[go: up one dir, main page]

TW202421902A - Construction method - hexagonal mesh fabric combined with flexible cement as a base - Google Patents

Construction method - hexagonal mesh fabric combined with flexible cement as a base Download PDF

Info

Publication number
TW202421902A
TW202421902A TW111145492A TW111145492A TW202421902A TW 202421902 A TW202421902 A TW 202421902A TW 111145492 A TW111145492 A TW 111145492A TW 111145492 A TW111145492 A TW 111145492A TW 202421902 A TW202421902 A TW 202421902A
Authority
TW
Taiwan
Prior art keywords
elastic cement
hexagonal mesh
construction
mesh
construction method
Prior art date
Application number
TW111145492A
Other languages
Chinese (zh)
Inventor
林濟民
Original Assignee
林政聿
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 林政聿 filed Critical 林政聿
Priority to TW111145492A priority Critical patent/TW202421902A/en
Publication of TW202421902A publication Critical patent/TW202421902A/en

Links

Landscapes

  • Laminated Bodies (AREA)

Abstract

A new construction method that can be used in ground, wall and ceiling. By using hexagonal mesh fabric and sticking with flexible cement, forming a base with strength, flexibility and flatness and other advantages.

Description

六角網打底工法Hexagonal mesh base construction method

改善輕質隔間縫隙的平整度Improve the smoothness of lightweight partition gaps

增加牆面的耐振強度及抗震耐力(地震及其他振源)Increase the vibration resistance and seismic resistance of the wall (earthquakes and other vibration sources)

增加後續工程的黏著強度與成功率Increase the adhesion strength and success rate of subsequent projects

大幅降低材料及工時成本Significantly reduce material and labor costs

天然砂石為有限資源,過量開採會造成環境破壞。本工法能減少砂石的使用率至零Natural sand and gravel are limited resources, and excessive mining will cause environmental damage. This method can reduce the use of sand and gravel to zero.

玻璃纖維網會造成施工人員肺部及皮膚危害。使用尼龍網來取代玻璃纖維網可以大量減少工作人員的健康維護成本Fiberglass mesh can cause lung and skin damage to construction workers. Using nylon mesh to replace fiberglass mesh can greatly reduce the health maintenance costs of workers.

傳統工法需要使用水,自來水含氯離子,會侵害到水泥強度。本工法完全不使用水,減少水資源的使用Traditional methods require the use of water, and tap water contains chlorine ions, which will damage the strength of cement. This method does not use water at all, reducing the use of water resources.

傳統打底工程需要3至7天的待乾。本工法隔日即可繼續施工Traditional primer works require 3 to 7 days to dry. This method allows you to continue construction the next day.

傳統打底需要處理施工廢料,本工法廢料量少Traditional primer needs to deal with construction waste, this method produces less waste

傳統打底施工需考量空氣濕度,本工法無需考量Traditional primer construction needs to consider air humidity, but this method does not need to consider

傳統打底層厚度約1至2公分。本工法只需3至5公釐。能減少牆面厚度,增加空間使用。The thickness of the traditional primer is about 1 to 2 cm. This method only requires 3 to 5 mm. It can reduce the thickness of the wall and increase the use of space.

本發明為減少建築業砂石、水資源之使用。減少施工廢棄物,減少工程人員職業傷害,降低成本及工時之創新工法。This invention is an innovative method to reduce the use of sand, gravel and water resources in the construction industry, reduce construction waste, reduce occupational injuries of construction workers, and reduce costs and working hours.

使用任何廠牌之「尼龍六角纖維網布」(網距 5 mm /寬 100 cm×長 50~100 m) 滾著任何廠牌之「彈性水泥」不得加水。Use any brand of "nylon hexagonal fiber mesh" (mesh spacing 5 mm/width 100 cm×length 50~100 m) and roll any brand of "elastic cement" without adding water.

適用時機: 1. 輕質隔間牆(例:石膏板、陶粒板、灌漿水泥板)。 2. 與防水工程一併施工。 3. 與隔音工程一併施工。 4. 天、地、壁三項均可施工。 【圖示簡單說明】 Applicable time: 1. Lightweight partition wall (e.g. gypsum board, ceramsite board, grouting cement board). 2. Construction together with waterproofing project. 3. Construction together with sound insulation project. 4. Construction can be done on the ceiling, floor and wall. [Simple explanation with pictures]

[圖示1]為此工法施工完成圖[Figure 1] is the completed picture of this construction method

材料及工具 1. 任何廠牌之「尼龍六角纖維網布」(網距5 mm/寬 100 cm × 長50~100 m)。 2. 任何廠牌之「彈性水泥」不得加水。 3. 尼龍滾筒刷 (長約24 cm)。 4. 剪刀 Materials and tools 1. Any brand of "nylon hexagonal fiber mesh" (mesh spacing 5 mm/width 100 cm × length 50~100 m). 2. Any brand of "elastic cement" must not be added with water. 3. Nylon roller brush (about 24 cm long). 4. Scissors

工法工序 1. 素地整平,清除表面雜物及突起物。 2. 與接著牆板滾著彈性水泥後,馬上平鋪六角網 (必須完全拉平)。 3. 網布交接面約 5~10 cm。 4. 待彈性水泥初凝後,再滾著一層彈性水泥,即可完成。 5. 隔天即可接續施工。 Construction process 1. Level the ground and remove the surface debris and protrusions. 2. After rolling the elastic cement with the adjacent wall board, immediately lay the hexagonal mesh (it must be completely flattened). 3. The mesh interface is about 5~10 cm. 4. After the elastic cement has initially set, roll another layer of elastic cement and it is done. 5. The construction can continue the next day.

without

Claims (5)

一種施工工法,包含尼龍六角網及彈性水泥。A construction method comprising nylon hexagonal mesh and elastic cement. 如請求項1,其特徵為結合尼龍六角網的韌性與彈性水泥黏著形成達到有強度、硬度、平整度及其他優點的施工方式。As in claim 1, the characteristic is that the toughness of nylon hexagonal mesh and elastic cement adhesion are combined to form a construction method that achieves strength, hardness, flatness and other advantages. 如請求項1,此工法可適用於天、地、壁三向之牆面。As in Request 1, this method can be applied to walls in three directions: ceiling, floor, and wall. 如請求項1,此工法改良傳統打底工法,去除傳統打底工法的缺點: 1. 待乾期長,且會因為天氣、環境影響後續工程安排。本工法待乾期為1天。2. 傳統打底層厚度約1至2公分。本工法只需3至5公釐。能減少牆面厚度,增加空間使用。 3. 傳統打底需要處理施工廢料,本工法幾乎無廢料。 4. 天然砂石過量開採會造成環境破壞。本工法能減少砂石的使用率至零。 As mentioned in Request 1, this method improves the traditional primer method and eliminates the shortcomings of the traditional primer method: 1. The drying period is long, and the subsequent project arrangements will be affected by the weather and environment. The drying period of this method is 1 day. 2. The thickness of the traditional primer layer is about 1 to 2 cm. This method only requires 3 to 5 mm. It can reduce the thickness of the wall and increase the use of space. 3. Traditional primer requires the treatment of construction waste, and this method has almost no waste. 4. Excessive mining of natural sand and gravel will cause environmental damage. This method can reduce the use rate of sand and gravel to zero. 如請求項1,此工法之工序: 1. 素地整平,清除表面雜物及突起物。 2. 與接著牆板滾著彈性水泥後,馬上平鋪六角網 (必須完全拉平)。 3. 網布交接面約 5~10 cm。 4. 待彈性水泥初凝後,再滾著一層彈性水泥,即可完成。 As in claim 1, the process of this method is: 1. Level the ground and remove the debris and protrusions on the surface. 2. After rolling the elastic cement with the adjacent wall board, immediately lay the hexagonal mesh (it must be completely flattened). 3. The mesh interface is about 5~10 cm. 4. After the elastic cement has initially set, roll another layer of elastic cement and it is done.
TW111145492A 2022-11-28 2022-11-28 Construction method - hexagonal mesh fabric combined with flexible cement as a base TW202421902A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW111145492A TW202421902A (en) 2022-11-28 2022-11-28 Construction method - hexagonal mesh fabric combined with flexible cement as a base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW111145492A TW202421902A (en) 2022-11-28 2022-11-28 Construction method - hexagonal mesh fabric combined with flexible cement as a base

Publications (1)

Publication Number Publication Date
TW202421902A true TW202421902A (en) 2024-06-01

Family

ID=92539943

Family Applications (1)

Application Number Title Priority Date Filing Date
TW111145492A TW202421902A (en) 2022-11-28 2022-11-28 Construction method - hexagonal mesh fabric combined with flexible cement as a base

Country Status (1)

Country Link
TW (1) TW202421902A (en)

Similar Documents

Publication Publication Date Title
CA1231849A (en) Exterior wall
CN104018598B (en) A kind of exterior wall structure and construction installation method
JP2017186895A5 (en)
TW202421902A (en) Construction method - hexagonal mesh fabric combined with flexible cement as a base
CN104790617B (en) A kind of assembled composite board
CN102383507A (en) Light steel keel and plasterboard vitrified tile decoration wall and method for constructing same
CN102182323A (en) Process for dry laying of autoclaved aerated concrete blocks in low-latitude plateaus
EP2770130A1 (en) Insulation assembly for the external cladding of buildings
CN211037384U (en) A new type of hollow PVC inner formwork sound insulation wall
CN204940903U (en) The old wall exterior wall reconstruction structure of a kind of building
CN104179287B (en) The method pasting heavy finishing material on lightweight board wall
CN202248387U (en) Light steel keel gypsum board vitrified tile decorative wall
US2687359A (en) Plasterboard
CN205822650U (en) A kind of glass fibre reinforced gypsum board imitation wood composite plate
CN206538891U (en) A kind of rock cotton board insulation construction
CN110565886A (en) Anti-hollowing and cracking plastering gypsum structure and construction method thereof
PL441665A1 (en) Template for creating and reproducing spatial arrangements of structures and architectural cladding in construction using masses, plasters and building mortars
CN215802402U (en) New and old wall surface prevents ftractureing and levels structure
CN206571082U (en) The soft or hard bag fixed structure of three proofings environmental protection
JPWO2015002133A1 (en) Landscape construction method using die-cut foaming material and die-cut foaming material
TWI537457B (en) Laminated layer structure and method of construction of the same
CN219528005U (en) Indoor heat preservation structure for curved building structure
CN215594688U (en) Quick construction structures in hollow block wall body surface
BR102016016435A2 (en) METHODS FOR COATING WALLS, CEILINGS, SLABS AND OTHER CONSTRUCTIVE ELEMENTS
Caldwell et al. Conservation of the 180 Wellington Building Mosaic in Ottawa, Ontario