Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Василь Володимирович Тодіріка, Василий Владимирович Тодирика, Іван Олександрович Федоренко, Иван Александрович Федоренко, Михайло Антонович Пилипенко, Михаил Антонович ПилипенкоfiledCriticalВасиль Володимирович Тодіріка
Priority to UA2000010002FpriorityCriticalpatent/UA36557A/en
Publication of UA3892SpublicationCriticalpatent/UA3892S/en
Publication of UA36557ApublicationCriticalpatent/UA36557A/en
The invention relates to area of bridge construction and can be used for reinforcement of existing beam span structures of bridges at implementation of capital repair of those. Method for reinforcement of beam span structure of bridge includes removal of bridge sheet till opening upper surface of beam span structure of bridge and laying monolithic reinforced-concrete plate. Before laying monolithic reinforced-concrete plate on beams of existing span structure of bridge in zone of tension long reinforcement elements are installed, those are connected to beams with glue joint.
UA2000010002F2000-01-042000-01-04Method for reinforcement of beam span of a bridge
UA36557A
(en)