[go: up one dir, main page]

US20100064856A1 - Process and plant for producing steel - Google Patents

Process and plant for producing steel Download PDF

Info

Publication number
US20100064856A1
US20100064856A1 US12/522,186 US52218607A US2010064856A1 US 20100064856 A1 US20100064856 A1 US 20100064856A1 US 52218607 A US52218607 A US 52218607A US 2010064856 A1 US2010064856 A1 US 2010064856A1
Authority
US
United States
Prior art keywords
converter
slag
intermediate metal
temperature
metal product
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US12/522,186
Inventor
Guido Kleinschmidt
Jochen Schlueter
Walter Weischedel
Udo Falkenreck
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SMS Siemag AG
Original Assignee
SMS Siemag AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SMS Siemag AG filed Critical SMS Siemag AG
Assigned to SMS SIEMAG AKTIENGESELLSCHAFT reassignment SMS SIEMAG AKTIENGESELLSCHAFT ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: WEISCHEDEL, WALTER, FALKENRECK, UDO, SCHLUETER, JOCHEN, KLEINSCHMIDT, GUIDO
Publication of US20100064856A1 publication Critical patent/US20100064856A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/36Processes yielding slags of special composition
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/285Plants therefor
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C2300/00Process aspects
    • C21C2300/08Particular sequence of the process steps
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/52Manufacture of steel in electric furnaces
    • C21C5/5252Manufacture of steel in electric furnaces in an electrically heated multi-chamber furnace, a combination of electric furnaces or an electric furnace arranged for associated working with a non electric furnace
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Definitions

  • the invention is directed to a process and an installation for producing steel and for obtaining slag having a high content of additional elements such as vanadium in a two-step process, wherein the liquid pig iron is initially blown onto a high-grade slag at a lower temperature, the slag being further processed separately after tapping, while the pig iron is supplied to at least one additional converter in which it is blown at a higher temperature to form steel.
  • the processing times in the first converter in which the high-grade slag is generated are substantially shorter than those for producing the steel in the second converter stage.
  • two converters are often used in practice in this second processing step.
  • the above-stated object is met according to the invention in that the intermediate metal product that is tapped from the first converter is subjected to a heating and/or holding phase before being supplied to the second converter.
  • the heating and/or holding is carried out by metered injection of oxygen.
  • the above-stated object is met according to the invention through the use of a heating stand having an oxygen injection device such as an oxygen lance.
  • productivity can be substantially increased at comparatively lower installation costs compared to an installation with three converters which is limited by the required cycle compensation.
  • FIG. 1 is a schematic diagram showing the process flow in an installation according to the invention with a heating stand
  • FIG. 2 is a schematic view of the heating stand
  • FIG. 3 shows a two-step installation according to the prior art with three converters
  • FIG. 4 shows a corresponding installation with two converters.
  • FIGS. 3 and 4 show that the liquid pig iron is initially blown in the converter 1 with the aim of achieving a high-grade slag.
  • the temperature is approximately 1400° C.
  • the intermediate metal product is fed after a compulsory waiting period to two converters 2 and 3 , where it is blown at approximately 1680° C. to form crude steel which is then subjected to further treatment, for example, in a vacuum installation.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Botany (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

A process for producing steel and for obtaining slag having a high content of additional elements such as vanadium in a two-step process. Liquid pig iron is initially blown onto a high-grade slag at a lower temperature, the slag being further processed separately after tapping, while the pig iron is supplied to at least one additional converter in which it is blown at a higher temperature to form steel. A high-grade slag is generated while shortening the steel production process using the process in that the intermediate metal product that is tapped from the first converter is subjected to a heating and/or holding phase before being supplied to the second converter.

Description

  • The invention is directed to a process and an installation for producing steel and for obtaining slag having a high content of additional elements such as vanadium in a two-step process, wherein the liquid pig iron is initially blown onto a high-grade slag at a lower temperature, the slag being further processed separately after tapping, while the pig iron is supplied to at least one additional converter in which it is blown at a higher temperature to form steel.
  • The processing times in the first converter in which the high-grade slag is generated are substantially shorter than those for producing the steel in the second converter stage. In order to overcome this disadvantage without having to set aside a waiting time to compensate for the different cycles, two converters are often used in practice in this second processing step.
  • Another problem which must be considered is that the working temperature in the first step is approximately 1400° C., while the temperature in the steel production step is approximately 1680° C.
  • Accordingly, whereas waiting times inevitably occur between the first, faster step and the second step in a two-step installation, the installation with two converters in tandem does not make full use of the working capacity of the two converters of the second stage for production of steel.
  • Apart from this, the total investment costs for two converters in the second stage are naturally higher.
  • Finally, there are other disadvantages with respect to the process in the installation having only one converter per step because the required waiting time before the second converter can be charged, that is, before this second converter is unoccupied again, leads to loss of production and, in some cases, also considerable problems for the melt because of the inevitable freezing to the transfer vessel.
  • Therefore, it is the object of the invention to provide a process and an installation which overcome the above-mentioned disadvantages and by which a high-grade slag can be produced on the one hand and the entire steel production process can be shortened on the other hand.
  • In a process in which the liquid pig iron is initially blown onto a high-grade slag at a lower temperature, the slag being further processed separately after tapping, while the pig iron is supplied to at least one additional converter in which it is blown at a higher temperature to form steel, the above-stated object is met according to the invention in that the intermediate metal product that is tapped from the first converter is subjected to a heating and/or holding phase before being supplied to the second converter.
  • The heating and/or holding is carried out by metered injection of oxygen.
  • With respect to the installation, the above-stated object is met according to the invention through the use of a heating stand having an oxygen injection device such as an oxygen lance.
  • As a result of the process according to the invention, the cycle times between blowing in the first converter and the production of the pig iron in the second converter, which proceeds substantially more slowly, are rendered insignificant because this time period can be bridged in the heating stand.
  • By supplying oxygen by means of a blowing lance, a portion of the carbon contained in the intermediate metal product is burnt off. The amount of injected oxygen can now be variously metered; specifically, it is possible merely to maintain the temperature during the waiting cycle, that is, to compensate for temperature losses which occur normally.
  • But, on the other hand, a larger amount of oxygen can also be supplied. In this way, the blowing process in the subsequent converter can be shortened because of the higher carbon burnoff. At the same time, however, the higher burnoff of carbon raises the temperature of the melt so that the higher temperature of about 1680° C. for the second blowing process can be reached already when transferring to the second converter. Also, this substantially reduces the treatment time in this second blowing step.
  • Because of the resulting overall reduction in treatment time in the installation, productivity can be substantially increased at comparatively lower installation costs compared to an installation with three converters which is limited by the required cycle compensation.
  • The invention will be described in the following with reference to the drawings.
  • FIG. 1 is a schematic diagram showing the process flow in an installation according to the invention with a heating stand; and
  • FIG. 2 is a schematic view of the heating stand;
  • FIG. 3 shows a two-step installation according to the prior art with three converters;
  • FIG. 4 shows a corresponding installation with two converters.
  • FIGS. 3 and 4 show that the liquid pig iron is initially blown in the converter 1 with the aim of achieving a high-grade slag. The temperature is approximately 1400° C. After tapping the slag which is then fed to a refining step, the intermediate metal product is fed after a compulsory waiting period to two converters 2 and 3, where it is blown at approximately 1680° C. to form crude steel which is then subjected to further treatment, for example, in a vacuum installation.
  • As was already mentioned above, the two converters in tandem in an installation of this kind can often not reach the working capacity of these converters. This disadvantage does not occur in the installation shown in FIG. 4, but in this case the waiting times required for adapting the blowing cycle of the first converter to the second converter constitute a significant, negative factor.
  • This disadvantage is remedied by the installation according to the invention in which a heating stand is provided between the two converter stages.
  • FIG. 2 is a schematic view showing how this heating stand might look, namely, by way of the example of an installation having two receptacles for transfer vessels. The left-hand side of the drawing shows the transfer vessel with the intermediate metal product contained therein in the blowing position in which oxygen is supplied or injected through a lance. The right-hand side of the drawing shows a transfer vessel which can be closed by a cover.

Claims (13)

1.-5. (canceled)
6. A process for producing steel and obtaining slag having a high content of additional elements comprising:
blowing liquid pig iron onto a high-grade slag at a first temperature in a first converter;
tapping an intermediate metal product from the first converter;
subjecting the intermediate metal product to at least one of a heating and a holding phase;
tapping the slag from the first converter
processing the slag after tapping; and
supplying the pig iron intermediate metal product to at least one additional converter in which it is blown at a second temperature to form steel, the second temperature being greater than the first temperature
7. The process according to claim 6, wherein the intermediate metal product is heated during the holding phase by injecting oxygen.
8. An apparatus for producing steel and obtaining slag having a high content of additional elements comprising:
a transfer vessel configured to transfer an intermediate metal;
a first converter for blowing liquid pig iron;
at least one second converter for producing crude steel configured to receiving the intermediate metal product tapped from the first converter; and
a heating stand configured to station the transfer vessel transferring the intermediate metal product from the first converter to the at least one second converter.
9. The apparatus according to claim 8, wherein the heating stand is configured to receive a plurality of transfer vessels.
10. The apparatus according to claim 8, further comprising a device for injecting oxygen into the transfer vessel when the transfer vessel is stationed at the heating stand.
11. The apparatus according to claim 8, wherein the vessel comprises a cover.
12. The apparatus according to claim 10, wherein the device for injecting oxygen into the transfer vessel is a lance.
13. The process according to claim 6, wherein the additional elements comprise vanadium.
14. The process according to claim 6, wherein the first temperature is about 1400 degrees Celsius.
15. The process according to claim 6, wherein the second temperature is about 1680 degrees Celsius.
16. The process according to claim 7, wherein the injected oxygen is metered.
17. The apparatus according to claim 8, wherein the heating stand is located between the first converter and the at least one second converter.
US12/522,186 2007-01-04 2007-12-10 Process and plant for producing steel Abandoned US20100064856A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE102007001098.4 2007-01-04
DE102007001098A DE102007001098A1 (en) 2007-01-04 2007-01-04 Process and plant for the production of steel
PCT/DE2007/002236 WO2008080379A1 (en) 2007-01-04 2007-12-10 Process and plant for producing steel

Publications (1)

Publication Number Publication Date
US20100064856A1 true US20100064856A1 (en) 2010-03-18

Family

ID=39232915

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/522,186 Abandoned US20100064856A1 (en) 2007-01-04 2007-12-10 Process and plant for producing steel

Country Status (12)

Country Link
US (1) US20100064856A1 (en)
EP (1) EP2108049B1 (en)
JP (1) JP5144681B2 (en)
KR (1) KR20090085156A (en)
CN (1) CN101573457B (en)
CA (1) CA2674131A1 (en)
DE (1) DE102007001098A1 (en)
RU (1) RU2418073C2 (en)
TW (1) TW200848518A (en)
UA (1) UA93610C2 (en)
WO (1) WO2008080379A1 (en)
ZA (1) ZA200903500B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102014222727A1 (en) * 2014-11-06 2016-05-12 Sms Group Gmbh Method and device for producing a stainless steel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3484088A (en) * 1966-06-03 1969-12-16 Impianti Spa Soc It Multi-converters pneumatic steelmaking plant
US4726839A (en) * 1985-04-26 1988-02-23 Voest-Alpine Aktiengesellschaft Process and an arrangement for the production of steel from sponge iron
US5160477A (en) * 1990-07-13 1992-11-03 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Temperature maintenance and metallurgical treatment furnace
US20050214157A1 (en) * 2004-03-29 2005-09-29 Stueck Gary A High strength steel
US20090031860A1 (en) * 2004-11-12 2009-02-05 Johann Reichel Production of Stainless Steel of AISI 4XX Grade Ferritic Steel in an Aod Converter

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5423017A (en) 1977-07-23 1979-02-21 Sumitomo Metal Ind Ltd Manufacture of low phosphorus steel
DE3530043A1 (en) 1985-08-22 1987-02-26 Linde Ag METHOD AND DEVICE FOR KEEPING A MEL IN A PAN
JPS63500873A (en) * 1985-08-22 1988-03-31 ウラルスキ− ナウチノ−イスレドワ−チエルスキ− インスチツ−ト チエルヌイフ メタロフ Vanadium slag and its manufacturing method
JP3776778B2 (en) * 2001-09-26 2006-05-17 株式会社神戸製鋼所 Method of removing vanadium from molten iron
CN100427630C (en) * 2005-12-29 2008-10-22 攀枝花钢铁(集团)公司 Production method of high-strength atmospheric corrosion-resistant steel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3484088A (en) * 1966-06-03 1969-12-16 Impianti Spa Soc It Multi-converters pneumatic steelmaking plant
US4726839A (en) * 1985-04-26 1988-02-23 Voest-Alpine Aktiengesellschaft Process and an arrangement for the production of steel from sponge iron
US5160477A (en) * 1990-07-13 1992-11-03 L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude Temperature maintenance and metallurgical treatment furnace
US20050214157A1 (en) * 2004-03-29 2005-09-29 Stueck Gary A High strength steel
US20090031860A1 (en) * 2004-11-12 2009-02-05 Johann Reichel Production of Stainless Steel of AISI 4XX Grade Ferritic Steel in an Aod Converter

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Cone "A converter foundry of large capacity", The Iron Age, 96 (13), 669-674, 1915 *

Also Published As

Publication number Publication date
EP2108049A1 (en) 2009-10-14
JP5144681B2 (en) 2013-02-13
ZA200903500B (en) 2010-04-28
JP2010514942A (en) 2010-05-06
KR20090085156A (en) 2009-08-06
CA2674131A1 (en) 2008-07-10
UA93610C2 (en) 2011-02-25
TW200848518A (en) 2008-12-16
RU2009129676A (en) 2011-02-10
CN101573457A (en) 2009-11-04
WO2008080379A1 (en) 2008-07-10
RU2418073C2 (en) 2011-05-10
CN101573457B (en) 2015-05-20
EP2108049B1 (en) 2013-02-27
DE102007001098A1 (en) 2008-07-10

Similar Documents

Publication Publication Date Title
CA2773024C (en) Flexible minimum energy utilization electric arc furnace system and processes for making steel products
US20100064856A1 (en) Process and plant for producing steel
KR20160003757A (en) Method for melting metal material in a melting plant and relative melting plant
CN103993118B (en) A kind of smelting method of vanadium-containing ilmenite
US5242484A (en) Plant for the processing of molten steel and method for the operation of such a plant
CN101389773B (en) Electric arc furnace steelmaking
EP0626547A1 (en) Process and installation for the liquid steel production from carbon-rich ferruginous material
CN106834592A (en) A kind of method that steel treatment is melted down in converter
KR20040091715A (en) Method and installation for producing stainless steel, especially high-quality steel containing chromium or nickel chromium
CA2467310A1 (en) Combined ironmaking and steelmaking plant
KR20190027552A (en) Method and installation for producing stainless steel,especially high-quality steel containing chromium ornickel chromium
JP6520255B2 (en) Operation method of converter
JP6414097B2 (en) How to reuse molten steel
KR100384635B1 (en) High-speed melting method in electric furnace
JP2018178190A (en) Method for heating-up molten iron
Bolshakov et al. New complex for the ultra-deep desulfurization of pig iron in large charging ladles
JPS58199831A (en) Production of al alloy cast ingot
JPS5836047B2 (en) Continuous steel manufacturing method
JPH06316720A (en) Converter steelmaking plant
JPS6340846B2 (en)
JP2000239722A (en) Pressurized waste metal refining method
KR20150015583A (en) Refining and degassing treatment apparatus and treatment method of non-heat treated steel
JPH0336210A (en) Method and apparatus for vacuum-refining steel

Legal Events

Date Code Title Description
AS Assignment

Owner name: SMS SIEMAG AKTIENGESELLSCHAFT,GERMANY

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:KLEINSCHMIDT, GUIDO;SCHLUETER, JOCHEN;WEISCHEDEL, WALTER;AND OTHERS;SIGNING DATES FROM 20090716 TO 20090728;REEL/FRAME:023136/0317

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION