SU968185A1 - Pile foundation - Google Patents

Pile foundation Download PDF

Info

Publication number
SU968185A1
SU968185A1 SU802944274A SU2944274A SU968185A1 SU 968185 A1 SU968185 A1 SU 968185A1 SU 802944274 A SU802944274 A SU 802944274A SU 2944274 A SU2944274 A SU 2944274A SU 968185 A1 SU968185 A1 SU 968185A1
Authority
SU
USSR - Soviet Union
Prior art keywords
pile
foundation
grillage
piles
pile foundation
Prior art date
Application number
SU802944274A
Other languages
Russian (ru)
Inventor
Явдат Шафагутдинович Зиязов
Олег Львович Денисов
Владимир Александрович Максимов
Юрий Михайлович Шеменков
Original Assignee
Научно-Исследовательский Институт Промышленного Строительства
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Научно-Исследовательский Институт Промышленного Строительства filed Critical Научно-Исследовательский Институт Промышленного Строительства
Priority to SU802944274A priority Critical patent/SU968185A1/en
Application granted granted Critical
Publication of SU968185A1 publication Critical patent/SU968185A1/en

Links

Landscapes

  • Foundations (AREA)

Description

(54) СВАЙНЫЙ ФУНПАМЕНТ(54) SWEET PORK

1one

Изобретение относитс  к строительству и может быть использовано при возведении свайных фундаментов под различные здани  и сооружени .The invention relates to construction and can be used in the construction of pile foundations for various buildings and structures.

Известен свайный фундамент, включающий полые круглые сваи, в полость которых заделаны колонны каркаса здани  при выполнении фундамента под каждую колонну погружаетс  одиночна  трубчата  сва , верхн   полость которой исполь-,о зуетсц в качестве стакана дл  установки колонны l .A pile foundation is known, including hollow round piles, in the cavity of which the columns of the building framework are embedded when the foundation for each column is immersed in a single tubular pile, the upper cavity of which is used as a container for installation of column l.

Недостатком таких фундаментов  вл етс  невозможность заделки в полость свай колонн больших размеров без разви- is того в плане плиты ростверка, а также невысока  несуща  способность при действии вертикальных и горизонтальных нагрузок . The disadvantage of such foundations is the impossibility of embedding large piles of columns in the cavity without developing a grillage in terms of the plate, as well as low bearing capacity under the action of vertical and horizontal loads.

Наиболее близким к изобретению по 20 технической сущности и достигаемому результату  вл етс  свайный фундамент, включающий куст из полых свай, объединенных монолитным железобетонным рост верком ,2 .The closest to the invention according to the technical essence and the achieved result is a pile foundation, including a bush of hollow piles, united by monolithic reinforced concrete growth by test, 2.

Недостатком известного фундамента  вл етс  большой расход материалов при изготовлении мощной плиты ростверка, больша  трудоемкость при производстве работ и недостаточна  несуща  способность по грунту.The disadvantage of the known foundation is the high consumption of materials in the manufacture of the powerful plate of the grillage, the greater labor intensity in the production of works and the insufficient bearing capacity over the ground.

Целью изобретен1ЕЯ  вл етс  повышение несущей способности, снижение материалоемкости и трудоемкости при производстве работ.The purpose of the invention is to increase the carrying capacity, reduce material consumption and labor intensity in the production of works.

Указанна  цель достигаетс  тем, что в свайном фундаменте, включающему куст из полых свай, объединенных монолитным железобетонным ростверком, на сторонах - свай, обращенных друг к другу, выполнены вырезы в верхней части, а ростверк размещен между сва ми в зоне вырезов.This goal is achieved by the fact that in the pile foundation, which includes a bush of hollow piles united by a monolithic reinforced concrete grillage, on the sides of the piles facing each other, cuts are made in the upper part, and the grillage is placed between the piles in the cut-outs zone.

На фиг. 1 изображена пола  сва  с вырезом; на фиг. 2 - схема погружени  сваи с вырезом; на фиг. 3 - описывавмый фундамент, разрез; на фиг. 4 - сечение А-А на фиг. 3.FIG. 1 shows the floor of the pile with a cutout; in fig. 2 shows a piling scheme with a notch; in fig. 3 - described foundation, section; in fig. 4 is a section A-A in FIG. 3

Фундамент включает полые сваи 1 с вь1 резом 2 в верхней части. В полости свай 1 -устроен ростверк 3 с-бетонными 5 пробками 4, с арматурной сеткой 5, приваренной к закладным детал м 6полой сваи i, и стакан 7, в котором замоноличена колонна 8.The foundation includes hollow piles 1 with b1 cut 2 in the upper part. In the cavity of the pile 1, a grillage 3 with concrete 5 plugs 4, with reinforcing mesh 5, welded to the mortgage parts m 6 floor piles i, and glass 7, in which the column 8 is monolithic, is welded.

Свайный фундамент выполн ют следую / Ю щим образом.The pile foundation is carried out as follows.

В грунт погружают полую сваю 1 с -.вырезом 2 в верхней части при помощи специального наголовника 9, который закрывает ее полость на высоту ростверка 15 3 и бетонной пробки 4. Затем погружаютследующую сваю вплотную к ранее забитой с вырезами, обращенными друг, к другу , или со смещением на размер наголовника 9, достаточного дл  заделки коло№- 20 ны 8. После ЭТОГО устанавливают арма- турную сетку 5, прикрепл  гее к закладным детал м 6 сваи 1 при помощи сварки, И бетонируют бетонные пробки 4, опирающиес  на грунтовые пробки 10, одноврет- 25 менно с плитой ростверка 3 в пределе-х вырезов 2 сваи, образу  стакан 7. Затем осуществл ют монтаж колонн 8 с замоноли иванием ее бетоном в стакане 7 ростверка 3.,30A hollow pile 1 with a cutout 2 in the upper part is immersed in the ground with the help of a special head cover 9, which closes its cavity to a height of the grillage 15 3 and concrete plug 4. Then the next pile is immersed close to the previously clogged one with cutouts facing each other, or displaced by the size of the head cover 9, sufficient for embedding a column of 20 to 8. After this, an armature grid 5 is installed, attached to the mortgage parts 6 m 1 of the pile 1 by welding, and concrete blocks 4, which rest on the ground plugs 10, simultaneously with a stove grillage 3 in the limits of the cut-outs of 2 piles, forming a cup 7. Then, installation of columns 8 is carried out with concrete grouting it in glass 7 of the grillage 3., 30

Бетонные пробки 4 выполн ют при необходимости такой высоты, чтобы при действии изгибающего момейта они могли воспринимать выдергивающие усили .Полые сваи с открытым концом могут быть погружены вплотную друг к другу или со смещением, а заполн ющий их полость грунту останавливаетс  на заданной отметке с помощью специального наголовника 9.Concrete plugs 4 are made, if necessary, at such a height that, under the action of a bending momeit, they can take out pulling forces. headband 9.

При использовании описанного фундамента достигаетс  повышение несущей способности свайного: фундамента за счет включени  в работу плиты ростверка при одновременном снижении материалоемкос ти и трудоемкости изготовлени  фундамента за счет исключени  земл ных, опалубочных и бетонных работ по устройству ростверков значительных габаритов и уменьшени  основных материалов полых свай с вырезами.When using the described foundation, an increase in the load bearing capacity of the pile is achieved: the foundation by putting the grillage into operation while reducing the material and labor-intensiveness of making the foundation by eliminating the ground, formwork and concrete works on the grillage of significant dimensions and reducing the basic materials of hollow piles with cutouts .

Claims (2)

1.Бабичев 3. В. Радиальные решени  свайных фундаментов дл  жилых и промышленных зданий и сооружений. М., Сборник докладов и сообщений по свайным фундаментам. Стройиздат, 1968,1. Babichev 3. B. Radial solutions of pile foundations for residential and industrial buildings and structures. M., Collection of reports and reports on pile foundations. Stroyizdat, 1968, с. 122-125.with. 122-125. 2.Материалы по проектированию сложных фундаментов и оснований и по производству изысканий. Сборник трудов,2. Materials on the design of complex foundations and bases and on the production of research. Collected Works вып. 15, ГПИ фунламентпроект. М., 1975, с. 37-38 (прототип).issue 15, GUI of the investment project. M., 1975, p. 37-38 (prototype). Фиг.FIG. XX 11eleven |1| 1 1g IIII 11eleven Фиг. 2FIG. 2 L/L / й/еЛth / eL
SU802944274A 1980-06-16 1980-06-16 Pile foundation SU968185A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802944274A SU968185A1 (en) 1980-06-16 1980-06-16 Pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802944274A SU968185A1 (en) 1980-06-16 1980-06-16 Pile foundation

Publications (1)

Publication Number Publication Date
SU968185A1 true SU968185A1 (en) 1982-10-23

Family

ID=20903578

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802944274A SU968185A1 (en) 1980-06-16 1980-06-16 Pile foundation

Country Status (1)

Country Link
SU (1) SU968185A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2751106C1 (en) * 2020-10-14 2021-07-08 федеральное государственное бюджетное образовательное учреждение высшего образования "Самарский государственный технический университет" Glass-type foundation for column

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2751106C1 (en) * 2020-10-14 2021-07-08 федеральное государственное бюджетное образовательное учреждение высшего образования "Самарский государственный технический университет" Glass-type foundation for column

Similar Documents

Publication Publication Date Title
AU682407B2 (en) Cellular structures for sustaining walls
SU968185A1 (en) Pile foundation
FI74096C (en) FOERFARANDE FOER FRAMSTAELLNING AV FUNDAMENT FOER EN KONSTRUKTION OCH ETT I FOERFARANDET ANVAENT MELLANSTYCKE.
CN103572762B (en) The bracket of the oblique inner support lower end of foundation pit supporting construction and fabrication tool and construction method
JPS6143493B2 (en)
SU607888A2 (en) Foundation for buildings and structures
SU827690A1 (en) Method of constructing foundations under buildings and structures
CN111576469A (en) Novel power transmission line tower foundation and construction method
CN110820800A (en) Chair type retaining wall
JPS62137324A (en) Foundation structure of high-rise buildings
Ngoma et al. Sustainable African housing through traditional techniques and materials: a proposal for a light seismic roof
JPS63151726A (en) Underground structure consisting of continuous underground wall
JPS57112523A (en) Substructure of building
SU903484A1 (en) Method of reinforcing foundation
RU2094568C1 (en) Modular foundation
SU1021719A1 (en) Strutting wall
JPS5712730A (en) Foundation work employing a precast reinforced concrete foundation beam
SU700616A1 (en) Steel pillar
SU1188251A1 (en) Foundation under tank
SU1113451A1 (en) Hydraulic engineering structure of moorage type
SU702116A1 (en) Foundation
SU652274A1 (en) Method of constructing a sunken-in well
SU1036846A1 (en) Foundation for building or installation
JP2766889B2 (en) Underground floor construction method for buildings
JPH06173278A (en) Basic structure of building structure