TWI307865B - Stamping products designing management system and method - Google Patents
Stamping products designing management system and method Download PDFInfo
- Publication number
- TWI307865B TWI307865B TW93125731A TW93125731A TWI307865B TW I307865 B TWI307865 B TW I307865B TW 93125731 A TW93125731 A TW 93125731A TW 93125731 A TW93125731 A TW 93125731A TW I307865 B TWI307865 B TW I307865B
- Authority
- TW
- Taiwan
- Prior art keywords
- design
- module
- work
- engineering design
- parameters
- Prior art date
Links
Landscapes
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
1307865 業的競爭 提高生產 的發展與 System ) 應用。在 大的發展 耗為目標 ,更重要 有效的監 。現代製 期縮短, 戶下單、 產中的對 之技術領域】 涉及一種工程設計營理么^ 铲 < 呌戽评金姑n 糸統及方法,特別是 私S史汁官理糸統及方法。 4 & 五、發明說明(1) 【發明所屬 本發明 種鈑金件工 【先前技術 現代企 地位,如何 著電腦技術1307865 Industry competition to improve production development and System) applications. In the big development, the consumption is the goal, and more important, the effective supervision. The modern system is shortened, and the technical field of the household order and production is involved in an engineering design. ^Shovel < 呌戽评金姑 n 糸 及 and methods, especially private S method. 4 & invention description (1) [the invention belongs to the invention of sheet metal work [previous technology modern enterprise status, how to use computer technology
Management 到了廣泛的 法得到了極 力、降低消 成本的優化 反饋,進行 目標的實現 產品生命周 要求,從客 後大批量生 越來越激烈 效率已成為 應用,專案 在製造業j 最近的幾十 ,它以縮短 。在計劃制 的是在計劃 督、控制和 造業生產的 為了快速、 樣品設計、 各種工作專 ,為保證企業的市場競爭 ^業的一大關注焦點。隨 官理系統(Project -程製造、工程設計中得 年中,專案管理系統和方 =期、提高效率、節約勞 定期間求得工期、資源、 的執行過程中,籍由資訊 調整,能夠保證專案預定 自動化程度進一步提高, 準確、及時回應客戶市場 樣品製作、樣品修改到最 案都需要進行有效的管理 微軟公司(Microsoft)的project 98,p Μ㈧,Pr0ject XP等系列專案管理軟體因盆 泛用性,目如在建築業、製造業、政府行政、 等仃業的專案管理活動中得到了廣泛的應用,以p · D ” 200 0軟體為例,Pro ject 2000把一個工作專牵八兔」eCl: 任務’把-個任務劃分為以下四個階段進行管:;干個Management has come to a wide range of methods to get the best feedback, reduce the cost of optimization feedback, to achieve the target product life cycle requirements, from the customer after the mass production of more and more intense efficiency has become an application, the project in the manufacturing industry j recent dozens, It is shortened. In the planning system, it is planned to supervise, control and manufacture. In order to ensure the rapid competition, sample design, and various work, it is a major concern for the company's market competition. With the official system (Project-process manufacturing, engineering design in the middle of the year, project management system and party = period, improve efficiency, save labor period during the implementation period, resources, the implementation process, the information adjustment, can guarantee The automation of the project is further improved, and the accurate and timely response to the customer market sample production, sample modification to the most cases need to be effectively managed Microsoft Corporation (Microsoft) project 98, p 八 (eight), Pr0ject XP and other series of project management software for pan-pan Sexuality has been widely used in project management activities such as construction, manufacturing, government administration, etc., taking the example of p · D ” 200 0 software, Pro ject 2000 takes a job for eight rabbits. eCl: The task 'divides the tasks into the following four stages:
1307865 五、發明說明(2) ::ί(原始計劃)、當前計劃、實際計劃和待執行 二罟次”、、°十劃或未完成計劃),它為每個階段的計劃都 設置了貧f攔,用戶隨時都可以查看。使用Project軟體 進!I專案s理的好處是用戶把採集到的專案任務完成和變 = 似士 2_後,系統就按專案實際發生的 :個袁::個專案計劃的計算’ _定新的關鍵路徑,預測 整專案則景。用戶能在同一張表上或橫道圖上查看到一 ΐ ί務的ΐΞ基準計劃"、"已經完成的計劃”及"待執行的 计的各種資料,依據這些充分的資料進 配,從而按期完成專案。 女排調 美國專利商標局1 998年6月2日公告的專利號為 5, 76 1,0 63 專利名稱為Design and Engineering Pr〇ject Management System (設計及工程項目管理系統)的專利 揭露了一種可用於管理存在多個複雜零部件的設計及工 項目的電腦系統’例如汽車設計領域及航空設計領域。該 系統包括一電腦處理晶片,記憶體,資料庫,一個或多^ 顯示裝置,進行分析判斷的邏輯處理模組,籍由邏 模組將一個複雜的設計及工程項目分解成若干個子 子部件,生成詳細的作業步驟,並顯示輸出結果。'、· 但是,上述先*前技術都是以工作專帛本身作為對 行管理,而不是以工作單位為對象進行管理,同時 了滿足上述管理系統軟體的廣泛的適用性,在使用對又 種限制資源的設定變化都必須手動進行設定,限制 管理的效率’上述管理系統軟體不能滿足于現代製造21307865 V. Invention description (2) ::ί (original plan), current plan, actual plan and pending two-times, “°10 or unfinished plan”, which sets poverty for each stage of the plan f block, the user can view at any time. Use Project software to enter! The advantage of I project is that the user completes the task of the collected project and changes = like 2_, the system actually happens according to the project: a Yuan:: The calculation of a project plan ' _ new critical path, predicting the overall project situation. Users can view the ΐΞ ΐΞ ΐΞ benchmark plan ", " completed plan on the same table or on the cross-road map "and " various materials to be executed, based on these sufficient information, so as to complete the project on time. The women's volleyball company's patent number is 5, 76 1,0 63. The patent name for the Design and Engineering Pr〇ject Management System patent reveals a For the management of computer systems with multiple complex parts design and engineering projects, such as automotive design and aerospace design. The system comprises a computer processing chip, a memory, a data library, one or more display devices, and a logic processing module for analyzing and judging, and the logic module is used to decompose a complex design and engineering project into several sub-components. Generate detailed job steps and display the output. ', · However, the above-mentioned first *pre-technology is based on the work of the work itself as the management of the line, rather than the work unit as the object of management, while meeting the wide applicability of the above-mentioned management system software, in the use of the same kind Restricted resource setting changes must be manually set to limit the efficiency of management 'The above management system software can not be satisfied with modern manufacturing 2
第10頁 1307865Page 10 1307865
以工作部門為單 進行管理的需求 【發明内容】 位’需要對幾十甚至數千個 工作專案同時 本發明的主要 理系統及方法,用 設計部門為對象, 輸出如排配計劃表 本發明揭露一 戶訂單,對鈑金件 監控資料,本系統 戶許可權、工段參 計產能參數;一工 表、排配計劃表、 表、績效考核資料 於與標準參數資料 上述資料庫中的資 取伺服器包括一存 標時,存取標準參 ;至少一用戶端電 與上述存取伺服器 設置模組,用於設 ,用於分析評估訂 及完成工程設計的 用於分析判斷各設 目的在於提供一種 於以設計工程師及 對鈑金件工程設計 、人員績效考核表 種鈑金件工程設計 的工程設計進程進 包括:一標準參數 數、標準工時參數 程設計管理資料庫 工作進度表、各部 ;一存取伺服器, 庫及工程設計管理 料;至少一備用存 取模組,用於在存 數資料庫及工程設 腦,提供一互動式 連接。其中用戶端 置系統標準參數; 單產品所涉及的製 標準工時;一工作 計單位及工程師設 鈑金件的工程設計管 設計單位如設計組、 進行管理監控並生成 等各種文件。 管理系統’能依據客 行管理監控,並輸出 資料庫,用於存儲用 、部門組織參數、設 ’用於存儲客戶訂單 門及工程師工作負荷 包括一存取模組,用 資料庫相連接,存取 取伺服器,該備用存 取伺服器工作負荷超 計管理資料庫的資料 用戶介面,籍由網路 電腦包括有:一系統 —訂單評估分析模組 造工藝可行性評估以 任務排配模擬模組, 計工作負荷,排配工The need to manage the work department as a single item [Summary of the invention] The position of 'the need for tens or even thousands of work projects at the same time the main rationale system and method of the present invention, with the design department as the object, output such as the allocation plan table. One order, the monitoring information of sheet metal parts, the permission of the system, the parameter of the production capacity of the section; the sheet of work, the schedule, the table, the performance appraisal data and the resource server in the above database with the standard parameter data Including a standard entry, accessing standard parameters; at least one user terminal and the above-mentioned access server setting module, for setting up, analyzing and completing engineering design for analysis and judgment, each setting is to provide a In the engineering design process of design engineer and sheet metal engineering design and personnel performance evaluation sheet metal sheet engineering design, including: a standard parameter number, standard working time parameter design management database working schedule, each department; one access Server, library and engineering design management materials; at least one spare access module for storing data and engineering Brain, providing an interactive connection. Among them, the user sets the system standard parameters; the standard working hours involved in the single product; the engineering design tube design unit of the work unit and the engineer's sheet metal parts, such as the design group, management monitoring and generation and other various documents. The management system can manage and monitor according to the customer's line, and output the database for storage, department organization parameters, set up 'for storing customer order gates and engineer workloads including an access module, connect with the database, save Obtaining a server, the standby access server workload exceeds the data user interface of the management database, and the network computer includes: a system-order evaluation analysis module manufacturing process feasibility evaluation to task scheduling simulation mode Group, work load, dispatcher
1307865 五、發明說明(4) 裎設計工作’並對排配結果進行模擬,判斷分析無誤後生 成排配計劃表傳送給相關單位執行;一工作追蹤反饋模組 ,用於追蹤反饋各工段當前工作進度及各設計單位及工程 師設計工作負荷,動態更新上述工程設計管理資料庫中的 各部門及工程師工作負荷表;一查詢模組,用於查詢客戶 訂單表、排配計劃表、當前工作進度、各設計單位及工程 師工作負荷表並可以輸出查詢結果。上述系統設置模組包 括如下子模組:一用戶權限設置子模組,用於設置用戶名 、用戶密碼、用戶使用管理權限;一工段設置子模組,用 於設置工程設計中涉及的多個設計工段參數;一標準工時 設置子模組’用於設置各設計工段的標準工時;一部門組 織設置子模組,用於設置部門的組織架構、人員組織資訊 ’具體配置各層次的人員和工作權責;一設計產能設置子 模組’用於設置最大設計產能參數與標準設計產能參數。 上述工作任務排配模擬模組包括如下子模組:一負荷分析 子模組’用於分析判斷各設計單位及工程師設計工作負荷 ’一工程設計排配子模組,用於排配工程設計工作的進程 ’一排配模擬子模組,用於對已排配的工程設計進程進行 模擬’確保工作排配合理無誤;—指令生成子模組,用於 生成排配計劃表;一指令發送子模組,用於將生成排配計 劃表傳送給相關部門、工程師執行。 本發明還揭露一種鈑金件工程設計管理方法,能依據 客戶訂單’對鈑金件的工程設計進行管理,本方法包括如 下步驟:(a )設置系統標準參數如用戶權限、工段參數1307865 V. Invention description (4) 裎 Design work 'simulates the results of the allocation, judges the analysis and generates the allocation schedule to be transmitted to the relevant units for execution; a work tracking feedback module is used to track the current work of each section The schedule and the design work load of each design unit and engineer dynamically update the work load table of each department and engineer in the above engineering design management database; a query module is used to query the customer order form, the allocation schedule, the current work schedule, Each design unit and engineer workload table can output the query results. The system setting module includes the following sub-modules: a user permission setting sub-module for setting a user name, a user password, and a user using the management authority; and a section setting sub-module for setting a plurality of engineering design Design section parameters; a standard working time setting sub-module 'used to set the standard working hours of each design section; a department organization setting sub-module, used to set the department's organizational structure, personnel organization information' specific configuration of each level of personnel And work rights and responsibilities; a design capacity setting sub-module 'used to set the maximum design capacity parameters and standard design capacity parameters. The above work task scheduling simulation module comprises the following sub-modules: a load analysis sub-module 'for analyzing and judging each design unit and engineer design work load' - an engineering design arranging sub-module for arranging engineering design work Process 'a row of analog sub-modules for simulating the assigned engineering design process' to ensure that the work layout is reasonable; - command generation sub-module for generating the scheduling plan; Group, used to transfer the generated scheduling schedule to relevant departments and engineers for execution. The invention also discloses a sheet metal engineering design management method, which can manage the engineering design of the sheet metal parts according to the customer order, the method comprises the following steps: (a) setting system standard parameters such as user authority and section parameters
第12頁 1307865Page 12 1307865
五、發明說明(5) 、標準工時參數、部門組織參數、設計產能參數;(b ) 讀取客戶訂單;(c )分析評估訂單產品所涉及的製造工 藝可行性評估以及完成工程設計的標準工時;(d )工作 任務排配模擬,即讀取工程設計管理資料庫,分析判斷各 設計單位及工程師設計工作負荷’排配工程設計工作,並 對排配結果進行模擬,判斷排配結果合理無誤後生成排配 計劃表傳送給相關部門、工程師執行;(e )追蹤反饋各 工段當前工作進度及各設計單位及工程師設計工作負荷, 動態更新上述工程設計管理資料庫中的各部門及工程師工 作負荷表;(f )查詢客戶訂單表、排配計劃表、當前工 作進度、各設計單位及工程師工作負荷表並可以輸出查詢 結果;(g)依據上述工作追蹤反饋步驟提供的資訊,對 工程SX计單位及工程師進行績效考核並輸出績效考核結果 的步驟。 利用本發明,可以依據客 計及設計部門進行管理監控並 員績效考核表等各種管理監控 部門工作效率,依照客戶要求 【實施方式】 戶訂單需求對鈑金件工程設 生成輸出如排配計劃表、人 文件’提高鈑金件工程設計 完成設計任務。 如弟 戶端電腦丨曰錄1/^个赏听的系統硬體架構圖,其中用 、顯示器及鍵盤、滑鼠,安裝有二:?、記憶體、硬碟 種基於TCP/IP通訊協定的‘ 面。網路2是- 电于網路,错由網路2可以將用5. Description of invention (5), standard working hours parameters, departmental organization parameters, design capacity parameters; (b) reading customer orders; (c) analyzing and evaluating the manufacturing process feasibility assessment of the ordered products and the criteria for completing the engineering design Working hours; (d) work task scheduling simulation, that is, reading the engineering design management database, analyzing and judging the design work load of each design unit and engineer 'distribution engineering design work, and simulating the distribution result to judge the distribution result After reasonable and correct, the dispatching schedule is transmitted to relevant departments and engineers for execution; (e) tracking and feedback the current work progress of each section and the design workload of each design unit and engineer, and dynamically updating the departments and engineers in the above engineering design management database. Workload table; (f) query customer order form, allocation schedule, current work schedule, design units and engineer workload tables and output query results; (g) information provided according to the above work tracking feedback step Steps for SX units and engineers to perform performance appraisal and output performance appraisal results . By using the invention, the management efficiency of various management and monitoring departments, such as management monitoring and performance appraisal tables, can be performed according to the customer plan and the design department, and the output order of the sheet metal parts is generated according to the customer's request [implementation method] The human file 'improves the sheet metal engineering design to complete the design task. For example, if you have a computer hardware record, you can use the monitor, keyboard, and mouse to install two: , memory, hard disk based on the TCP / IP protocol. Network 2 is - electricity on the network, the wrong network 2 can be used
1307865 五、發明說明 戶端電腦1與一存取伺服器3和至少一備用存取伺服器4連 接丄存^饲服器3籍由連接5與標準參數資料庫6和工程設 °十2理貝料庫7中相連接’用於存取標準參數資料庫6和工 程认斤官理資料庫7中的資料,備用存取伺服器4用於在存 取器工作負荷超標時,代替存取伺服器3存取標準參 數5貝料庫6及工程設計管理資料庫7中的資料,第一圖中只 顯不一台備用存取伺服器。連接5是一種Sql server 200 0 -貝料庫連接(SQL Database Connectivity,SDBC),也 可以疋其他如開放式資料庫連接(〇pen Diabase1307865 V. The invention shows that the client computer 1 is connected to an access server 3 and at least one standby access server 4, and the storage device is provided by the connection 5 and the standard parameter database 6 and the engineering setting. The connection in the shell library 7 is used to access the data in the standard parameter database 6 and the engineering database 7, and the standby access server 4 is used to replace the access when the accessor workload exceeds the standard. The server 3 accesses the data in the standard parameter 5 bunker library 6 and the engineering design management database 7, and only one alternate access server is displayed in the first figure. Connection 5 is a Sql server 200 0 - SQL Database Connectivity (SDBC), can also be connected to other open database (〇pen Diabase
Connectivity ’ODBC) ’ 或者 java 資料庫連接(java Database Connectivity,JDBC )。標準參數資料庫6 是一 種SQL Server 2000資料庫或其他類型資料庫,用於存儲 用戶權限、工段參數、標準工時參數、部門組織參數、設 計?能參數。其中用戶權限為用戶名、用戶密碼及不同用 戶擁有不同的管理使用系統的權限配置;工段參數為鈑金 件工程設計中的各種設計工段如下料、折彎、鐳射等的具 體加工參數,包括加工精度、加工尺寸範圍等;標準工時 參數為預先設定設計工程師、設計組、設計部門的標準設 計時間;部門組織參數為設計工程師、設計組、設計部門 的組織架構及職能劃分、設計能力權重偏向等;設計產能 參數包括最大設計未能參數與標準產能參數,是預先設定 的設計工程師、設計組、設計部門的最大設計產能參數或 者標準產能參數,例如設定某工程師一小時的設計產能為 1,則每天的標準產能為8 ’假設每天最大可以加班時間為Connectivity 'ODBC' or java database Connectivity (JDBC). The standard parameter database 6 is a SQL Server 2000 database or other type of database for storing user rights, section parameters, standard work parameters, department organization parameters, design? Can parameters. The user authority is the user name, the user password and the different user have different permission to configure the management system; the segment parameters are the specific processing parameters of the various design sections in the sheet metal engineering design, such as materials, bending, laser, etc., including machining accuracy. The standard working time parameter is the standard design time of the design engineer, the design team and the design department. The organizational parameters of the department are the organizational structure and functional division of the design engineer, design team, design department, design capability weight bias, etc. The design capacity parameters include the maximum design failure parameters and standard capacity parameters, which are the maximum design capacity parameters or standard capacity parameters of the design engineer, design team, and design department. For example, if an engineer's design capacity is set to 1 for one hour, The standard capacity per day is 8 '. Suppose the maximum overtime per day is
第14頁 1307865 五、發明說明(7) 2小時’則該工程師每天的最大設計產能為1 〇,最本設計 產能參數和標準產能參數還有每周、每月、每季度的標準 ’設計組的設計產能為其所屬工程師產能之和,設計部門 的》又。十產成為其所屬設計組產能之和。除了使用時間來作 為變數參數外’還可以用其他的變數參數如完成工段數來 表示。工程設計管理資料庫7是一種SQL Server 2000資料 庫或者其他類型資料庫,用於存儲客戶訂單表、排配計劃 表、工作進度表、工程師及各部門工作負荷表、績效考核 資料,客戶訂單表記錄將客戶直接訂單按照預定格式進行 轉化整理的資料;排配計劃表記錄設計工程師、設計組、 設計部門的每日、每周、每月設計任務排配計劃;工作進 度表記錄各設計工段的當前工作進度,可以依照案件名稱 、工程師、設計組、設計㈣、客戶等多個分類類別 二程師及各部門工作負荷表記錄工程師及設計組 部門的排配及當前工作量占其設計?能中的負。 路8是一種基於TCP/IP通訊協定的電子網路,籍由網路8罔Page 14 1307865 V. Invention Description (7) 2 hours' The engineer's maximum design capacity per day is 1 〇. The most designed capacity parameters and standard capacity parameters are also weekly, monthly, and quarterly standard design teams. The design capacity is the sum of the productivity of its engineers, and the design department. Ten productions become the sum of the production capacity of its design group. In addition to using time as a variable parameter, other variable parameters such as the number of completed segments can be used. The Engineering Design Management Database 7 is a SQL Server 2000 database or other type of database for storing customer order forms, scheduling schedules, work schedules, engineer and department workload tables, performance review data, customer order forms. Record the data of the customer's direct order conversion according to the predetermined format; the allocation schedule records the daily, weekly, and monthly design task scheduling plan of the design engineer, design team, and design department; the work schedule records the design sections. The current work schedule can be based on the name of the case, the engineer, the design team, the design (4), the customer, and other classification categories. The two-shift division and the work load table of each department record the layout and current workload of the engineer and design team. Negative in energy. Road 8 is an electronic network based on TCP/IP protocol, based on network 8罔
以將本發明鈑金件工程設計管$ _ T 七 ^ . T e理糸統與外部系統9連接起 來’實現資料資源分享。外部糸絲q亦,ν β \ 1 管理系統,也可以是互聯網J 内部資訊 如第二圖所#,為本發明存取二:纟貧訊纟理系統。 -欠』丨* 明存取飼服器的功能模组阁 -貝枓存取模組31用於存取標準參數 衩組圖。 里貝枓庫7中的貝枓,負何判斷模組32 伺服器3的工作負荷,在判斷在抱向 。#斷刀析存取 時’發出指令開通備用存取伺服5二:3的工作負荷超標 # 1 j服器4開始存取工作。In order to realize the sharing of data resources, the sheet metal engineering design management unit of the present invention is connected with the external system 9. The external twisted wire q, ν β \ 1 management system, can also be the internal information of the Internet J, such as the second figure, #, is the access of the present invention: 纟 poor information processing system. - 欠 丨 明 明 存取 存取 存取 存取 存取 存取 存取 存取 存取 存取 存取 存取 存取 存取 存取 存取 存取 存取 存取 存取 存取 存取 存取 存取In the case of the Belle in the Rebecca Library 7, the workload of the module 32 server 3 is judged to be in the hug. #断刀析存取 When the command is issued, the standby access servo 5 2: 3 is overloaded with the workload # 1 j The server 4 starts accessing the work.
1307865 立、發明說明(8) 如第三圖所示,為本發明備用存取伺服器的功能模組 圖。資料存取模組4 1用於存取標準參數資料庫6和工程設 計管理資料庫7中的資料;負荷判斷模組4 2用於判斷分析 備用存取伺服器4的工作負荷,在判斷存取伺服器4的工作 負荷超標時’發出指令開通其他備用存取伺服器開始存取 工作。 如第四圖所示,為本發明用戶端電腦的功能模組圖。 系統設置模組11用於設置系統標準參數如用戶許可權、標 準工時參數、工段參數、標準工時參數、部門組織參數、 最大設計產能參數與標準產能參數;訂單評估分析模組】2 用於分析評估訂單產品所涉及的製造工藝可行性評估以及 完成工程設計的標準工時;工作任務排配模擬模組丨3,用 於分析判斷各設計單位及工程師設計工作負荷,排配工程 設計工作,並對排配結果進行模擬,判斷分析無誤後生成 排配片劃表傳送給相關單位執行;工作追縱反饋模組1 4, 1於追蹤反饋各工段當前工作進度及各設計單位及工程師 設計工作負荷,動態更新上述工程設計管理資料庫7中的 各,門及工程師工作負荷表;查詢模組1 5,用於查詢客戶 訂單表、排配計劃表、當前工作進度、各設計單位及工程 師工作負荷表並可以輸出查詢結果;績效考核模組丨6,能 依據上述工作追蹤反饋模組1 5提供的資訊,對工程設計單 =如設計組、設計部門及工程師進行績效考核並輸出績效 考核結果。 如第五圖所示,為本發明用戶端電腦的系統設置模組1307865 立, invention description (8) As shown in the third figure, it is a functional module diagram of the standby access server of the present invention. The data access module 4 1 is used to access the data in the standard parameter database 6 and the engineering design management database 7; the load determination module 42 is used to determine and analyze the workload of the standby access server 4, and When the workload of the server 4 exceeds the standard, 'issue the command to open other alternate access servers to start the access work. As shown in the fourth figure, it is a functional module diagram of the client computer of the present invention. The system setting module 11 is used to set system standard parameters such as user permission, standard working time parameter, work segment parameter, standard working time parameter, department organization parameter, maximum design capacity parameter and standard capacity parameter; order evaluation analysis module] Analyze and evaluate the manufacturing process feasibility assessment involved in the order product and the standard working hours for completing the engineering design; the work task scheduling simulation module 丨3 is used to analyze and judge the design workload of each design unit and engineer, and arrange the engineering design work. And the simulation results are simulated. After the analysis is correct, the distribution plan is generated and transmitted to the relevant units for execution. The work tracking feedback module 1 4, 1 tracks the feedback on the current work progress of each section and the design of each design unit and engineer. Workload, dynamically update each of the above-mentioned engineering design management database 7, door and engineer workload table; query module 15 for querying customer order form, scheduling schedule, current work schedule, various design units and engineers The work load table can output the query result; the performance appraisal module 丨6 can be based on the above For tracking information feedback module 15 provided for the engineering design of a single group = as design, engineer and design department performance appraisal and outputs the results of performance assessment. As shown in the fifth figure, the system setting module of the user terminal computer of the present invention is shown.
1307865 五、發明說明(9) 的子功能模組圖。用戶許可權設置子模組1 1 1 ’用於設置 用戶名、用戶密碼、用戶使用管理許可權;工段設置子模 組11 2,用於設置工程設計中涉及的多個設計工段參數; 標準工時設置子模組11 3,用於設置各設計工段的標準工 時;部門組織設置子模組11 4,用於設置部門的組織架構 、人員組織資訊’具體配置各層次的人員和工作權責;設 計產能設置子模組115,用於設置最大設計?能參數與標準 設計產能參數° 如第六圖所示’為本發明用戶端電腦的工作任務排配 模擬模組1 3的子功能模組圖°負荷分析子模組1 3 1 ’用於 分析判斷各設計單位及工程師設計工作負荷;工程設計排 配子模組1 3 2 ’用於排配工程設計工作的進程;排配模擬 子模組1 33,用於對已排配的工程設計進程進行模擬’確 保工作排配合理無誤;指令生成子模組1 3 4,用於生成排 配計劃表;指令發送子模組1 3 5 ’用於將生成排配計劃表 傳送給相關部門、工程師執行。 如第七圖所示’為本發明鈑金件工程設計管理方法的 作業流程圖。首先’系統管理員設置用戶權限、包括設置 用戶名、用戶密碼、用戶使用管理權限,系統為不同的類 型級別的用戶提供了不同的用戶介面以及管理及使用權限 ,例如用戶可以分為主管及工程師兩大類’其中’主管又 可以依據職能部門的不同分為有企劃管理主管、工程評估 主管、工程設計主管、程式設計主管等,對應的工程師有 管理工程師、評估工程師、工程設計工程師、程式設計工1307865 V. Sub-function module diagram of invention description (9). The user permission setting sub-module 1 1 1 ' is used for setting a user name, a user password, and a user usage management permission; the station setting sub-module 11 2 is used for setting a plurality of design section parameters involved in the engineering design; The sub-module 11 3 is set to set the standard working hours of each design section; the department organization setting sub-module 11 4 is used to set the organizational structure of the department, the organization information of the personnel, and the specific personnel and work rights of each level are configured. Design capacity setting sub-module 115 for setting the maximum design? Energy parameters and standard design capacity parameters ° As shown in the sixth figure, 'the sub-function module diagram of the simulation module 1 3 for the work task of the user terminal computer of the present invention. The load analysis sub-module 1 3 1 'for analysis Judging the design workload of each design unit and engineer; engineering design arranging sub-module 1 3 2 'for the process of arranging engineering design work; arranging simulation sub-module 1 33 for performing the scheduled engineering design process The simulation 'ensifies that the work arrangement is reasonable; the command generation sub-module 1 3 4 is used to generate the arrangement plan table; the command transmission sub-module 1 3 5 ' is used to transmit the generated arrangement plan table to the relevant department and the engineer to execute . As shown in the seventh figure, it is a flowchart of the operation of the sheet metal engineering design management method of the present invention. First of all, the system administrator sets user rights, including setting user name, user password, and user management rights. The system provides different user interfaces and management and usage rights for users of different types. For example, users can be divided into supervisors and engineers. The two major categories of 'the' supervisors can be divided into planning management supervisors, engineering evaluation supervisors, engineering design supervisors, and program design supervisors according to different functional departments. The corresponding engineers include management engineers, evaluation engineers, engineering design engineers, and programmers.
第17頁 1307865 五、發明說明(ίο) 程師等,用戶權限設置完畢後,相關用戶可以進一步設定 工段參數、標準工時參數、部門組織參數、設計產能參數 等參數,企劃管理工程師有權設置部門組織參數、讀取客 戶訂單,與評估工程師一起設置設計產能參數;評估工程 師有權設置標準工時參數、標準工時參數;各部門主管有 權對以上設置進行審核調整(步驟s 1 )。然後,對客戶訂 單依照預定的格式轉成客戶訂單表,如將客戶訂單内容轉 成包含有如下欄位的客戶訂單表,”客戶名"、"訂單號"、 產品號1 產品數Ϊ βυΜ 衣现(ΒΟΜ, 訂單類型Page 17 1307865 V. Invention Description (ίο) After the user authority is set, the relevant users can further set parameters such as the section parameters, standard working hours parameters, department organization parameters, design capacity parameters, etc. The planning management engineer has the right to set The department organizes the parameters, reads the customer orders, and sets the design capacity parameters together with the evaluation engineer; the evaluation engineer has the right to set the standard working hours parameters and the standard working hours parameters; the department heads have the right to review and adjust the above settings (step s 1 ). Then, the customer order is converted into a customer order form according to a predetermined format, such as converting the customer order content into a customer order form containing the following fields, "Customer Name", ""Order Number", Product Number 1 Product Number Ϊ βυΜ Clothes (ΒΟΜ, order type
Bill of Material物料清單表)、',產品交期"、"設計 父期"及"圖檔編號》等,以便於後續步驟的作業(步驟S2 )。依據標準參數資料庫6中的相關參數對客戶訂單表及 ,附屬文件如Β0Μ表、原始設計圖檔等進行分析評估,如 訂Λ表中的訂單類型:”海外訂單"’依據標準參 —^癌*中.的工作權責參數確定對應的設計單位對其進 ^ 理,依據標準參數資料庫6中的工段參數對訂單 涉及多個工Θ ‘ 丁 μ 了仃拄進仃评估,原始設計圖檔中 各工段關鍵;"下下二折二等,則從原州 6中的設計工段參數 :’對應查詢標準參數資料庫 否滿足條件;依據標準來工範圍等是 該訂單預設標準工瞎^枓庫6中的標準工時參數為 驟同樣也可以為用戶提;;單評估分析步 仃分析評估判斷生成卫程 、t的用戶”面’由人工進 成权汗估表(步驟s3)。進行工#_Bill of Material Bill of Materials, ', Product Delivery', "Design Parental" and "Graphic Number, etc., to facilitate the next step of the operation (step S2). According to the relevant parameters in the standard parameter database 6, the customer order form and the attached documents such as Β0Μ table, original design drawing files, etc. are analyzed and evaluated, such as the order type in the order form: "Overseas Orders" "Based on the standard parameters - ^The work rights and responsibilities parameters of the cancer* are determined by the corresponding design unit. According to the parameter parameters in the standard parameter database 6, the order involves multiple processes. Ding μ 仃拄 仃 仃 evaluation, original design The key of each work section in the file file; "2nd and 2nd lower, the design section parameters from the original state 6: 'The corresponding query standard parameter database does not meet the conditions; according to the standard scope of work, etc. is the preset standard of the order The standard working time parameter in the work 瞎^枓6 can also be provided for the user; the single evaluation analysis step analysis and evaluation judges the generation of the weicheng, t user "face" from the artificial entry right sweat estimate table (step S3). Work #_
第18頁 1307865 五、發明說明(11) 務排配杈擬,生成並發送工令單及排配計劃表至相關單位 執打,詳細見第八圖工作任務排配模擬模組的作業流程圖 的介紿(步驟S4 )。在相關設計部門、設計组、設計工程 師依,排配計劃表對完成各階段設計任務時候,發出後續 作業或者呈送主管時’工作追蹤反饋模組15同步發出 反饋=號,更新當前工作進度表、各設計單位及工程師工 作,荷,工作任務排配模擬模組1 3依據以上反饋資訊,判 斷疋否需要調整工作排配計劃表(步驟S5 ),當工作進度 表顯不=作任務不能提前完成且各設計單位及設計工程師 工作負荷未超載(<丨00% )時判斷結果為是,轉入步驟S4 ,重新,行工作任務排配模擬;各設計單位及設計工程師 工作負荷滿載時(=100% )判斷結果為否,轉入步驟S6。 依,士述工作追蹤反饋模組14更新的資料資訊,生成各工 ,田則工作進度、各設計部門、設計組及工程師的工作負 荷表(步驟S6 )。依據工作追蹤反饋模組丨4提供的資訊, 績效考核模組1 6計算出某設計工程師、設計組、設計部門 在一段時間(周、月、季度)内的計劃工作時間及實際工 2時間,以及任務提前、按時、滯後完成的次數情況,整 合後生成輸出績效考核結果(步驟S7 )。依據查詢要求, f〔旬模組1 5輸出客戶訂單綜合内容、排配計劃表、各工段 當前工作進度、部門及工程師工作負荷表(步驟S8 )。 如第八圖所示,為本發明工作任務排配模擬模組的作 業流程圖。在完成了訂單評估分析(步驟s3 )生成工程評 估表後,工作任務排配模擬模組的作業流程包括如下步驟Page 18 1307865 V. Invention Description (11) The flow arrangement is simulated, and the work order form and the allocation plan form are generated and sent to the relevant units for execution. For details, see the operation flow chart of the work task allocation simulation module in the eighth figure. Introduction (step S4). In the relevant design department, design team, design engineer, and the scheduling plan to complete the design tasks of each stage, when the follow-up operation is presented or the supervisor is submitted to the supervisor, the work tracking feedback module 15 simultaneously sends a feedback = number to update the current work schedule, Each design unit and engineer work, load, work task allocation simulation module 1 3 based on the above feedback information, determine whether you need to adjust the work scheduling plan (step S5), when the work schedule is not = the task can not be completed in advance When the workload of each design unit and design engineer is not overloaded (<丨00%), the judgment result is yes, and the process proceeds to step S4, and the work task is scheduled to be simulated; when the design units and design engineers are fully loaded (= 100%) If the result of the determination is no, the process proceeds to step S6. According to the updated information information of the feedback work module 14 of the work, the work schedule of each work, the work of the work, the work load of each design department, the design team and the engineer is generated (step S6). According to the information provided by the work tracking feedback module 丨4, the performance evaluation module 16 calculates the planned working time and the actual working time of a design engineer, design group, and design department in a period of time (week, month, quarter). And the number of times the task is advanced, on time, and delayed, and the output performance evaluation result is generated after the integration (step S7). According to the query requirements, f [Ten Module 15 outputs the customer order comprehensive content, the allocation schedule, the current work schedule of each section, the department and the engineer workload table (step S8). As shown in the eighth figure, a flowchart of the operation of the simulation module for the work task of the present invention is shown. After the order evaluation analysis (step s3) is completed and the engineering evaluation form is generated, the work flow of the work task scheduling simulation module includes the following steps.
第19頁 1307865 五、發明說明(12) :負荷分析子模組1 31從工程設計;f s資料庫7中 門及工程師工作負荷表’系統初始使 :° 設設計部門的工作負荷為〇,當排配設Λ二、 工作^在nm之間。此外,當各工段設計任=階段 性ίίΐ志工作追蹤反饋模組15將即時更新各設計單位的 工作負:表,負荷分析子模組131將重新分 及工程師的卫作負# (步驟S41)。卫程設計排配子模組 1 32依據工程評估表的内容,從標準參數資料庫6中讀取 門組織參數、工程設計管理資料庫7中的各部門及工程師 工作負荷來排配工程設計任務(步驟S42 ),排配演算法 原則可以是平均原貝I卜順序優先原則、隨機原則、獎賞原 則等,平均原則依照設計工程師及設計組、設計部門的工 作負荷平,進行排配,確保每個設計單位獲得儘量相等的 設計工作量,如某項設計依據部門組織參數和工段參數確 定為由設計一組、設計二組、設計三組來完成,則工程設 計排配子模組1 3 2依據三個組別的工作負荷平均來分配工 作任務;順序優先原則是依據各設計單位在標準參數資料 庫6中的排列順序,排配工作任務,如在設計一組工作負 荷排滿之後,再來配排設計二組的工作任務;隨機原則由 電腦在可以排配的設計單位和時段内隨機排配;獎賞原則 依據績效考核的結果,績效考核成績靠後的設計單位將優 先安排設計工作,排配原則不限於以上四項,還可以是其 他的演算法。依據各設計工程師、設計組、設計部門的工 作負荷以及標準設計能力參數與最大設計能力參數,對已Page 19 1307865 V. Description of invention (12): Load analysis sub-module 1 31 from engineering design; fs database 7 door and engineer workload table 'system initial: ° set the design department's workload to 〇, when The arrangement is set to two, and the work ^ is between nm. In addition, when the work sections are designed to be phased, the work tracking feedback module 15 will immediately update the work negatives of each design unit: the table, the load analysis sub-module 131 will be re-divided into the engineer's work negative # (step S41) . According to the content of the engineering evaluation form, the maintenance design arranging sub-module 1 32 reads the door organization parameters from the standard parameter database 6, and the various departments and engineer workloads in the engineering design management database 7 to arrange the engineering design tasks ( Step S42), the principle of the ranking algorithm may be an average original shell I order priority principle, a random principle, a reward principle, etc., and the average principle is arranged according to the workload of the design engineer, the design group, and the design department, and each of them is arranged to ensure each The design unit obtains the same amount of design work as possible. If a design is determined by the department's organizational parameters and the section parameters, the design is divided into two groups, and the design is divided into two groups. The engineering design is configured according to the sub-module 1 3 2 The workload of each group is assigned to the work task on average; the order priority principle is based on the order of the design units in the standard parameter database 6, and the work tasks are arranged, for example, after designing a set of workloads to be full, The design task of the second group of rows; the random principle is randomly arranged by the computer in the design units and time slots that can be allocated; the reward original According to the results of performance appraisal, the design unit with lower performance appraisal results will prioritize the design work. The principle of allocation is not limited to the above four items, but also other algorithms. According to the work load of each design engineer, design team, design department, and standard design capability parameters and maximum design capability parameters,
第20頁Page 20
13078651307865
經排配的工作進裎進行模擬執行,判斷是否合理無誤(步 ,S43 )。判斷結果為是時’指令生成子模組丨34生成工令 f及排配計劃表(步驟S44 ),指令傳送子模組135將工令 單及排配計劃表傳送到相關部門、工程師執行(步驟S45 )’判斷結果為否時,轉入步驟S42重新進行排配工程設 汁工作的進程,當全部設計單位(設計工程師、設計組、 設計部門)依照標準設計能力參數負荷滿載後,則依照最 大設計能力參數負荷進行排配。 綜上所述,本發明所提出之鈑金衝壓件的工程設計管 理系統及方法確實可符合發明專利要件,爰依法提出專利 申請。惟,以上所述者僅為本發明鈑金衝壓件的工程設計 管理系統及方法之較佳實施例,舉凡熟悉本案技藝之人士 ’在參照本發明所做等效修飾或變化,皆應包含於以下申 §青專利之範圍内。The simulated work is carried out for simulation execution, and it is judged whether it is reasonable or not (step, S43). When the determination result is YES, the instruction generation sub-module 34 generates a work order f and an arrangement plan table (step S44), and the instruction transmission sub-module 135 transmits the work order and the arrangement plan to the relevant department and the engineer to execute ( Step S45) When the judgment result is no, the process proceeds to step S42 to re-execute the process of arranging the work of the arranging project. When all the design units (design engineers, design groups, design departments) are fully loaded according to the standard design capability parameters, The maximum design capability parameter load is scheduled. In summary, the engineering design management system and method for the sheet metal stamping parts proposed by the present invention can indeed meet the requirements of the invention patents, and the patent application is filed according to law. However, the above description is only a preferred embodiment of the engineering design management system and method of the sheet metal stampings of the present invention. Any equivalent modifications or variations made by the person skilled in the art of the present invention should be included in the following. Within the scope of the § § patent.
13078651307865
圖式簡單說明 【圖示簡單說明】 第一圖係本發明的系統硬體架構圖 第二圖係本發明存取伺服器的功旎模組^ 第三圖係本發明備用存取伺服器的功月圖 第四圖係本發明用戶端電腦的功能模組 第五圖係本發明用戶端電腦的系統設置模、,且、^ 模組圖。 第六圖係本發明用戶端電腦的工作任務排配模擬模組 的子功能模組圖。 第七圖係本發明飯金件工程設計管理方法的作業流程 圖 。 圖 係本發明工作任務排配模擬模組的作業流程 【主要元件圖示說明】 11 111 112 113 114 115 12 13 14 用戶端電腦 系統設置模組 用戶權限設置子模組 工段設置子模組 標準工時設置子模組 部門組織設置子模組 設計產能設置子模組 訂單分析評估模組 工作任務排配模擬模組 工作追蹤反饋模組BRIEF DESCRIPTION OF THE DRAWINGS [Brief Description of the Drawing] The first drawing is a system hardware diagram of the present invention. The second drawing is a power module of the present invention accessing the server. The third drawing is the standby access server of the present invention. The fourth diagram of the power month diagram is the function module of the user terminal computer of the present invention. The fifth diagram is the system setting mode of the user terminal computer of the present invention, and the module diagram. The sixth figure is a sub-function module diagram of the work task scheduling simulation module of the client computer of the present invention. The seventh figure is the operation flow chart of the engineering design management method of the rice gold piece of the present invention. Figure 1 is the workflow of the task task simulation module of the present invention [Main component illustration] 11 111 112 113 114 115 12 13 14 User computer system setting module user authority setting sub-module section setting sub-module standard Set sub-module department organization setting sub-module design capacity setting sub-module order analysis evaluation module work task scheduling analog module work tracking feedback module
第22頁 1307865 圖式簡單說明Page 22 1307865 Simple illustration
第23頁 查詢模組 15 動效考核核組 16 網路 2 存取伺服器 3 數據存取模組 31 負荷判斷模組 32 備用存取伺服器 4 數據存取模組 41 負荷判斷模組 42 連接 5 標準參數資料庫 6 工程設計管理資料庫 7 網路 8 外部系統 9Page 23 Query Module 15 Dynamic Evaluation Core Group 16 Network 2 Access Server 3 Data Access Module 31 Load Judgment Module 32 Alternate Access Server 4 Data Access Module 41 Load Judgment Module 42 Connection 5 Standard Parameter Database 6 Engineering Design Management Database 7 Network 8 External System 9
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW93125731A TWI307865B (en) | 2004-08-27 | 2004-08-27 | Stamping products designing management system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
TW93125731A TWI307865B (en) | 2004-08-27 | 2004-08-27 | Stamping products designing management system and method |
Publications (2)
Publication Number | Publication Date |
---|---|
TW200608254A TW200608254A (en) | 2006-03-01 |
TWI307865B true TWI307865B (en) | 2009-03-21 |
Family
ID=45071694
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
TW93125731A TWI307865B (en) | 2004-08-27 | 2004-08-27 | Stamping products designing management system and method |
Country Status (1)
Country | Link |
---|---|
TW (1) | TWI307865B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI703519B (en) * | 2019-06-18 | 2020-09-01 | 冠呈能源環控有限公司 | Green building engineering mechanical and electrical equipment performance inspection management system |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112734348B (en) * | 2019-10-14 | 2024-03-29 | 冠呈能源环控有限公司 | Green building engineering electromechanical device performance inspection management system |
-
2004
- 2004-08-27 TW TW93125731A patent/TWI307865B/en active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI703519B (en) * | 2019-06-18 | 2020-09-01 | 冠呈能源環控有限公司 | Green building engineering mechanical and electrical equipment performance inspection management system |
Also Published As
Publication number | Publication date |
---|---|
TW200608254A (en) | 2006-03-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Chin et al. | The practice of time management on construction project | |
Lopes et al. | Pharmaceutical quality control laboratory digital twin–A novel governance model for resource planning and scheduling | |
Tsai et al. | Human resource selection for software development projects using Taguchi’s parameter design | |
US20170147960A1 (en) | Systems and Methods for Project Planning and Management | |
US20160034474A1 (en) | Enterprise Data Mining in a Multi-Tenant Database | |
Wesz et al. | Planning and controlling design in engineered-to-order prefabricated building systems | |
WO2011050482A1 (en) | Enterprise data mining in a hosted multi-tenant database | |
KR20220003861A (en) | Integrated smart human resource management system and method for evaluating weekly work performance using the same | |
Hertz et al. | A simulation-based decision support system for industrial field service network planning | |
JP7297817B2 (en) | man hour system | |
JP5681456B2 (en) | Method, system and computer program for integrated volume management workflow (integrated volume management workflow) | |
Abello et al. | Using the k-chaining approach to solve a stochastic days-off-scheduling problem in a retail store | |
CN104715313A (en) | Dispatch management system and method | |
Weber et al. | Business process management | |
Denkena et al. | Competence-based personnel scheduling through production data | |
CN1741046A (en) | Sheet metal engineering design management system and method | |
Du et al. | Modeling and simulation of time and value throughputs of data-aware workflow processes | |
US20060004620A1 (en) | Method and tool for estimating a ship date profile for a business | |
Kasim et al. | Enhancing material tracking practices of material management in construction project | |
TWI307865B (en) | Stamping products designing management system and method | |
US20120233115A1 (en) | Real-time document management system and method | |
US20130238404A1 (en) | Competence assessment method and system | |
Pun et al. | Key performance indicators for traffic intensive web‐enabled business processes | |
Simonova | Identification of IT-service metrics for a business process when planning a transition to outsourcing | |
US7310562B2 (en) | System and method for scheduling mold manufacturing |