core drilling parameters and its forecast method” by Hongke Gao et. Al, from: Int J Coal Sci Technol (2021) 8(4):605-613 discloses that the rock uniaxial compressive strength (UCS) is the basic parameter for support designs in underground engineering.
- the rock UCS should be obtained rapidly for underground engineering with complex geological conditions, such as soft rock, fracture areas, and high stress, to adjust the excavation and support plan and ensure construction safety.
- a rock UCS forecast idea is proposed using digital core drilling. The digital core drilling tests and uniaxial compression tests are performed based on the developed rock mass digital drilling system.
- the results indicate that the drilling parameters are highly responsive to the rock UCS.
- the mechanical analysis of rock cutting provides the digital core drilling strength, and a quantitative relationship model (CDP-UCS model) for the digital core drilling parameters and rock UCS is established.
- CDP-UCS model quantitative relationship model
- the digital core drilling-based rock UCS forecast method is proposed to provide a theoretical basis for continuous and quick testing of the surrounding rock UCS.
- a method for monitoring a drilling operation includes: providing a drill bit for drilling a wellbore into a geological formation using a drilling motor for rotating the drill bit; determining depth of cut (DOC) of the drill bit and torque exerted on the drill bit by the drilling motor using parameters measured while drilling the wellbore; simulating drilling of a hypothetical wellbore using a hypothetical drill bit similar or identical to the drill bit and determining a function that provides strength of a hypothetical geological formation from the DOC of the hypothetical drill bit and the torque exerted on the hypothetical drill bit; and determining strength of the geological formation using the function and the determined DOC and the torque.
- DOC depth of cut
- a method for monitoring a drilling operation includes: providing a drill bit for drilling a wellbore into a geological formation using a drilling motor for rotating the drill bit; determining depth of cut (DOC) of the drill bit and torque exerted on the drill bit by the drilling motor using parameters measured while drilling the wellbore; simulating drilling of a hypothetical wellbore using a hypothetical drill bit similar or identical to the drill bit and determining a function that provides weight on bit (WOB) of the simulated drilling from the DOC of the hypothetical drill bit and the torque exerted on the hypothetical drill bit; and determining WOB using the function and the determined DOC and the torque.
- DOC depth of cut
- WOB weight on bit
- FIG. 1 illustrates drilling of a first wellbore into a geological formation, according to one embodiment of the present disclosure.
- FIG. 2 A illustrates a bottom hole assembly (BHA) used in drilling of the first wellbore.
- FIG. 2 B illustrates an alternative BHA, according to another embodiment of the present disclosure.
- FIG. 3 illustrates simulation of a hypothetical drill bit drilling a hypothetical geological formation to obtain a function that provides strength of a hypothetical geological formation from the depth of cut (DOC) of the hypothetical drill bit and the torque (TOQ) exerted on the hypothetical drill bit.
- DOC depth of cut
- TOQ torque
- FIG. 4 illustrates determining strength of the geological formation along the first wellbore using the function to select a location of a junction of a second wellbore.
- FIG. 5 illustrates drilling of a second wellbore at the location of the junction.
- FIG. 6 illustrates determining weight on bit (WOB) of the drilling operation along the second wellbore using a second function, according to another embodiment of the present disclosure.
- FIG. 7 illustrates deploying a downhole tubular into the second wellbore having used the second function to determine a centralizer program of the downhole tubular.
- FIG. 8 illustrates determining strength of the geological formation along the second wellbore using the function to locate a fault in the geological formation.
- FIG. 9 illustrates perforation of the downhole tubular lining the second wellbore while avoiding the fault.
- FIG. 10 illustrates drilling of the first wellbore into the geological formation while utilizing the function and/or the second function, according to another embodiment of the present disclosure.
- FIG. 1 illustrates drilling of a first wellbore 1 a into a geological formation 17 , according to one embodiment of the present disclosure.
- the first wellbore 1 a may be drilled using a drilling system 2 .
- the drilling system 2 may include a drilling rig 2 r , a fluid handling system 2 f , a blowout preventer (BOP) 2 b , a drill string 3 , and a controller, such as programmable logic controller (PLC) 2 p .
- PLC programmable logic controller
- the drilling rig 2 r may include a derrick 4 d , top drive 5 , draw works 6 , and a floor 4 f at its lower end having an opening through which the drill string 3 extends downwardly into the first wellbore 1 a via a wellhead 19 h .
- the BOP 2 b may be connected to the wellhead 19 h.
- FIG. 2 A illustrates a bottom hole assembly (BHA) 3 b used in drilling of the first wellbore 1 a .
- the drill string 3 may include the BHA 3 b and a pipe string 3 p .
- the pipe string 3 p may include joints of drill pipe connected together, such as by threaded couplings.
- the BHA 3 b may be connected to the pipe string 3 p , such as by threaded couplings, and include a drill bit 7 , a measurement while drilling (MWD) sub 8 w , a bent sub 8 b , and a drilling motor 8 m .
- the drilling motor 8 m may be a mud motor.
- the BHA members 7 , 8 b,m,w may be interconnected, such as by threaded couplings.
- the MWD sub 8 w may include one or more sensors, such as accelerometers and magnetometers, to enable the PLC 2 p to calculate navigation parameters, such as azimuth, inclination, and/or tool face angle of the BHA 3 b .
- the MWD sub 8 w may be connected to the bent sub 8 b and the pipe string 3 p .
- the bent sub 3 b may be connected to the MWD sub 8 w and a stator of the drilling motor 8 m .
- the drill bit 7 may be connected to a rotor of the drilling motor 8 m.
- the drill bit 7 may include the cutting face, a bit body, a shank, and a gage section.
- a lower portion of the bit body may be made from a composite material, such as a ceramic and/or cermet matrix powder infiltrated by a metallic binder, and an upper portion of the bit body may be made from a softer material than the composite material of the upper portion, such as a metal or alloy shoulder powder infiltrated by the metallic binder.
- the bit body may be mounted to the shank during molding thereof.
- the shank may be tubular and made from a metal or alloy, such as steel, and have a coupling, such as a threaded pin, formed at an upper end thereof for connection of the drill bit 1 a to drilling motor 8 m .
- the shank may have a flow bore formed therethrough and the flow bore may extend into the bit body to a plenum (not shown) thereof.
- the cutting face may form a lower end of the drill bit 7 and the gage section may form at an outer portion
- the bit body 2 may be metallic, such as being made from steel, and may be hardfaced.
- the metallic bit body may be connected to a modified shank by threaded couplings and then secured by a weld or the metallic bit body may be monoblock having an integral body and shank.
- the cutting face may include one or more primary blades, one or more secondary blades, fluid courses formed between the blades, a row of leading cutters mounted along each blade, and backup cutters mounted to each blade.
- the cutting face may have one or more sections, such as an inner cone, an outer shoulder, and an intermediate nose between the cone and the shoulder sections.
- the blades may be disposed around the cutting face and each blade may be formed during molding of the bit body and may protrude from a bottom of the bit body.
- the primary blades and the secondary blades may be arranged about the cutting face in an alternating fashion.
- the primary blades may each extend from a center of the cutting face, across a portion of the cone section, across the nose and shoulder sections, and to the gage section.
- the secondary blades may each extend from a periphery of the cone section, across the nose and shoulder sections, and to the gage section. Each blade may extend generally radially across the portion of the cone section (primary only) and nose section with a slight spiral curvature and across the shoulder section radially and longitudinally with a slight helical curvature. Each primary blade may be inclined in the cone section by a cone angle. The cone angle may range between five and forty-five degrees.
- Each blade may be made from the same material as the lower portion of the bit body.
- the leading cutters may be mounted along leading edges of the blades after infiltration of the bit body.
- the leading cutters may be pre-formed, such as by high pressure and temperature sintering, and mounted, such as by brazing, in respective leading pockets formed in the blades adjacent to the leading edges thereof.
- Each blade may have a lower face extending between a leading edge and a trailing edge thereof. Starting in the nose section or shoulder section, each blade may have a row of backup pockets formed in the lower face thereof and extending therealong. Each backup pocket may be aligned with or slightly offset from a respective leading pocket.
- the backup cutters may be mounted, such as by brazing, in the backup pockets formed in the lower faces of the blades.
- the backup cutters may be pre-formed, such as by high pressure and temperature sintering.
- the backup cutters may extend along at least the shoulder section of each blade.
- the drill bit 7 may further include shock studs protruding from the lower face of each primary blade in the cone section and each shock stud may be aligned with or slightly offset from a respective leading cutter.
- One or more ports may be formed in the bit body and each port may extend from the plenum and through the bottom of the bit body to discharge the drilling fluid 21 along the fluid courses.
- a nozzle may be disposed in each port and fastened to the bit body. Each nozzle may be fastened to the bit body by having a threaded coupling formed in an outer surface thereof and each port may be a threaded socket for engagement with the respective threaded coupling.
- the ports may include an inner set of one or more ports disposed in the cone section and an outer set of one or more ports disposed in the nose section and/or shoulder section. Each inner port may be disposed between an inner end of a respective secondary blade and the center of the cutting face.
- the gage section may define a gage diameter of the drill bit.
- the gage section may include a plurality of gage pads (not shown), such as one gage pad for each blade, a plurality of gage trimmers and junk slots formed between the gage pads.
- the junk slots may be in fluid communication with the fluid courses formed between the blades.
- the gage pads may be disposed around the gage section and each pad may be formed during molding of the bit body and may protrude from the outer portion of the bit body.
- Each gage pad may be made from the same material as the bit body and each gage pad may be formed integrally with a respective blade.
- Each gage pad may extend upward from a shoulder portion of the respective blade to an exposed outer surface of the shank.
- Each gage pad may have a rectangular lower portion and a tapered upper portion.
- the tapered upper portions may transition an outer diameter of the drill bit 7 from the gage diameter to a lesser diameter of the shank.
- a taper angle may be the same for each upper portion and may range between thirty and sixty degrees as measured from a transverse axis of the drill bit.
- Each gage trimmer may be mounted to a leading edge of each lower portion.
- the gage trimmers may be mounted, such as by brazing, in respective pockets formed in the lower portions adjacent to the leading edges thereof.
- the rectangular lower portions may have flat outer surfaces (except for the pockets therein).
- the gage trimmers may have flats formed in outer surfaces thereof so as not to extend past the gage diameter of the drill bit.
- gage pads may have gage protectors embedded therein.
- Each cutter and gage trimmer may include a superhard cutting table, such as polycrystalline diamond (PCD), attached to a hard substrate, such as a cermet, thereby forming a compact, such as a polycrystalline diamond compact (PDC).
- PCD polycrystalline diamond
- Each cutter gage trimmer may be a shear cutter having a planar working face.
- the cermet may be a carbide cemented by a Group VIIIB metal, such as cobalt.
- the substrate and the cutting table may each be solid and cylindrical and a diameter of the substrate may be equal to a diameter of the cutting table.
- a working face of each cutter and gage trimmer may be opposite to the substrate and may be smooth and planar.
- Each gage protector may be made from thermally stable PCD or PDC.
- one or more of the cutters of each blade may have a non-planar working face.
- the drill bit 7 may be rotated 9 r by the top drive 5 via the pipe string 3 p and/or by the drilling motor 8 m .
- the BHA 3 b may be operable in a rotary mode or a sliding mode.
- the pipe string 3 p may be held rotationally stationary and inclination of the drill bit 7 by the bent sub 3 b may cause drilling along a curved trajectory.
- the drill string 3 may be rotated 9 r by the top drive 5 to negate the curvature effect of the bent sub 8 b (aka corkscrew path) and the drilling trajectory may be straight.
- the inclination of the bent sub 3 b has been exaggerated for illustrative purpose.
- the BHA 3 b may further include a transmitter for communication of the MWD sub 8 w with the PLC 2 p (and the PLC may include a corresponding receiver).
- the bent sub 8 b may be integrated with the drilling motor 8 m .
- the bent sub 8 b and/or the MWD sub 8 w may be omitted from the BHA 3 b.
- an upper end of the pipe string 3 p may be connected to a quill of the top drive 5 .
- the top drive 5 may include a motor for rotating 9 r the drill string 3 .
- the top drive motor may be electric or hydraulic.
- a frame of the top drive 5 may be coupled to a rail (not shown) of the derrick 4 d for preventing rotation of the top drive frame during rotation 9 r of the drill string 3 and allowing for vertical movement of the top drive with a traveling block 6 t of the draw works 6 .
- the frame of the top drive 5 may be suspended from the derrick 4 d by the traveling block 6 t .
- the traveling block 6 t may be supported by wire rope 6 r connected at its upper end to a crown block 6 c .
- the wire rope 6 r may be woven through sheaves of the blocks 6 c,t and extend to a winch 6 w for reeling thereof, thereby raising or lowering the traveling block 6 t relative to the rig floor 4 f.
- the wellhead 19 h may be mounted on a casing string 10 which has been deployed into the first wellbore 1 a and cemented 11 therein.
- a lower section of the first wellbore 1 a may be vertical (shown) or deviated (not shown).
- the fluid system 2 f may include a mud pump 12 , a drilling fluid reservoir, such as a pit 13 or tank, a solids separator, such as a shale shaker 14 , a pressure sensor 15 , one or more flow lines, such as a return line 16 r , a supply line 16 s , and a feed line 16 f , a mud logging tool 17 , and a stroke counter 18 .
- a first end of the return line 16 r may be connected to a flow cross 19 x mounted on the wellhead 19 h and a second end of the return line may be connected to an inlet of the shaker 14 .
- a lower end of the supply line 16 s may be connected to an outlet of the mud pump 12 and an upper end of the supply line may be connected to an inlet of the top drive 5 .
- the pressure sensor 15 may be assembled as part of the supply line 16 s .
- a first end of the feed line 16 f may be connected to an outlet of the pit 13 and a second end of the feed line may be connected to an inlet of the mud pump 12 .
- the pressure sensor 15 may be in data communication with the PLC 2 p and may be operable to monitor standpipe pressure (SPP).
- SPP standpipe pressure
- a drilling technician may enter the current mode of the drilling operation into the PLC 2 p .
- the PLC 2 p may monitor and record SPP both when the drill bit 7 is drilling and when the drill bit is lifted from engagement with a bottom of the wellbore for adding joints or stands to the pipe string 3 p .
- the stroke counter 18 may also be in data communication with the PLC 2 p and the PLC may be operable to calculate and record a flow rate of the mud pump 12 .
- the PLC 2 p may also be in communication with a hook load cell clamped to the wire rope 6 r , and a position sensor of the winch 6 w .
- a drilling technician may enter lengths of joints or stands of pipe added to the pipe string 3 p and the length of the BHA 3 b into a tally of the PLC 2 p so that the PLC can record measured depth of the wellbore 1 a .
- the drilling technician may also enter weight of the drill string components into the tally.
- the PLC 2 p may use a plurality of depth measurements and the time interval therebetween to calculate rate of penetration (ROP).
- the PLC 2 p may record the various measurements and calculations in a memory unit (MEM) 20 for later use.
- the PLC 2 p may utilize data from the MWD sub 8 w to calculate true vertical depth (TVD) from the measured depth.
- the PLC 2 p may further be in communication with a torque sensor and tachometer of the top drive 5 .
- the torque sensor may measure torque exerted on the quill of the top drive 5 .
- the tachometer may measure the angular speed of the top drive quill.
- the PLC 2 p may utilize the tally of the drill string 3 for calculating weight on bit (WOB) using the hook load and torque exerted on the pipe string 3 p using the torque exerted on the quill.
- WOB weight on bit
- the mud pump 12 may pump drilling fluid 21 from the pit 13 , through the supply line 16 s , and to the top drive 5 .
- the drilling fluid 21 may include a base liquid.
- the base liquid may be refined or synthetic oil, water, brine, or a water/oil emulsion.
- the drilling fluid 21 may further include solids dissolved or suspended in the base liquid, such as organophilic clay, lignite, and/or asphalt, thereby forming a mud.
- the drilling fluid 21 may flow from the supply line 16 s and into a bore of the pipe string 3 p via the top drive 5 .
- the drilling fluid 21 may flow down the pipe string 3 p , through a bore of the BHA 3 b , and exit the drill bit 7 , where the fluid may circulate cuttings away from the bit and return the cuttings up an annulus 22 formed between an inner surface of the casing 10 or the first wellbore 1 a and an outer surface of the drill string 3 .
- the returns 23 (drilling fluid 21 plus cuttings) may flow up the annulus 22 , to the wellhead 19 h , and exit the wellhead through the flow cross 19 x .
- the returns 23 may continue through the return line 16 r .
- the returns 23 may then flow into the shale shaker 14 and be processed thereby to remove the cuttings, thereby completing a cycle.
- the drill string 3 may be rotated 9 r by the top drive 5 and/or the drilling motor 3 m and lowered 9 a by the traveling block 6 t , thereby extending the first wellbore 1 a into and/or through the geologic formation 17 .
- the geologic formation 17 may be hydrocarbon-bearing.
- FIG. 3 illustrates simulation of a hypothetical drill bit 26 drilling a hypothetical geological formation to obtain a function 27 that provides strength of the hypothetical geological formation from depth of cut (DOC) of the hypothetical drill bit and the torque (TOQ) exerted on the hypothetical drill bit.
- Typical drilling parameters 25 a may be supplied to a computer 24 .
- the specific parameters 25 b of the drill bit 7 or at least parameters similar thereto may also be supplied to the computer 24 .
- a range of typical UCSs 25 c for the hypothetical formation may also be supplied to the computer 24 .
- the computer 24 may then conduct multiple simulations 28 a - c of the hypothetical drill bit 26 , each simulation having the bit drilling into the hypothetical formation with a different UCS.
- the computer 24 may then process the results of the simulation to create the function 27 that provides UCS of the hypothetical formation from the DOC of the hypothetical drill bit 26 and the TOQ exerted on the hypothetical drill bit.
- the computer 24 may conduct a second set of multiple simulations (not shown) of the hypothetical drill bit 26 , each simulation having the bit drilling into the hypothetical formation with a different WOB.
- the computer 24 may then process the results of the simulation to create a second function 42 ( FIG. 6 ) that provides WOB of the simulated drilling operation from the DOC of the hypothetical drill bit 26 and the TOQ exerted on the hypothetical drill bit.
- FIG. 4 illustrates determining strength of the geological formation 17 along the first wellbore 1 a using the function 27 to select a location of a junction 31 of a second wellbore 1 b ( FIG. 5 ).
- the measured data from the memory unit 20 may be supplied to the computer 24 .
- the function 27 may also be supplied to the computer 24 .
- Performance data 43 of the drilling motor 8 m may also be supplied to the computer 24 .
- the performance data 43 may include TOQ output by the drilling motor 8 m as a function of differential pressure ( ⁇ P) across the drilling motor and angular speed (RPM) of the rotor of the drilling motor as a function of flow rate (FLR) of drilling fluid 21 pumped through the drilling motor.
- the computer 24 may utilize the measured data from the memory unit 20 to determine the ⁇ P across the drilling motor 8 m by subtracting the SPP measured while the drill bit 7 was off bottom from the SPP measured while the drill bit was drilling the first wellbore 1 a.
- the computer 24 may utilize the calculated ⁇ P and the performance data 43 to determine the TOQ exerted on the drill bit 7 .
- the computer 24 may also utilize the FLR pumped through the drilling motor 8 m and the performance data 43 thereof to determine the RPM of the rotor (and also the drill bit 7 ).
- the computer 24 may then utilize the ROP from the memory unit 20 to calculate the DOC by dividing ROP by RPM of the drilling motor 8 m .
- the computer 24 may then utilize the function 27 , the DOC of the drill bit 7 , and the TOQ output by the drilling motor 8 m to calculate UCS of the formation 17 .
- the computer 24 may repeat the calculations for various depths along the first wellbore and may generate a UCS log 29 a .
- a drilling engineer may then utilize the UCS log 29 a to identify one or more (pair shown) zones of interest, such as soft zones 30 a,b of the formation 17 .
- the soft zones 30 a,b may be portions of the UCS log 29 a with a lesser or minimum UCS.
- the depth of one of the soft zones 30 a,b may be used to locate a junction 31 with the second wellbore 1 b such that the second wellbore will be drilled into one of the soft zones. Drilling of the second wellbore 1 b into one of the soft zones 30 a,b is advantageous in that it minimizes wear on the drill bit 7 .
- the drilling engineer may identify and select a hard zone (greater or maximum UCS) for drilling of the second wellbore 1 b . While selection of the hard zone may result in more wear on the drill bit 7 , it may have other advantages, such as better susceptibility to hydraulic fracturing.
- the computer may utilize a motor efficiency (not shown) to adjust the TOQ and/or FLR for improved accuracy.
- the computer 24 may calculate internal friction angle (IFA) as an indicator of formation strength instead of UCS. The log output by the computer 24 would then be an IFA log instead of the UCS log 29 a .
- the UCS log 29 a may include MD instead of TVD.
- FIG. 2 B illustrates an alternative BHA 39 , according to another embodiment of the present disclosure.
- the alternative BHA 39 may be used for the drilling operation instead of the BHA 3 b .
- the alternative BHA 39 may be similar to the BHA 3 b except for the inclusion of one or more additional sensors.
- the alternative BHA 39 may include a pressure sensor 40 n in fluid communication with a bore of the MWD sub 8 w (upstream of the drilling motor 8 m ).
- a controller (not shown) of the MWD sub 8 w may monitor the measurements from the pressure sensor 40 n and may record them in a memory unit 40 m thereof. Measurements recorded by the memory unit 40 m may then be supplied to the computer 24 and used thereby instead of the SPP for the ⁇ P across the drilling motor 8 m.
- the alternative BHA 39 may include a pressure sensor 400 located downstream of the drilling motor 8 m , such as carried by the drill bit 7 and in fluid communication with a bore of the drill bit.
- the alternative BHA 39 may include a short-range transmitter (not shown) for communicating measurements by the pressure sensor 400 to the controller of the MWD sub 8 w , a receiver (not shown) for receiving the measurements, and a battery for powering the pressure sensor 400 .
- Measurements recorded by the memory unit 40 m from both pressure sensors 40 n,o may then be supplied to the computer 24 and used thereby instead of the SPP for the ⁇ P across the drilling motor 8 m . Such measurements would include only those made while the drill bit was drilling and not including measurements made while the drill bit was off bottom.
- the alternative BHA 39 may include a tachometer 40 t and/or a torque sensor 40 q mounted to a rotor of the drilling motor 8 m .
- the tachometer 40 t may be operable to measure the RPM of the rotor of the drilling motor 8 m and the torque sensor may be operable to measure TOQ exerted on the drill bit by the rotor of the drilling motor.
- the alternative BHA 39 may include a short-range transmitter (not shown) for communicating measurements by the sensors 40 t,q to the controller of the MWD sub 8 w , and a battery for powering the sensors 40 t,q .
- Measurements recorded by the memory unit 40 m from both sensors 40 t,q may then be supplied to the computer 24 and used thereby instead of the ⁇ P across the drilling motor 8 m and the performance data 43 for determining TOQ and/or instead of the FLR and the performance data for determining RPM.
- the pressure sensor 400 may have a memory unit (not shown) instead of or in addition to a transmitter.
- the tachometer 40 t and/or a torque sensor 40 q may have a memory unit (not shown) instead of or in addition to a transmitter.
- FIG. 5 illustrates drilling of the second wellbore 1 b at one of the soft zones 30 a,b , according to one embodiment of the present disclosure.
- the drill string 3 may be removed from the first wellbore 1 a and a whipstock and plug (not shown) may be deployed, oriented, and set at the selected soft zone 30 b .
- the drill string 3 may then be redeployed into the first wellbore 1 a and guided along a planned trajectory of the second wellbore 1 b by the whipstock.
- the first wellbore 1 a may be lined by a downhole tubular, such as a (second) casing string or a liner string, and a window milled through the downhole tubular before drilling the second wellbore 1 b to reinforce the junction 31 .
- the whipstock and plug may be used to guide milling of the window.
- FIG. 6 illustrates determining WOB of the drilling operation along the second wellbore 1 b using the second function 42 , according to another embodiment of the present disclosure.
- the computer 24 may also utilize the FLR pumped through the drilling motor 8 m and the performance data 43 thereof to determine the RPM of the rotor (and also the drill bit 7 ), as discussed above. The computer 24 may then utilize the ROP from the memory unit 20 to calculate the DOC, as discussed above.
- the computer 24 may then utilize the second function 42 , the DOC of the drill bit 7 , and the TOQ output by the drilling motor 8 m to calculate actual WOB (ACT WOB).
- the computer 24 may repeat the calculations for various depths along the first and second wellbores 1 a , 1 b and may correlate the ACT WOB with the (apparent) WOB calculated by the PLC 2 p (APP WOB) to generate a drag log 44 .
- the differential between the APP WOB and the ACT WOB is indicative of a drag force exerted by the wellbores 1 a,b on the drill string 3 .
- a casing engineer may then utilize the drag log 44 to develop a centralizer program for a downhole tubular 33 ( FIG.
- the centralizer program may include the types of centralizers, such as rigid, semi-rigid, or bow spring, and the number and location of the centralizers.
- the drag log 44 may include an ideal line 44 d which illustrates APP WOB being equal to ACT WOB for reference.
- the drag log 44 may be generated for the first wellbore 1 a instead of or in addition to the second wellbore 1 b and the downhole tubular 33 may be for deployment into the first wellbore 1 a.
- FIG. 7 illustrates deploying the downhole tubular 33 into the second wellbore 1 b having used the second function 42 to determine a centralizer program of the downhole tubular 33 .
- the downhole tubular 33 may include a liner hanger and packer 33 h , a float collar (not shown), joints of liner, a shoe 33 s , and a plurality of centralizers, such as one or more bow spring centralizers 33 b and one or more rigid centralizers 33 r . Except for the centralizers 33 b,r , the liner string members may each be connected together, such as by threaded couplings.
- the centralizers 33 b,r may be mounted to individual joints of liner by stop collars.
- the downhole tubular 33 may be deployed into the second wellbore 1 b using a work string 41 .
- the work string 41 may include the pipe string 3 p and a deployment assembly (not shown).
- the deployment assembly may include a setting tool, a running tool, a stinger, and a wiper plug.
- the liner hanger 33 h may be set against a lower portion of the casing string 10 .
- Cement slurry may then be pumped through the work string 41 and downhole tubular 33 and into an annulus between the downhole tubular and the second wellbore 1 b using a dart and the wiper plug.
- the packer 33 h may be set and the work string released from the downhole tubular
- the work string 41 may then be retrieved to the rig 2 r and the drilling system 2 dispatched from the well site.
- the cement slurry may cure, thereby forming a cement sheath 34 ( FIG.
- the centralizer program including the centralizers 33 b,r may ensure that the downhole tubular 33 is centralized within the first and second wellbores 1 a,b , thereby providing a cement sheath 34 with integrity.
- the downhole tubular 33 may be a casing string instead of a liner string.
- FIG. 8 illustrates determining strength of the geological formation 17 along the second wellbore 1 b using the function 27 to locate an unstable zone, such as fault 32 , in the geological formation.
- the completions engineer may avoid the fault in the fracturing plan of the second wellbore 1 b . Avoidance of the fault 32 is advantageous to prevent the fault from absorbing proppant during a hydraulic fracturing operation which was otherwise intended to be distributed throughout the formation 17 .
- the unstable zone may be a depleted zone instead of the fault 32 .
- FIG. 9 illustrates perforation of a downhole tubular 33 lining the second wellbore 1 b while avoiding the fault 32 .
- a fracturing system may be deployed once the drilling system 2 has been dispatched from the wellsite.
- the fracturing system may include a lubricator (not shown), a fluid system (not shown), a production tree (not shown), a deployment cable, such as wireline 36 , and a BHA 35 .
- the production tree may be installed on the wellhead 19 h.
- the fluid system may include the injector head, a shutoff valve, one or more pressure gauges, a stroke counter, a launcher, a fracture pump, and a fracture fluid mixer.
- the injector head may be installed on the production tree and the lubricator may be installed on the injector head.
- a first pressure gauge may be connected to the flow cross and may be operable to monitor wellhead pressure.
- a second pressure gauge may be connected between the fracture pump and the valve and may be operable to measure discharge pressure of the fracture pump.
- the stroke counter may be operable to measure a flow rate of the fracture pump.
- the gauges may be sensors in data communication with a (second) PLC (not shown) for automated or semi-automated control of the fracturing operation.
- a closing plug such as a ball
- a closing plug may be disposed in the launcher for selective release and pumping downhole to close a bore of a frac plug 35 p of the BHA 35 .
- a technician may release the ball by operating the launcher actuator.
- the pumped stream of fracturing fluid (not shown) may then carry the ball from the launcher, into the wellhead via the injector head and tree, and to the frac plug 35 p.
- the BHA 35 may include a cable head 35 h , a collar locator 350 , a perforation gun 35 g , a setting tool 35 s , and the frac plug 35 p .
- the perforation gun 35 g may include a firing head and a charge carrier.
- the charge carrier may include a housing, a plurality of shaped charges, and detonation cord connecting the charges to the firing head.
- the firing head may receive electricity from the wireline 36 to operate an electric match thereof. The electric match may ignite the detonation cord to fire the shape charges.
- the setting tool 35 s may be releasably connected to a mandrel of the frac plug 35 p , such as by one or more shearable fasteners (not shown).
- the BHA 35 may be deployed into the second wellbore 1 b using the wireline 36 with assistance from the fracture pump or a tractor (not shown). Once the BHA 35 has been deployed to the setting depth listed by the fracturing plan, the frac plug 35 p may be set by supplying electricity to the BHA 35 at a first polarity via the wireline 36 to activate the setting tool 35 s , thereby engaging the frac plug 35 p with the downhole tubular 33 .
- a tensile force may then be exerted on the BHA 35 , thereby releasing the frac plug 35 p from the rest of the BHA 35 g,h,o,s .
- the remaining BHA 35 g,h,o,s may then be raised using the wireline 36 until the perforation guns 35 g are at a depth of a production zone, according to the fracturing plan. Electricity may then be resupplied to the remaining 35 g,h,o,s via the wireline 36 at a second polarity to fire the perforation guns 35 g into the downhole tubular 33 , thereby forming perforations 37 . Once the perforations 37 have been formed, the remaining BHA 35 g,h,o,s may be retrieved to the lubricator using the wireline 36 . A shutoff valve of the lubricator may then be closed.
- the ball may then be released from the launcher and the fracturing fluid may be pumped from the mixer into the injector head via the valve by the fracture pump.
- the fracturing fluid may be a slurry including: proppant, such as sand, water, and chemical additives. Continued pumping of the fracturing fluid may drive the ball toward the frac plug until the ball lands onto a seat of the plug mandrel, thereby closing the plug mandrel bore.
- Continued pumping of the fracturing fluid may exert pressure on the seated ball until pressure in the downhole tubular 33 increases to force the fracturing fluid (above the seated ball) through the perforations 37 , cement sheath 34 and into the production zone by creating a fracture.
- the proppant may be deposited into the fracture by the fracturing fluid.
- Pumping of the fracturing fluid may continue until a desired quantity (listed in the fracturing plan) has been pumped into the production zone.
- a depth of the perforations 37 may be located such that an adequate buffer distance 38 is created from the fault 32 such that the fault does not absorb the proppant meant for distribution throughout the formation 17 .
- Additional production zones may be fractured using one or more additional respective BHAs (not shown) in a similar fashion.
- the lubricator and injector head may be removed from the tree.
- a coiled tubing unit may be connected to the tree and a coiled tubing work string deployed to mill the fracture plugs 35 p .
- the flow cross may be connected to a disposal pit or tank (not shown) and spent fracturing fluid (minus proppant) allowed to flow from the second wellbore 1 b to the pit.
- a production choke (not shown) may be connected to the flow cross and to a separation, treatment, and storage facility (not shown). Production of the fractured zones may then commence.
- fracture valves may be assembled as part of the downhole tubular 33 instead of having to perforate the downhole tubular.
- a location of each fracture valve may be listed in the fracturing plan.
- a fracture valve may be included for each zone and the fracture valves opened using respective pump down plugs or deploying a shifting tool using wireline or coiled tubing.
- fracture valves may be assembled as part of the downhole tubular 33 instead of having to perforate the liner string and each fracture valve may have a packer for isolating the respective zone instead of having to cement the liner string.
- FIG. 10 illustrates drilling of the first wellbore 1 a into the geological formation while utilizing the function 27 and/or the second function 42 , according to another embodiment of the present disclosure.
- either or both functions 27 , 40 may be determined before the drilling operation and provided to the PLC 2 p .
- the performance data 43 may also be provided to the PLC 2 p before the drilling operation such that the PLC may calculate UCS and/or ACT WOB during the drilling operation of the first wellbore 1 a (and/or the second wellbore 1 b ).
- the PLC 2 p may then produce portions of the UCS logs 29 a,b and/or the drag log 44 as the respective wellbores are being drilled.
- the drilling engineer may then utilize the real time logs 29 a,b , 44 to adjust drilling parameters during the drilling operation(s). For example the drilling engineer may utilize the UCS logs 29 a,b to adjust the trajectories of the respective wellbores 1 a,b during drilling (aka geo-steering).
- the PLC 2 p may also generate the real time drag log 44 during drilling of either or both wellbores 1 a,b .
- the drilling engineer may utilize the real time drag log to optimize ROP (if ACT WOB is insufficient and needs to be increased) and/or extend life of the drill bit 7 (if ACT WOB is overloading the drill bit and needs to be decreased) by adjusting the ACT WOB.
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Chemical & Material Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Mechanical Engineering (AREA)
- Analytical Chemistry (AREA)
- Earth Drilling (AREA)
Abstract
A method for monitoring a drilling operation includes: providing a drill bit for drilling a wellbore into a geological formation using a drilling motor for rotating the drill bit; determining depth of cut (DOC) of the drill bit and torque exerted on the drill bit by the drilling motor using parameters measured while drilling the wellbore; simulating drilling of a hypothetical wellbore using a hypothetical drill bit similar or identical to the drill bit and determining a function that provides strength of a hypothetical geological formation from the DOC of the hypothetical drill bit and the torque exerted on the hypothetical drill bit; and determining strength of the geological formation using the function and the determined DOC and the torque.
Description
- The present disclosure generally relates to determination of unconfined (aka uniaxial) compressive strength (UCS) from drilling data and drill bit parameters.
- U.S. Pat. No. 4,914,591 discloses a method for determining rock compressive strength of a subterranean formation penetrated by a wellbore. A mathematical model of a drill bit and an estimate of rock ductility of a particular subterranean formation in conjunction with weight-on-bit (WOB), bit rotational speed RPM, and rate of penetration (ROP) are used as inputs. From the above inputs, the rock compressive strength can be determined while the wellbore is being drilled or afterwards. A depth correlated log can be generated of rock compressive strength that can be compared to other logs obtained from adjacent wellbores to obtain a refined estimate of the depth of a particular subterranean formation feature. Further, the above method can be utilized for obtaining an indication of bit wear or bit damage while the bit is drilling a wellbore by comparing a first rock compressive strength log of a wellbore to a rock compressive strength log being generated while the drill bit is actually drilling a second wellbore. Any significant deviation between the two logs provides an indication of bit wear or bit damage.
- U.S. Pat. No. 7,555,414 discloses a method for estimating the CCS for a rock in the depth of cut zone of a subterranean formation which is to be drilled using a drilling fluid is disclosed. An UCS is determined for a rock in the depth of cut zone. A change in the strength of the rock due to applied stresses imposed on the rock during drilling is calculated which includes estimating the ΔPP. The CCS for the rock in the depth of cut zone is calculated by adding the estimated change in strength to the UCS. The present invention calculates the ΔPP in accordance with Skempton theory where impermeable rock or soil has a change in pore volume due to applied loads or stresses while fluid flow into and out of the rock or soil is substantially non-existent. CCS may be calculated for deviated wellbores and to account for factors such as wellbore profile, stress raisers, bore diameter, and mud weight utilizing correction factors derived using computer modeling and using a baseline formula for determining an uncorrected value for CCS.
- U.S. Pat. No. 8,082,104 discloses a method of identifying one or more rock properties and/or one or more abnormalities occurring within a subterranean formation. The method includes obtaining a plurality of drilling parameters, which include at least the rate of penetration, the weight on bit, and the bit revolutions per minute, and then normalizing these plurality of drilling parameters by calculating a depth of cut and an intrinsic drilling impedance. Typically, the intrinsic drilling impedance is specific to the type of bit used to drill the wellbore and includes using a plurality of drill bit constants. From this intrinsic drilling impedance, the porosity and/or the rock strength may be determined which is then compared to the actual values to identify the specific type of the one or more abnormalities occurring. Additionally, the intrinsic drilling impedance may be compared to other logging parameters to also identify the specific type of the one or more abnormalities occurring.
- U.S. Pat. No. 9,556,728 discloses a method for analyzing a wellbore drilling operation includes acquiring sonic log data, gamma ray log data, and rate of penetration (ROP) data. The sonic log data, the gamma ray log data, and the ROP data are associated with depth intervals of a wellbore. The method further includes determining unconfined compressive strength (UCS) of a rock formation associated with the wellbore using well log data and drilling data. The well log data is limited to the sonic log data and the gamma ray log data, and the drilling data is limited to the ROP data.
- U.S. Pat. No. 10,094,210 discloses estimation of rock strength during drilling using a rate of penetration model or a modified mechanical specific energy model. The rock strength estimate can be used in conducting further drilling, for example by a drilling system. Drilling parameters may be altered as a result of determining rock strength, for example to avoid undesirable trending fractures, such as extensive vertical fractures.
- U.S. Pat. No. 10,963,600 discloses estimating in-situ stress of an interval having drilling response data is described. Estimating involves obtaining drilling response data of a data rich interval with available data. Estimating relative rock strength as a composite value that includes in-situ stress and rock strength. Estimating a Poisson's ratio from the relative rock strength. Generating a stress model that includes uniaxial strain model using the Poisson's ratio. Verifying the stress model with the available data. Applying the stress models in a non-data rich interval.
- U.S. Pat. No. 11,905,828 discloses a method and a system for a confined compressive strength (CCS) and an unconfined compressive strength (UCS) for one or more bedding layers. The method may include identifying a depth interval during a drilling operation as a distance between a first depth and a second depth, measuring one or more drill bit responses within the depth interval using a sensor package disposed on the drill bit, identifying one or more torsional bit vibrations, and identifying one or more bedding layers of the formation within the depth interval from the one or more torsional bit vibrations. The method may further include identifying the (CCS) and the (UCS) for each of the one or more bedding layers and identifying a bit wear of the drill bit within each of the one or more bedding layers using the one or more drill bit responses and the one or more torsional bit vibrations.
- The paper SPWLA-2022-0039 discloses that proper understanding of the strength of rocks, and its variability along the length of the well, is essential for efficient and economic drilling operation. Traditionally, the industry has used log-based strength estimates calibrated to strength measured on core samples. However, coring and core testing is costly and time consuming and downhole logs may also be left out of the program to manage costs. In comparison, drilling data is almost always available as the well is drilled. An innovative and robust method is presented which capitalizes on availability of drilling tools, which measure key drilling data downhole. As the measurements are acquired downhole, uncertainties associated with surface-to-downhole conversions are reduced. Reliable results are available over the length of the wellbore, irrespective of complexity in well trajectory. The work also reviews the development of tools measuring downhole-drilling data. This method uses downhole weight-on-bit, rotational speed, downhole torque, and rate-of-penetration to characterize the downhole mechanical specific energy (MSEDownhole) consumed in the process. The bit diameter, mud-weight, and depth of drilling are also accounted for. If the task is to optimize drilling parameters for a new formation (e.g. drill-off-test), then the parameters with the “minimum” MSEDownhole are captured. However, if the task is for stage and cluster-wise hydraulic fracture design, then “instantaneous” MSEDownhole is used to infer confined compressive strength (CCS). The CCS together with internal friction angle (IFA) provides unconfined compressive strength (UCS) using Mohr-failure envelope inversion. The MSEDownhole is compared to Drilling Strength over the same interval. Drilling Strength is defined as Weight on Bit/(Bit Diameter*Penetration per Revolution) and has been used to estimate rock strength. The comparison between MSEDownhole and Drilling Strength highlights the differences in the estimated strength from the two methods. Current work shows the results from 14 drilling simulator tests, in shale and limestone, under typical ‘drill-off-test.’ The minimum-MSE obtained was transformed to CCS using user-defined ‘efficiency factor.’ The CCS was translated to UCS using basic Mohr-failure envelope and compared with core test data. Utilization of lab tests for calibration greatly improves the trust in this conversion. The concept of ‘instantaneous MSE’ was applied in a Gulf-of-Mexico well where drilling parameters obtained from downhole sensor were maintained in a close range. Formation evaluation logs were used to compare UCS obtained. The CCS and UCS estimates benefit drilling engineers, geoscientists, and completion engineers. The less known ‘Efficiency Factor’ is also discussed and reviewed.
- The paper ARMA-07-214 discloses that it is critical to obtain the rock strength parameters along the wellbore. Rock strength logs are used to conduct different types of analysis such as preventing wellbore failure, deciding on completion design methods and controlling sand production. One source of data which is often overlooked in calculating rock strength is drilling data. To utilize the drilling data in calculating strength, correlations are developed from inverted rate of penetration models. From these models unconfined compressive rock strength can be calculated from drilling data. The rate of penetration models takes into account operational drilling parameters, bit types/designs and geological formation information. Results from various onshore and offshore fields verify that drilling based rock strength compares to other methods of estimating rock strength. The big advantage using drilling data is that rock strength can be calculated for all hole sections, less expensive onshore wells and from old wells, where electrical logs or preserved core samples do not exist.
- The paper, titled “Estimating rock strength parameters using drilling data” by Sajjad Kalantari et. Al, from: International Journal of Rock Mechanics and Mining Sciences, Volume 104, 2018, Pages 45-52, discloses that estimating rock strength parameters using operational drilling data can be a fast and reliable method. In this case, several researchers have proposed different analytical models based on force or energy equilibrium methods. Most of them propose methods to estimate uniaxial compressive strength through the investigation of interaction between the bit and rock in drilling process. Although in the proposed models, operational drilling system, rock strength parameters, bit geometry and contact friction were considered, some of the important factors such as crushed zone and its mechanical properties, contact frictions between the bit and rock and friction between the rock and crushed zone need to be explicitly considered. In this research work, a theoretical model is developed based on limit equilibrium of forces and considering contact frictions, crushed zone and bit geometry in the rotary drilling process by a T-shaped drag bit. Based on the model, a method is used to estimate rock strength parameters form operational drilling data. The operational drilling parameters such as thrust force, torque, rate of penetration and speed of rotation were obtained by a developed portable drilling machine. The portable drilling machine is able to drill the rocks with different strength range coincident with measure and record the parameters. A set of drilling experiments were conducted on three different rocks ranged from weak, medium and hard strength. Obtained results based on proposed model for uniaxial compressive strength, cohesion and internal friction angle of rock are well fitted to the results of the conventional standard tests.
- The paper titled “Relationship between rock uniaxial compressive strength and digital core drilling parameters and its forecast method” by Hongke Gao et. Al, from: Int J Coal Sci Technol (2021) 8(4):605-613 discloses that the rock uniaxial compressive strength (UCS) is the basic parameter for support designs in underground engineering. In particular, the rock UCS should be obtained rapidly for underground engineering with complex geological conditions, such as soft rock, fracture areas, and high stress, to adjust the excavation and support plan and ensure construction safety. To solve the problem of obtaining real-time rock UCS at engineering sites, a rock UCS forecast idea is proposed using digital core drilling. The digital core drilling tests and uniaxial compression tests are performed based on the developed rock mass digital drilling system. The results indicate that the drilling parameters are highly responsive to the rock UCS. Based on the cutting and fracture characteristics of the rock digital core drilling, the mechanical analysis of rock cutting provides the digital core drilling strength, and a quantitative relationship model (CDP-UCS model) for the digital core drilling parameters and rock UCS is established. Thus, the digital core drilling-based rock UCS forecast method is proposed to provide a theoretical basis for continuous and quick testing of the surrounding rock UCS.
- The present disclosure generally relates to determination of unconfined (aka uniaxial) compressive strength (UCS) from drilling data and drill bit parameters. In one embodiment, a method for monitoring a drilling operation includes: providing a drill bit for drilling a wellbore into a geological formation using a drilling motor for rotating the drill bit; determining depth of cut (DOC) of the drill bit and torque exerted on the drill bit by the drilling motor using parameters measured while drilling the wellbore; simulating drilling of a hypothetical wellbore using a hypothetical drill bit similar or identical to the drill bit and determining a function that provides strength of a hypothetical geological formation from the DOC of the hypothetical drill bit and the torque exerted on the hypothetical drill bit; and determining strength of the geological formation using the function and the determined DOC and the torque.
- In another embodiment, a method for monitoring a drilling operation includes: providing a drill bit for drilling a wellbore into a geological formation using a drilling motor for rotating the drill bit; determining depth of cut (DOC) of the drill bit and torque exerted on the drill bit by the drilling motor using parameters measured while drilling the wellbore; simulating drilling of a hypothetical wellbore using a hypothetical drill bit similar or identical to the drill bit and determining a function that provides weight on bit (WOB) of the simulated drilling from the DOC of the hypothetical drill bit and the torque exerted on the hypothetical drill bit; and determining WOB using the function and the determined DOC and the torque.
- So that the manner in which the above recited features of the present disclosure can be understood in detail, a more particular description of the disclosure, briefly summarized above, may be had by reference to embodiments, some of which are illustrated in the appended drawings. It is to be noted, however, that the appended drawings illustrate only typical embodiments of this disclosure and are therefore not to be considered limiting of its scope, for the disclosure may admit to other equally effective embodiments.
-
FIG. 1 illustrates drilling of a first wellbore into a geological formation, according to one embodiment of the present disclosure. -
FIG. 2A illustrates a bottom hole assembly (BHA) used in drilling of the first wellbore.FIG. 2B illustrates an alternative BHA, according to another embodiment of the present disclosure. -
FIG. 3 illustrates simulation of a hypothetical drill bit drilling a hypothetical geological formation to obtain a function that provides strength of a hypothetical geological formation from the depth of cut (DOC) of the hypothetical drill bit and the torque (TOQ) exerted on the hypothetical drill bit. -
FIG. 4 illustrates determining strength of the geological formation along the first wellbore using the function to select a location of a junction of a second wellbore. -
FIG. 5 illustrates drilling of a second wellbore at the location of the junction. -
FIG. 6 illustrates determining weight on bit (WOB) of the drilling operation along the second wellbore using a second function, according to another embodiment of the present disclosure. -
FIG. 7 illustrates deploying a downhole tubular into the second wellbore having used the second function to determine a centralizer program of the downhole tubular. -
FIG. 8 illustrates determining strength of the geological formation along the second wellbore using the function to locate a fault in the geological formation. -
FIG. 9 illustrates perforation of the downhole tubular lining the second wellbore while avoiding the fault. -
FIG. 10 illustrates drilling of the first wellbore into the geological formation while utilizing the function and/or the second function, according to another embodiment of the present disclosure. -
FIG. 1 illustrates drilling of afirst wellbore 1 a into ageological formation 17, according to one embodiment of the present disclosure. Thefirst wellbore 1 a may be drilled using adrilling system 2. Thedrilling system 2 may include adrilling rig 2 r, afluid handling system 2 f, a blowout preventer (BOP) 2 b, adrill string 3, and a controller, such as programmable logic controller (PLC) 2 p. Thedrilling rig 2 r may include aderrick 4 d,top drive 5, draw works 6, and afloor 4 f at its lower end having an opening through which thedrill string 3 extends downwardly into thefirst wellbore 1 a via awellhead 19 h. TheBOP 2 b may be connected to thewellhead 19 h. -
FIG. 2A illustrates a bottom hole assembly (BHA) 3 b used in drilling of thefirst wellbore 1 a. Referring also toFIG. 1 , thedrill string 3 may include theBHA 3 b and apipe string 3 p. Thepipe string 3 p may include joints of drill pipe connected together, such as by threaded couplings. TheBHA 3 b may be connected to thepipe string 3 p, such as by threaded couplings, and include adrill bit 7, a measurement while drilling (MWD)sub 8 w, abent sub 8 b, and adrilling motor 8 m. Thedrilling motor 8 m may be a mud motor. The 7, 8 b,m,w may be interconnected, such as by threaded couplings. TheBHA members MWD sub 8 w may include one or more sensors, such as accelerometers and magnetometers, to enable thePLC 2 p to calculate navigation parameters, such as azimuth, inclination, and/or tool face angle of theBHA 3 b. TheMWD sub 8 w may be connected to thebent sub 8 b and thepipe string 3 p. Thebent sub 3 b may be connected to theMWD sub 8 w and a stator of thedrilling motor 8 m. Thedrill bit 7 may be connected to a rotor of thedrilling motor 8 m. - The
drill bit 7 may include the cutting face, a bit body, a shank, and a gage section. A lower portion of the bit body may be made from a composite material, such as a ceramic and/or cermet matrix powder infiltrated by a metallic binder, and an upper portion of the bit body may be made from a softer material than the composite material of the upper portion, such as a metal or alloy shoulder powder infiltrated by the metallic binder. The bit body may be mounted to the shank during molding thereof. The shank may be tubular and made from a metal or alloy, such as steel, and have a coupling, such as a threaded pin, formed at an upper end thereof for connection of thedrill bit 1 a todrilling motor 8 m. The shank may have a flow bore formed therethrough and the flow bore may extend into the bit body to a plenum (not shown) thereof. The cutting face may form a lower end of thedrill bit 7 and the gage section may form at an outer portion thereof. - Alternatively, the
bit body 2 may be metallic, such as being made from steel, and may be hardfaced. The metallic bit body may be connected to a modified shank by threaded couplings and then secured by a weld or the metallic bit body may be monoblock having an integral body and shank. - The cutting face may include one or more primary blades, one or more secondary blades, fluid courses formed between the blades, a row of leading cutters mounted along each blade, and backup cutters mounted to each blade. The cutting face may have one or more sections, such as an inner cone, an outer shoulder, and an intermediate nose between the cone and the shoulder sections. The blades may be disposed around the cutting face and each blade may be formed during molding of the bit body and may protrude from a bottom of the bit body. The primary blades and the secondary blades may be arranged about the cutting face in an alternating fashion. The primary blades may each extend from a center of the cutting face, across a portion of the cone section, across the nose and shoulder sections, and to the gage section. The secondary blades may each extend from a periphery of the cone section, across the nose and shoulder sections, and to the gage section. Each blade may extend generally radially across the portion of the cone section (primary only) and nose section with a slight spiral curvature and across the shoulder section radially and longitudinally with a slight helical curvature. Each primary blade may be inclined in the cone section by a cone angle. The cone angle may range between five and forty-five degrees.
- Each blade may be made from the same material as the lower portion of the bit body. The leading cutters may be mounted along leading edges of the blades after infiltration of the bit body. The leading cutters may be pre-formed, such as by high pressure and temperature sintering, and mounted, such as by brazing, in respective leading pockets formed in the blades adjacent to the leading edges thereof. Each blade may have a lower face extending between a leading edge and a trailing edge thereof. Starting in the nose section or shoulder section, each blade may have a row of backup pockets formed in the lower face thereof and extending therealong. Each backup pocket may be aligned with or slightly offset from a respective leading pocket. The backup cutters may be mounted, such as by brazing, in the backup pockets formed in the lower faces of the blades. The backup cutters may be pre-formed, such as by high pressure and temperature sintering. The backup cutters may extend along at least the shoulder section of each blade.
- Alternatively, the
drill bit 7 may further include shock studs protruding from the lower face of each primary blade in the cone section and each shock stud may be aligned with or slightly offset from a respective leading cutter. - One or more ports may be formed in the bit body and each port may extend from the plenum and through the bottom of the bit body to discharge the
drilling fluid 21 along the fluid courses. A nozzle may be disposed in each port and fastened to the bit body. Each nozzle may be fastened to the bit body by having a threaded coupling formed in an outer surface thereof and each port may be a threaded socket for engagement with the respective threaded coupling. The ports may include an inner set of one or more ports disposed in the cone section and an outer set of one or more ports disposed in the nose section and/or shoulder section. Each inner port may be disposed between an inner end of a respective secondary blade and the center of the cutting face. - The gage section may define a gage diameter of the drill bit. The gage section may include a plurality of gage pads (not shown), such as one gage pad for each blade, a plurality of gage trimmers and junk slots formed between the gage pads. The junk slots may be in fluid communication with the fluid courses formed between the blades. The gage pads may be disposed around the gage section and each pad may be formed during molding of the bit body and may protrude from the outer portion of the bit body. Each gage pad may be made from the same material as the bit body and each gage pad may be formed integrally with a respective blade. Each gage pad may extend upward from a shoulder portion of the respective blade to an exposed outer surface of the shank.
- Each gage pad may have a rectangular lower portion and a tapered upper portion. The tapered upper portions may transition an outer diameter of the
drill bit 7 from the gage diameter to a lesser diameter of the shank. A taper angle may be the same for each upper portion and may range between thirty and sixty degrees as measured from a transverse axis of the drill bit. Each gage trimmer may be mounted to a leading edge of each lower portion. The gage trimmers may be mounted, such as by brazing, in respective pockets formed in the lower portions adjacent to the leading edges thereof. The rectangular lower portions may have flat outer surfaces (except for the pockets therein). The gage trimmers may have flats formed in outer surfaces thereof so as not to extend past the gage diameter of the drill bit. - Alternatively, the gage pads may have gage protectors embedded therein.
- Each cutter and gage trimmer may include a superhard cutting table, such as polycrystalline diamond (PCD), attached to a hard substrate, such as a cermet, thereby forming a compact, such as a polycrystalline diamond compact (PDC). Each cutter gage trimmer may be a shear cutter having a planar working face. The cermet may be a carbide cemented by a Group VIIIB metal, such as cobalt. The substrate and the cutting table may each be solid and cylindrical and a diameter of the substrate may be equal to a diameter of the cutting table. A working face of each cutter and gage trimmer may be opposite to the substrate and may be smooth and planar. Each gage protector may be made from thermally stable PCD or PDC.
- Alternatively, one or more of the cutters of each blade may have a non-planar working face.
- The
drill bit 7 may be rotated 9 r by thetop drive 5 via thepipe string 3 p and/or by thedrilling motor 8 m. TheBHA 3 b may be operable in a rotary mode or a sliding mode. To operate in the sliding mode, thepipe string 3 p may be held rotationally stationary and inclination of thedrill bit 7 by thebent sub 3 b may cause drilling along a curved trajectory. To operate in the rotary mode, thedrill string 3 may be rotated 9 r by thetop drive 5 to negate the curvature effect of thebent sub 8 b (aka corkscrew path) and the drilling trajectory may be straight. The inclination of thebent sub 3 b has been exaggerated for illustrative purpose. - Additionally, the
BHA 3 b may further include a transmitter for communication of theMWD sub 8 w with thePLC 2 p (and the PLC may include a corresponding receiver). Alternatively, thebent sub 8 b may be integrated with thedrilling motor 8 m. Alternatively, thebent sub 8 b and/or theMWD sub 8 w may be omitted from theBHA 3 b. - Returning to
FIG. 1 , an upper end of thepipe string 3 p may be connected to a quill of thetop drive 5. Thetop drive 5 may include a motor for rotating 9 r thedrill string 3. The top drive motor may be electric or hydraulic. A frame of thetop drive 5 may be coupled to a rail (not shown) of thederrick 4 d for preventing rotation of the top drive frame duringrotation 9 r of thedrill string 3 and allowing for vertical movement of the top drive with a travelingblock 6 t of the draw works 6. The frame of thetop drive 5 may be suspended from thederrick 4 d by the travelingblock 6 t. The travelingblock 6 t may be supported bywire rope 6 r connected at its upper end to acrown block 6 c. Thewire rope 6 r may be woven through sheaves of theblocks 6 c,t and extend to awinch 6 w for reeling thereof, thereby raising or lowering the travelingblock 6 t relative to therig floor 4 f. - The
wellhead 19 h may be mounted on acasing string 10 which has been deployed into thefirst wellbore 1 a and cemented 11 therein. A lower section of thefirst wellbore 1 a may be vertical (shown) or deviated (not shown). - The
fluid system 2 f may include amud pump 12, a drilling fluid reservoir, such as apit 13 or tank, a solids separator, such as ashale shaker 14, apressure sensor 15, one or more flow lines, such as areturn line 16 r, asupply line 16 s, and afeed line 16 f, amud logging tool 17, and astroke counter 18. A first end of thereturn line 16 r may be connected to aflow cross 19 x mounted on thewellhead 19 h and a second end of the return line may be connected to an inlet of theshaker 14. A lower end of thesupply line 16 s may be connected to an outlet of themud pump 12 and an upper end of the supply line may be connected to an inlet of thetop drive 5. Thepressure sensor 15 may be assembled as part of thesupply line 16 s. A first end of thefeed line 16 f may be connected to an outlet of thepit 13 and a second end of the feed line may be connected to an inlet of themud pump 12. - The
pressure sensor 15 may be in data communication with thePLC 2 p and may be operable to monitor standpipe pressure (SPP). A drilling technician may enter the current mode of the drilling operation into thePLC 2 p. ThePLC 2 p may monitor and record SPP both when thedrill bit 7 is drilling and when the drill bit is lifted from engagement with a bottom of the wellbore for adding joints or stands to thepipe string 3 p. The stroke counter 18 may also be in data communication with thePLC 2 p and the PLC may be operable to calculate and record a flow rate of themud pump 12. ThePLC 2 p may also be in communication with a hook load cell clamped to thewire rope 6 r, and a position sensor of thewinch 6 w. A drilling technician may enter lengths of joints or stands of pipe added to thepipe string 3 p and the length of theBHA 3 b into a tally of thePLC 2 p so that the PLC can record measured depth of thewellbore 1 a. The drilling technician may also enter weight of the drill string components into the tally. ThePLC 2 p may use a plurality of depth measurements and the time interval therebetween to calculate rate of penetration (ROP). ThePLC 2 p may record the various measurements and calculations in a memory unit (MEM) 20 for later use. ThePLC 2 p may utilize data from theMWD sub 8 w to calculate true vertical depth (TVD) from the measured depth. - Additionally or alternatively, the
PLC 2 p may further be in communication with a torque sensor and tachometer of thetop drive 5. The torque sensor may measure torque exerted on the quill of thetop drive 5. The tachometer may measure the angular speed of the top drive quill. ThePLC 2 p may utilize the tally of thedrill string 3 for calculating weight on bit (WOB) using the hook load and torque exerted on thepipe string 3 p using the torque exerted on the quill. - The
mud pump 12 may pumpdrilling fluid 21 from thepit 13, through thesupply line 16 s, and to thetop drive 5. Thedrilling fluid 21 may include a base liquid. The base liquid may be refined or synthetic oil, water, brine, or a water/oil emulsion. Thedrilling fluid 21 may further include solids dissolved or suspended in the base liquid, such as organophilic clay, lignite, and/or asphalt, thereby forming a mud. - The
drilling fluid 21 may flow from thesupply line 16 s and into a bore of thepipe string 3 p via thetop drive 5. Thedrilling fluid 21 may flow down thepipe string 3 p, through a bore of theBHA 3 b, and exit thedrill bit 7, where the fluid may circulate cuttings away from the bit and return the cuttings up anannulus 22 formed between an inner surface of thecasing 10 or thefirst wellbore 1 a and an outer surface of thedrill string 3. The returns 23 (drilling fluid 21 plus cuttings) may flow up theannulus 22, to thewellhead 19 h, and exit the wellhead through theflow cross 19 x. Thereturns 23 may continue through thereturn line 16 r. Thereturns 23 may then flow into theshale shaker 14 and be processed thereby to remove the cuttings, thereby completing a cycle. As thedrilling fluid 21 and returns 23 circulate, thedrill string 3 may be rotated 9 r by thetop drive 5 and/or the drilling motor 3 m and lowered 9 a by the travelingblock 6 t, thereby extending thefirst wellbore 1 a into and/or through thegeologic formation 17. Thegeologic formation 17 may be hydrocarbon-bearing. -
FIG. 3 illustrates simulation of ahypothetical drill bit 26 drilling a hypothetical geological formation to obtain afunction 27 that provides strength of the hypothetical geological formation from depth of cut (DOC) of the hypothetical drill bit and the torque (TOQ) exerted on the hypothetical drill bit.Typical drilling parameters 25 a may be supplied to acomputer 24. Thespecific parameters 25 b of thedrill bit 7 or at least parameters similar thereto may also be supplied to thecomputer 24. A range oftypical UCSs 25 c for the hypothetical formation may also be supplied to thecomputer 24. Thecomputer 24 may then conduct multiple simulations 28 a-c of thehypothetical drill bit 26, each simulation having the bit drilling into the hypothetical formation with a different UCS. Thecomputer 24 may then process the results of the simulation to create thefunction 27 that provides UCS of the hypothetical formation from the DOC of thehypothetical drill bit 26 and the TOQ exerted on the hypothetical drill bit. - Additionally, the
computer 24 may conduct a second set of multiple simulations (not shown) of thehypothetical drill bit 26, each simulation having the bit drilling into the hypothetical formation with a different WOB. Thecomputer 24 may then process the results of the simulation to create a second function 42 (FIG. 6 ) that provides WOB of the simulated drilling operation from the DOC of thehypothetical drill bit 26 and the TOQ exerted on the hypothetical drill bit. -
FIG. 4 illustrates determining strength of thegeological formation 17 along thefirst wellbore 1 a using thefunction 27 to select a location of ajunction 31 of asecond wellbore 1 b (FIG. 5 ). Once drilling of thefirst wellbore 1 a has concluded, the measured data from thememory unit 20 may be supplied to thecomputer 24. Thefunction 27 may also be supplied to thecomputer 24.Performance data 43 of thedrilling motor 8 m may also be supplied to thecomputer 24. Theperformance data 43 may include TOQ output by thedrilling motor 8 m as a function of differential pressure (ΔP) across the drilling motor and angular speed (RPM) of the rotor of the drilling motor as a function of flow rate (FLR) ofdrilling fluid 21 pumped through the drilling motor. Thecomputer 24 may utilize the measured data from thememory unit 20 to determine the ΔP across thedrilling motor 8 m by subtracting the SPP measured while thedrill bit 7 was off bottom from the SPP measured while the drill bit was drilling thefirst wellbore 1 a. - The
computer 24 may utilize the calculated ΔP and theperformance data 43 to determine the TOQ exerted on thedrill bit 7. Thecomputer 24 may also utilize the FLR pumped through thedrilling motor 8 m and theperformance data 43 thereof to determine the RPM of the rotor (and also the drill bit 7). Thecomputer 24 may then utilize the ROP from thememory unit 20 to calculate the DOC by dividing ROP by RPM of thedrilling motor 8 m. Thecomputer 24 may then utilize thefunction 27, the DOC of thedrill bit 7, and the TOQ output by thedrilling motor 8 m to calculate UCS of theformation 17. Thecomputer 24 may repeat the calculations for various depths along the first wellbore and may generate aUCS log 29 a. A drilling engineer may then utilize the UCS log 29 a to identify one or more (pair shown) zones of interest, such assoft zones 30 a,b of theformation 17. Thesoft zones 30 a,b may be portions of the UCS log 29 a with a lesser or minimum UCS. The depth of one of thesoft zones 30 a,b may be used to locate ajunction 31 with thesecond wellbore 1 b such that the second wellbore will be drilled into one of the soft zones. Drilling of thesecond wellbore 1 b into one of thesoft zones 30 a,b is advantageous in that it minimizes wear on thedrill bit 7. - Alternatively, the drilling engineer may identify and select a hard zone (greater or maximum UCS) for drilling of the
second wellbore 1 b. While selection of the hard zone may result in more wear on thedrill bit 7, it may have other advantages, such as better susceptibility to hydraulic fracturing. Additionally, the computer may utilize a motor efficiency (not shown) to adjust the TOQ and/or FLR for improved accuracy. Alternatively, thecomputer 24 may calculate internal friction angle (IFA) as an indicator of formation strength instead of UCS. The log output by thecomputer 24 would then be an IFA log instead of the UCS log 29 a. Alternatively, the UCS log 29 a may include MD instead of TVD. -
FIG. 2B illustrates analternative BHA 39, according to another embodiment of the present disclosure. Thealternative BHA 39 may be used for the drilling operation instead of theBHA 3 b. Thealternative BHA 39 may be similar to theBHA 3 b except for the inclusion of one or more additional sensors. Thealternative BHA 39 may include apressure sensor 40 n in fluid communication with a bore of theMWD sub 8 w (upstream of thedrilling motor 8 m). During drilling of the first wellbore, a controller (not shown) of theMWD sub 8 w may monitor the measurements from thepressure sensor 40 n and may record them in amemory unit 40 m thereof. Measurements recorded by thememory unit 40 m may then be supplied to thecomputer 24 and used thereby instead of the SPP for the ΔP across thedrilling motor 8 m. - The
alternative BHA 39 may include apressure sensor 400 located downstream of thedrilling motor 8 m, such as carried by thedrill bit 7 and in fluid communication with a bore of the drill bit. Thealternative BHA 39 may include a short-range transmitter (not shown) for communicating measurements by thepressure sensor 400 to the controller of theMWD sub 8 w, a receiver (not shown) for receiving the measurements, and a battery for powering thepressure sensor 400. Measurements recorded by thememory unit 40 m from bothpressure sensors 40 n,o may then be supplied to thecomputer 24 and used thereby instead of the SPP for the ΔP across thedrilling motor 8 m. Such measurements would include only those made while the drill bit was drilling and not including measurements made while the drill bit was off bottom. - The
alternative BHA 39 may include atachometer 40 t and/or atorque sensor 40 q mounted to a rotor of thedrilling motor 8 m. Thetachometer 40 t may be operable to measure the RPM of the rotor of thedrilling motor 8 m and the torque sensor may be operable to measure TOQ exerted on the drill bit by the rotor of the drilling motor. Thealternative BHA 39 may include a short-range transmitter (not shown) for communicating measurements by thesensors 40 t,q to the controller of theMWD sub 8 w, and a battery for powering thesensors 40 t,q. Measurements recorded by thememory unit 40 m from bothsensors 40 t,q may then be supplied to thecomputer 24 and used thereby instead of the ΔP across thedrilling motor 8 m and theperformance data 43 for determining TOQ and/or instead of the FLR and the performance data for determining RPM. - Alternatively, the
pressure sensor 400 may have a memory unit (not shown) instead of or in addition to a transmitter. Alternatively, thetachometer 40 t and/or atorque sensor 40 q may have a memory unit (not shown) instead of or in addition to a transmitter. -
FIG. 5 illustrates drilling of thesecond wellbore 1 b at one of thesoft zones 30 a,b, according to one embodiment of the present disclosure. Once the location of thejunction 31 has been determined (atsoft zone 30 b shown) by the drilling engineer using the UCS log 29 a, thedrill string 3 may be raised such that thedrill bit 7 is at the depth of the selectedsoft zone 30 b. Thedrill bit 7 may be oriented and the drilling of thesecond wellbore 1 b into theformation 17 may commence in a similar fashion as drilling of thefirst wellbore 1 a (discussed above). Since thesecond wellbore 1 b is drilled from thefirst wellbore 1 a, the second wellbore may be known as a lateral wellbore and thefirst wellbore 1 a may be known as a main wellbore. - Alternatively, the
drill string 3 may be removed from thefirst wellbore 1 a and a whipstock and plug (not shown) may be deployed, oriented, and set at the selectedsoft zone 30 b. Thedrill string 3 may then be redeployed into thefirst wellbore 1 a and guided along a planned trajectory of thesecond wellbore 1 b by the whipstock. Alternatively, thefirst wellbore 1 a may be lined by a downhole tubular, such as a (second) casing string or a liner string, and a window milled through the downhole tubular before drilling thesecond wellbore 1 b to reinforce thejunction 31. The whipstock and plug may be used to guide milling of the window. -
FIG. 6 illustrates determining WOB of the drilling operation along thesecond wellbore 1 b using thesecond function 42, according to another embodiment of the present disclosure. Once drilling of thesecond wellbore 1 b has concluded, the measured data from thememory unit 20 may be supplied to thecomputer 24. Thesecond function 42 may also be supplied to thecomputer 24. Theperformance data 43 of thedrilling motor 8 m may also be supplied to thecomputer 24. Thecomputer 24 may utilize the measured data from thememory unit 20 to determine the ΔP across thedrilling motor 8 m, as discussed above. Thecomputer 24 may utilize the calculated ΔP and theperformance data 43 to determine the TOQ exerted on thedrill bit 7, as discussed above. Thecomputer 24 may also utilize the FLR pumped through thedrilling motor 8 m and theperformance data 43 thereof to determine the RPM of the rotor (and also the drill bit 7), as discussed above. Thecomputer 24 may then utilize the ROP from thememory unit 20 to calculate the DOC, as discussed above. - The
computer 24 may then utilize thesecond function 42, the DOC of thedrill bit 7, and the TOQ output by thedrilling motor 8 m to calculate actual WOB (ACT WOB). Thecomputer 24 may repeat the calculations for various depths along the first and 1 a,1 b and may correlate the ACT WOB with the (apparent) WOB calculated by thesecond wellbores PLC 2 p (APP WOB) to generate adrag log 44. The differential between the APP WOB and the ACT WOB is indicative of a drag force exerted by thewellbores 1 a,b on thedrill string 3. A casing engineer may then utilize thedrag log 44 to develop a centralizer program for a downhole tubular 33 (FIG. 7 ), such as a liner string, for deployment into thesecond wellbore 1 b. The centralizer program may include the types of centralizers, such as rigid, semi-rigid, or bow spring, and the number and location of the centralizers. Thedrag log 44 may include anideal line 44 d which illustrates APP WOB being equal to ACT WOB for reference. - Alternatively, the
drag log 44 may be generated for thefirst wellbore 1 a instead of or in addition to thesecond wellbore 1 b and the downhole tubular 33 may be for deployment into thefirst wellbore 1 a. -
FIG. 7 illustrates deploying the downhole tubular 33 into thesecond wellbore 1 b having used thesecond function 42 to determine a centralizer program of thedownhole tubular 33. The downhole tubular 33 may include a liner hanger andpacker 33 h, a float collar (not shown), joints of liner, ashoe 33 s, and a plurality of centralizers, such as one or morebow spring centralizers 33 b and one or morerigid centralizers 33 r. Except for thecentralizers 33 b,r, the liner string members may each be connected together, such as by threaded couplings. Thecentralizers 33 b,r may be mounted to individual joints of liner by stop collars. The downhole tubular 33 may be deployed into thesecond wellbore 1 b using awork string 41. Thework string 41 may include thepipe string 3 p and a deployment assembly (not shown). The deployment assembly may include a setting tool, a running tool, a stinger, and a wiper plug. - Once the
downhole tubular 33 has been advanced into thesecond wellbore 1 b by the work string 9 to a desired deployment depth, theliner hanger 33 h may be set against a lower portion of thecasing string 10. Cement slurry may then be pumped through thework string 41 and downhole tubular 33 and into an annulus between the downhole tubular and thesecond wellbore 1 b using a dart and the wiper plug. Thepacker 33 h may be set and the work string released from the downhole tubular Thework string 41 may then be retrieved to therig 2 r and thedrilling system 2 dispatched from the well site. The cement slurry may cure, thereby forming a cement sheath 34 (FIG. 9 ) between thedownhole tubular 33 and thesecond wellbore 1 b. The centralizer program including thecentralizers 33 b,r may ensure that thedownhole tubular 33 is centralized within the first andsecond wellbores 1 a,b, thereby providing acement sheath 34 with integrity. - Alternatively, the downhole tubular 33 may be a casing string instead of a liner string.
-
FIG. 8 illustrates determining strength of thegeological formation 17 along thesecond wellbore 1 b using thefunction 27 to locate an unstable zone, such asfault 32, in the geological formation. Once drilling of thesecond wellbore 1 b has concluded, the measured data from thememory unit 20 may be supplied to thecomputer 24 and the computer may generate aUCS log 29 b of theformation 17 along thesecond wellbore 1 b in a similar fashion to the UCS log 29 a (discussed above). A completions engineer may then utilize theUCS log 29 b to identify thefault 32 in theformation 17. Thediscontinuity 32 in theUCS log 29 b may be used to identify thefault 32. Once thefault 32 has been located, the completions engineer may avoid the fault in the fracturing plan of thesecond wellbore 1 b. Avoidance of thefault 32 is advantageous to prevent the fault from absorbing proppant during a hydraulic fracturing operation which was otherwise intended to be distributed throughout theformation 17. - Alternatively, the unstable zone may be a depleted zone instead of the
fault 32. -
FIG. 9 illustrates perforation of a downhole tubular 33 lining thesecond wellbore 1 b while avoiding thefault 32. A fracturing system may be deployed once thedrilling system 2 has been dispatched from the wellsite. The fracturing system may include a lubricator (not shown), a fluid system (not shown), a production tree (not shown), a deployment cable, such aswireline 36, and aBHA 35. The production tree may be installed on thewellhead 19 h. - The fluid system may include the injector head, a shutoff valve, one or more pressure gauges, a stroke counter, a launcher, a fracture pump, and a fracture fluid mixer. The injector head may be installed on the production tree and the lubricator may be installed on the injector head. A first pressure gauge may be connected to the flow cross and may be operable to monitor wellhead pressure. A second pressure gauge may be connected between the fracture pump and the valve and may be operable to measure discharge pressure of the fracture pump. The stroke counter may be operable to measure a flow rate of the fracture pump.
- Alternatively, the gauges may be sensors in data communication with a (second) PLC (not shown) for automated or semi-automated control of the fracturing operation.
- A closing plug, such as a ball, may be disposed in the launcher for selective release and pumping downhole to close a bore of a
frac plug 35 p of theBHA 35. In operation, a technician may release the ball by operating the launcher actuator. The pumped stream of fracturing fluid (not shown) may then carry the ball from the launcher, into the wellhead via the injector head and tree, and to thefrac plug 35 p. - The
BHA 35 may include acable head 35 h, acollar locator 350, aperforation gun 35 g, asetting tool 35 s, and thefrac plug 35 p. Theperforation gun 35 g may include a firing head and a charge carrier. The charge carrier may include a housing, a plurality of shaped charges, and detonation cord connecting the charges to the firing head. In operation, the firing head may receive electricity from thewireline 36 to operate an electric match thereof. The electric match may ignite the detonation cord to fire the shape charges. Thesetting tool 35 s may be releasably connected to a mandrel of thefrac plug 35 p, such as by one or more shearable fasteners (not shown). - The
BHA 35 may be deployed into thesecond wellbore 1 b using thewireline 36 with assistance from the fracture pump or a tractor (not shown). Once theBHA 35 has been deployed to the setting depth listed by the fracturing plan, thefrac plug 35 p may be set by supplying electricity to theBHA 35 at a first polarity via thewireline 36 to activate thesetting tool 35 s, thereby engaging thefrac plug 35 p with thedownhole tubular 33. - A tensile force may then be exerted on the
BHA 35, thereby releasing thefrac plug 35 p from the rest of theBHA 35 g,h,o,s. The remainingBHA 35 g,h,o,s may then be raised using thewireline 36 until theperforation guns 35 g are at a depth of a production zone, according to the fracturing plan. Electricity may then be resupplied to the remaining 35 g,h,o,s via thewireline 36 at a second polarity to fire theperforation guns 35 g into thedownhole tubular 33, thereby formingperforations 37. Once theperforations 37 have been formed, the remainingBHA 35 g,h,o,s may be retrieved to the lubricator using thewireline 36. A shutoff valve of the lubricator may then be closed. - The ball may then be released from the launcher and the fracturing fluid may be pumped from the mixer into the injector head via the valve by the fracture pump. The fracturing fluid may be a slurry including: proppant, such as sand, water, and chemical additives. Continued pumping of the fracturing fluid may drive the ball toward the frac plug until the ball lands onto a seat of the plug mandrel, thereby closing the plug mandrel bore.
- Continued pumping of the fracturing fluid may exert pressure on the seated ball until pressure in the downhole tubular 33 increases to force the fracturing fluid (above the seated ball) through the
perforations 37,cement sheath 34 and into the production zone by creating a fracture. The proppant may be deposited into the fracture by the fracturing fluid. Pumping of the fracturing fluid may continue until a desired quantity (listed in the fracturing plan) has been pumped into the production zone. A depth of theperforations 37 may be located such that anadequate buffer distance 38 is created from thefault 32 such that the fault does not absorb the proppant meant for distribution throughout theformation 17. - Additional production zones (not shown) may be fractured using one or more additional respective BHAs (not shown) in a similar fashion. Once the fracturing operation of all the production zones has been completed, the lubricator and injector head may be removed from the tree. A coiled tubing unit may be connected to the tree and a coiled tubing work string deployed to mill the fracture plugs 35 p. The flow cross may be connected to a disposal pit or tank (not shown) and spent fracturing fluid (minus proppant) allowed to flow from the
second wellbore 1 b to the pit. A production choke (not shown) may be connected to the flow cross and to a separation, treatment, and storage facility (not shown). Production of the fractured zones may then commence. - Alternatively, fracture valves may be assembled as part of the downhole tubular 33 instead of having to perforate the downhole tubular. A location of each fracture valve may be listed in the fracturing plan. A fracture valve may be included for each zone and the fracture valves opened using respective pump down plugs or deploying a shifting tool using wireline or coiled tubing. Alternatively, fracture valves may be assembled as part of the downhole tubular 33 instead of having to perforate the liner string and each fracture valve may have a packer for isolating the respective zone instead of having to cement the liner string.
-
FIG. 10 illustrates drilling of thefirst wellbore 1 a into the geological formation while utilizing thefunction 27 and/or thesecond function 42, according to another embodiment of the present disclosure. Instead of being performed after the drilling operation as implied by the discussion ofFIG. 3 above, either or bothfunctions 27,40 may be determined before the drilling operation and provided to thePLC 2 p. Theperformance data 43 may also be provided to thePLC 2 p before the drilling operation such that the PLC may calculate UCS and/or ACT WOB during the drilling operation of thefirst wellbore 1 a (and/or thesecond wellbore 1 b). ThePLC 2 p may then produce portions of the UCS logs 29 a,b and/or thedrag log 44 as the respective wellbores are being drilled. The drilling engineer may then utilize the real time logs 29 a,b,44 to adjust drilling parameters during the drilling operation(s). For example the drilling engineer may utilize the UCS logs 29 a,b to adjust the trajectories of therespective wellbores 1 a,b during drilling (aka geo-steering). ThePLC 2 p may also generate the realtime drag log 44 during drilling of either or bothwellbores 1 a,b. The drilling engineer may utilize the real time drag log to optimize ROP (if ACT WOB is insufficient and needs to be increased) and/or extend life of the drill bit 7 (if ACT WOB is overloading the drill bit and needs to be decreased) by adjusting the ACT WOB. - While the foregoing is directed to embodiments of the present disclosure, other and further embodiments of the disclosure may be devised without departing from the basic scope thereof, and the scope of the invention is determined by the claims that follow.
Claims (15)
1. A method for monitoring a drilling operation, comprising:
providing a drill bit for drilling a wellbore into a geological formation using a drilling motor for rotating the drill bit;
determining depth of cut (DOC) of the drill bit and torque exerted on the drill bit by the drilling motor using parameters measured while drilling the wellbore;
simulating drilling of a hypothetical wellbore using a hypothetical drill bit similar or identical to the drill bit and determining a function that provides strength of a hypothetical geological formation from the DOC of the hypothetical drill bit and the torque exerted on the hypothetical drill bit; and
determining strength of the geological formation using the function and the determined DOC and the torque.
2. The method of claim 1 , further comprising:
identifying a zone of interest of the geological formation using the determined strength thereof; and
drilling a lateral wellbore at the zone of interest.
3. The method of claim 1 , further comprising:
identifying an unstable zone in the geological formation using the determined strength thereof; and
fracturing the geological formation at a buffer distance from the unstable zone.
4. The method of claim 1 , further comprising:
drilling the wellbore into the geological formation using the drill bit and the drilling motor; and
measuring the parameters while drilling the wellbore.
5. The method of claim 4 , wherein:
drilling the wellbore also uses a drilling rig,
the parameters are measured at the drilling rig, and
the DOC of the drill bit and torque exerted thereon are determined also using performance data of the drilling motor.
6. The method of claim 4 , wherein at least one of the parameters is measured downhole.
7. The method of claim 4 , wherein:
the drilling of the hypothetical wellbore is simulated before drilling the wellbore, and
the strength of the geological formation is determined while drilling the wellbore.
8. The method of claim 1 , further comprising:
further simulating drilling of the hypothetical wellbore using the hypothetical drill bit and determining a second function that provides weight on bit (WOB) of the simulated drilling from the DOC of the hypothetical drill bit and the torque exerted on the hypothetical drill bit;
determining weight on bit (WOB) using the second function and the determined DOC and the torque.
9. The method of claim 8 , further comprising planning a centralizer program of a downhole tubular using the determined WOB.
10. The method of claim 1 , wherein the drill bit is a PDC drill bit.
11. A method for monitoring a drilling operation, comprising:
providing a drill bit for drilling a wellbore into a geological formation using a drilling motor for rotating the drill bit;
determining depth of cut (DOC) of the drill bit and torque exerted on the drill bit by the drilling motor using parameters measured while drilling the wellbore;
simulating drilling of a hypothetical wellbore using a hypothetical drill bit similar or identical to the drill bit and determining a function that provides weight on bit (WOB) of the simulated drilling from the DOC of the hypothetical drill bit and the torque exerted on the hypothetical drill bit; and
determining WOB using the function and the determined DOC and the torque.
12. The method of claim 11 , further comprising:
drilling the wellbore into the geological formation using the drill bit and the drilling motor; and
measuring the parameters while drilling the wellbore.
13. The method of claim 12 , wherein:
drilling the wellbore also uses a drilling rig,
the parameters are measured at the drilling rig, and
the DOC of the drill bit and torque exerted thereon are determined also using performance data of the drilling motor.
14. The method of claim 12 , wherein:
the drilling of the hypothetical wellbore is simulated before drilling the wellbore, and
the WOB is determined while drilling the wellbore.
15. The method of claim 11 , further comprising planning a centralizer program of a downhole tubular using the determined WOB.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US18/634,392 US20240368976A1 (en) | 2023-05-03 | 2024-04-12 | Determination of unconfined compressive strength from drilling data and drill bit parameters |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US202363499820P | 2023-05-03 | 2023-05-03 | |
| US18/634,392 US20240368976A1 (en) | 2023-05-03 | 2024-04-12 | Determination of unconfined compressive strength from drilling data and drill bit parameters |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20240368976A1 true US20240368976A1 (en) | 2024-11-07 |
Family
ID=90971401
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US18/634,392 Pending US20240368976A1 (en) | 2023-05-03 | 2024-04-12 | Determination of unconfined compressive strength from drilling data and drill bit parameters |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US20240368976A1 (en) |
| EP (1) | EP4459096A3 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN120119887B (en) * | 2025-03-11 | 2025-09-02 | 中国矿业大学(北京) | Intelligent anchor detection system and method for underground engineering |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6879947B1 (en) * | 1999-11-03 | 2005-04-12 | Halliburton Energy Services, Inc. | Method for optimizing the bit design for a well bore |
| US20140121972A1 (en) * | 2012-10-26 | 2014-05-01 | Baker Hughes Incorporated | System and method for well data analysis |
| US20210230993A1 (en) * | 2020-01-29 | 2021-07-29 | Halliburton Energy Services, Inc. | Trajectory control for directional drilling using formation evaluation measurement feedback |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4914591A (en) | 1988-03-25 | 1990-04-03 | Amoco Corporation | Method of determining rock compressive strength |
| US6460631B2 (en) * | 1999-08-26 | 2002-10-08 | Baker Hughes Incorporated | Drill bits with reduced exposure of cutters |
| US7555414B2 (en) | 2004-12-16 | 2009-06-30 | Chevron U.S.A. Inc. | Method for estimating confined compressive strength for rock formations utilizing skempton theory |
| US8082104B2 (en) | 2009-01-23 | 2011-12-20 | Varel International Ind., L.P. | Method to determine rock properties from drilling logs |
| US9022140B2 (en) * | 2012-10-31 | 2015-05-05 | Resource Energy Solutions Inc. | Methods and systems for improved drilling operations using real-time and historical drilling data |
| US10094210B2 (en) * | 2013-10-01 | 2018-10-09 | Rocsol Technologies Inc. | Drilling system |
| US9556728B2 (en) | 2014-01-13 | 2017-01-31 | Varel Europe S.A.S. | Methods and systems of analyzing wellbore drilling operations |
| CA2990033C (en) | 2015-07-09 | 2023-08-29 | Conocophillips Company | Rock strength and in-situ stresses from drilling response |
| US11905828B1 (en) | 2022-07-27 | 2024-02-20 | Halliburton Energy Services, Inc. | Monitoring drilling conditions and estimating rock properties |
-
2024
- 2024-04-12 US US18/634,392 patent/US20240368976A1/en active Pending
- 2024-05-02 EP EP24173893.9A patent/EP4459096A3/en active Pending
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6879947B1 (en) * | 1999-11-03 | 2005-04-12 | Halliburton Energy Services, Inc. | Method for optimizing the bit design for a well bore |
| US20140121972A1 (en) * | 2012-10-26 | 2014-05-01 | Baker Hughes Incorporated | System and method for well data analysis |
| US20210230993A1 (en) * | 2020-01-29 | 2021-07-29 | Halliburton Energy Services, Inc. | Trajectory control for directional drilling using formation evaluation measurement feedback |
Also Published As
| Publication number | Publication date |
|---|---|
| EP4459096A2 (en) | 2024-11-06 |
| EP4459096A3 (en) | 2025-01-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3385497B1 (en) | Method of optimizing drilling operation using empirical data | |
| US10282497B2 (en) | Model for estimating drilling tool wear | |
| Hareland et al. | Calculating unconfined rock strength from drilling data | |
| Kerkar et al. | Estimation of rock compressive strength using downhole weight-on-bit and drilling models | |
| US20100078216A1 (en) | Downhole vibration monitoring for reaming tools | |
| Shelkholeslami et al. | Drilling and production aspects of horizontal wells in the Austin Chalk | |
| EP4034749B1 (en) | Rate of penetration drilling operation controller | |
| Etesami et al. | A semiempirical model for rate of penetration with application to an offshore gas field | |
| US20240368976A1 (en) | Determination of unconfined compressive strength from drilling data and drill bit parameters | |
| Prassl | Drilling Engineering | |
| Nguyen | Drilling | |
| Prasad et al. | An Innovative and Reliable Method of Estimating Rock Strength From Drilling Data Acquired Downhole | |
| Jebur | Directional Drilling Tools Assessment and the Impact of Bottom Hole Assembly Configuration on the Well Trajectory and Operation Optimization | |
| Sperber et al. | Drilling into geothermal reservoirs | |
| Islam et al. | Application of mechanical specific energy and at-the-bit measurements for geothermal drilling applications in hot, high strength, high modulus reservoirs | |
| Amorer et al. | Surface hydraulic fracturing trial at Cadia East | |
| Rachman et al. | Hydraulic Workover Unit Utilization for New Well Openhole Drilling with Directional Motor and Logging-While-Drilling Bottom-Hole-Assembly in M Area | |
| Kolmer et al. | Using Drilling Data of Offset Wells and Core Data to Optimize Perforation Selection for the Caney Shale | |
| Al Hindi et al. | Quantifying Hole Cleaning in Real-Time Optimizes Drilling Performance and Demonstrably Reduces NPT and ILT in a Complex Multilateral Well | |
| Skinner et al. | Coring at extreme temperatures, design and operation of a core barrel for the Iceland Deep Drilling Project (IDDP) | |
| Stavychnyi et al. | Specific features and prospects of well recovery by sidetracking based on the example of the Stynava field | |
| AU2020355349B2 (en) | Rate of penetration drilling operation controller | |
| US11608706B2 (en) | Single trip liner running and tie back system | |
| Fasheloum | Investigation of drilling parameters indicators | |
| Villeneuve et al. | Informing deep geothermal reservoir rock mass properties from drilling data-experience from Krafla, Iceland |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION COUNTED, NOT YET MAILED |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |