US20190309497A1 - Precast Concrete Panels Used as Surface Lining of Perimeter Surfaces of Excavations - Google Patents
Precast Concrete Panels Used as Surface Lining of Perimeter Surfaces of Excavations Download PDFInfo
- Publication number
- US20190309497A1 US20190309497A1 US16/317,717 US201716317717A US2019309497A1 US 20190309497 A1 US20190309497 A1 US 20190309497A1 US 201716317717 A US201716317717 A US 201716317717A US 2019309497 A1 US2019309497 A1 US 2019309497A1
- Authority
- US
- United States
- Prior art keywords
- flexible seal
- concrete panels
- precast concrete
- piles
- columns
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 239000011178 precast concrete Substances 0.000 title claims abstract description 108
- 238000009412 basement excavation Methods 0.000 title claims abstract description 28
- 239000007787 solid Substances 0.000 claims abstract description 25
- 239000004567 concrete Substances 0.000 claims description 64
- 238000000034 method Methods 0.000 claims description 39
- 239000000463 material Substances 0.000 claims description 25
- 238000007789 sealing Methods 0.000 claims description 10
- 230000004888 barrier function Effects 0.000 claims description 8
- 238000009434 installation Methods 0.000 claims description 4
- 238000005553 drilling Methods 0.000 claims description 2
- 239000011150 reinforced concrete Substances 0.000 claims description 2
- 230000002787 reinforcement Effects 0.000 claims description 2
- 208000014617 hemorrhoid Diseases 0.000 description 54
- 238000010276 construction Methods 0.000 description 16
- 239000011435 rock Substances 0.000 description 14
- 230000002441 reversible effect Effects 0.000 description 10
- 230000015572 biosynthetic process Effects 0.000 description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 9
- 238000003466 welding Methods 0.000 description 8
- 229920001903 high density polyethylene Polymers 0.000 description 7
- 239000004700 high-density polyethylene Substances 0.000 description 7
- 239000011800 void material Substances 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 5
- 239000011440 grout Substances 0.000 description 5
- 239000011378 shotcrete Substances 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 4
- 239000004746 geotextile Substances 0.000 description 4
- 239000004033 plastic Substances 0.000 description 4
- 229920003023 plastic Polymers 0.000 description 4
- 239000000126 substance Substances 0.000 description 4
- 238000004078 waterproofing Methods 0.000 description 4
- 239000007788 liquid Substances 0.000 description 3
- 239000012528 membrane Substances 0.000 description 3
- 229920000642 polymer Polymers 0.000 description 3
- -1 Polyethylene Polymers 0.000 description 2
- 239000011324 bead Substances 0.000 description 2
- 239000002131 composite material Substances 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 230000000670 limiting effect Effects 0.000 description 2
- 230000036961 partial effect Effects 0.000 description 2
- 230000000717 retained effect Effects 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- VVQNEPGJFQJSBK-UHFFFAOYSA-N Methyl methacrylate Chemical compound COC(=O)C(C)=C VVQNEPGJFQJSBK-UHFFFAOYSA-N 0.000 description 1
- 229920005372 Plexiglas® Polymers 0.000 description 1
- 239000004698 Polyethylene Substances 0.000 description 1
- 239000004743 Polypropylene Substances 0.000 description 1
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 239000004809 Teflon Substances 0.000 description 1
- 229920006362 Teflon® Polymers 0.000 description 1
- 230000006750 UV protection Effects 0.000 description 1
- 238000005299 abrasion Methods 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 239000011210 fiber-reinforced concrete Substances 0.000 description 1
- 230000009970 fire resistant effect Effects 0.000 description 1
- 230000004927 fusion Effects 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 239000012212 insulator Substances 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 239000013521 mastic Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 229920000573 polyethylene Polymers 0.000 description 1
- 229920002959 polymer blend Polymers 0.000 description 1
- 229920001155 polypropylene Polymers 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000002829 reductive effect Effects 0.000 description 1
- 239000011347 resin Substances 0.000 description 1
- 229920005989 resin Polymers 0.000 description 1
- 239000000565 sealant Substances 0.000 description 1
- 239000003566 sealing material Substances 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
- E21D11/083—Methods or devices for joining adjacent concrete segments
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
- E21D11/385—Sealing means positioned between adjacent lining members
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/04—Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Definitions
- the present invention relates to a system for the construction of excavations such as underground structures, including but not limited to car parks, train stations or containment cells for contaminated materials. More particularly, although not exclusively, the system comprises lining (and in some instances further including waterproofing) a perimeter surface (which may include horizontal and vertical surfaces) of an excavation with precast (in some instances prestressed and/or post tensioned) concrete panels affixed to solid structures to form a lining in the form of a wall or floor structure.
- Shoring systems are constructed to retain earth and the adjacent structures when a bulk excavation is required.
- a shoring system comprises piles inserted vertically into the ground at the design spacing around the exterior of the perimeter of a new structure. The area in front and between the piles is excavated in increments (maximum 2.00 meters), which is a time consuming and difficult task.
- the piles can be reinforced by bracing with temporary anchors and installing steel dowels between the piles before creating a shotcrete wall interface (see FIG. 1 ).
- WO 2011/009219 A1 to Alfonso Gonzalez, SFS Structures Ltd. discloses the use of precast concrete panels to build a wall in a shoring-free excavation and basement construction apparatus and method.
- the concrete panels in WO 2011/009219 A1 are moulded with a parabolic cross section and lateral faces of the panels are attached between the piles-columns using a bolt system.
- the bolt system comprises a bolt through the metal post to a steel plate bonded to the back-side of the concrete panel.
- the bolt mechanism acts to prevent the panel from any downward movement during the excavation process. This system does not allow any tolerance on the installation of the columns/soldier piles and requires the soil/earth between the piles-columns to be excavated.
- U.S. Pat. No. 6,220,789 B1 to Richard White discloses a method of constructing an underground building structure without the use of a conventional shoring system.
- the shoring method requires inserting columns into the ground and vertically arranging concrete or shoring panels against the exterior wall columns. Thus the panels vertically exert force on the ground whilst being reinforced with temporary braces. In this technique the panels are not permanently bolted in place.
- a system for lining a perimeter surface of an excavation comprising: the perimeter surface defined by a solid structure; the perimeter surface lined by means of precast concrete panels which are affixed to the solid structure.
- a system for lining a perimeter vertical and horizontal surface of an excavation for the purpose of waterproof tanking including the base floor area; the perimeter surface defined by a solid structure; the perimeter surface lined by means of precast concrete panels which are affixed to the solid structure.
- a method for lining a perimeter surface of an excavation comprising: the perimeter surface defined by a solid structure; the perimeter surface lined by means of precast concrete panels which are affixed to the solid structure.
- the perimeter surface is a vertical surface.
- the perimeter surface is a horizontal surface.
- a top-down method of affixing precast concrete panels to piles including the steps of:
- a bottom-up method for the construction of an underground structure can be used subsequent to the completion of the formation level of the precast concrete panel system affixed to piles; said method including the steps of:
- a top-down method of affixing precast concrete panels to a rock face including the steps of:
- a bottom-up method for the construction of the underground structure can be used subsequent to the completion of the formation level of the precast concrete panel system affixed to rock a face; said method including the steps of:
- a top-down method of affixing precast concrete panels to canopy tubes including the steps of:
- the solid structure is a rock face.
- the solid structure comprises a plurality of columns.
- precast concrete panels are affixed to a front portion of the columns.
- the material in the volume between the columns is not excavated.
- precast concrete panels are arranged with their edges in a juxtaposed relationship.
- an expansion seal, gasket or wall seal system (as described further in this patent application) can be utilized to seal between the adjacent precast concrete panels.
- precast concrete panels adjoin at a location between the columns.
- precast concrete panels adjoin vertically.
- precast concrete panels adjoin horizontally.
- the columns are substantially parallel to each other.
- the columns comprise piles.
- the piles comprise soldier piles.
- the piles comprise of contiguous piles
- the piles comprise of secant piles.
- the piles are comprised of reinforced concrete.
- each pile of the piles is formed by the step of drilling so as to define a tubular cavity followed by the step of inserting reinforcement material into the tubular cavity followed by the step of pouring concrete into the tubular cavity and allowing it to set thereby to construct the pile.
- the columns comprise canopy tubes.
- the canopy tubes are filled with grout.
- the perimeter surface is substantially planar.
- the perimeter surface is substantially curved.
- precast concrete panels are comprised of steel and/or fibre reinforced concrete.
- precast concrete panels are cast in a mould.
- precast concrete panels are cast with a fully covering vertical drainage structure void HDPE mesh.
- the mesh is covered both sides with a geotextile being a composite material that is adhered to the reverse side of the precast concrete panels.
- the reverse side of the precast concrete panels comprising said fully covering vertical drainage structure void HDPE mesh.
- the mesh is covered both sides with a geotextile being a composite material that is positioned against the solid structure to which the precast concrete panels are affixed.
- the precast concrete panels are cast with an encapsulated flexible seal member extending from at least one edge of the precast concrete panels.
- precast concrete panels are affixed to the solid structure by means of rock bolts.
- precast concrete panels are affixed to the solid structure by means of chemical bolts.
- precast concrete panels are affixed to the solid structure by means of mechanical bolts.
- precast concrete panels are affixed in a first step by means of anchors extending beyond the perimeter surface into material located behind the perimeter surface.
- the anchors are deactivated after alternative support structures are implemented.
- the anchors are deactivated after the basement floors are built.
- excavation occurs at a maximum of 2 metre increments.
- precast concrete panels horizontally on the lowest basement and vertically on the perimeter of the structure.
- sealing is performed utilising overlapping seals, expansion seal, gasket or the wall seal system as described further in this application.
- FIG. 1 is a prior art illustration of a conventional pile and shotcrete wall shoring system used for lining excavations.
- the inset FIG. 1B illustrates detail of the piles and intervening shotcrete fill construction.
- FIGS. 2A , B and C illustrate respectively a plan, side and front view a precast concrete panel system applied to piles for the construction of walls lining the perimeter surface of an excavation, in accordance with a first preferred embodiment of the present invention.
- FIG. 3 illustrates, in a first preferred embodiment, a detailed side section view of the piles and precast concrete panel system of FIG. 2 incorporating a drainage system in accordance with a further embodiment.
- FIGS. 4A , B and C illustrate respectively the plan, front and side views of the system of FIG. 2 or FIG. 3 with a joint sealing system in accordance with a further preferred embodiment.
- FIG. 5 shows a side section view of the joint sealing system of FIG. 4 .
- FIGS. 6A , B and C illustrate respectively a plan, side and front view of the system of precast concrete panels affixed directly to a rock face for the construction of walls lining the perimeter surface of an excavation, in accordance with a further preferred embodiment.
- FIG. 7 illustrates an end cross section view of a precast concrete panels system in accordance with a further embodiment affixed to canopy tubes installed in an arch formation for the construction of a tunnel.
- FIG. 8 comprises views as illustrated of a flexible seal system in accordance with a first preferred embodiment applied to adjacent concrete panels
- FIG. 9A comprises a side section detail view of a welded portion of the flexible seal of members of FIG. 8 ;
- FIGS. 9B and 9C comprise a further plan and sectioned end view with enlargements of the flexible seal members of FIG. 8 ;
- FIG. 10 comprises views as illustrated of a flexible seal system in accordance with a second preferred embodiment applied to adjacent concrete panels;
- FIGS. 10A and 10B comprise view of variations of the flexible seal system of FIG. 10 ;
- FIG. 11 comprises views as illustrated of a flexible seal system in accordance with a third preferred embodiment applied to adjacent concrete panels;
- FIG. 11A comprises a side section detail view of a welded portion of the flexible seal of members of FIG. 11
- FIG. 12 illustrates a wall panel arrangement constructed from the embodiments of any one of FIGS. 8 to 11 ;
- FIG. 13 is a diagrammatic arrangement of a methodology for defining a landfill volume
- FIG. 14 illustrates a methodology for defining a landfill volume which can advantageously utilise the wall seal system of any one of FIGS. 8 to 11 ;
- FIG. 15 comprises views as illustrated of a flexible seal system in accordance with a fourth preferred embodiment, applicable to any of the above-described methodologies
- FIG. 16 is a perspective view of an alternative embodiment for sealing adjoined precast concrete panels
- FIG. 17 is a perspective view of a further embodiment of a precast concrete panel incorporating surface cavities.
- Embodiments of the present invention are concerned with the use of precast concrete panels affixed to solid structures to form the interior walls or linings of excavations such as tunnels or underground structures which may be in the form of car parks, train stations and containment cells for contaminated materials.
- components of the system may be used to form a shoring system to facilitate formation of the excavations.
- FIG. 2A there is illustrated a plan view of a first embodiment of the present invention where the solid structures in this instance comprise vertical piles 121 .
- the excavation is built utilizing a precast concrete panel system 100 in this instance by way of a top-down construction method.
- the construction of the underground structure can start using a bottom-up method.
- piles 121 are inserted into the ground at a horizontal spacing 145 around the exterior perimeter 144 of the underground structure 146 to be formed.
- the horizontal spacing 145 between the piles is calculated preferably using the vertical loads and the side loads exerted on the piles.
- a typical, non-limiting spacing is approximately 2-2.5 metres.
- the material directly in front of the piles 121 may be excavated in vertical increments 147 (preferably maximum 2 metres) to avoid ground collapse.
- the rectangular precast concrete panels 122 are affixed, in this instance, to the front portion of two or more piles 121 .
- the precast concrete panels 122 are oriented with their longest dimension parallel to the ground.
- the precast concrete panels 122 may include decorative features. In one form these features may include relief patterns.
- the preferred juxtaposed relationship between precast concrete panels 121 ensures that they vertically adjoin at a region 149 located intermediate the piles.
- the region 149 at no stage is located flush with the front 148 of the piles 121 .
- the preferred method of affixing the precast concrete panels to the piles 21 is by means of bolts 26 passing through the precast concrete panels 122 and into the piles 121 .
- a minimum of 4 bolts 126 is utilised to affix each precast concrete panel 122 to piles 121 .
- a temporary anchor 120 is inserted through a steel plate 123 and driven at an angle into a precast concrete panel 122 .
- the temporary anchor 120 passes through the precast concrete panel 122 and then through the soldier pile 121 to which the precast concrete panel is abutted.
- the temporary anchor 120 then extends into the material 151 located behind the perimeter surface 144 (see FIG. 2B ) thereby to anchor the precast concrete panels 122 into the material 151 .
- There remains a portion of the temporary anchor 120 which protrudes at an angle from the surface of the wall 150 .
- This arrangement provides at least temporary bracing or shoring of the precast concrete panels 122 pending utilisation of alternative forms of bracing or shoring.
- the basement slabs 127 may form the floor of each respective level.
- the slabs 127 are installed sequentially from the lowest level up.
- the floors provide the required bracing or shoring for the precast concrete panel system 100 .
- the relevant temporary anchor 120 may be destressed and the anchor plates 123 and protruding section of the temporary anchor 150 removed.
- the precast concrete panels 122 are cast with a fully covering vertical drainage structure 125 on the reverse side.
- the vertical drainage structure 125 includes either a bi-dimensional or tri-dimensional HDPE mesh void structure, encapsulated by a geotextile fabric.
- the vertical drainage structure 125 may function as a conveyance passage for water and/or gas emissions. In addition, or in the alternative it may be used as a thermal and/or noise insulator.
- FIGS. 4A , B and C and FIG. 5 there is illustrated a second preferred embodiment of the present precast concrete panel system 200 wherein the gaps between the affixed precast concrete panels 122 are sealed using a flexible seal system for provision of a substantially watertight seal between adjacent concrete panels.
- the precast concrete panels are cast with an encapsulated flexible seal member extending from at least one edge of the precast concrete panels.
- the precast concrete panels are constructed from a method comprising pouring concrete into formers moulds; suspending flexible seal members into the concrete prior to its setting such that at least the anchor portion of the flexible seal member is encased within the concrete; The concrete then sets to form a solid concrete panel having one or more flexible seal members anchored therein.
- the concrete panels are arranged in juxtaposed relationship such that an overlap component of a flexible seal member of a first type overlaps at least a portion of a surface component of a flexible seal member of a second type so as to form an elongated weld zone along edges of the juxtaposed concrete panels.
- a welding operation is performed along the length of the elongated weld zone whereby the overlap component of the flexible seal member of the first type is welded to the flexible seal member of the second type substantially along the elongated weld zone thereby to form a substantially water tight flexible seal between the juxtaposed concrete panels.
- the overlap component of the overlap components of the flexible seal members proximate the vertical edge of first and second vertical concrete panels are welded.
- Panels may be stacked on the longitudinal alignment of panels
- one particular form of the wall seal system comprises an F shaped membrane 130 having an overlap component 130 A is anchored into precast concrete panel 122 by means of anchor component 130 B.
- the overlap component 130 A is dimensioned so as to, in use, overlay an external portion of C shaped membrane 131 and to which it is subsequently welded by double weld 132 .
- the C shaped membrane is anchored into the adjacent panel 122 by means of anchor components 131 B.
- a tongue in groove or male/female joint 128 is utilised to position and retain adjacent precast concrete panels 122 in juxtaposed relationship.
- precast concrete panels 122 are fixed in a manner to suit the construction sequence of the underground structure and seek to avoid the male-female interlocking joints 128 from interfering with basement slabs 127 and walls.
- the ground water table is very high partial or full tanking of the underground structure may be required.
- the lowest basement is built using the precast concrete panels 122 placed horizontally.
- the joints 128 between the precast concrete panels may be waterproofed using the Wall Seal System 124 .
- the solid structure illustrated comprises piles 121 arranged in soldier pile format.
- the horizontal spacing between the piles 145 becomes negligible and the solid structure takes the form of contiguous piles 171 .
- a plan view of such an arrangement is shown in FIG. 1D .
- the precast concrete panels 121 may then be affixed directly to the front region 148 of the contiguous piles in a juxtaposed relationship.
- the gaps between the affixed precast concrete panels 122 are sealed using sealing material.
- a flexible seal system (as described elsewhere in the specification) for provision of a substantially watertight seal between adjacent concrete panels may be adopted.
- the fully covering vertical drainage structure void HDPE mesh adhered to the reverse side of the precast concrete panels acts as a drainage system between the contiguous piles and the inner wall.
- the solid structure illustrated is piles 121 .
- the piles 121 may be cast such that they are interlocked and the solid structure takes the form of secant piles (see FIG. 1D ).
- the construction of secant piles involves casting primary (female) piles 172 first with secondary (male) piles 173 , cutting into the primary piles forming a continuous wall.
- the primary and secondary piles may be cast from different concrete.
- the fully covering vertical drainage structure void HDPE mesh adhered to the reverse side of the precast concrete panels acts as the drainage system between the piles and the inner wall.
- precast concrete panel system 300 wherein precast concrete panels 122 are affixed directly to a rock face 133 to line the perimeter surface 144 of an excavation 146 in this instance defined substantially by the rock face 133 .
- the precast concrete panels 122 may be directly affixed to the rock face 133 or rocky ground.
- the preferred method of affixing the precast concrete panels to the rock face 133 is by means of rock bolts 134 passing through the precast concrete panel 122 and into the rock face 133 .
- no temporary anchor bolts are required.
- the rock bolts 134 are used to support the panels 122 in place on a permanent basis.
- FIG. 7 there is illustrated a fourth embodiment of the present precast concrete panel system 400 wherein curved precast concrete panels 135 are affixed to canopy tubes 142 , to line the perimeter surface 144 of an arch formation 152 .
- hollow canopy tubes 142 are driven into material 151 at a distance slightly higher than the perimeter surface 144 of the intended arch formation 152 .
- the canopy tubes 142 are filled with grout 153 and the material 151 directly below is excavated in increments.
- the curved precast concrete panels 135 are affixed to the grout filled canopy tubes, in this instance using stainless steel bolts 136 , as the excavation progresses.
- the curved precast concrete panels 135 may include on the reverse side a fully covered drainage structure which in a preferred form comprises of a biplanar or tri-planar HDPE mesh void structure encapsulated by a geotextile fabric 125 .
- Adjacent curved precast panels 135 may be joined using the flexible seal system 124 described earlier. In preferred forms the flexible seal system 124 acts to form a waterproof joint between adjacent panels 135 .
- the precast concrete panel 122 is defined by surface edges 154 .
- the perimeter of the precast concrete panel 122 near the surface edge 163 is rimmed with a conductor, preferably copper wire positioned beneath a layer of the flexible seal system 124 .
- a through channel 161 is formed communicating from the front side 122 A to the reverse side of the precast concrete panel 122 .
- the edges 154 of two adjacent precast concrete panels 122 may be sealed by electrofusion welding by means of heating the copper wire 165 using the through channel 161 to establish an electrical connection with the copper wire on the reverse side of the precast concrete panel 122 .
- electro conductive welding is utilised to weld both the front layers of the flexible seal system and the reverse side layers of the panels 122 thereby providing a double seal.
- FIG. 17 there is illustrated a perspective view of a further embodiment of a precast concrete panel 122 incorporating cavities 160 .
- the cavities 160 in this instance comprise hollowed out passages through the precast concrete panel from one surface edge 154 to another. These cavities 160 can be used to house services such as electrical and communication cables thereby to facilitate the enclosed transportation of services around the perimeter of the underground structure 146 .
- the flexible seal system 124 described above may take a number of forms when used to assist in sealing any of the above described embodiments. Further examples of the flexible seal system are described below and with reference to FIGS. 8 to 15 .
- the flexible seal system is for sealing the joints between abutting concrete (or other settable material) panels.
- each panel is prepared when cast with flexible seal members of two distinct configurations; a first flexible seal member and a second flexible seal member.
- Both the flexible seal members include at least one anchor component embedded within the concrete and a surface portion which extends over, or overlays, a portion of the outer surface of the panel.
- the first flexible seal member is distinguished from the second flexible seal member in that an overlap portion extends from its surface portion in such a way that the overlap portion extends beyond the edge of the panel.
- first flexible seal system 10 used to create a substantially watertight seal between, in this instance, a first concrete panel 11 and a second concrete panel 12 .
- first flexible seal member 13 proximate a first end of concrete panel 12 .
- First flexible seal member 13 includes a surface component 24 extending over, and anchored into, a surface region 14 first concrete panel 11 .
- the first flexible seal member 13 further includes at least an anchor component formed as legs or elongate flanges 15 A, 15 B which, in this instance project substantially normal from and are cast into the surface region 14 of the first concrete panel 11 , leaving the surface component 24 exposed above surface region 14 .
- the first flexible seal member 13 further includes an overlap component 16 mechanically supported by and extending from the surface component 24 to extend past the end of the concrete panel 11 .
- the first flexible seal member 13 thus described is shown in profile 1 of FIG. 8 .
- the flexible seal system 10 further comprises a second flexible seal member 17 , disposed proximate a second end of an abutting concrete panel 12 , comprising, in this instance, a surface component 18 extending over a portion of the surface region 20 .
- Second flexible seal member further includes an anchor component 19 in this instance in the form of a first leg 19 A and a second leg 19 B projecting preferably substantially at right angles from surface component 18 , The legs 19 A and 19 B are cast into the surface region 20 of second concrete panel 12 in such a way as to anchor surface component 18 reliably into the second concrete panel 12 whilst leaving surface component 18 exposed above surface region 20 .
- the flexible seal members are arranged so that each concrete panel is provided with a first flexible seal member along each of a first pair of contiguous edges and with a second flexible seal member along each of a second pair of contiguous edges.
- first and second flexible seal members provides, in this embodiment, for sealing around both the vertical and horizontal edges of the panel.
- FIG. 9B As shown in the plan view of a concrete panel 11 prepared with the flexible seal system of the invention in FIG. 9B , the ends of the first flexible seal members 13 at their intersection 42 are mitrered and welded to form a watertight continuous seal surface. Similarly, the second flexible seal members 17 at their intersection 44 are mitrered and welded. The junctions 46 between first and second flexible seal members are also mitrered and welded so that there is formed a continuous seal surface at the perimeter of the concrete panel.
- FIG. 9C show the disposition of each of the first and second flexible seal members and their anchor portions relative the opposite edges of the concrete panel.
- the concrete panels of this preferred embodiment may be formed as follows.
- the flexible seal members are prepared in lengths to suit the dimensions of the panel to which they are to be applied and the ends mitrered as described above.
- the first and second flexible seal members are then welded at their intersections to form the continuous seal surface and positioned over formwork for the pouring of the concrete, with the anchor members suspended relative the formwork so as to become embedded within the concrete, and leaving the surface components extending over the surface.
- One the concrete has set; pressure testing of the flexible seal members completes the process.
- Each of the first and second flexible seal members comprises an integral polymer structure.
- first concrete panel 11 and the second concrete panel 12 are juxtaposed in sufficiently close relationship that overlap component 16 or at least a portion of it overlaps a longitudinal length of at least a portion of the surface component 18 as shown in the plan view of FIG. 1 thereby to define a weld zone 21 .
- the surface component extending along an outer surface of the concrete panel with the overlap portion disposed as shown in FIGS. 8 and 9A affords considerable flexibility to the seal of the invention, allowing some movement between two adjacent panels in at least two directions.
- the relatively short distance the anchor components of the two flexible seal members intrude into the concrete allows the flexible seal system of the invention to be used with relatively thin concrete panels. This may be contrasted for example with the arrangement of FR2415693 to Bachy discussed above, in which the arrangement of the flexible seal members require a much greater thickness of panel. It is noted also that the Bachy system creates an inherent weakness in the concrete by the long intrusion likely to lead to cracking.
- the overlap component 16 and surface component 18 are made from a weldable plastics material whereby, following the juxtaposition of the adjacent panels the overlap component 16 is welded along its length to the surface component 18 by means not shown.
- the overlap component of the first flexible seal member is of thinner or more pliable than the anchor components.
- Preferred materials for the flexible seal members 13 , 17 include plastics materials, in particular, plastic materials which have the capacity to stretch and flex and preferably to be welded one to the other.
- Suitable materials include polymers; HDPE; PVC; Teflon and polymer blends. Preferably these materials may be particularly selected and optimized for properties such as elongation, resistance to chemicals, and resistance to heat. Polyethylene and polypropylene are particularly suited for petrochemical applications. PVC or PET may be suited to water applications.
- the same material is used for both the first flexible seal member 13 and the second flexible seal member 17 thereby to assist in homogeneity of the weld (see below).
- a preferred process of welding is thermal fusion welding utilising a modified plastics extruder machine (not shown) that can be hand operated and which extrudes a molten bead of High Elongation resin through a “stepped” die head over an overlapping weld zone 21 .
- the weld zone 21 is prepared via abrasion prior to extrusion welding to remove surface grit and contamination.
- the weld consumable comprises the same material composition as that of the first flexible seal member 13 and second flexible seal member 17 .
- FIG. 9A is a side section view of a preferred form of weld showing the consumable 40 enveloping a beveled edge portion of the overlap component 16 and at least a portion of the surface component 18 .
- each weld is tested for water tightness at the completion of the weld.
- a plexiglass dome provided with a seal around its periphery, is placed over the area to be tested and a partial vacuum created under the dome to show up any imperfections. This testing is facilitated by the ready access available to the overlap component of the first flexible seal member and the bead of welding along the overlap edge.
- a preferred arrangement for the first concrete panel 11 is to have a flexible seal member of the first flexible seal member 13 aligned along a first edge 22 thereof and to have a second flexible seal member 17 aligned along an opposite parallel second edge 23 thereof as illustrated. Panels of like types and flexible seal member arrangements can then be juxtaposed side-by-side in the manner illustrated in the adjacent wall panels plan view of FIG. 8 .
- a preferred distance between edges of adjacent panels is approximately 20 mm and with the opposed anchor component inset approximately 50 mm from an edge of an opposed panel edge with the overlap component extending approximately 130 mm from an edge of the panel into which it is anchored so as to thereby provide a weld zone of around 60 mm and where the face of the surface region of the second flexible seal member over which it extends is of the order of 90 mm in width.
- Typical precast concrete panel or cast in situ panel dimensions can be of the order of 4000 mm ⁇ 2000 mm or as large as 2000 mm ⁇ 6000 mm or as required by the application.
- the panels themselves may be square, rectangular, cruciform, arched or other suitable shapes preferably adapted for adjacent abutting of long edges thereof.
- the flexible seal members are applied on the “inside” of the resulting barrier structure. That is to say on the side abutting the material or liquid which is being retained by the structure.
- first flexible seal member 213 includes a single anchor component 215 subtending from a surface component 24 which, in this instance, then extends integrally to the overlap component 216 .
- FIG. 11 there is illustrated a further embodiment of a flexible seal system 310 where like components are numbered as for the embodiment described with reference to FIG. 8 except in the 300 s series.
- the construction of the flexible seal members 313 , 317 is substantially the same as that for the first embodiment.
- the second flexible seal member is placed as close to an edge of the concrete panel as possible rather than inset 50 mm as was the case with the arrangement of FIG. 8 .
- the extension of the overlap component 316 may be reduced to 75 mm as a result.
- a wall structure 29 is comprised of lower juxtaposed panels 25 , 26 joined at weld zone 30 above which are placed further panels 27 , 28 which are themselves joined at weld zone 31 .
- Upper panel 27 is joined at weld zone 32 to lower panel 25 whilst upper panel 28 is joined to lower panel 26 at weld zone 33 thereby to form a wall structure comprised of four concrete panels.
- the wall panel arrangement of FIG. 12 can be used by way on non-limiting example of a dam wall, tunnel arch, tank farm vertical bund wall, sea wall.
- a fire-resistant/heat-resistant/chemical-resistant/UV-resistant expandable and/or flexible sealant or mastic may be inserted in the gap region between adjacent panels. In some forms this will be for the purpose of providing UV resistance. In other forms it will be for the purpose of providing heat resistance. In some forms this will be particularly for protecting the welded flexible seal.
- FIG. 13 With reference to FIG. 13 there is illustrated a berm 50 traditionally used to define a boundary for a landfill volume.
- An alternative arrangement which permits use of substantially the volume of the berm involves use of a substantially vertical wall structure 51 thereby permitting use of volume 52 that otherwise would be occupied by the berm itself.
- the vertical wall structure 51 is constructed utilising the arrangements described with reference to the earlier embodiments of FIGS. 8 to 12 .
- a preferred system which can be used as part of a landfill system includes:
- a liner may be applied to the filling area 60 .
- a contiguous liner may be applied over the inside face of the wall structure 63 , 65 . . . .
- the concrete panels with the flexible seal system of the invention are used for the sequential erection of a wall defining the boundary of refuse land fill.
- the concrete panels are erected with the flexible seal members on the rear surface of the panels, that is away from refuse land fill.
- the flexible seal member along the lower horizontal edge of the lowermost or first row of panels of the wall is the second flexible seal member described above and designated 17 in FIGS. 8 and 9A .
- a liquid proof seal between the wall and ground cover sheet of the land fill area can then be made by extending the polymer ground sheet of the land fill surface to lie under the foundation or toe of the wall to curve upward and, after the concrete panels are erected, welding the edge of the ground cover sheet to the flexible seal member of the panel.
- FIG. 15 there is illustrated a wall seal system 410 , in accordance with a further preferred embodiment of the invention, wherein like components are numbered as for earlier embodiments, except in the 400 series.
- the overlap component 416 comprises a separate component from the first flexible seal member 413 and the second flexible seal member 417 . Accordingly, in use, the adjacent wall panels 411 , 412 are juxtaposed and then the overlap component 416 is applied so as to overlap at least a portion of both the first flexible seal member 413 and the second flexible seal member 417 , and substantially along the entire length thereof. The overlap component 416 is then welded to both flexible seal members 413 , 417 .
- This embodiment is suited for use in most situations where the previously-described embodiments are applicable.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Geology (AREA)
- Geochemistry & Mineralogy (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Lining And Supports For Tunnels (AREA)
- Panels For Use In Building Construction (AREA)
Abstract
A system for lining a perimeter surface of an excavation; the perimeter surface defined by a solid structure; the perimeter surface lined by means of precast concrete panels which are affixed to the solid structure.
Description
- The present invention relates to a system for the construction of excavations such as underground structures, including but not limited to car parks, train stations or containment cells for contaminated materials. More particularly, although not exclusively, the system comprises lining (and in some instances further including waterproofing) a perimeter surface (which may include horizontal and vertical surfaces) of an excavation with precast (in some instances prestressed and/or post tensioned) concrete panels affixed to solid structures to form a lining in the form of a wall or floor structure.
- Shoring systems are constructed to retain earth and the adjacent structures when a bulk excavation is required. Traditionally, a shoring system comprises piles inserted vertically into the ground at the design spacing around the exterior of the perimeter of a new structure. The area in front and between the piles is excavated in increments (maximum 2.00 meters), which is a time consuming and difficult task. As excavation progresses the piles can be reinforced by bracing with temporary anchors and installing steel dowels between the piles before creating a shotcrete wall interface (see
FIG. 1 ). - Ensuring that permanent underground wall structures and floors remain watertight is not a trivial task. Several methods have been used including; constructing a concrete block wall in front of the piles from the basement up to the ground level, to “hide from view” the water leakages and the uneven surface of the piles and the shotcrete walls. In addition, a vertical geosynthetic drainage strip material can be attached to the rear side of the reinforcing steel dowels prior to shotcreting to provide a direct flow of passage of seepage to the basement prior to pumping it out. In the case where the ground has a particularly high water table, a secant piles wall may be used to provide the tanking of the underground structure.
- WO 2011/009219 A1 to Alfonso Gonzalez, SFS Structures Ltd. discloses the use of precast concrete panels to build a wall in a shoring-free excavation and basement construction apparatus and method. The concrete panels in WO 2011/009219 A1 are moulded with a parabolic cross section and lateral faces of the panels are attached between the piles-columns using a bolt system. The bolt system comprises a bolt through the metal post to a steel plate bonded to the back-side of the concrete panel. The bolt mechanism acts to prevent the panel from any downward movement during the excavation process. This system does not allow any tolerance on the installation of the columns/soldier piles and requires the soil/earth between the piles-columns to be excavated.
- U.S. Pat. No. 6,220,789 B1 to Richard White discloses a method of constructing an underground building structure without the use of a conventional shoring system. The shoring method requires inserting columns into the ground and vertically arranging concrete or shoring panels against the exterior wall columns. Thus the panels vertically exert force on the ground whilst being reinforced with temporary braces. In this technique the panels are not permanently bolted in place.
- Some of the main disadvantages of the traditional shoring method using piles and shotcrete walls are time consuming steps including excavating the earth between the piles and the additional supply and installation of dowel bars. Furthermore, shotcreting is not only time-consuming but also extremely sensitive to inclement weather. The traditional shoring method cannot provide waterproofed walls and strip drains are difficult to install and most of the time inefficient. Generally, the construction of an additional concrete block wall in front of the piles is required to overcome these problems. Overall, the construction of underground structures is a long and complex activity, that is expensive and requires the expertise of tradesmen in areas such as: diggers, steel fixers, shotcreters and brick layers
- It would be advantageous if a system and method could be provided which did not require the participation of multiple trades and yet provided for a means of shoring, even in unstable or water laden ground. It would be further advantageous in at least some forms to provide a waterproofing seal at the soldier pile interface. It would be further advantageous if a system and method could be provided which did not require the construction of additional facades in order to provide a finished, functional lining for the perimeter surface of an excavation.
- It is an object of the present invention to address or at least ameliorate some of the above disadvantages.
- The term “comprising” (and grammatical variations thereof) is used in this specification in the inclusive sense of “having” or “including”, and not in the exclusive sense of “consisting only of”. The above discussion of the prior art in the Background of the invention, is not an admission that any information discussed therein is citable prior art or part of the common general knowledge of persons skilled in the art in any country.
- Accordingly, in one broad form of the invention there is provided a system for lining a perimeter surface of an excavation; the perimeter surface defined by a solid structure; the perimeter surface lined by means of precast concrete panels which are affixed to the solid structure.
- Accordingly, in a further broad form of the invention there is provided a system for lining a perimeter vertical and horizontal surface of an excavation for the purpose of waterproof tanking including the base floor area; the perimeter surface defined by a solid structure; the perimeter surface lined by means of precast concrete panels which are affixed to the solid structure.
- Accordingly, in a further broad form of the invention there is provided a method for lining a perimeter surface of an excavation; the perimeter surface defined by a solid structure; the perimeter surface lined by means of precast concrete panels which are affixed to the solid structure.
- Preferably the perimeter surface is a vertical surface.
- Preferably the perimeter surface is a horizontal surface.
- Accordingly, in yet a further broad form of the invention there is provided a top-down method of affixing precast concrete panels to piles; said method including the steps of:
-
- (a) inserting piles to design depth around the exterior of a design perimeter of an underground structure with a predetermined horizontal pile spacing.
- (b) Excavate in increments.
- (c) Affix precast concrete panels to the piles.
- (d) Install temporary anchors progressively, with the advancement of the excavation and the installation of precast concrete panels.
- (e) Stress the temporary anchors.
- Accordingly, in yet a further broad form of the invention there is provided a bottom-up method for the construction of an underground structure can be used subsequent to the completion of the formation level of the precast concrete panel system affixed to piles; said method including the steps of:
-
- (a) Constructing internal footings, drainage and sewer systems.
- (b) Constructing lift shafts.
- (c) Constructing additional underground structure including basement slabs and wall.
- (d) Progressively destress the relevant temporary anchors and remove the anchor plates and protruding portions of the temporary anchors.
- Accordingly, in yet a further broad form of the invention there is provided a top-down method of affixing precast concrete panels to a rock face; said method including the steps of:
-
- (a) Excavate in increments.
- (b) Affix precast concrete panels to the rock face thereby to line the rock face with the precast concrete panels preparatory to commencing the next increment of excavation.
- Accordingly, in yet a further broad form of the invention there is provided a bottom-up method for the construction of the underground structure can be used subsequent to the completion of the formation level of the precast concrete panel system affixed to rock a face; said method including the steps of:
-
- (a) Constructing internal footings, drainage and sewer systems,
- (b) Constructing lift shafts.
- (c) Constructing underground structure: basement slabs and wall
- Accordingly, in yet a further broad form of the invention there is provided a top-down method of affixing precast concrete panels to canopy tubes; said method including the steps of:
-
- (a) Inserting hollow canopy tubes into soil/earth in an arched formation slightly above the intended arched formation,
- (b) Fill canopy tubes with grout.
- (c) Excavate in increments below the tubes to commence tunnelling.
- (d) Affix precast concrete panels to grout filled canopy tubes
- Preferably the solid structure is a rock face.
- Preferably the solid structure comprises a plurality of columns.
- Preferably the precast concrete panels are affixed to a front portion of the columns.
- Preferably the material in the volume between the columns is not excavated.
- Preferably the precast concrete panels are arranged with their edges in a juxtaposed relationship.
- Preferably an expansion seal, gasket or wall seal system (as described further in this patent application) can be utilized to seal between the adjacent precast concrete panels.
- Preferably the precast concrete panels adjoin at a location between the columns.
- Preferably the precast concrete panels adjoin vertically.
- Preferably the precast concrete panels adjoin horizontally.
- Preferably the columns are substantially parallel to each other.
- Preferably the columns comprise piles.
- Preferably the piles comprise soldier piles.
- Preferably the piles comprise of contiguous piles
- Preferably the piles comprise of secant piles.
- Preferably the piles are comprised of reinforced concrete.
- Preferably each pile of the piles is formed by the step of drilling so as to define a tubular cavity followed by the step of inserting reinforcement material into the tubular cavity followed by the step of pouring concrete into the tubular cavity and allowing it to set thereby to construct the pile.
- Preferably the columns comprise canopy tubes.
- Preferably the canopy tubes are filled with grout.
- Preferably the perimeter surface is substantially planar.
- Preferably the perimeter surface is substantially curved.
- Preferably the precast concrete panels are comprised of steel and/or fibre reinforced concrete.
- Preferably the precast concrete panels are cast in a mould.
- Preferably the precast concrete panels are cast with a fully covering vertical drainage structure void HDPE mesh.
- In a preferred form the mesh is covered both sides with a geotextile being a composite material that is adhered to the reverse side of the precast concrete panels.
- Preferably the reverse side of the precast concrete panels comprising said fully covering vertical drainage structure void HDPE mesh.
- In a preferred form the mesh is covered both sides with a geotextile being a composite material that is positioned against the solid structure to which the precast concrete panels are affixed.
- Preferably the precast concrete panels are cast with an encapsulated flexible seal member extending from at least one edge of the precast concrete panels.
- Preferably the precast concrete panels are affixed to the solid structure by means of rock bolts.
- Preferably the precast concrete panels are affixed to the solid structure by means of chemical bolts.
- Preferably the precast concrete panels are affixed to the solid structure by means of mechanical bolts.
- Preferably the precast concrete panels are affixed in a first step by means of anchors extending beyond the perimeter surface into material located behind the perimeter surface.
- Preferably the anchors are deactivated after alternative support structures are implemented.
- Preferably the anchors are deactivated after the basement floors are built.
- Preferably excavation occurs at a maximum of 2 metre increments.
- Preferably if tanking of the underground structure is required, install the precast concrete panels horizontally on the lowest basement and vertically on the perimeter of the structure.
- Preferably there is a further step of sealing all joints between adjacent panels.
- Preferably sealing is performed utilising overlapping seals, expansion seal, gasket or the wall seal system as described further in this application.
- Embodiments of the present invention will now be described with reference to the accompanying drawings wherein:
-
FIG. 1 , is a prior art illustration of a conventional pile and shotcrete wall shoring system used for lining excavations. The insetFIG. 1B illustrates detail of the piles and intervening shotcrete fill construction. -
FIGS. 2A , B and C, illustrate respectively a plan, side and front view a precast concrete panel system applied to piles for the construction of walls lining the perimeter surface of an excavation, in accordance with a first preferred embodiment of the present invention. -
FIG. 3 illustrates, in a first preferred embodiment, a detailed side section view of the piles and precast concrete panel system ofFIG. 2 incorporating a drainage system in accordance with a further embodiment. -
FIGS. 4A , B and C illustrate respectively the plan, front and side views of the system ofFIG. 2 orFIG. 3 with a joint sealing system in accordance with a further preferred embodiment. -
FIG. 5 shows a side section view of the joint sealing system ofFIG. 4 . -
FIGS. 6A , B and C, illustrate respectively a plan, side and front view of the system of precast concrete panels affixed directly to a rock face for the construction of walls lining the perimeter surface of an excavation, in accordance with a further preferred embodiment. -
FIG. 7 illustrates an end cross section view of a precast concrete panels system in accordance with a further embodiment affixed to canopy tubes installed in an arch formation for the construction of a tunnel. -
FIG. 8 comprises views as illustrated of a flexible seal system in accordance with a first preferred embodiment applied to adjacent concrete panels; -
FIG. 9A comprises a side section detail view of a welded portion of the flexible seal of members ofFIG. 8 ; -
FIGS. 9B and 9C comprise a further plan and sectioned end view with enlargements of the flexible seal members ofFIG. 8 ; -
FIG. 10 comprises views as illustrated of a flexible seal system in accordance with a second preferred embodiment applied to adjacent concrete panels; -
FIGS. 10A and 10B comprise view of variations of the flexible seal system ofFIG. 10 ; -
FIG. 11 comprises views as illustrated of a flexible seal system in accordance with a third preferred embodiment applied to adjacent concrete panels; -
FIG. 11A comprises a side section detail view of a welded portion of the flexible seal of members ofFIG. 11 -
FIG. 12 illustrates a wall panel arrangement constructed from the embodiments of any one ofFIGS. 8 to 11 ; -
FIG. 13 is a diagrammatic arrangement of a methodology for defining a landfill volume; -
FIG. 14 illustrates a methodology for defining a landfill volume which can advantageously utilise the wall seal system of any one ofFIGS. 8 to 11 ; -
FIG. 15 comprises views as illustrated of a flexible seal system in accordance with a fourth preferred embodiment, applicable to any of the above-described methodologies -
FIG. 16 is a perspective view of an alternative embodiment for sealing adjoined precast concrete panels, -
FIG. 17 is a perspective view of a further embodiment of a precast concrete panel incorporating surface cavities. - Embodiments of the present invention are concerned with the use of precast concrete panels affixed to solid structures to form the interior walls or linings of excavations such as tunnels or underground structures which may be in the form of car parks, train stations and containment cells for contaminated materials. In one form components of the system may be used to form a shoring system to facilitate formation of the excavations.
- With reference to
FIG. 2A , there is illustrated a plan view of a first embodiment of the present invention where the solid structures in this instance comprisevertical piles 121. - In this preferred embodiment, the excavation is built utilizing a precast
concrete panel system 100 in this instance by way of a top-down construction method. Once the formation of the excavation has been achieved, the construction of the underground structure can start using a bottom-up method. - In the first embodiment of the precast
concrete panels system 100piles 121 are inserted into the ground at ahorizontal spacing 145 around theexterior perimeter 144 of theunderground structure 146 to be formed. In preferred forms thehorizontal spacing 145 between the piles is calculated preferably using the vertical loads and the side loads exerted on the piles. A typical, non-limiting spacing is approximately 2-2.5 metres. - With reference to
FIG. 2C , in the first preferred embodiment, the material directly in front of thepiles 121 may be excavated in vertical increments 147 (preferably maximum 2 metres) to avoid ground collapse. At each excavatedvertical increment 147, the rectangular precastconcrete panels 122 are affixed, in this instance, to the front portion of two ormore piles 121. In a preferred form the precastconcrete panels 122 are oriented with their longest dimension parallel to the ground. In another form the precastconcrete panels 122 may include decorative features. In one form these features may include relief patterns. - With reference to
FIG. 2C , the preferred juxtaposed relationship between precastconcrete panels 121 ensures that they vertically adjoin at aregion 149 located intermediate the piles. In a preferred form there may be a gap, for example of up to 20 mm, between adjacent precast concrete panels. In this embodiment theregion 149 at no stage is located flush with thefront 148 of thepiles 121. - In this instance the preferred method of affixing the precast concrete panels to the
piles 21 is by means ofbolts 26 passing through the precastconcrete panels 122 and into thepiles 121. In a particular preferred form, a minimum of 4bolts 126 is utilised to affix each precastconcrete panel 122 topiles 121. - In a preferred embodiment, a
temporary anchor 120 is inserted through asteel plate 123 and driven at an angle into a precastconcrete panel 122. In a preferred form thetemporary anchor 120 passes through the precastconcrete panel 122 and then through thesoldier pile 121 to which the precast concrete panel is abutted. Thetemporary anchor 120 then extends into thematerial 151 located behind the perimeter surface 144 (seeFIG. 2B ) thereby to anchor the precastconcrete panels 122 into thematerial 151. There remains a portion of thetemporary anchor 120 which protrudes at an angle from the surface of the wall 150. This arrangement provides at least temporary bracing or shoring of the precastconcrete panels 122 pending utilisation of alternative forms of bracing or shoring. - In a preferred embodiment, the
basement slabs 127 may form the floor of each respective level. Theslabs 127 are installed sequentially from the lowest level up. The floors provide the required bracing or shoring for the precastconcrete panel system 100. As each floor is installed the relevanttemporary anchor 120 may be destressed and theanchor plates 123 and protruding section of the temporary anchor 150 removed. - In a preferred embodiment, the precast
concrete panels 122 are cast with a fully coveringvertical drainage structure 125 on the reverse side. Thevertical drainage structure 125 includes either a bi-dimensional or tri-dimensional HDPE mesh void structure, encapsulated by a geotextile fabric. Thevertical drainage structure 125 may function as a conveyance passage for water and/or gas emissions. In addition, or in the alternative it may be used as a thermal and/or noise insulator. - With reference to
FIGS. 4A , B and C andFIG. 5 there is illustrated a second preferred embodiment of the present precastconcrete panel system 200 wherein the gaps between the affixed precastconcrete panels 122 are sealed using a flexible seal system for provision of a substantially watertight seal between adjacent concrete panels. - In a preferred embodiment the precast concrete panels are cast with an encapsulated flexible seal member extending from at least one edge of the precast concrete panels.
- In this second preferred embodiment the precast concrete panels are constructed from a method comprising pouring concrete into formers moulds; suspending flexible seal members into the concrete prior to its setting such that at least the anchor portion of the flexible seal member is encased within the concrete; The concrete then sets to form a solid concrete panel having one or more flexible seal members anchored therein.
- The concrete panels are arranged in juxtaposed relationship such that an overlap component of a flexible seal member of a first type overlaps at least a portion of a surface component of a flexible seal member of a second type so as to form an elongated weld zone along edges of the juxtaposed concrete panels. A welding operation is performed along the length of the elongated weld zone whereby the overlap component of the flexible seal member of the first type is welded to the flexible seal member of the second type substantially along the elongated weld zone thereby to form a substantially water tight flexible seal between the juxtaposed concrete panels. The overlap component of the overlap components of the flexible seal members proximate the vertical edge of first and second vertical concrete panels are welded. Panels may be stacked on the longitudinal alignment of panels
- With reference to inset
FIG. 5 one particular form of the wall seal system comprises an F shapedmembrane 130 having an overlap component 130A is anchored into precastconcrete panel 122 by means of anchor component 130B. The overlap component 130A is dimensioned so as to, in use, overlay an external portion of C shaped membrane 131 and to which it is subsequently welded by double weld 132. The C shaped membrane is anchored into theadjacent panel 122 by means of anchor components 131B. - In this instance a tongue in groove or male/female joint 128 is utilised to position and retain adjacent precast
concrete panels 122 in juxtaposed relationship. - In one form the precast
concrete panels 122 are fixed in a manner to suit the construction sequence of the underground structure and seek to avoid the male-female interlocking joints 128 from interfering withbasement slabs 127 and walls. - In an instance where the ground water table is very high partial or full tanking of the underground structure may be required. In this case the lowest basement is built using the precast
concrete panels 122 placed horizontally. Thejoints 128 between the precast concrete panels may be waterproofed using theWall Seal System 124. - Further examples of the
wall seal system 124 which may be applied to any of the described above embodiments, are described later in this specification. - In the precast
concrete panels system 200 shown inFIG. 4A the solid structure illustrated comprisespiles 121 arranged in soldier pile format. In a further preferred embodiment the horizontal spacing between thepiles 145 becomes negligible and the solid structure takes the form ofcontiguous piles 171. A plan view of such an arrangement is shown inFIG. 1D . The precastconcrete panels 121 may then be affixed directly to thefront region 148 of the contiguous piles in a juxtaposed relationship. In preferred forms the gaps between the affixed precastconcrete panels 122 are sealed using sealing material. In a particular preferred form, a flexible seal system (as described elsewhere in the specification) for provision of a substantially watertight seal between adjacent concrete panels may be adopted. In this instance the fully covering vertical drainage structure void HDPE mesh adhered to the reverse side of the precast concrete panels acts as a drainage system between the contiguous piles and the inner wall. - In the precast
concrete panels system 200 shown inFIG. 4A the solid structure illustrated ispiles 121. In a further preferred embodiment, where thematerial 151 has a high water table, thepiles 121 may be cast such that they are interlocked and the solid structure takes the form of secant piles (seeFIG. 1D ). The construction of secant piles involves casting primary (female) piles 172 first with secondary (male) piles 173, cutting into the primary piles forming a continuous wall. In one form the primary and secondary piles may be cast from different concrete. In this instance the fully covering vertical drainage structure void HDPE mesh adhered to the reverse side of the precast concrete panels acts as the drainage system between the piles and the inner wall. - With reference to
FIGS. 6A , B and C there is illustrated a third preferred embodiment of the present precastconcrete panel system 300 wherein precastconcrete panels 122 are affixed directly to arock face 133 to line theperimeter surface 144 of anexcavation 146 in this instance defined substantially by therock face 133. - In this embodiment, particularly where the
perimeter surface 144 of an excavation is too dense to insert any additional solid fixtures, the precastconcrete panels 122 may be directly affixed to therock face 133 or rocky ground. In this instance, the preferred method of affixing the precast concrete panels to therock face 133 is by means ofrock bolts 134 passing through the precastconcrete panel 122 and into therock face 133. In this instance, no temporary anchor bolts are required. In a preferred form, therock bolts 134 are used to support thepanels 122 in place on a permanent basis. - With reference to
FIG. 7 , there is illustrated a fourth embodiment of the present precastconcrete panel system 400 wherein curved precastconcrete panels 135 are affixed tocanopy tubes 142, to line theperimeter surface 144 of anarch formation 152. - In the fourth preferred embodiment
hollow canopy tubes 142 are driven intomaterial 151 at a distance slightly higher than theperimeter surface 144 of the intendedarch formation 152. Thecanopy tubes 142 are filled with grout 153 and thematerial 151 directly below is excavated in increments. The curved precastconcrete panels 135 are affixed to the grout filled canopy tubes, in this instance usingstainless steel bolts 136, as the excavation progresses. - In a preferred embodiment, the curved precast
concrete panels 135 may include on the reverse side a fully covered drainage structure which in a preferred form comprises of a biplanar or tri-planar HDPE mesh void structure encapsulated by ageotextile fabric 125. Adjacent curvedprecast panels 135 may be joined using theflexible seal system 124 described earlier. In preferred forms theflexible seal system 124 acts to form a waterproof joint betweenadjacent panels 135. - With reference to
FIG. 16 , there is illustrated a perspective view of an alternative embodiment for sealing the reverse side of adjacent precast concrete panels. The precastconcrete panel 122 is defined by surface edges 154. In this instance the perimeter of the precastconcrete panel 122 near thesurface edge 163 is rimmed with a conductor, preferably copper wire positioned beneath a layer of theflexible seal system 124. A throughchannel 161 is formed communicating from thefront side 122A to the reverse side of the precastconcrete panel 122. Theedges 154 of two adjacent precastconcrete panels 122 may be sealed by electrofusion welding by means of heating thecopper wire 165 using the throughchannel 161 to establish an electrical connection with the copper wire on the reverse side of the precastconcrete panel 122. In a particular preferred form electro conductive welding is utilised to weld both the front layers of the flexible seal system and the reverse side layers of thepanels 122 thereby providing a double seal. - With reference to
FIG. 17 , there is illustrated a perspective view of a further embodiment of a precastconcrete panel 122 incorporatingcavities 160. Thecavities 160 in this instance comprise hollowed out passages through the precast concrete panel from onesurface edge 154 to another. Thesecavities 160 can be used to house services such as electrical and communication cables thereby to facilitate the enclosed transportation of services around the perimeter of theunderground structure 146. - The
flexible seal system 124 described above may take a number of forms when used to assist in sealing any of the above described embodiments. Further examples of the flexible seal system are described below and with reference toFIGS. 8 to 15 . - The flexible seal system is for sealing the joints between abutting concrete (or other settable material) panels. In each of the below described embodiments, each panel is prepared when cast with flexible seal members of two distinct configurations; a first flexible seal member and a second flexible seal member. Both the flexible seal members include at least one anchor component embedded within the concrete and a surface portion which extends over, or overlays, a portion of the outer surface of the panel. The first flexible seal member is distinguished from the second flexible seal member in that an overlap portion extends from its surface portion in such a way that the overlap portion extends beyond the edge of the panel.
- With reference to
FIG. 8 , there is illustrated a first embodiment of aflexible seal system 10 used to create a substantially watertight seal between, in this instance, a firstconcrete panel 11 and a secondconcrete panel 12. As shown in the plan view there is a firstflexible seal member 13 proximate a first end ofconcrete panel 12. Firstflexible seal member 13 includes a surface component 24 extending over, and anchored into, asurface region 14 firstconcrete panel 11. In this instance the firstflexible seal member 13 further includes at least an anchor component formed as legs orelongate flanges surface region 14 of the firstconcrete panel 11, leaving the surface component 24 exposed abovesurface region 14. Each of thelegs flexible seal member 13 further includes anoverlap component 16 mechanically supported by and extending from the surface component 24 to extend past the end of theconcrete panel 11. The firstflexible seal member 13 thus described is shown inprofile 1 ofFIG. 8 . - The
flexible seal system 10 further comprises a secondflexible seal member 17, disposed proximate a second end of an abuttingconcrete panel 12, comprising, in this instance, asurface component 18 extending over a portion of thesurface region 20. Second flexible seal member further includes an anchor component 19 in this instance in the form of afirst leg 19A and asecond leg 19B projecting preferably substantially at right angles fromsurface component 18, Thelegs surface region 20 of secondconcrete panel 12 in such a way as to anchorsurface component 18 reliably into the secondconcrete panel 12 whilst leavingsurface component 18 exposed abovesurface region 20. - The flexible seal members are arranged so that each concrete panel is provided with a first flexible seal member along each of a first pair of contiguous edges and with a second flexible seal member along each of a second pair of contiguous edges. Thus the differences between the first and second flexible seal members provides, in this embodiment, for sealing around both the vertical and horizontal edges of the panel.
- As shown in the plan view of a
concrete panel 11 prepared with the flexible seal system of the invention inFIG. 9B , the ends of the firstflexible seal members 13 at theirintersection 42 are mitrered and welded to form a watertight continuous seal surface. Similarly, the secondflexible seal members 17 at their intersection 44 are mitrered and welded. Thejunctions 46 between first and second flexible seal members are also mitrered and welded so that there is formed a continuous seal surface at the perimeter of the concrete panel. The cross sectioned view and enlargements ofFIG. 9C show the disposition of each of the first and second flexible seal members and their anchor portions relative the opposite edges of the concrete panel. - The concrete panels of this preferred embodiment may be formed as follows. The flexible seal members are prepared in lengths to suit the dimensions of the panel to which they are to be applied and the ends mitrered as described above. The first and second flexible seal members are then welded at their intersections to form the continuous seal surface and positioned over formwork for the pouring of the concrete, with the anchor members suspended relative the formwork so as to become embedded within the concrete, and leaving the surface components extending over the surface. One the concrete has set; pressure testing of the flexible seal members completes the process.
- Each of the first and second flexible seal members comprises an integral polymer structure. In use the first
concrete panel 11 and the secondconcrete panel 12 are juxtaposed in sufficiently close relationship that overlapcomponent 16 or at least a portion of it overlaps a longitudinal length of at least a portion of thesurface component 18 as shown in the plan view ofFIG. 1 thereby to define aweld zone 21. - It should be noted that the surface component extending along an outer surface of the concrete panel with the overlap portion disposed as shown in
FIGS. 8 and 9A , affords considerable flexibility to the seal of the invention, allowing some movement between two adjacent panels in at least two directions. Moreover, the relatively short distance the anchor components of the two flexible seal members intrude into the concrete allows the flexible seal system of the invention to be used with relatively thin concrete panels. This may be contrasted for example with the arrangement of FR2415693 to Bachy discussed above, in which the arrangement of the flexible seal members require a much greater thickness of panel. It is noted also that the Bachy system creates an inherent weakness in the concrete by the long intrusion likely to lead to cracking. - The
overlap component 16 andsurface component 18 are made from a weldable plastics material whereby, following the juxtaposition of the adjacent panels theoverlap component 16 is welded along its length to thesurface component 18 by means not shown. Preferably, the overlap component of the first flexible seal member is of thinner or more pliable than the anchor components. - Preferred materials for the
flexible seal members - Suitable materials include polymers; HDPE; PVC; Teflon and polymer blends. Preferably these materials may be particularly selected and optimized for properties such as elongation, resistance to chemicals, and resistance to heat. Polyethylene and polypropylene are particularly suited for petrochemical applications. PVC or PET may be suited to water applications.
- Preferably the same material is used for both the first
flexible seal member 13 and the secondflexible seal member 17 thereby to assist in homogeneity of the weld (see below). - A preferred process of welding is thermal fusion welding utilising a modified plastics extruder machine (not shown) that can be hand operated and which extrudes a molten bead of High Elongation resin through a “stepped” die head over an overlapping
weld zone 21. Preferably theweld zone 21 is prepared via abrasion prior to extrusion welding to remove surface grit and contamination. - In preferred forms the weld consumable comprises the same material composition as that of the first
flexible seal member 13 and secondflexible seal member 17. AtFIG. 9A is a side section view of a preferred form of weld showing the consumable 40 enveloping a beveled edge portion of theoverlap component 16 and at least a portion of thesurface component 18. - Preferably, each weld is tested for water tightness at the completion of the weld. In a preferred method, after preparing the seal to be tested with a suitable liquid, a plexiglass dome, provided with a seal around its periphery, is placed over the area to be tested and a partial vacuum created under the dome to show up any imperfections. This testing is facilitated by the ready access available to the overlap component of the first flexible seal member and the bead of welding along the overlap edge.
- With reference to the wall panel plan view of
FIG. 8 a preferred arrangement for the firstconcrete panel 11 is to have a flexible seal member of the firstflexible seal member 13 aligned along afirst edge 22 thereof and to have a secondflexible seal member 17 aligned along an opposite parallelsecond edge 23 thereof as illustrated. Panels of like types and flexible seal member arrangements can then be juxtaposed side-by-side in the manner illustrated in the adjacent wall panels plan view ofFIG. 8 . In this embodiment a preferred distance between edges of adjacent panels is approximately 20 mm and with the opposed anchor component inset approximately 50 mm from an edge of an opposed panel edge with the overlap component extending approximately 130 mm from an edge of the panel into which it is anchored so as to thereby provide a weld zone of around 60 mm and where the face of the surface region of the second flexible seal member over which it extends is of the order of 90 mm in width. - Typical precast concrete panel or cast in situ panel dimensions can be of the order of 4000 mm×2000 mm or as large as 2000 mm×6000 mm or as required by the application. The panels themselves may be square, rectangular, cruciform, arched or other suitable shapes preferably adapted for adjacent abutting of long edges thereof.
- In preferred forms the flexible seal members are applied on the “inside” of the resulting barrier structure. That is to say on the side abutting the material or liquid which is being retained by the structure.
- With reference to
FIG. 10 there is illustrated a further embodiment of aflexible seal system 210 wherein like components are numbered as for the first embodiment described with reference toFIG. 8 except in the 200 s series. In this instance firstflexible seal member 213 includes asingle anchor component 215 subtending from a surface component 24 which, in this instance, then extends integrally to theoverlap component 216. - The overlaps of the arrangement of
FIG. 10 are approximately the same as for the arrangement ofFIG. 8 . - With reference to
FIG. 11 there is illustrated a further embodiment of aflexible seal system 310 where like components are numbered as for the embodiment described with reference toFIG. 8 except in the 300 s series. The construction of theflexible seal members FIG. 8 . Correspondingly the extension of theoverlap component 316 may be reduced to 75 mm as a result. - As shown in
FIG. 12 further panels can then be stacked on the initial longitudinal alignment of panels and joined by welds along all four edges to create a wall structure of substantially any length and any height. In this instance awall structure 29 is comprised of lowerjuxtaposed panels weld zone 30 above which are placedfurther panels weld zone 31.Upper panel 27 is joined atweld zone 32 tolower panel 25 whilstupper panel 28 is joined tolower panel 26 at weld zone 33 thereby to form a wall structure comprised of four concrete panels. - The wall panel arrangement of
FIG. 12 can be used by way on non-limiting example of a dam wall, tunnel arch, tank farm vertical bund wall, sea wall. - In addition, in respect of any one of the above described embodiments, a fire-resistant/heat-resistant/chemical-resistant/UV-resistant expandable and/or flexible sealant or mastic may be inserted in the gap region between adjacent panels. In some forms this will be for the purpose of providing UV resistance. In other forms it will be for the purpose of providing heat resistance. In some forms this will be particularly for protecting the welded flexible seal.
- The above described system of any previous embodiments including those of
FIGS. 1 to 7 can be utilised as part of a methodology to reclaim landfill volume. - With reference to
FIG. 13 there is illustrated aberm 50 traditionally used to define a boundary for a landfill volume. - An alternative arrangement which permits use of substantially the volume of the berm involves use of a substantially
vertical wall structure 51 thereby permitting use ofvolume 52 that otherwise would be occupied by the berm itself. - Advantageously, the
vertical wall structure 51 is constructed utilising the arrangements described with reference to the earlier embodiments ofFIGS. 8 to 12 . - With reference to
FIG. 14 , a preferred system which can be used as part of a landfill system includes: -
- (a) defining a substantially
flat filling area 60 defined in part by at least afar edge region 61 separated from anear edge region 62 - (b) constructing a first substantially
vertical wall structure 63 from concrete panels to a first panel height h1 substantially along thefar edge region 61 - (c) placing
landfill 64 up to the level of the first panel height h1 - (d) constructing a substantially vertical
second wall structure 65 along top edges of the first substantiallyvertical wall structure 63 to a second panel height h2 - (e) placing
landfill 66 to the level of the second panel height h2. The process may be continued as necessary until a desired maximum wall height hn is achieved.
- (a) defining a substantially
- In some applications a liner may be applied to the filling
area 60. In some applications a contiguous liner may be applied over the inside face of thewall structure - Applications for embodiments of the invention described above include, but not are limited to:
-
- (a) Water retained structures
- (b) Hydraulic barrier structures such as sea walls or cut off walls
- (c) Chemical spill barrier structures in tankfarm bundwall storages
- (d) Retaining wall barriers
- (e) Waterproofing of the low grade concrete structures
- (f) Waterproofing of tunnel arch structures
- (g) Volume capacity reclaiming structures for landfills
- In a preferred arrangement in which the concrete panels with the flexible seal system of the invention are used for the sequential erection of a wall defining the boundary of refuse land fill, the concrete panels are erected with the flexible seal members on the rear surface of the panels, that is away from refuse land fill. In this arrangement, the flexible seal member along the lower horizontal edge of the lowermost or first row of panels of the wall, is the second flexible seal member described above and designated 17 in
FIGS. 8 and 9A . A liquid proof seal between the wall and ground cover sheet of the land fill area can then be made by extending the polymer ground sheet of the land fill surface to lie under the foundation or toe of the wall to curve upward and, after the concrete panels are erected, welding the edge of the ground cover sheet to the flexible seal member of the panel. - With reference to
FIG. 15 , there is illustrated awall seal system 410, in accordance with a further preferred embodiment of the invention, wherein like components are numbered as for earlier embodiments, except in the 400 series. - In this instance, the
overlap component 416 comprises a separate component from the firstflexible seal member 413 and the secondflexible seal member 417. Accordingly, in use, theadjacent wall panels overlap component 416 is applied so as to overlap at least a portion of both the firstflexible seal member 413 and the secondflexible seal member 417, and substantially along the entire length thereof. Theoverlap component 416 is then welded to bothflexible seal members - This embodiment is suited for use in most situations where the previously-described embodiments are applicable.
Claims (21)
1.-66. (canceled)
67. A lined barrier system for supporting and lining a perimeter surface of an excavation; said system comprising in combination a plurality of support columns and a flexible seal system; the perimeter surface supported by and defined by a solid structure in the form of the support columns; the perimeter surface lined by means of precast concrete panels which are affixed to the support columns; gaps between adjacent concrete panels sealed by the flexible seal system; the flexible seal system including a flexible seal member of a first type and a flexible seal member of a second type in which an overlap component of the flexible seal member of the first type overlaps a portion of a surface component of the flexible seal member of the second type to form an elongated weld zone along edges of juxtaposed concrete panels; the overlap component welded to the portion of the surface component to form a substantially watertight flexible seal between the concrete panels and thereby to form a sealed lining in combination with the support columns.
68. The system of claim 67 wherein the precast concrete panels are affixed to a front portion of the columns.
69. The system of claim 67 wherein material in the volume between the columns is not excavated.
70. The system of claim 67 wherein the precast concrete panels are arranged with their edges in a juxtaposed relationship.
71. The system of claim 67 wherein the precast concrete panels adjoin at a location between the columns.
72. The system of claim 67 wherein the precast concrete panels adjoin vertically.
73. The system of claim 67 where the precast concrete panels adjoin horizontally.
74. The system of claim 67 wherein the columns are substantially parallel to each other.
75. The system of claim 67 wherein the columns comprise piles.
76. The system of claim 75 wherein the piles comprise soldier piles.
77. The system of claim 75 wherein the piles comprise of contiguous piles
78. The system of claim 75 wherein the piles comprise of secant piles.
79. The system of claim 75 wherein the piles are comprised of reinforced concrete.
80. The system of claim 75 wherein each pile of the piles is formed by the step of drilling so as to define a tubular cavity followed by the step of inserting reinforcement material into the tubular cavity followed by the step of pouring concrete into the tubular cavity and allowing it to set thereby to construct the pile.
81. The system of claim 75 wherein the columns comprise canopy tubes.
82. A sealed barrier method for creating a substantially watertight lined barrier for a perimeter surface of an excavation; the perimeter surface supported by and defined by a solid structure in the form of support columns in combination with precast concrete panels of a flexible sealing system; the perimeter surface lined by means of precast concrete panels which are affixed to the support columns; gaps between adjacent precast concrete panels sealed by the flexible seal system; the flexible seal system including a flexible seal member of a first type and a flexible seal member of a second type in which an overlap component of the flexible seal member of the first type overlaps a portion of a surface component of the flexible seal member of the second type to form an elongated weld zone along edges of juxtaposed concrete panels; the overlap component welded to the portion of the surface component to form a substantially watertight flexible seal between the precast concrete panels and thereby to form a sealed lining in combination with the support columns.
83. The method of claim 82 wherein the precast concrete panels are affixed to a front portion of the columns.
84. The method of claim 82 wherein material in the volume between the columns is not excavated.
85. The method of claim 82 wherein the precast concrete panels are arranged with their edges in a juxtaposed relationship.
86. The lined barrier system of claim 67 constructed according to a top-down method of affixing precast concrete panels to columns or piles; said method including the steps of:
a) Inserting columns or piles to design depth around the exterior of a design perimeter of an underground structure with a predetermined horizontal column or pile spacing.
b) Excavate in increments
c) Permanently affix precast concrete panels to the columns or piles
d) Install temporary anchors progressively, with the advancement of the excavation and the installation of precast concrete panels.
e) Stress the temporary anchors, and
wherein gaps between adjacent concrete panels are sealed by the flexible seal system; the flexible seal system including the flexible seal member of the first type and the flexible seal member of the second type in which an overlap component of the flexible seal member of the first type overlaps a portion of a surface component of the flexible seal member of the second type to form the elongated weld zone along edges of juxtaposed concrete panels; the overlap component welded to the portion of the surface component to form a substantially watertight flexible seal between the concrete panels.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2016204976 | 2016-07-15 | ||
AU2016204976A AU2016204976A1 (en) | 2016-07-15 | 2016-07-15 | Precast Concrete Panels used as Surface Lining of Perimeter Surfaces of Excavations |
PCT/AU2017/000148 WO2018009958A1 (en) | 2016-07-15 | 2017-07-13 | Precast concrete panels used as surface lining of perimeter surfaces of excavations |
Publications (1)
Publication Number | Publication Date |
---|---|
US20190309497A1 true US20190309497A1 (en) | 2019-10-10 |
Family
ID=60951576
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US16/317,717 Abandoned US20190309497A1 (en) | 2016-07-15 | 2017-07-13 | Precast Concrete Panels Used as Surface Lining of Perimeter Surfaces of Excavations |
Country Status (4)
Country | Link |
---|---|
US (1) | US20190309497A1 (en) |
EP (1) | EP3485143B1 (en) |
AU (2) | AU2016204976A1 (en) |
WO (1) | WO2018009958A1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111636441A (en) * | 2020-07-02 | 2020-09-08 | 福建省永泰建筑工程公司 | Deep foundation pit supporting structure and construction method thereof |
CN112922028A (en) * | 2021-02-02 | 2021-06-08 | 中铁四局集团有限公司 | Construction method suitable for oversized circular subway station |
CN113338305A (en) * | 2021-06-30 | 2021-09-03 | 广东省构建工程建设有限公司 | Internal support structure for underground structure and construction method thereof |
US11384502B2 (en) * | 2019-07-24 | 2022-07-12 | Qingdao university of technology | Concrete inside interface processing structure and method for secant pile construction |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110835917A (en) * | 2019-10-23 | 2020-02-25 | 江苏兴厦建设工程集团有限公司 | Multidirectional rotary-spraying stirring straight-inclined alternating supporting structure and supporting method |
CN111255462B (en) * | 2020-01-15 | 2021-05-18 | 中铁七局集团有限公司 | Pipe curtain cover excavation top-down construction method for subway station construction |
CN113174964A (en) * | 2021-05-06 | 2021-07-27 | 哈尔滨工业大学 | Frame-suspension pile supporting structure system for protecting subway tunnel and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4653962A (en) * | 1985-10-17 | 1987-03-31 | The Reinforced Earth Company | Retaining wall construction and method of manufacture |
US4836718A (en) * | 1988-03-21 | 1989-06-06 | Schnabel Foundation Company | Earth retaining method and structure with improved corrosion protection and drainage |
US5558470A (en) * | 1992-10-09 | 1996-09-24 | Jte, Inc. | System and method for adjustably anchoring traffic barriers and wall facing panels to the soldier beams of a wall |
JP2006322222A (en) * | 2005-05-19 | 2006-11-30 | Metropolitan Expressway Public Corp | Construction method of large section tunnel |
AU2013206618B1 (en) * | 2013-06-28 | 2014-10-09 | Mark Robert Edmund Curtis | Wall Seal System |
US20150086278A1 (en) * | 2013-09-25 | 2015-03-26 | Post Tensioning Solutions LLC | Systems and methods to reinforce excavation walls |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2415693A1 (en) | 1978-01-30 | 1979-08-24 | Sif Entreprise Bachy | Seals for panels forming support walls against earth - are embedded thermoplastic edging strips welding together or to cover |
US4913594A (en) * | 1986-10-27 | 1990-04-03 | Schnabel Foundation Company | Adjustable connection system for precast facing panel and soldier pile |
DE19723554C2 (en) * | 1997-06-05 | 2002-11-21 | Franz Kerner Phd Entwicklungen | Sealing for drip pans and method for producing such a seal |
JP5308116B2 (en) * | 2008-10-08 | 2013-10-09 | 大成建設株式会社 | How to build a tunnel |
CA2673876A1 (en) * | 2009-07-24 | 2011-01-24 | Alfonso Gonzalez | Shoring free excavation and basement construction apparatus and method |
-
2016
- 2016-07-15 AU AU2016204976A patent/AU2016204976A1/en not_active Abandoned
-
2017
- 2017-07-13 EP EP17826669.8A patent/EP3485143B1/en active Active
- 2017-07-13 US US16/317,717 patent/US20190309497A1/en not_active Abandoned
- 2017-07-13 WO PCT/AU2017/000148 patent/WO2018009958A1/en active Search and Examination
-
2023
- 2023-06-09 AU AU2023203639A patent/AU2023203639B2/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4653962A (en) * | 1985-10-17 | 1987-03-31 | The Reinforced Earth Company | Retaining wall construction and method of manufacture |
US4836718A (en) * | 1988-03-21 | 1989-06-06 | Schnabel Foundation Company | Earth retaining method and structure with improved corrosion protection and drainage |
US5558470A (en) * | 1992-10-09 | 1996-09-24 | Jte, Inc. | System and method for adjustably anchoring traffic barriers and wall facing panels to the soldier beams of a wall |
JP2006322222A (en) * | 2005-05-19 | 2006-11-30 | Metropolitan Expressway Public Corp | Construction method of large section tunnel |
AU2013206618B1 (en) * | 2013-06-28 | 2014-10-09 | Mark Robert Edmund Curtis | Wall Seal System |
US20150086278A1 (en) * | 2013-09-25 | 2015-03-26 | Post Tensioning Solutions LLC | Systems and methods to reinforce excavation walls |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11384502B2 (en) * | 2019-07-24 | 2022-07-12 | Qingdao university of technology | Concrete inside interface processing structure and method for secant pile construction |
CN111636441A (en) * | 2020-07-02 | 2020-09-08 | 福建省永泰建筑工程公司 | Deep foundation pit supporting structure and construction method thereof |
CN112922028A (en) * | 2021-02-02 | 2021-06-08 | 中铁四局集团有限公司 | Construction method suitable for oversized circular subway station |
CN113338305A (en) * | 2021-06-30 | 2021-09-03 | 广东省构建工程建设有限公司 | Internal support structure for underground structure and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
EP3485143C0 (en) | 2025-02-12 |
AU2023203639A1 (en) | 2023-07-06 |
WO2018009958A1 (en) | 2018-01-18 |
EP3485143A1 (en) | 2019-05-22 |
AU2023203639B2 (en) | 2024-10-24 |
EP3485143A4 (en) | 2020-09-30 |
EP3485143B1 (en) | 2025-02-12 |
AU2016204976A1 (en) | 2018-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2023203639B2 (en) | Precast Concrete Panels used as Surface Lining of Perimeter Surfaces of Excavations | |
US10435883B2 (en) | Wall seal system | |
CN101736749B (en) | Method for constructing soft soil foundation continuous caisson | |
US7500807B2 (en) | Method of construction using sheet piling sections | |
HRP20010434A2 (en) | Embankment dam and waterproofing method | |
CN107558501B (en) | Construction method for reserved joint structure of underground passage free from later excavation | |
JP2025028357A (en) | Leachate collection pit, waste disposal facility, and method for constructing a leachate collection pit | |
CN106088758B (en) | A kind of bilayer assembled underground granary | |
CN109024668B (en) | Construction method of multilayer subway station | |
CN110735641A (en) | Construction method of transfer passage of underpass pipeline | |
CN217026767U (en) | Existing culvert structure is striden on open cut tunnel | |
CN106013911B (en) | A kind of interior steel plated assembled circle underground granary with premoulded filler strip | |
RU2465401C1 (en) | Method to erect underground structures by "wall in soil" method and wall in soil erected by this method | |
JPH0813495A (en) | Earth retaining wall and method thereof | |
KR102699128B1 (en) | Construction method for permanent underground wall used as earth retaining wall having interlocking structure and permanent underground wall used as earth retaining wall constructed thereby | |
CN106049948B (en) | Bag Plastic preform bulkhead underground granary in a kind of insertion slot type | |
CN106193744B (en) | The round prefabricated assembled underground granary of equal steel plated inside and outside one kind | |
CN106088759B (en) | The equal stepped prefabricated assembled circular underground granary of steel plated inside and outside one kind | |
KR101778206B1 (en) | New water-proofing method for large diameter propelling tunner | |
JP7470423B2 (en) | Water-resistant wall, water-resistant wall construction method, and precast concrete wall | |
CN105971354B (en) | The plastic prefabricated assembled underground granary of material inside and outside one kind | |
CN106013909A (en) | Plastic-wrapped prefabrication assembly type rectangular underground granary | |
CN106049950B (en) | A kind of double-layer plate assembled circle underground granary with premoulded filler strip | |
CN106193746B (en) | A kind of prefabricated assembled round underground granary of encased steel plate | |
CN106088761B (en) | A kind of stepped prefabricated assembled underground granary of plastic lining |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |