SU972112A1 - Method of roof control in workings with bulging soil - Google Patents

Method of roof control in workings with bulging soil Download PDF

Info

Publication number
SU972112A1
SU972112A1 SU802962079A SU2962079A SU972112A1 SU 972112 A1 SU972112 A1 SU 972112A1 SU 802962079 A SU802962079 A SU 802962079A SU 2962079 A SU2962079 A SU 2962079A SU 972112 A1 SU972112 A1 SU 972112A1
Authority
SU
USSR - Soviet Union
Prior art keywords
soil
workings
rocks
bulging
roof control
Prior art date
Application number
SU802962079A
Other languages
Russian (ru)
Inventor
Николай Кадирович Сагдинов
Владислав Сергеевич Трушин
Original Assignee
Научно-исследовательский и проектно-конструкторский институт по добыче полезных ископаемых открытым способом
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Научно-исследовательский и проектно-конструкторский институт по добыче полезных ископаемых открытым способом filed Critical Научно-исследовательский и проектно-конструкторский институт по добыче полезных ископаемых открытым способом
Priority to SU802962079A priority Critical patent/SU972112A1/en
Application granted granted Critical
Publication of SU972112A1 publication Critical patent/SU972112A1/en

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

Изобретение относитс  к области креплени  и поддержани  горных выработок в пучащих породах, проводимых вприсечку к выработанному пространству.The invention relates to the field of fastening and maintaining mine workings in pulling rocks, which are carried in the extension to the developed space.

Известны способы поддержани  горных выработок с пучащими породами почвы, заключающиес  в укреплении последних анкерной крепью I.Methods are known for maintaining mine workings with thickening soil rocks, which consist in reinforcing the latter with anchoring I.

Недостатком этого способа  вл етс  больща  трудое.мкость операции, кроме того, смещение пород не исключаетс , а лищь замедл етс  в 1,5-2,0 раза. В дальнейшем не удаетс  избежать большого объема работ, св занных с поддиром выдавленных в сечение выработки пород почвы.The disadvantage of this method is the greater difficulty of the operation, in addition, the displacement of rocks is not excluded, and the deceleration is slowed down 1.5-2.0 times. In the future, it is not possible to avoid the large amount of work associated with the subdire squeezed into the cross section of the development of soil rocks.

Наиболее близким к предлагаемому  вл етс  способ поддержани  присечных выработок с пучащей почвой, включающий установку лежки на ровную почву выработки, стоек и верхн ка 2.Closest to the present invention, there is a method of maintaining the subsectional workings with tipping soil, including the installation of maturation on level soil, racks and top 2.

Недостатком данного способа  вл етс  то, что он не позвол ет сохранить выработку в рабочем состо нии на весь период ее службы. Происходит это из-за большой реакции пород почвы с разрушением лежней и выдавливанием пород в сечение выработки .The disadvantage of this method is that it does not allow to keep production in working condition for the entire period of its service. This is due to the large reaction of the soil rocks with the destruction of the bosses and the extrusion of rocks into the cross section of the mine.

Цель изобретени  - увеличение срока службы выработки путем исключени  выдав ливани  пород в сечение выработки.The purpose of the invention is to increase the service life of the mine by eliminating the pouring of rocks into the cross section of the mine.

Поставленна  цель достигаетс  тем, что почву выработки устраивают наклонной в сторону массива дл  установки лежн , имеющего обратный уклон, причем лежень по поверхности контакта с почвой выработки предварительно обрабатывают антифрик10 ционным средством.This goal is achieved by arranging the working soil inclined towards the array to install a bed that has a reverse slope, and the soil on the contact surface with the working soil is pretreated with antifriction means.

На фиг. 1 изображено крепеление горной выработки, общий вид.FIG. 1 shows the attachment of the mine workings, a general view.

Способ осуществл етс  следующим образом .The method is carried out as follows.

Почву выработки выполн ют наклонной The soil is made sloping

15 в сторону массива и на нее укладывают леж ни 1 с обратным уклоном, причем лежень на поверхности 2 контакта с почвой предва рительно обрабатывают антифрикционным 20 средством, затем производ т установку стоек 3 и верхн ка 4.15 in the direction of the array and on it are laid 1 with a reverse bias, and the ground on the surface 2 of contact with the soil is pretreated with antifriction 20 means, then the racks 3 and the top 4 are installed.

исследовани ми установлено, что выдав ливание пород почвы в отработанное пространство из-под лежн  будет происходитьstudies have established that the squeezing of soil rocks into the waste space from under the bed will occur

потому, что напр жение на контакте обрушенные породы - почва меньше, чем напр  жение На контакте массив угольного пластапочва .because the voltage at the contact of the collapsed rocks - the soil is less than the voltage On the contact is an array of coal plastapoch.

Обработка лежн  по поверхности контакта с породой почвы способствует большому смешению и выдавливанию пород по поверхности лежн  в сторону выработанного пространства.The processing of the bed along the surface of contact with the rock of the soil contributes to a great mixing and extrusion of the rocks along the surface of the bed towards the developed space.

Использование предлагаемого способа поддержани  присечных выработок позвол ет получить значительный экономический эффект.The use of the proposed method for maintaining the pit openings allows to obtain a significant economic effect.

Экономи  На 1 м выработки составл ет 26,8 руб.Economy On 1 m of production is 26.8 rubles.

Claims (2)

1.Гелескул М. Н. Справочник по креплению горных выработок. М., «Недра, 1976, с. 98, р. 59.1. Geleskul MN Reference for mounting mine workings. M., “Nedra, 1976, p. 98, p. 59. 2.Городничев В. М. Современные методы борьбы с пучением горных пород. М., Госгортехиздат , 1960, с. 43-56, 67-68.2.Gorodnichev V.M. Modern methods of struggle with the heaving of rocks. M., Gosgortekhizdat, 1960, p. 43-56, 67-68.
SU802962079A 1980-07-15 1980-07-15 Method of roof control in workings with bulging soil SU972112A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802962079A SU972112A1 (en) 1980-07-15 1980-07-15 Method of roof control in workings with bulging soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802962079A SU972112A1 (en) 1980-07-15 1980-07-15 Method of roof control in workings with bulging soil

Publications (1)

Publication Number Publication Date
SU972112A1 true SU972112A1 (en) 1982-11-07

Family

ID=20910427

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802962079A SU972112A1 (en) 1980-07-15 1980-07-15 Method of roof control in workings with bulging soil

Country Status (1)

Country Link
SU (1) SU972112A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110925017A (en) * 2019-12-11 2020-03-27 西安科技大学 A method for retaining and supporting special-shaped gob-side roadways in long-wall mining of medium-thick coal seams with large dip angle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110925017A (en) * 2019-12-11 2020-03-27 西安科技大学 A method for retaining and supporting special-shaped gob-side roadways in long-wall mining of medium-thick coal seams with large dip angle
CN110925017B (en) * 2019-12-11 2021-11-09 西安科技大学 Reserving and supporting method for long-wall mining special-shaped gob-side roadway in large-dip-angle medium-thickness coal seam trend

Similar Documents

Publication Publication Date Title
SU972112A1 (en) Method of roof control in workings with bulging soil
SU1573101A1 (en) Trailing ground receiver of earth suction dredger
SU881331A1 (en) Method of constructing shallow-depth tunnel in unsolid rock
RU2143068C1 (en) Tunneling and stoping complex
SU1017778A1 (en) Single-vault station for deep underground electric railway
SU1125333A1 (en) Method of decreasing water inflow in mine workings in mining coal seams
SU1195008A1 (en) Method of supporting mine working in stoping work influence area
GB1161565A (en) Trench Digging Apparatus
SU676731A1 (en) Method of selective excavation of various components of minerals in beds
SU914774A1 (en) Filling set
SU1190036A1 (en) Method of moving air-bladder roof support when mining steep coal seams
SU1740672A1 (en) Ore storage for hydraulic production
SU834348A1 (en) Method of working gently sloping beds
SU619658A1 (en) Arrangement for underwater excavation of mud ground under ice conditions
SU415361A1 (en)
SU1203244A1 (en) Method of constructing an underground facility
SU141125A1 (en) The method of excavation of coal under flexible overlap
SU693017A1 (en) Method of mining mineral deposits
SU388084A1 (en) Gangway shield
SU972124A1 (en) Trench support
SU521864A1 (en) Feed Loader
SU815123A1 (en) Method of driving a vertical working
RU1774996C (en) Method of forming terraces
SU844670A1 (en) Drain construction method
RU96115719A (en) METHOD FOR MOUNTING MINES FOR MINING