[go: up one dir, main page]

TR201000280T2 - Production process of copper welded double layer steel pipe by long cooling line annealing method. - Google Patents

Production process of copper welded double layer steel pipe by long cooling line annealing method.

Info

Publication number
TR201000280T2
TR201000280T2 TR2010/00280T TR201000280T TR201000280T2 TR 201000280 T2 TR201000280 T2 TR 201000280T2 TR 2010/00280 T TR2010/00280 T TR 2010/00280T TR 201000280 T TR201000280 T TR 201000280T TR 201000280 T2 TR201000280 T2 TR 201000280T2
Authority
TR
Turkey
Prior art keywords
layer
steel pipe
production process
double layer
cooling line
Prior art date
Application number
TR2010/00280T
Other languages
Turkish (tr)
Inventor
Cenker İsmai̇l
Original Assignee
Bant Boru Sanayi̇ Ve Ti̇caret Anoni̇m Şi̇rketi̇
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=40120243&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=TR201000280(T2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Bant Boru Sanayi̇ Ve Ti̇caret Anoni̇m Şi̇rketi̇ filed Critical Bant Boru Sanayi̇ Ve Ti̇caret Anoni̇m Şi̇rketi̇
Publication of TR201000280T2 publication Critical patent/TR201000280T2/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/08Making tubes with welded or soldered seams
    • B21C37/09Making tubes with welded or soldered seams of coated strip material ; Making multi-wall tubes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

Buluş, çelik sac katmanı (1.1) üzerine elektroliz yöntemi ile bakır kaplanması, elde edilen bakır katmanlı (1.2) levha katmanından (1.1) iki tabakalı boru (1) elde edilmesi, iki tabakalı borunun (1) kaynak sıcaklığına ulaşması, kaynak sıcaklığında ısıtılması ve optimum kaynak gerçekleşene kadar ısıtılan bakır kaynağı ile bir araya getirilen iki katlı metal boru (1) üretim prosesi olup, uzama hattına (A) entegre edilen tavlama hattı (T) vasıtası ile uzama hattı (A) ve tavlama hattı (T) boyunca borunun (1) hava ile temas etmesi sağlanarak soğutulması ile ilgilidirThe invention relates to electroplated copper coating on the steel sheet layer (1.1), to obtain a two-layer tube (1) from the sheet layer (1.1) of the copper layer (1.2) obtained, to achieve the welding temperature of the two-layer tube (1), to heat it at the welding temperature and The two-layer metal pipe (1) combined with the heated copper weld until optimum welding takes place, and the annealing line (T) is integrated into the extension line (A) through the extension line (A) and the pipe (T) along the annealing line (T). 1) It is related to cooling by making contact with air

TR2010/00280T 2007-09-11 2008-08-27 Production process of copper welded double layer steel pipe by long cooling line annealing method. TR201000280T2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
TR2007/06266A TR200706266A2 (en) 2007-09-11 2007-09-11 Process of manufacturing of copper welded double layer steel pipe with long cooling line annealing method.
PCT/TR2008/000103 WO2009035425A1 (en) 2007-09-11 2008-08-27 Process for producing copper-brazed double wall steel tubes by means of long cooling line annealing method

Publications (1)

Publication Number Publication Date
TR201000280T2 true TR201000280T2 (en) 2011-05-23

Family

ID=40120243

Family Applications (2)

Application Number Title Priority Date Filing Date
TR2007/06266A TR200706266A2 (en) 2007-09-11 2007-09-11 Process of manufacturing of copper welded double layer steel pipe with long cooling line annealing method.
TR2010/00280T TR201000280T2 (en) 2007-09-11 2008-08-27 Production process of copper welded double layer steel pipe by long cooling line annealing method.

Family Applications Before (1)

Application Number Title Priority Date Filing Date
TR2007/06266A TR200706266A2 (en) 2007-09-11 2007-09-11 Process of manufacturing of copper welded double layer steel pipe with long cooling line annealing method.

Country Status (4)

Country Link
CA (1) CA2699249A1 (en)
DE (1) DE112008002490T5 (en)
TR (2) TR200706266A2 (en)
WO (1) WO2009035425A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US12194520B2 (en) 2018-12-10 2025-01-14 Net Boru Sanayi Ve Dis Ticaret Kollektif Sirketi Bora Saman Ve Ortagi Heating system for production of a double-layer tube

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111390321B (en) * 2020-03-16 2024-07-19 浙江伟江电器股份有限公司 Bottom surface brazing device and method for stainless steel electric heating appliance

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2373116A (en) * 1941-10-31 1945-04-10 Bundy Tubing Co Method of uniting metals
JPH07258886A (en) 1994-03-24 1995-10-09 Nippon Steel Corp Zinc-based electroalloy plated steel sheet with excellent spot weldability
US20030012909A1 (en) 2000-03-10 2003-01-16 Stephane Jung Double-layer pipe
US6575197B2 (en) 2001-09-04 2003-06-10 Esser-Werke Kg Double-layer pipe for fluidic transport of abrasive solids
TR200502248U (en) * 2005-06-13 2005-09-21 Beş Yapi Ürünleri̇ San. Ti̇c. Ltd Şti̇. Stainless steel sheet raw material from band form into cylindrical pipe and welded as automation units

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US12194520B2 (en) 2018-12-10 2025-01-14 Net Boru Sanayi Ve Dis Ticaret Kollektif Sirketi Bora Saman Ve Ortagi Heating system for production of a double-layer tube

Also Published As

Publication number Publication date
CA2699249A1 (en) 2009-03-19
DE112008002490T5 (en) 2010-09-23
TR200706266A2 (en) 2007-12-24
WO2009035425A1 (en) 2009-03-19

Similar Documents

Publication Publication Date Title
CN103350124B (en) A kind of manufacture method of vertical masonry joint bimetallic composite welded pipe of transfer oil natural gas
BRPI0811314A2 (en) TANK MANUFACTURING METHOD
MX389757B (en) PREVIOUSLY WELDED STEEL PART FORMED BY HEAT WITH VERY HIGH MECHANICAL RESISTANCE, AND PRODUCTION METHOD.
CN103317306B (en) A kind of manufacture method of spiral seam bimetallic composite welded pipe
RU2009104936A (en) HOT PIPE AND METHOD FOR PRODUCING IT
CN104404299B (en) A kind of titanium alloy coiled tubing and manufacture method
CN102909278B (en) Preparation method of metal composite pipe
JP2019521859A (en) Double pipe manufacturing method
ATE509127T1 (en) PROCESS OF PRODUCTION OF ALUMINUM ALLOY STRIP OR SHEET FOR HEAT EXCHANGER
CN103350320A (en) Production method of corrosion-resistant bimetal composite pipe
CN107552961B (en) A method of laser beam welding TiAl alloy
CN103599957B (en) A kind of extrusion process of hydrocracking stove austenitic stainless steel seamless pipe
TR201000280T2 (en) Production process of copper welded double layer steel pipe by long cooling line annealing method.
CN104266003A (en) Bimetallic composite steel pipe and production method thereof
HRP20110175T1 (en) Method for manufacturing and fitting superheater coils of steam creation devices
CN104070271B (en) 15Cr1Mo1V valve body and WB36 pipe arrangement different steel weld method
CN201795230U (en) Prefabricated steel bushing steel direct-buried elbow pipe applicable to steam pipeline
CN106903405A (en) A kind of low thermal weld stress method of improvement P92 pipeline welding performances
WO2008134958A1 (en) A copper plating method for steel tubular
RU147694U1 (en) BIMETALLIC PIPE FOR REDUCED STEAM PIPELINES
CN107755980B (en) A kind of manufacturing method of 2205/X65 bimetal metallurgy composite-curve
JP2014092329A (en) Heat exchanger for radiant tube burner
CN104014916B (en) F91 valve body and 10CrMo910 pipe arrangement different steel weld method
JP2014155948A (en) Welded steel pipe for line pipe with excellent low-temperature toughness, and method of manufacturing the same
JP2011133141A (en) Heating pipe and cooking machine