US20100183407A1 - Container transfer port system - Google Patents
Container transfer port system Download PDFInfo
- Publication number
- US20100183407A1 US20100183407A1 US12/398,193 US39819309A US2010183407A1 US 20100183407 A1 US20100183407 A1 US 20100183407A1 US 39819309 A US39819309 A US 39819309A US 2010183407 A1 US2010183407 A1 US 2010183407A1
- Authority
- US
- United States
- Prior art keywords
- offshore
- onshore
- container
- containers
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000003860 storage Methods 0.000 claims description 19
- 230000014759 maintenance of location Effects 0.000 claims description 4
- 244000144619 Abrus precatorius Species 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 7
- 230000001934 delay Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 230000002860 competitive effect Effects 0.000 description 1
- 230000008021 deposition Effects 0.000 description 1
- PWPJGUXAGUPAHP-UHFFFAOYSA-N lufenuron Chemical compound C1=C(Cl)C(OC(F)(F)C(C(F)(F)F)F)=CC(Cl)=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F PWPJGUXAGUPAHP-UHFFFAOYSA-N 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G63/00—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
- B65G63/002—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations for articles
- B65G63/004—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations for articles for containers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/22—Arrangement of ship-based loading or unloading equipment for cargo or passengers of conveyers, e.g. of endless-belt or screw-type
Definitions
- the present invention relates to a container transfer port system, specifically to a system for transferring containers between an onshore container terminal and an offshore container terminal located apart from the onshore terminal.
- a container terminal in a port comprises quays for berthing ships, cargo handling equipments, and storage facilities for loaded and empty containers. And it is connected to land vehicles, for example trains or trucks, for the transshipment of containers between ships and land vehicles.
- an offshore terminal located apart from a land terminal thus having a sufficient depth, is proposed.
- the offshore terminal will require many feeders or barges for transferring containers between itself and the land terminal. This will generate additional transfer cost, pollution, delays, and interruptions from unfavorable weather condition.
- U.S. Pat. No. 6,802,684 issued on Oct. 12, 2004. to John O. Arntzen et al. (the ‘684 Patent’) describes a container terminal comprising a structure with a storage area and a plurality of docks; elevated ground conveyance rails; longitudinal conveyance rails; transverse overhead conveyance beams; and container vehicles.
- the system of the 684 Patent is distinguished by its reliance on the superstructure in the container terminal.
- U.S. Pat. No. 3,807,582 issued on Apr. 30, 1974, to Lief P. R. Anderson (the ‘582 Patent’) describes a loading and unloading installation for transferring containers between a ship and a wharf.
- the installation comprises a frame with a lateral beam; a carriage device in the beam; lifting devices; and conveyors.
- the system of the 582 Patent is distinguished by its reliance on the container handling installation.
- Still another object of the present invention to provide a port system which can operate in unfavorable weather condition.
- Yet another object of the present invention to provide a port system which minimizes the use of feeders, barges, and trucks, thus reduces traffic, pollution caused therefrom.
- a container transfer port system is provided according to the present invention.
- the container transfer port system of the present invention for transferring containers between an onshore container terminal and an offshore container terminal located apart from the onshore terminal, comprises an offshore quay: an undersea tunnel: a tunnel conveyor; an offshore lift; and an onshore lift.
- the offshore quay at the offshore container terminal is equipped with cranes for transferring containers between the quay and ships berthed to it.
- the undersea tunnel is constructed between the undersea of the offshore quay and the underground of the onshore terminal for providing a route for transferring containers;
- the tunnel conveyor is installed in the undersea tunnel for transferring containers along the undersea tunnel.
- the offshore lift is provided for transferring containers vertically between the offshore quay and the undersea tunnel.
- the onshore lift is provided for transferring containers vertically between the undersea tunnel and the onshore container terminal.
- the container transfer port system further includes an offshore conveyor being installed on the offshore quay for transferring the containers longitudinally along the quay.
- the offshore lift (or onshore lift) is a paternoster type installment moving cyclically for transferring containers vertically, and comprises a plurality of compartments.
- each compartment of the offshore lift is provided with a compartment conveyor for transferring a container horizontally.
- the container transfer port system further includes relay conveyors for relaying containers between the offshore quay and the top of the offshore lift; between the bottom of the offshore lift and the offshore-side end of the tunnel conveyor; between the onshore-side end of the tunnel conveyor and the bottom of the onshore lift: and between the top of the onshore lift and the onshore container terminal.
- relay conveyors for relaying containers between the offshore quay and the top of the offshore lift; between the bottom of the offshore lift and the offshore-side end of the tunnel conveyor; between the onshore-side end of the tunnel conveyor and the bottom of the onshore lift: and between the top of the onshore lift and the onshore container terminal.
- the container transfer port system further includes an onshore conveyor being installed on the onshore container terminal for transferring the containers on the terminal.
- the container transfer port system further includes buffer storages being established for storing containers temporarily between the offshore conveyor and the top of the offshore lift; between the bottom of the offshore lift and the offshore-side end of the undersea tunnel; and between the onshore-side end of the undersea tunnel and the bottom of the onshore lift, wherein relay vehicles operate for transferring containers.
- buffer storages being established for storing containers temporarily between the offshore conveyor and the top of the offshore lift; between the bottom of the offshore lift and the offshore-side end of the undersea tunnel; and between the onshore-side end of the undersea tunnel and the bottom of the onshore lift, wherein relay vehicles operate for transferring containers.
- the container transfer port system further includes a shunting junction being located between the bottom of the offshore lift and the offshore-side end of the undersea tunnel, wherein relay vehicles operate for shunting containers.
- each of the relay vehicles being driven by a person comprises a side deck for loading a container, and a transverse crane for transferring it transversely.
- FIG. 1 is a schematic top plan view of the first embodiment of a container transfer port system of the present invention.
- FIG. 2 is a schematic cross-sectional view of the first embodiment.
- FIG. 3 is an enlarged schematic cross-sectional view of the transfer of containers around the offshore lift.
- FIG. 4 is a front elevational view of the carriage of containers in the offshore lift.
- FIG. 5 is a schematic top plan view of a buffer storage on the offshore quay.
- FIG. 6 is a schematic top plan view of the operation of relay vehicles in the shunting junction for two conveyors.
- FIG. 7 is a schematic top plan view of the operation of relay vehicles in the shunting junction for four conveyors.
- FIG. 8A is a rear elevational view of a relay vehicle.
- FIG. 8B is a top plan view of a relay vehicle.
- FIG. 9 is a schematic elevational view of an alternative embodiment, wherein relay vehicles transfer containers between the offshore conveyor and the undersea tunnel
- FIG. 10 is a schematic elevational view of an alternative embodiment, wherein relay vehicles transfer containers between the offshore storage and the undersea tunnel
- FIG. 11 is a schematic elevational view of an alternative embodiment, wherein relay vehicles transfer containers between the offshore storage and the relay conveyor at the top of the offshore lift.
- FIG. 12A is a schematic top plan view of an additional embodiment showing one quay aligned with the undersea tunnel.
- FIG. 12B is a schematic top plan view of an additional embodiment showing two quays connected at the front (seaward).
- FIG. 12C is a schematic top plan view of an additional embodiment showing two quays connected by an interquay at the rear, and one of the quays is connected to the undersea tunnel diagonally.
- FIG. 2 is a representative drawing for the present invention.
- the system of the present invention comprises an offshore quay 32 , an undersea tunnel 41 , tunnel conveyors 45 , offshore lifts 52 , and onshore lifts 51 basically; and further includes offshore conveyors 35 ( FIGS. 1 , 5 , and 10 ), relay conveyors 65 ( FIGS. 2 , 3 , 5 , and 6 ), relay vehicles 70 ( FIGS. 6 , 7 , 8 , and 9 ), buffer storages 80 ( FIG. 5 ), and a shunting junction 90 ( FIGS. 2 , 6 , and 7 ) optionally.
- the first embodiment of the present invention includes all the elements (basic and optional) as illustrated in FIG. 1 (top plan view) and FIG. 2 (schematic cross-sectional view).
- onshore container terminal 21 established at onshore 20 comprises quays 22 to which container ships 12 berth, cranes 13 for loading and unloading of containers (not shown), and container storages 23 .
- offshore quay 32 is constructed at offshore 30 being fixed to undersea 40 taking into consideration of: the depth of waters; the distance from onshore terminal 21 ; and directions of tides, winds, and waves.
- the quay 32 is provided with mooring equipments (not shown) for berthing ships 12 , cranes 13 , storage facilities (not shown), and optionally, offshore conveyors 35 .
- the quay 32 is also provided with wind breaker 33 for protecting containers 11 and ships 12 from a strong wind.
- the quay 32 is established at a location where its water depth is sufficient for accommodating a large ship and the distance from the onshore terminal 21 is minimal.
- the quay 32 is established, for example, perpendicularly to undersea tunnel 41 .
- undersea tunnel 41 is constructed at undersea 40 between offshore container terminal 31 and onshore container terminal 21 , more specifically between the bottom of offshore lift 52 , and the bottom of onshore lift 51 .
- the tunnel 41 provides a route for transferring containers 11 .
- a couple of tunnel conveyors 45 are installed in the tunnel 41 as shown in
- both conveyors 45 move in the same direction, for example, from the offshore side to the onshore side; or move in different direction, for example, one moves towards offshore and the other towards onshore.
- Each conveyor 45 is provided with guide rails 63 on its both side ends for guiding containers 11 .
- the number of the conveyors 45 can be increased to more than two.
- undersea tunnel 41 is provided with a couple of corridors 43 along tunnel conveyors 45 .
- the corridors 43 are used by small vehicles for dealing with problems in the flow of containers 11 , and the maintenance of the tunnel 41 and the conveyors 45 .
- a couple of offshore lifts 52 are established between offshore quay 32 and undersea tunnel 41 .
- Each offshore lift 52 carries containers 11 arrived from offshore quay 32 to undersea tunnel 41 vertically, and containers 11 arrived from the tunnel 41 to the quay 32 vertically.
- the lift 52 is a paternoster type installment moving cyclically for transferring containers 11 vertically, and comprises a plurality of compartments 53 .
- a couple of offshore conveyors 35 are provided on offshore quay 32 .
- Each offshore conveyor 35 receives containers 11 from crane 13 and transfers those to the top of offshore lift 52 longitudinally along the quay 32 , and receives containers 11 from offshore lift 52 and carries those to the locations to be picked up by crane 13 .
- Offshore conveyor 35 halts just before crane 13 picks up or releases a container on it. However, the duration of the halt is short enough for the conveyor 35 .move at a substantial speed. Crane operators control the conveyor 35 concurrently.
- each compartment 53 of offshore lifts 52 is provided with a compartment conveyor 55 for transferring a container between the compartment 53 and relay conveyor 65 horizontally.
- relay conveyors 65 are provided between offshore conveyors 35 and the top of offshore lifts 52 , and at the bottom of the lifts 52 for transferring containers 11 horizontally.
- shunting junction 90 is provided between the bottom of offshore lifts 52 and the offshore-side end of undersea tunnel 41 for changing the orientations of containers 11 .
- the orientations of containers 11 are changed while moving between the bottom of offshore lifts 52 and tunnel conveyors 45 .
- the shunting can be carried out by an automated system or by a vehicle driven by a person.
- the junction 90 is a wider and deeper space than undersea tunnel 41 , and provided with person-driving relay vehicles 70 .
- offshore conveyor 35 rolls over a container to relay conveyor 65 , and the relay conveyor 65 rolls over it to compartment conveyor 55 of the lift 52 .
- the compartment conveyor 55 accommodates the container, and later at the bottom, rolls over it to relay conveyor 65 in shunting junction 90 .
- relay conveyor 65 rolls over a container to compartment conveyor 55 of the lift 52 .
- the compartment conveyor 55 accommodates the container, and later at the top, rolls over it to relay conveyor 65 directed to offshore conveyor 35 .
- a container can be smoothly transferred between relay conveyor 65 and compartment conveyor 55 by both operating concurrently and adjacently in a good alignment.
- each offshore lift 52 receives a container at the top from relay conveyor 65 directed from offshore conveyor 35 , and rolls over a container at the bottom to relay conveyor 65 in shunting junction 90 simultaneously. Similarly the lift 52 rolls over a container to relay conveyor 65 at the top and receives a container from relay conveyor 65 at the bottom simultaneously. Such synchronization reduces the time for container transfer.
- FIG. 6 shows a case for two relay conveyors 65 and two tunnel conveyors 45 in shunting junction 90 .
- Relay conveyors 65 are extended towards tunnel 41 for accommodating relay vehicles 70 at their sides.
- tunnel conveyors 45 are extended towards offshore lifts 52 for accommodating relay vehicles 70 at their sides.
- FIG. 7 shows a case for four relay conveyors 65 and four tunnel conveyors 45 in shunting junction 90 .
- the inner two relay conveyors 65 are further extended to tunnel 41 so that relay vehicles 70 can access four relay conveyors 65 simultaneously.
- the inner two tunnel conveyors 45 further extended to offshore lifts 52 so that relay vehicles 70 can access four tunnel conveyors 45 simultaneously.
- a relay vehicle 70 picks up a container from relay conveyor 65 , moves to one side of tunnel conveyor 45 , and releases it onto the conveyor 45 .
- a relay vehicle 70 picks up a container from tunnel conveyor 45 , moves to one side of relay conveyor 65 , and releases it onto the conveyor 65 .
- Relay vehicles 70 carry out the shunting of containers 11 by repeatedly following the exemplary routes depicted in FIGS. 6 and 7 .
- a relay vehicle 70 grips or releases a container while moving along tunnel conveyor 45 at the same speed, thus enables the conveyor 45 to operate with a minimum halt.
- a buffer storage 80 is provided between offshore conveyor 35 and the top of offshore lifts 52 (as shown in FIG. 5 ), and the bottom of the lifts 52 and the offshore-side end of tunnel conveyors 45 (not shown) respectively for storing containers temporarily.
- the storage 80 is a space for storing containers temporarily when a delay occurs to the flow of the containers.
- Shunting junction 90 can also be used as a buffer storage.
- the transfer of containers between the onshore-side end of undersea tunnel 41 and onshore container terminal 21 is similar to that of between the offshore-side end of undersea tunnel 41 and offshore container terminal 31 .
- onshore lifts 51 are exactly same as those of offshore lifts 52 .
- a buffer storage (not shown) is provided between the bottom of onshore lifts 51 and the onshore-side end of tunnel conveyors 45 .
- the numbers of offshore lifts 52 ; onshore lifts 51 ; tunnel conveyors 45 ; offshore conveyors 35 ; and compartments 53 in offshore lifts 52 and onshore lifts 51 are determined synchronously so that the system of the present invention does not have a bottleneck or an interruption in the flow of containers.
- conveyors like offshore conveyors 35 , tunnel conveyors 45 , relay conveyors 65 , onshore conveyors 25 , and compartment conveyors 55 in the present invention can be recognized by one reasonably skilled in the art, thus the detailed description for those is omitted here.
- Relay vehicles 70 can also transfer containers between a buffer storage 80 and the conveyors: relay conveyors 65 , tunnel conveyors 45 , and offshore conveyors 35 .
- the vehicle 70 can be a side-loadable forklift of any type, or a custom-made vehicle as shown in FIGS. 8A and 8B , which minimizes the space required for the shunting by adopting a side deck 71 and a transverse crane 72 .
- the vehicle 70 is driven, for example, by four electrically powered wheels 73 , and may have its side deck 71 on its left side or right side. Both types are used according to circumstances.
- a container moves smoothly as follows: a container in ship 12 is picked up by crane 13 and released onto offshore conveyor 35 ; then it moves to relay conveyor 65 (at the top of offshore lift 52 ); and to compartment 53 of the lift 52 ; there it travels downward by the lift 52 ; and moves to relay conveyor 65 (at the bottom of the lift 52 ); and moves to tunnel conveyor 45 by a relay vehicle 70 shunting its direction; and travels along undersea tunnel 41 ; upon the completion of the travel in tunnel 41 , it moves to relay conveyor 65 (at the bottom of onshore lift 51 ); and to compartment 53 of the lift 51 ; there it travels upward by the lift 51 ; and moves to relay conveyor 65 (at the top of onshore lift 51 ): and finally moves to onshore conveyor 25 at onshore container terminal 21 .
- a container also moves reversely.
- FIG. 9 shows an alternative embodiment of the present invention, wherein relay vehicles 70 transfer containers 11 between offshore conveyor 35 and the offshore-side end of tunnel conveyor 45 .
- Each relay vehicle 70 picks up a container from offshore conveyor 35 , and embarks a compartment 53 of offshore lift 52 , and disembark from the lift 52 when it arrives at its bottom, and approaches to the side of tunnel conveyor 45 and releases the container onto the conveyor 45 .
- each compartment 53 of the lift 52 has a larger dimension in width and height for accommodating a relay vehicle 70 loaded with a container, and is provided with a set of safety devices (not shown) for lighting and ventilation, etc. But the compartment 53 needs not to be provided with a compartment conveyor. Also relay conveyors need not to be provided in the embodiment.
- Relay vehicles 70 transfer containers between the onshore-side end of tunnel conveyor 45 and onshore container terminal 21 in the same way.
- FIG. 10 Another embodiment of the present invention is presented, as shown in FIG. 10 , for the case where offshore conveyor is not provided, wherein relay vehicles 70 transfer containers between offshore storage (not shown) on offshore quay 32 and the offshore-side end of tunnel conveyor 45 . Others are same as described just before.
- FIG. 11 Yet another embodiment of the present invention is presented, as shown in FIG. 11 , for the case where offshore conveyor is not provided, but relay conveyor 65 and compartment conveyor 55 are provided, wherein relay vehicles 70 transfer containers between offshore storage (not shown) on offshore quay 32 and relay conveyor 65 provided at the top of offshore lift 52 .
- relay vehicles 70 do not embark or disembark offshore lift 52 (or onshore lift 51 ). Others are same as described in the first embodiment of the present invention as shown in FIG. 3 .
- FIGS. 12A , 12 B, and 12 C illustrate additional embodiments of the present invention with regard to the arrangement of undersea tunnel 41 and offshore quay 32 .
- an offshore quay 32 is established in the same direction with that of undersea tunnel 41 .
- relay conveyors (not shown) at the bottom of the offshore lift 52 may be directly connected to tunnel conveyors (not shown).
- FIG. 12B two quays are connected in the front (seaward) side, and the space of the connection is used for a buffer storage 80 .
- containers unloaded to the one quay may be transferred to the other quay by relay vehicles (not shown) through the connection.
- interquay tunnel 42 is provided between the quays at the rear side, and undersea tunnel 41 is connected to one of the quays diagonally.
- the containers unloaded to the one quay may be transferred to the other quay by relay vehicles (not shown) through interquay tunnel 42 ,
- the port system can comprise a plurality of the offshore quays (more than two) in various connections. Accordingly, the scope should be determined not by the embodiments illustrated, but by the appended claims and their legal equivalents.
Landscapes
- Ship Loading And Unloading (AREA)
Abstract
The present invention relates to a container transfer port system for transferring containers between an onshore container terminal and an offshore container terminal located apart from the onshore terminal. The container transfer port system of the present invention comprises: an offshore quay (32) at the offshore container terminal (31) equipped with cranes (13) for transferring containers (11) between the offshore quay (32) and a ship (12) berthed to the quay (32); an undersea tunnel (41) constructed between undersea of the quay (32) and underground of the onshore container terminal (21) for providing a route for transferring the containers; a tunnel conveyor (45) installed in the tunnel (41) for transferring the containers along the tunnel (41): an offshore lift (52) for transferring the containers vertically between the offshore quay (32) and the tunnel (41); and an onshore lift (51) for transferring the containers vertically between the tunnel (41) and the onshore container terminal (21).
Description
- This application claims the benefit of patent application Ser. No. 10-2009-0004836, filed Jan. 21, 2009 and a CIP Ser. No. 10-2009-0007928. filed Feb. 2, 2009 in Korea by the present inventor.
- Not Applicable.
- Not Applicable.
- 1. Field
- The present invention relates to a container transfer port system, specifically to a system for transferring containers between an onshore container terminal and an offshore container terminal located apart from the onshore terminal.
- 2. Prior Art
- A container terminal in a port comprises quays for berthing ships, cargo handling equipments, and storage facilities for loaded and empty containers. And it is connected to land vehicles, for example trains or trucks, for the transshipment of containers between ships and land vehicles.
- Recently competition among existing ports for attracting container ships becomes tense internationally and domestically. For a port to be competitive in the container shipping world, it should have a sufficient capacity to accommodate large ships and to handle containers rapidly at a low cost.
- However, it is not easy for an existing port to expand its capacity due to difficulties in securing a site with proper water depth.
- To overcome such difficulties, an offshore terminal located apart from a land terminal, thus having a sufficient depth, is proposed. The offshore terminal will require many feeders or barges for transferring containers between itself and the land terminal. This will generate additional transfer cost, pollution, delays, and interruptions from unfavorable weather condition.
- In December 2005, a container terminal was established around two islands near to the port of Shanghai, China and connected to a land terminal by a bridge of about 30 kilometers. In the port, many trucks transfer containers between the island terminal and the land terminal, thus the port generates additional transfer cost, pollution, delays, and interruptions from unfavorable weather condition as above.
- U.S. Pat. No. 6,802,684 issued on Oct. 12, 2004. to John O. Arntzen et al. (the ‘684 Patent’) describes a container terminal comprising a structure with a storage area and a plurality of docks; elevated ground conveyance rails; longitudinal conveyance rails; transverse overhead conveyance beams; and container vehicles. The system of the 684 Patent is distinguished by its reliance on the superstructure in the container terminal.
- U.S. Pat. No. 5.570,986 issued on Nov. 5, 1996. to Shuji Hasegawa et al. (the ‘986 Patent’) describes a container transfer system for a cargo handling crane having a horizontal gantry supported by a crane superstructure at an elevated location above the container pickup and deposition areas. The system of the 986 Patent is distinguished by its reliance on the cargo handling crane.
- U.S. Pat. No. 3,807,582 issued on Apr. 30, 1974, to Lief P. R. Anderson (the ‘582 Patent’) describes a loading and unloading installation for transferring containers between a ship and a wharf. The installation comprises a frame with a lateral beam; a carriage device in the beam; lifting devices; and conveyors. The system of the 582 Patent is distinguished by its reliance on the container handling installation.
- None of the above patents is seen to describe the present invention as claimed.
- Accordingly, it is a principal object of the present invention to provide a port system which can be applied to an existing port for expanding its facility without difficulties of securing a site with proper water depth.
- It is another object of the present invention to provide a port system which can accommodate large container ships by tendering a deep water depth.
- It is a further object of the present invention to provide a port system which transfers containers automatically for the most part, thus reduces container handling times and labor cost.
- Still another object of the present invention to provide a port system which can operate in unfavorable weather condition.
- Yet another object of the present invention to provide a port system which minimizes the use of feeders, barges, and trucks, thus reduces traffic, pollution caused therefrom.
- And it is yet a further object of the present invention to provide a port system which can be applied to the construction of a new port for establishing its capacity to maximum at a minimal cost.
- To accomplish the above objects, a container transfer port system is provided according to the present invention.
- The container transfer port system of the present invention, for transferring containers between an onshore container terminal and an offshore container terminal located apart from the onshore terminal, comprises an offshore quay: an undersea tunnel: a tunnel conveyor; an offshore lift; and an onshore lift.
- The offshore quay at the offshore container terminal is equipped with cranes for transferring containers between the quay and ships berthed to it.
- The undersea tunnel is constructed between the undersea of the offshore quay and the underground of the onshore terminal for providing a route for transferring containers;
- The tunnel conveyor is installed in the undersea tunnel for transferring containers along the undersea tunnel.
- The offshore lift is provided for transferring containers vertically between the offshore quay and the undersea tunnel.
- The onshore lift is provided for transferring containers vertically between the undersea tunnel and the onshore container terminal.
- Preferably, the container transfer port system further includes an offshore conveyor being installed on the offshore quay for transferring the containers longitudinally along the quay.
- Preferably, the offshore lift (or onshore lift) is a paternoster type installment moving cyclically for transferring containers vertically, and comprises a plurality of compartments.
- Preferably, each compartment of the offshore lift (or onshore lift) is provided with a compartment conveyor for transferring a container horizontally.
- Preferably, the container transfer port system further includes relay conveyors for relaying containers between the offshore quay and the top of the offshore lift; between the bottom of the offshore lift and the offshore-side end of the tunnel conveyor; between the onshore-side end of the tunnel conveyor and the bottom of the onshore lift: and between the top of the onshore lift and the onshore container terminal.
- Preferably, the container transfer port system further includes an onshore conveyor being installed on the onshore container terminal for transferring the containers on the terminal.
- Preferably, the container transfer port system further includes buffer storages being established for storing containers temporarily between the offshore conveyor and the top of the offshore lift; between the bottom of the offshore lift and the offshore-side end of the undersea tunnel; and between the onshore-side end of the undersea tunnel and the bottom of the onshore lift, wherein relay vehicles operate for transferring containers.
- Preferably, the container transfer port system further includes a shunting junction being located between the bottom of the offshore lift and the offshore-side end of the undersea tunnel, wherein relay vehicles operate for shunting containers.
- Preferably, each of the relay vehicles being driven by a person comprises a side deck for loading a container, and a transverse crane for transferring it transversely.
- From the description above, a number of advantages of the present invention become evident:
-
- (a) The offshore terminal of the system of the present invention is established apart from the onshore terminal and containers are transferred by a conveyor through an undersea tunnel. Thus the system can be applied to an existing port for expanding its facility without difficulties of securing a site with proper water depth.
- (b) The offshore terminal of the system of the present invention is established apart from the congested onshore terminal and containers are transferred by a conveyor through an undersea tunnel. Thus the system reduces delay of container handling, and traffic and pollution caused therefrom.
- (c) The offshore terminal of the system of the present invention is established at the location of deep water depth apart from the onshore terminal. Thus the system can accommodate large container ships.
- (d) The system of the present invention transfers containers through a undersea tunnel instead of transferring containers by feeders, barges, or trucks. Thus the system reduces transfer cost, pollution, delays, and interruption from unfavorable weather condition.
- (e) The system of the present invention transfers containers on the conveyors automatically for the most part, thus reduces container handling times and labor cost.
- (f) The system of the present invention transfers containers in an enclosed space (tunnel) for the most part, thus the system can operate in an unfavorable weather condition.
- (g) The offshore terminal of the system of the present invention is established apart from the onshore terminal and containers are transferred by a conveyor through an undersea tunnel. Thus the system can be applied to a construction of a new port for establishing its capacity to maximum at a minimal cost without difficulties to secure a site with proper water depth,
- The above and related objects, features and advantages of the present invention will be more fully understood by referring to the following detailed description of the preferred embodiments of the present invention when taken in conjunction with the accompanying drawing wherein:
-
FIG. 1 is a schematic top plan view of the first embodiment of a container transfer port system of the present invention. -
FIG. 2 is a schematic cross-sectional view of the first embodiment. -
FIG. 3 is an enlarged schematic cross-sectional view of the transfer of containers around the offshore lift. -
FIG. 4 is a front elevational view of the carriage of containers in the offshore lift. -
FIG. 5 is a schematic top plan view of a buffer storage on the offshore quay. -
FIG. 6 is a schematic top plan view of the operation of relay vehicles in the shunting junction for two conveyors. -
FIG. 7 is a schematic top plan view of the operation of relay vehicles in the shunting junction for four conveyors. -
FIG. 8A is a rear elevational view of a relay vehicle. -
FIG. 8B is a top plan view of a relay vehicle. -
FIG. 9 is a schematic elevational view of an alternative embodiment, wherein relay vehicles transfer containers between the offshore conveyor and the undersea tunnel -
FIG. 10 is a schematic elevational view of an alternative embodiment, wherein relay vehicles transfer containers between the offshore storage and the undersea tunnel -
FIG. 11 is a schematic elevational view of an alternative embodiment, wherein relay vehicles transfer containers between the offshore storage and the relay conveyor at the top of the offshore lift. -
FIG. 12A is a schematic top plan view of an additional embodiment showing one quay aligned with the undersea tunnel. -
FIG. 12B is a schematic top plan view of an additional embodiment showing two quays connected at the front (seaward). -
FIG. 12C is a schematic top plan view of an additional embodiment showing two quays connected by an interquay at the rear, and one of the quays is connected to the undersea tunnel diagonally. -
FIG. 2 is a representative drawing for the present invention. -
-
11: container 12: ship 13: crane 20: onshore 21: onshore container terminal 25: onshore conveyor 30: offshore 31: offshore container terminal 32: offshore quay 35: offshore conveyor 40: undersea 41: undersea tunnel 45: tunnel conveyor 51: onshore lift 52: offshore lift 53: compartment 55: compartment conveyor 65: relay conveyor 70: relay vehicle 80: buffer storage 90: shunting junction - As shown in
FIGS. 1 and 2 , the system of the present invention comprises anoffshore quay 32, anundersea tunnel 41,tunnel conveyors 45, offshore lifts 52, andonshore lifts 51 basically; and further includes offshore conveyors 35 (FIGS. 1 , 5, and 10), relay conveyors 65 (FIGS. 2 , 3, 5, and 6), relay vehicles 70 (FIGS. 6 , 7, 8, and 9), buffer storages 80 (FIG. 5 ), and a shunting junction 90 (FIGS. 2 , 6, and 7) optionally. - The first embodiment of the present invention includes all the elements (basic and optional) as illustrated in
FIG. 1 (top plan view) andFIG. 2 (schematic cross-sectional view). - As shown in
FIG. 1 ,onshore container terminal 21 established at onshore 20 comprisesquays 22 to whichcontainer ships 12 berth,cranes 13 for loading and unloading of containers (not shown), andcontainer storages 23. - As shown in
FIGS. 1 and 2 ,offshore quay 32 is constructed at offshore 30 being fixed toundersea 40 taking into consideration of: the depth of waters; the distance fromonshore terminal 21; and directions of tides, winds, and waves. Thequay 32 is provided with mooring equipments (not shown) forberthing ships 12,cranes 13, storage facilities (not shown), and optionally,offshore conveyors 35. Thequay 32 is also provided withwind breaker 33 for protectingcontainers 11 andships 12 from a strong wind. - The
quay 32 is established at a location where its water depth is sufficient for accommodating a large ship and the distance from theonshore terminal 21 is minimal. Thequay 32 is established, for example, perpendicularly toundersea tunnel 41. - The structures and operations of a quay like
offshore quay 32 in the present invention can be recognized by one reasonably skilled in the art, thus the detailed description for that is omitted here. - As shown in
FIGS. 1 and 2 ,undersea tunnel 41 is constructed atundersea 40 betweenoffshore container terminal 31 andonshore container terminal 21, more specifically between the bottom ofoffshore lift 52, and the bottom ofonshore lift 51. Thetunnel 41 provides a route for transferringcontainers 11. - A couple of
tunnel conveyors 45 are installed in thetunnel 41 as shown in -
FIG. 1 , wherein bothconveyors 45 move in the same direction, for example, from the offshore side to the onshore side; or move in different direction, for example, one moves towards offshore and the other towards onshore. Eachconveyor 45 is provided withguide rails 63 on its both side ends for guidingcontainers 11. The number of theconveyors 45 can be increased to more than two. - As shown in
FIG. 1 ,undersea tunnel 41 is provided with a couple ofcorridors 43 alongtunnel conveyors 45. Thecorridors 43 are used by small vehicles for dealing with problems in the flow ofcontainers 11, and the maintenance of thetunnel 41 and theconveyors 45. - The structures and operations of a tunnel like
undersea tunnel 41 in the present invention can be recognized by one reasonably skilled in the art, thus the detailed description for that is omitted here. - As shown in
FIGS. 2 , 4, and 5, a couple ofoffshore lifts 52, for example, are established betweenoffshore quay 32 andundersea tunnel 41. Eachoffshore lift 52 carriescontainers 11 arrived fromoffshore quay 32 toundersea tunnel 41 vertically, andcontainers 11 arrived from thetunnel 41 to thequay 32 vertically. - The
lift 52 is a paternoster type installment moving cyclically for transferringcontainers 11 vertically, and comprises a plurality ofcompartments 53. - Optionally, as shown in
FIGS. 1 and 5 , a couple ofoffshore conveyors 35, for example, are provided onoffshore quay 32. Eachoffshore conveyor 35 receivescontainers 11 fromcrane 13 and transfers those to the top ofoffshore lift 52 longitudinally along thequay 32, and receivescontainers 11 fromoffshore lift 52 and carries those to the locations to be picked up bycrane 13. -
Offshore conveyor 35 halts just beforecrane 13 picks up or releases a container on it. However, the duration of the halt is short enough for the conveyor 35.move at a substantial speed. Crane operators control theconveyor 35 concurrently. - Optionally, as shown in
FIGS. 3 , 4, and 5, eachcompartment 53 ofoffshore lifts 52 is provided with acompartment conveyor 55 for transferring a container between thecompartment 53 andrelay conveyor 65 horizontally. - Optionally, as shown in
FIGS. 3 and 5 ,relay conveyors 65 are provided betweenoffshore conveyors 35 and the top ofoffshore lifts 52, and at the bottom of thelifts 52 for transferringcontainers 11 horizontally. - Optionally, as shown in
FIG. 2 , shuntingjunction 90 is provided between the bottom ofoffshore lifts 52 and the offshore-side end ofundersea tunnel 41 for changing the orientations ofcontainers 11. In thejunction 90, the orientations ofcontainers 11 are changed while moving between the bottom ofoffshore lifts 52 andtunnel conveyors 45. The shunting can be carried out by an automated system or by a vehicle driven by a person. - The
junction 90 is a wider and deeper space thanundersea tunnel 41, and provided with person-drivingrelay vehicles 70. - As shown in
FIG. 3 , at the top ofoffshore lift 52,offshore conveyor 35 rolls over a container to relayconveyor 65, and therelay conveyor 65 rolls over it tocompartment conveyor 55 of thelift 52. Thecompartment conveyor 55 accommodates the container, and later at the bottom, rolls over it to relayconveyor 65 in shuntingjunction 90. At the bottom of thelift 52,relay conveyor 65 rolls over a container tocompartment conveyor 55 of thelift 52. Thecompartment conveyor 55 accommodates the container, and later at the top, rolls over it to relayconveyor 65 directed tooffshore conveyor 35. - A container can be smoothly transferred between
relay conveyor 65 andcompartment conveyor 55 by both operating concurrently and adjacently in a good alignment. - As shown in
FIG. 3 , eachoffshore lift 52 receives a container at the top fromrelay conveyor 65 directed fromoffshore conveyor 35, and rolls over a container at the bottom to relayconveyor 65 in shuntingjunction 90 simultaneously. Similarly thelift 52 rolls over a container to relayconveyor 65 at the top and receives a container fromrelay conveyor 65 at the bottom simultaneously. Such synchronization reduces the time for container transfer. -
FIG. 6 shows a case for tworelay conveyors 65 and twotunnel conveyors 45 in shuntingjunction 90.Relay conveyors 65 are extended towardstunnel 41 for accommodatingrelay vehicles 70 at their sides. Alsotunnel conveyors 45 are extended towardsoffshore lifts 52 for accommodatingrelay vehicles 70 at their sides. -
FIG. 7 shows a case for fourrelay conveyors 65 and fourtunnel conveyors 45 in shuntingjunction 90. The inner tworelay conveyors 65 are further extended totunnel 41 so thatrelay vehicles 70 can access fourrelay conveyors 65 simultaneously. Similarly the inner twotunnel conveyors 45 further extended tooffshore lifts 52 so thatrelay vehicles 70 can access fourtunnel conveyors 45 simultaneously. - In shunting
junction 90, arelay vehicle 70 picks up a container fromrelay conveyor 65, moves to one side oftunnel conveyor 45, and releases it onto theconveyor 45. Similarly, arelay vehicle 70 picks up a container fromtunnel conveyor 45, moves to one side ofrelay conveyor 65, and releases it onto theconveyor 65.Relay vehicles 70 carry out the shunting ofcontainers 11 by repeatedly following the exemplary routes depicted inFIGS. 6 and 7 . - A
relay vehicle 70 grips or releases a container while moving alongtunnel conveyor 45 at the same speed, thus enables theconveyor 45 to operate with a minimum halt. - Optionally, a
buffer storage 80 is provided betweenoffshore conveyor 35 and the top of offshore lifts 52 (as shown inFIG. 5 ), and the bottom of thelifts 52 and the offshore-side end of tunnel conveyors 45 (not shown) respectively for storing containers temporarily. Thestorage 80 is a space for storing containers temporarily when a delay occurs to the flow of the containers. Shuntingjunction 90 can also be used as a buffer storage. - The transfer of containers between the onshore-side end of
undersea tunnel 41 andonshore container terminal 21 is similar to that of between the offshore-side end ofundersea tunnel 41 andoffshore container terminal 31. - The structures and operations of
onshore lifts 51 are exactly same as those of offshore lifts 52. - However, no shunting junction is provided at the bottom of
onshore lifts 51 since thelifts 51 are aligned, it can be easily done since thelifts 51 are constructed in land, withundersea tunnel 41. - Optionally, a buffer storage (not shown) is provided between the bottom of
onshore lifts 51 and the onshore-side end oftunnel conveyors 45. - The numbers of
offshore lifts 52; onshore lifts 51;tunnel conveyors 45;offshore conveyors 35; and compartments 53 inoffshore lifts 52 andonshore lifts 51 are determined synchronously so that the system of the present invention does not have a bottleneck or an interruption in the flow of containers. - The structures and operations of conveyors like
offshore conveyors 35,tunnel conveyors 45,relay conveyors 65,onshore conveyors 25, andcompartment conveyors 55 in the present invention can be recognized by one reasonably skilled in the art, thus the detailed description for those is omitted here. - In the same token, the structures and operations of lifts like
offshore lifts 52 andonshore lifts 51 in the present invention can be recognized by one reasonably skilled in the art, thus the detailed description for those is also omitted here. -
Relay vehicles 70 can also transfer containers between abuffer storage 80 and the conveyors:relay conveyors 65,tunnel conveyors 45, andoffshore conveyors 35. Thevehicle 70 can be a side-loadable forklift of any type, or a custom-made vehicle as shown inFIGS. 8A and 8B , which minimizes the space required for the shunting by adopting aside deck 71 and atransverse crane 72. Thevehicle 70 is driven, for example, by four electricallypowered wheels 73, and may have itsside deck 71 on its left side or right side. Both types are used according to circumstances. - In the first embodiment of the present invention, as shown in
FIGS. 2 and 3 , a container moves smoothly as follows: a container inship 12 is picked up bycrane 13 and released ontooffshore conveyor 35; then it moves to relay conveyor 65 (at the top of offshore lift 52); and tocompartment 53 of thelift 52; there it travels downward by thelift 52; and moves to relay conveyor 65 (at the bottom of the lift 52); and moves totunnel conveyor 45 by arelay vehicle 70 shunting its direction; and travels alongundersea tunnel 41; upon the completion of the travel intunnel 41, it moves to relay conveyor 65 (at the bottom of onshore lift 51); and tocompartment 53 of thelift 51; there it travels upward by thelift 51; and moves to relay conveyor 65 (at the top of onshore lift 51): and finally moves toonshore conveyor 25 atonshore container terminal 21. Naturally a container also moves reversely. -
FIG. 9 shows an alternative embodiment of the present invention, whereinrelay vehicles 70transfer containers 11 betweenoffshore conveyor 35 and the offshore-side end oftunnel conveyor 45. Eachrelay vehicle 70 picks up a container fromoffshore conveyor 35, and embarks acompartment 53 ofoffshore lift 52, and disembark from thelift 52 when it arrives at its bottom, and approaches to the side oftunnel conveyor 45 and releases the container onto theconveyor 45. In the embodiment, eachcompartment 53 of thelift 52 has a larger dimension in width and height for accommodating arelay vehicle 70 loaded with a container, and is provided with a set of safety devices (not shown) for lighting and ventilation, etc. But thecompartment 53 needs not to be provided with a compartment conveyor. Also relay conveyors need not to be provided in the embodiment.Relay vehicles 70 transfer containers between the onshore-side end oftunnel conveyor 45 andonshore container terminal 21 in the same way. - Another embodiment of the present invention is presented, as shown in
FIG. 10 , for the case where offshore conveyor is not provided, whereinrelay vehicles 70 transfer containers between offshore storage (not shown) onoffshore quay 32 and the offshore-side end oftunnel conveyor 45. Others are same as described just before. - Yet another embodiment of the present invention is presented, as shown in
FIG. 11 , for the case where offshore conveyor is not provided, butrelay conveyor 65 andcompartment conveyor 55 are provided, whereinrelay vehicles 70 transfer containers between offshore storage (not shown) onoffshore quay 32 andrelay conveyor 65 provided at the top ofoffshore lift 52. In the embodiment,relay vehicles 70 do not embark or disembark offshore lift 52 (or onshore lift 51). Others are same as described in the first embodiment of the present invention as shown inFIG. 3 . -
FIGS. 12A , 12B, and 12C illustrate additional embodiments of the present invention with regard to the arrangement ofundersea tunnel 41 andoffshore quay 32. - In
FIG. 12A , anoffshore quay 32 is established in the same direction with that ofundersea tunnel 41. Thus it eliminates the need for changing the orientation of containers while being transferred. Accordingly, in the embodiment, relay conveyors (not shown) at the bottom of theoffshore lift 52 may be directly connected to tunnel conveyors (not shown). - In
FIG. 12B , two quays are connected in the front (seaward) side, and the space of the connection is used for abuffer storage 80. In the embodiment, containers unloaded to the one quay may be transferred to the other quay by relay vehicles (not shown) through the connection. - In
FIG. 12C ,interquay tunnel 42 is provided between the quays at the rear side, andundersea tunnel 41 is connected to one of the quays diagonally. In the embodiment, the containers unloaded to the one quay may be transferred to the other quay by relay vehicles (not shown) throughinterquay tunnel 42, - As seen from the above, the embodiments of the present invention accomplish the objects and advantages described in the summary without difficulties.
- Although the description above contains many specifications, these should not be construed as limiting the scope of the embodiments but as merely providing illustrations of some of the presently preferred embodiments. Many other variations are possible. For example, the port system can comprise a plurality of the offshore quays (more than two) in various connections. Accordingly, the scope should be determined not by the embodiments illustrated, but by the appended claims and their legal equivalents.
Claims (10)
1. A container transfer port system for transferring containers between an onshore container terminal and an offshore container terminal located apart from said onshore container terminal, comprising:
(a) an offshore quay at said offshore container terminal equipped with cranes for transferring said containers between said offshore quay and a ship berthed to said offshore quay;
(b) an undersea tunnel constructed between undersea of said offshore quay and underground of said onshore container terminal for providing a route for transferring said containers;
(c) a tunnel conveyor installed in said undersea tunnel for transferring said containers along said undersea tunnel;
(d) an offshore lift established between said offshore quay and said undersea tunnel for transferring said containers vertically between said offshore quay and said undersea tunnel; and
(e) an onshore lift established between said undersea tunnel and said onshore container terminal for transferring said containers vertically between said undersea tunnel and said onshore container terminal.
2. The container transfer port system of claim 1 , further including an offshore conveyor installed on said offshore quay for transferring said containers longitudinally along said offshore quay.
3. The container transfer port system of claim 1 , wherein said offshore lift (or said onshore lift) is a paternoster type installment moving cyclically for transferring said containers vertically, and comprises a plurality of compartments.
4. The container transfer port system of claim 1 , wherein each compartment of said offshore lift (or said onshore lift) is provided with a compartment conveyor for transferring a container horizontally.
5. The container transfer port system of claim 1 , further including relay conveyors for relaying said containers between said offshore quay and the top of said offshore lift; between the bottom of said offshore lift and the offshore-side end of said tunnel conveyor; between the onshore-side end of said tunnel conveyor and the bottom of said onshore lift; and between the top of said onshore lift and said onshore container terminal.
6. The container transfer port system of claim 1 , further including an onshore conveyor installed on said onshore container terminal for transferring said containers on said onshore container terminal.
7. The container transfer port system of claim 1 , wherein relay vehicles transfer containers between said offshore quay and the offshore-side end of said undersea tunnel, and between the onshore-side end of said undersea tunnel and said onshore container terminal.
8. The container transfer port system of claim 1 , further including buffer storages provided for storing said containers temporarily between said offshore quay and the top of said offshore lift; between the bottom of said offshore lift and the offshore-side end of said undersea tunnel; and between the onshore-side end of said undersea tunnel and the bottom of said onshore lift, wherein relay vehicles operate for transferring said containers.
9. The container transfer port system of claim 1 , further including a shunting junction provided between the bottom of said offshore lift and the offshore-side end of said undersea tunnel, wherein relay vehicles operate for shunting said containers.
10. The container transfer port system according to claims 7 , 8 , and 9, wherein each of said relay vehicles being driven by a person comprises a side deck for loading a container, and a transverse crane for transferring the container transversely.
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20090004836 | 2009-01-21 | ||
KR10-2009-0004836 | 2009-01-21 | ||
KR1020090007928A KR101096890B1 (en) | 2009-01-21 | 2009-02-02 | Container Transfer Port System |
KR10-2009-0007928 | 2009-02-02 |
Publications (1)
Publication Number | Publication Date |
---|---|
US20100183407A1 true US20100183407A1 (en) | 2010-07-22 |
Family
ID=42337080
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US12/398,193 Abandoned US20100183407A1 (en) | 2009-01-21 | 2009-03-05 | Container transfer port system |
Country Status (1)
Country | Link |
---|---|
US (1) | US20100183407A1 (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150353299A1 (en) * | 2014-06-09 | 2015-12-10 | Sergey N. Razumov | Order picking station and method of order picking |
WO2016126504A1 (en) * | 2015-02-08 | 2016-08-11 | Hyperloop Technologies, Inc | Transportation system |
US9533697B2 (en) | 2015-02-08 | 2017-01-03 | Hyperloop Technologies, Inc. | Deployable decelerator |
US9566987B2 (en) | 2015-02-08 | 2017-02-14 | Hyperloop Technologies, Inc. | Low-pressure environment structures |
US9599235B2 (en) | 2015-02-08 | 2017-03-21 | Hyperloop Technologies, Inc. | Gate valves and airlocks for a transportation system |
US9641117B2 (en) | 2015-02-08 | 2017-05-02 | Hyperloop Technologies, Inc. | Dynamic linear stator segment control |
US9764648B2 (en) | 2015-02-08 | 2017-09-19 | Hyperloop Technologies, Inc. | Power supply system and method for a movable vehicle within a structure |
WO2017158034A1 (en) * | 2016-03-15 | 2017-09-21 | Amova Gmbh | Transport and handover system for storing and removing or relocating storage goods in high-bay warehouses, and storage and retrieval machine |
US10683172B2 (en) * | 2018-07-26 | 2020-06-16 | International Business Machines Corporation | Underground storage system with gravitational and buoyancy force-based package delivery |
US10897216B2 (en) | 2015-10-29 | 2021-01-19 | Hyperloop Technologies, Inc. | Variable frequency drive system |
US10958147B2 (en) | 2015-02-08 | 2021-03-23 | Hyperloop Technologies, Inc. | Continuous winding for electric motors |
US20220112675A1 (en) * | 2020-01-21 | 2022-04-14 | Galataport Istanbul Liman Isletmeciligi Ve Yatirimlari Anonim Sirketi | Cruise port operation system and method |
WO2023170331A1 (en) * | 2022-03-11 | 2023-09-14 | Port 2.0 Oy | A storage unit, a system and a method for storing and handling shipping containers |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2781922A (en) * | 1953-05-25 | 1957-02-19 | George J Hibbard | Automobile storage elevator |
US3807582A (en) * | 1971-02-05 | 1974-04-30 | L Anderson | Loading and unloading device for ship containers |
US4024968A (en) * | 1975-09-02 | 1977-05-24 | Towmotor Corporation | Heavy lift side loader truck |
US4739876A (en) * | 1985-01-17 | 1988-04-26 | Weimar, N.V. | Platform conveyor |
US4878796A (en) * | 1987-03-03 | 1989-11-07 | Ammeraal Thomas C M | Conveying apparatus for loading and unloading goods, in particular for use with ships |
US4897012A (en) * | 1987-11-06 | 1990-01-30 | Custom Technologies, Inc. | Cargo handling system |
US5197843A (en) * | 1987-07-09 | 1993-03-30 | ATEBA Automatisieren-Technik Bauen fur Gewerbe und Industrie GmbH | Device for loading and unloading unitary cargo onto and from ships |
US5421688A (en) * | 1991-06-25 | 1995-06-06 | Krupp Industrietechnik Gesellschaft Mit Beschrankter Haftung | Installation for the load transfer of piece goods in the form of load units such as containers, returnable containers, semi-trailers or the like |
US5655625A (en) * | 1995-11-29 | 1997-08-12 | Otis Elevator Company | Emergency elevator cab commandeering shuttle |
US5857821A (en) * | 1995-09-08 | 1999-01-12 | Krupp Fordertechnik Gmbh | System for loading and unloading rail vehicles |
US5861586A (en) * | 1996-06-19 | 1999-01-19 | Otis Elevator Company | Horizontal and vertical passenger transport |
US6378689B1 (en) * | 1999-09-28 | 2002-04-30 | Wst Steuerungstechnik Gmbh | Vertical conveyor for a palletizing apparatus |
US20020071743A1 (en) * | 1999-12-11 | 2002-06-13 | Amoss W. J. | Container cargo transfer system |
US6524050B1 (en) * | 1998-03-10 | 2003-02-25 | Acta Maritime Development Corporation | Container transfer terminal system and method |
-
2009
- 2009-03-05 US US12/398,193 patent/US20100183407A1/en not_active Abandoned
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2781922A (en) * | 1953-05-25 | 1957-02-19 | George J Hibbard | Automobile storage elevator |
US3807582A (en) * | 1971-02-05 | 1974-04-30 | L Anderson | Loading and unloading device for ship containers |
US4024968A (en) * | 1975-09-02 | 1977-05-24 | Towmotor Corporation | Heavy lift side loader truck |
US4739876A (en) * | 1985-01-17 | 1988-04-26 | Weimar, N.V. | Platform conveyor |
US4878796A (en) * | 1987-03-03 | 1989-11-07 | Ammeraal Thomas C M | Conveying apparatus for loading and unloading goods, in particular for use with ships |
US5197843A (en) * | 1987-07-09 | 1993-03-30 | ATEBA Automatisieren-Technik Bauen fur Gewerbe und Industrie GmbH | Device for loading and unloading unitary cargo onto and from ships |
US4897012A (en) * | 1987-11-06 | 1990-01-30 | Custom Technologies, Inc. | Cargo handling system |
US5421688A (en) * | 1991-06-25 | 1995-06-06 | Krupp Industrietechnik Gesellschaft Mit Beschrankter Haftung | Installation for the load transfer of piece goods in the form of load units such as containers, returnable containers, semi-trailers or the like |
US5857821A (en) * | 1995-09-08 | 1999-01-12 | Krupp Fordertechnik Gmbh | System for loading and unloading rail vehicles |
US5655625A (en) * | 1995-11-29 | 1997-08-12 | Otis Elevator Company | Emergency elevator cab commandeering shuttle |
US5861586A (en) * | 1996-06-19 | 1999-01-19 | Otis Elevator Company | Horizontal and vertical passenger transport |
US6524050B1 (en) * | 1998-03-10 | 2003-02-25 | Acta Maritime Development Corporation | Container transfer terminal system and method |
US6378689B1 (en) * | 1999-09-28 | 2002-04-30 | Wst Steuerungstechnik Gmbh | Vertical conveyor for a palletizing apparatus |
US20020071743A1 (en) * | 1999-12-11 | 2002-06-13 | Amoss W. J. | Container cargo transfer system |
Cited By (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150353299A1 (en) * | 2014-06-09 | 2015-12-10 | Sergey N. Razumov | Order picking station and method of order picking |
US10088061B2 (en) | 2015-02-08 | 2018-10-02 | Hyperloop Technologies, Inc. | Gate valves and airlocks for a transportation system |
US20220106136A1 (en) * | 2015-02-08 | 2022-04-07 | Hyperloop Technologies, Inc. | Transportation system |
US9517901B2 (en) | 2015-02-08 | 2016-12-13 | Hyperloop Technologies, Inc. | Transportation system |
US9533697B2 (en) | 2015-02-08 | 2017-01-03 | Hyperloop Technologies, Inc. | Deployable decelerator |
US10093493B2 (en) | 2015-02-08 | 2018-10-09 | Hyperloop Technologies, Inc. | Transportation system |
US9599235B2 (en) | 2015-02-08 | 2017-03-21 | Hyperloop Technologies, Inc. | Gate valves and airlocks for a transportation system |
US9604798B2 (en) | 2015-02-08 | 2017-03-28 | Hyperloop Technologies, Inc. | Transportation system |
US9641117B2 (en) | 2015-02-08 | 2017-05-02 | Hyperloop Technologies, Inc. | Dynamic linear stator segment control |
US9718630B2 (en) | 2015-02-08 | 2017-08-01 | Hyperloop Technologies, Inc. | Transportation system |
US9764648B2 (en) | 2015-02-08 | 2017-09-19 | Hyperloop Technologies, Inc. | Power supply system and method for a movable vehicle within a structure |
US11772914B2 (en) * | 2015-02-08 | 2023-10-03 | Hyperloop Technologies, Inc. | Transportation system |
US9809232B2 (en) | 2015-02-08 | 2017-11-07 | Hyperloop Technologies, Inc. | Deployable decelerator |
US9511959B2 (en) | 2015-02-08 | 2016-12-06 | Hyperloop Technologies, Inc. | Transportation system |
US10046776B2 (en) | 2015-02-08 | 2018-08-14 | Hyperloop Technologies, Inc. | Low-pressure environment structures |
US9566987B2 (en) | 2015-02-08 | 2017-02-14 | Hyperloop Technologies, Inc. | Low-pressure environment structures |
WO2016126504A1 (en) * | 2015-02-08 | 2016-08-11 | Hyperloop Technologies, Inc | Transportation system |
EP3253636A4 (en) * | 2015-02-08 | 2019-01-16 | Hyperloop Technologies, Inc. | TRANSPORT SYSTEM |
US10326386B2 (en) | 2015-02-08 | 2019-06-18 | Hyperloop Technologies, Inc. | Dynamic linear stator segment control |
US10370204B2 (en) | 2015-02-08 | 2019-08-06 | Hyperloop Technologies, Inc. | Transportation system |
US10958147B2 (en) | 2015-02-08 | 2021-03-23 | Hyperloop Technologies, Inc. | Continuous winding for electric motors |
US10906411B2 (en) | 2015-02-08 | 2021-02-02 | Hyperloop Technologies, Inc. | Power supply system and method for a movable vehicle within a structure |
US10897216B2 (en) | 2015-10-29 | 2021-01-19 | Hyperloop Technologies, Inc. | Variable frequency drive system |
AU2017232270B2 (en) * | 2016-03-15 | 2018-12-13 | Amova Gmbh | Transport and handover system for storing and removing or relocating storage goods in high-bay warehouses, and storage and retrieval machine |
WO2017158034A1 (en) * | 2016-03-15 | 2017-09-21 | Amova Gmbh | Transport and handover system for storing and removing or relocating storage goods in high-bay warehouses, and storage and retrieval machine |
US10683172B2 (en) * | 2018-07-26 | 2020-06-16 | International Business Machines Corporation | Underground storage system with gravitational and buoyancy force-based package delivery |
US20220112675A1 (en) * | 2020-01-21 | 2022-04-14 | Galataport Istanbul Liman Isletmeciligi Ve Yatirimlari Anonim Sirketi | Cruise port operation system and method |
US12116741B2 (en) * | 2020-01-21 | 2024-10-15 | Galataport Istanbul Liman Isletmeciligi Ve Yatirimlari Anonim Sirketi | Cruise port operation system and method |
WO2023170331A1 (en) * | 2022-03-11 | 2023-09-14 | Port 2.0 Oy | A storage unit, a system and a method for storing and handling shipping containers |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20100183407A1 (en) | Container transfer port system | |
RU2384510C2 (en) | Method and system for reloading | |
US11174102B2 (en) | System for the transfer, storage and distribution of intermodal containers | |
US6802684B2 (en) | Container tranfer terminal system and method | |
EP1612165B1 (en) | Large-sized automated warehouse system for harbor facilities | |
KR100737362B1 (en) | Redistribution facility | |
JP2017502896A (en) | Stacking crane with intermediate storage area for containers | |
JP2003048625A (en) | Container terminal | |
US3727776A (en) | An integrated system for loading and unloading containers in or from container ships | |
US4055263A (en) | Freight handling method | |
KR101068662B1 (en) | Floating hybrid mobile port | |
EP2192065A1 (en) | Automatic system for handling and transporting containers between a quay and an inland stocking site | |
KR20110017228A (en) | Mobile port system and its simultaneous loading and unloading method | |
KR101096890B1 (en) | Container Transfer Port System | |
ES2625535T3 (en) | A crane | |
JPH0818788B2 (en) | Container crane | |
NL9302101A (en) | Method and installation for unloading and/or transferring packaged cargo | |
KR20150082868A (en) | Container physical distribution system | |
HK1090901B (en) | A method and system for transferring cargo |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |