SU955850A3 - Mooring and unloading device for oil carriers - Google Patents
Mooring and unloading device for oil carriers Download PDFInfo
- Publication number
- SU955850A3 SU955850A3 SU772535796A SU2535796A SU955850A3 SU 955850 A3 SU955850 A3 SU 955850A3 SU 772535796 A SU772535796 A SU 772535796A SU 2535796 A SU2535796 A SU 2535796A SU 955850 A3 SU955850 A3 SU 955850A3
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- boom
- mooring
- section
- column
- pivotally
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B67—OPENING, CLOSING OR CLEANING BOTTLES, JARS OR SIMILAR CONTAINERS; LIQUID HANDLING
- B67D—DISPENSING, DELIVERING OR TRANSFERRING LIQUIDS, NOT OTHERWISE PROVIDED FOR
- B67D9/00—Apparatus or devices for transferring liquids when loading or unloading ships
- B67D9/02—Apparatus or devices for transferring liquids when loading or unloading ships using articulated pipes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B22/00—Buoys
- B63B22/02—Buoys specially adapted for mooring a vessel
- B63B22/021—Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/24—Arrangement of ship-based loading or unloading equipment for cargo or passengers of pipe-lines
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- Loading And Unloading Of Fuel Tanks Or Ships (AREA)
- Earth Drilling (AREA)
- Cleaning Or Clearing Of The Surface Of Open Water (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
Description
Изобретение относится к судостроению, в частности к швартовно-разгрузочным устройствам для нефтеналивных устройств.The invention relates to shipbuilding, in particular to mooring and unloading devices for oil loading devices.
Известно швартовно-разгрузочное устройство для нефтеналивных судов, содержащее колонну с поворотной головкой, установленную на морском дне, стрелу, шарнирно, соединенную с головкой колонны, а также швартовный трос, одним концом связанный с противовесом, и проходящий внутри колонны трубопровод, первым участком связанный со стрелой, а концом второго участка связанный с соединительным узлом, включающим конусообразный раструб [1].Known mooring and unloading device for oil vessels, containing a column with a rotary head mounted on the seabed, an arrow, pivotally connected to the head of the column, as well as a mooring cable, one end connected with a counterweight, and a pipe passing inside the column, the first section connected with an arrow, and the end of the second section is connected with the connecting node, including a cone-shaped bell [1].
Недостатком известного устройства является малая надежность в эксплуатации.A disadvantage of the known device is its low reliability.
Цель изобретения - повышение надежности устройства в эксплуатации.The purpose of the invention is to increase the reliability of the device in operation.
Поставленная цель достигается тем, что оно снабжено группой шарнирно соединенных между собой тяг, а второй участок трубопровода включает группу шарнирно соединенных между собой труб, шарнирно связанных с группой упомянутых шарнирно соеди2 ненных между собой тяг, образуя шарнирно-рычажный механизм многократного параллелограмма, снабженный узлом изменения его длины при этом один конец упомянутого шарнирно-рычажного многократного параллелограмма шарнирно связан с первым участком трубопровода, другой его конец посредством части трубопровода и тяги шарнирно связан с соединительным узлом, а последний связан кинематически с узлом изменения длины шарнирно-рычажного механизма многократного параллелограмма, причем швартовный троссвязан другим концом с упомянутым соединительным узлом,This goal is achieved in that it is equipped with a group of articulated interconnected rods, and the second section of the pipeline includes a group of articulated interconnected pipes articulated with a group of articulated interconnected rods, forming an articulated-lever mechanism of multiple parallelogram equipped with a change unit its length while one end of the said articulated-lever multiple parallelogram is pivotally connected to the first section of the pipeline, its other end through part of the pipe oestrus and rods pivotally connected to the connecting node and the last node is connected kinematically with the length changes jointed parallelogram linkage repeated, wherein the mooring trossvyazan other end with said connecting unit,
Кроме того, стрела выполнена из двух шарнирно соединенных между собой частей, снабженных узлом компенсации качки, включающим пневмогидравлический цилиндр, смонтированный на первой’части стрелы и одним концом шарнирно соединенный с ней,а другим концом шарнирно свяэанфяй со второй частью стрелы,при этом первая часть стрелы шарнирно связана с голов кой колонны,вторая часть стрелы шарнирно связана с концом шарнирнорычажного механизма многократного параллелограмма, а первый участок трубопровода выполнен из двух шарнирно соединенных между собой частей, смонтированных соответственно на первой и второй частях стрелы.In addition, the boom is made of two parts pivotally connected to each other, equipped with a pitch compensation unit, including a pneumatic hydraulic cylinder mounted on the first part of the boom and pivotally connected to it by one end and pivotally connected to the second part of the boom by the other end, while the first part the boom is pivotally connected to the head of the column, the second part of the boom is pivotally connected to the end of the articulated link mechanism of multiple parallelogram, and the first section of the pipeline is made of two pivotally connected between in a parts mounted respectively on the first and second parts of the boom.
Также узел изменения' длины шарнирно-рычажного механизма многократного параллелограмма содержит двигатель с лебедкой и дополнительный трос, заведенный одним концом на лебедку, а другим концом связанный с соединительным узлом, а1 последний снабжен радио.телеметрической системой его наведения.Also, the node changes' length jointed parallelogram linkage comprises multiple motor and winch additional rope wound on the winch at one end and the other end connected to the connecting node, and the last one is provided with radio.telemetricheskoy its guidance system.
сисузла устазав кинематически с углом изменения длины шарнирно-рычажного механизма многократного параллелограмма. Швартовный трос 5 связан другим концом с соединительным узлом. В варианте изобретения (фиг. 3), стрела выполнена из двух шарниров 20 соединенных между собой частей 21 и 22, снабженных узлом компенсации качки, вкхПочающим пневмогидравлический цилиндр 23, смонтированный на первой части 21 стрелы и одним концом шарниром 24 соединенный с ней, а другим концом шарниром 25 связанный с второй частью 22 стрелы. Пневмогидравлический цилиндр 23 связан с пневмогидравлическим аккумулятором 26. Первая часть 21 стрелы через опорный элемент 27 связана шарнирно с балкой '28 поворотной головки 3, вторая часть 22 стрелы шарниром 18 связана с концом ί шарнирно-рычажного механизма многократного параллелограмма, а первый участок <3 трубопровода выполнен из двух шарнирно соединенных между собой частей 29 и 30, смонтированных соответственно на первой и второй частях 21 и 22 стрелы.the system has been kinematically fixed with the angle of change of the length of the articulated-lever mechanism of multiple parallelogram. Mooring cable 5 is connected at the other end to the connecting node. In the embodiment of the invention (Fig. 3), the boom is made of two hinges 20 of interconnected parts 21 and 22, equipped with a pitch compensation unit, including a pneumatic-hydraulic cylinder 23 mounted on the first part 21 of the boom and connected to it by one end 24 and the other the end of the hinge 25 connected with the second part 22 of the boom. The pneumatic-hydraulic cylinder 23 is connected to the pneumatic-hydraulic accumulator 26. The first part 21 of the boom is pivotally connected to the beam '28 of the rotary head 3 through the support member 27, the second part 22 of the boom is pivoted by the pivot 18 to the end ί of the multiple link parallelogram linkage mechanism, and the first section <3 of the pipeline made of two parts 29 and 30 pivotally connected to each other, mounted respectively on the first and second parts 21 and 22 of the boom.
Узел изменения длины шарнирно-рычажного механизма многократного па- раллелограмма содержит двигатель 31 с лебедкой 32 и дополнительный трос 33, доведенный одним концом через направляющий шкив 34 на лебедку 32, а другим концом связанный с соединительным узлом, а последний снабжен радиотелеметрической системой его наведения.The multiple-parallelogram link-length mechanism includes a motor 31 with a winch 32 and an additional cable 33, brought at one end through a guide pulley 34 to the winch 32, and the other end connected to the connecting unit, and the latter is equipped with a radio telemetry guidance system.
Радиотелеметрическая система наведения соединительного узла содержит телевизионные камеры 35, установлен40 ные на конусообразном раструбе 10 соединительного узла. Двигатель 31 с лебедкой 32 смонтированы на стреле 4.Двигатель 31 с лебедкой 32 согласно варианту исполнения изобретения (на фиг. 3)расположены на второй части 22 стрелы. Швартовный трос 5 сопряжен другим концом с соединительным узлом через установленное на последнем с возможностью свободного вращения кольцо 36. Судно 1 имеет расположенный у форштевня движитель 37.The radio telemetry guidance system of the connecting unit comprises television cameras 35 mounted on a cone-shaped socket 10 of the connecting unit. An engine 31 with a winch 32 is mounted on the boom 4. An engine 31 with a winch 32 according to an embodiment of the invention (in FIG. 3) is located on the second part 22 of the boom. The mooring cable 5 is connected at the other end to the connecting unit through a ring 36 mounted on the latter with the possibility of free rotation. The vessel 1 has a propulsion unit 37 located at the stem.
Причем радиотелеметрическая тема наведения соединительного содержит телевизионные камеры, новленные на конусообразном раструбе, а двигатель с лебедкой смонтированы на стреле.Moreover, the radio telemetry topic of connecting guidance contains television cameras that are new on a cone-shaped bell, and the engine with a winch is mounted on an arrow.
Кроме того, двигатель с лебедкой расположены на второй части стрелы.In addition, the engine with a winch is located on the second part of the boom.
На фиг. 1 изображено швартовноразгрузочное устройство для нефтеналивных судов, общий вид; на фиг.In FIG. 1 shows a mooring device for oil vessels, a general view; in FIG.
- вид А на фиг. 1; нафиг. 3 - вариант выполнения швартовно-разгрузочного устройства в общем виде. »- view A in FIG. 1; nafig. 3 is an embodiment of a mooring and unloading device in a general form. "
Швартовно-разгрузочное устройство 1 для нефтеналивных судов ( танкеров/ содержит колонну 2 с поворотной головкой 3, установленную жесткоили шарнирно на морском дне, стрелуMooring and unloading device 1 for oil vessels (tankers / contains a column 2 with a rotary head 3 mounted rigidly or articulated on the seabed, an arrow
4, шарнирно соединенную с головкой колонны, а также швартовный трос4, pivotally connected to the column head, as well as a mooring cable
5, одним концом связанный через направляющий блок 6 с противовесом 7, и проходящий- внутри колонны 2 трубопровод 8, первым участком, а связанный со стрелой 4, а концом второго участка связанный с соединительным узлом для заправочного патрубка 9 судна, включающим конусообразный раструб 10. Заправочный патрубок 9 судна (танкера ) выполнен с кольцевой проточкой 11, взаимодействующей с узлом блокировки конусообразного раструба 10 соединительного узла. Приемный трубопровод 12 судна подключен к заправочному патрубку, 9. Устройство снабжено группой шарнирами 13 соединенных между собой тяг 1'4,а второй участок трубопровода включает группу шарнирами 15 соединенных между собой труб 16,шарнирами 17 связанных с группой шарнирно соединенных между собой тяг. 14,образуя шарнирно-рычажный механизм многократного параллелограмма,снабженный узлом · изменения его длины.Один конец „δ шарнирно-рычажного многократного па— 60 раллелограмма карданным шарниром 18 связан с первым участкомтрубопровода, другой его конец-в посредством трубы 16 и тяги 14 шарниром 19 связан с соединительным узлом,а последний свя-&5 мощью установленного у фарштевня5, connected at one end through a guiding block 6 with a counterweight 7, and passing through the pipe 2 inside the column 2, the first section, and connected to the boom 4, and the end of the second section connected to the connecting node for the fueling pipe 9 of the vessel, including a cone-shaped bell 10. The fuel pipe 9 of the vessel (tanker) is made with an annular groove 11 that interacts with the blocking unit cone-shaped bell 10 of the connecting node. The receiving pipe 12 of the vessel is connected to the filling pipe 9. The device is equipped with a group of hinges 13 of interconnected rods 1'4, and the second section of the pipeline includes a group of hinges 15 of interconnected pipes 16, hinges 17 connected to a group of articulated interconnected rods. 14, forming an articulated-lever mechanism of multiple parallelogram equipped with a knot · changing its length. One end „δ of the articulated-lever multiple pa — 60 parallelogram is connected by a cardanic joint 18 to the first section of the pipeline, its other end — by means of pipe 16 and rod 14 by hinge 19 connected to the connecting unit, and the latter with the & 5 power installed in the minced meat
Швартовно-разгрузочное устройство работает следующим образом.Mooring and unloading device operates as follows.
Шарнирно-рычажный механизм многократного параллелограмма, составленный из труб 16 и тяг 14, перед операцией швартования находится в растянутом положении, конусообразный .раструб 10 соединительного узла опущен вниз до уровня заправочного патрубка 9 нефтеналивного судна (танкера) , а стрела 4 ориентирована в направлении ветра. Танкер в это время маневрирует, в частности, с по- # движителя 37, причем этим маневром управляет или с колонны 2 квалифицированный персонал, или непосредственно с танкера 1 блок радиоэлектронного дистанционного управления, управляющее движителем 37 и другими органами маневрирования.The articulated-lever mechanism of multiple parallelogram, composed of pipes 16 and rods 14, is in the stretched position before the mooring operation, the cone-shaped socket 10 of the connecting unit is lowered down to the level of the filling pipe 9 of the oil tanker (tanker), and the boom 4 is oriented in the direction of the wind. The tanker at this time maneuvers, in particular, from the engine # 37, and this maneuver is controlled either by qualified personnel from column 2 or directly from the tanker 1 by the electronic remote control unit controlling the engine 37 and other maneuvering bodies.
После достижения стыковки конусообразного раструба 10 соединительного узла с заправочным патрубком 9 танкера, они блокируются между собой с помощью штоков, входя’ щих в кольцевую проточку 11 патрубка.After the docking of the cone-shaped socket 10 of the connecting unit with the tanker refueling pipe 9 is reached, they are interlocked by means of rods entering the annular groove 11 of the pipe.
Швартовка обеспечивается,'например, с помощью швартовного троса 5, который удерживается в натянутом состоянии противовесом 7 (фиг. 31.The mooring is provided, for example, using a mooring cable 5, which is held in tension by the counterweight 7 (Fig. 31.
Таким же образом работает устройство в варианте его исполнения по фиг. 3. При этом осуществляется компенсация перемещения частей 21 и 22 .стрелы и устранение резонанса элементов устройства и их взаимного перемещения, возникающих под влиянием iволнения моря и качки колонны 2. Эта компенсация взаимных перемещений частей 21 и 22 стрелы осуществляется работой пневмогидравлического цилиндра 23, соединенного с пневмогидравлическим аккумулятором 26. Растяжение шарнирно-рычажного механизма многократного параллелограмма происходит за счет силы тяжести составляющих его труб 16 и тяг 14 и за счет травления с лебедки 32 дополнительного троса 33, связанного с соединительным узлом. Посредством телевизионных камер 35, установленных на конусообразном раструбе 10 соединительного узла, осуществляется дистанционный визуальный контроль за операцией стыковки раструба 10 и заправочного патрубка 9 танкера, а также наведение раструба 10 на патрубок 9. После осуществления стыковки раструба 10 и патрубка 9 и их блокировки производится перекачка с колонны 2 на танкер 1 жидкого топлива (нефти/ по трубопроводу 8, при этом жидкое топливо проходит через шарнирно соединенные трубы 16 bto-jq рого его участка.In the same way, the device in the embodiment of FIG. 3. In this case, compensation is made for the movement of the parts 21 and 22 of the boom and the elimination of the resonance of the elements of the device and their mutual movement arising under the influence of sea waves and the rolling of the column 2. This compensation of the mutual movements of the parts 21 and 22 of the boom is carried out by the operation of a pneumohydraulic cylinder 23 connected to pneumohydraulic accumulator 26. The tension of the articulated link mechanism of multiple parallelogram occurs due to the gravity of its constituent pipes 16 and rods 14 and due to etching from the winch 32 additional body cable 33 associated with the connecting node. By means of television cameras 35 mounted on a cone-shaped bell 10 of the connecting unit, remote visual control of the operation of docking the bell 10 and the tanker 9 filling pipe is performed, as well as pointing the bell 10 to the pipe 9. After docking the bell 10 and pipe 9 and blocking them, pumping is performed from column 2 to tanker 1 of liquid fuel (oil / through pipeline 8, while liquid fuel passes through articulated pipes 16 of its bto-jq section.
После окончания операции перекачки' жидкого топлива осуществляется отстыковка конусообразного раструба 10 соединительного узла от заправочного патрубка 9 танкера и сжатие ( складывание) шарнирно-рычажного механизма многократного параллелограмма, образованного трубами 16 и тягами 14 и соответственно подъем соединительного узла с конусообразным раструбом 10 за счет выбирания лебедкой 32, дополнительного троса 33. Предложенное швартовно-рагруэочное устройство обладает повышенной надежностью в эксплуатации и повы-_ [ценной точностью выполнения операции стыковки с танкером.After the pumping operation of the liquid fuel is completed, the cone-shaped socket 10 of the connecting unit is undocked from the tanker’s refueling pipe 9 and the multiple-parallel linkage mechanism formed by the pipes 16 and rods 14 is compressed (folded) and the connection unit with the cone-shaped socket 10 is lifted accordingly by selecting the winch 32, an additional cable 33. The proposed mooring-ragrueochny device has increased reliability in operation and increased _ [valuable accuracy Ia docking operations with the tanker.
Claims (5)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR7631119A FR2367700A1 (en) | 1976-10-15 | 1976-10-15 | IMPROVEMENTS CONTRIBUTION |
Publications (1)
Publication Number | Publication Date |
---|---|
SU955850A3 true SU955850A3 (en) | 1982-08-30 |
Family
ID=9178822
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU772535796A SU955850A3 (en) | 1976-10-15 | 1977-10-14 | Mooring and unloading device for oil carriers |
Country Status (11)
Country | Link |
---|---|
JP (1) | JPS6055400B2 (en) |
AR (1) | AR223308A1 (en) |
BR (1) | BR7706879A (en) |
CA (1) | CA1086183A (en) |
DE (1) | DE2745890C2 (en) |
ES (1) | ES463251A1 (en) |
FR (1) | FR2367700A1 (en) |
GB (1) | GB1591646A (en) |
NL (1) | NL7711310A (en) |
NO (1) | NO157494C (en) |
SU (1) | SU955850A3 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2455224C2 (en) * | 2006-07-13 | 2012-07-10 | Сосьете Еуропеенн Д'Инженери Механик-Еуродим | System to transfer natural liquefied gas from inshore tanker to floating or stationary storage |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4121616A (en) * | 1977-03-04 | 1978-10-24 | Fmc Corporation | Articulated fluid loading arm |
FR2474012B2 (en) * | 1979-05-28 | 1986-01-31 | Fmc Europe | COUPLING AND TRANSFER MEANS FOR ARTICULATED LOADING ARMS FOR TRANSFERRING FLUIDS |
FR2457836A1 (en) * | 1979-05-28 | 1980-12-26 | Fmc Europe | Articulated device for transferring fluids - comprising two pipelines in parallel planes giving min. press. drop and number of connections and folding into compact structure |
DE2945768A1 (en) * | 1979-11-13 | 1981-05-27 | Hans 8000 München Tax | CHARGING SYSTEM FOR LIQUID CARGOES |
JPS60191594U (en) * | 1984-05-31 | 1985-12-19 | 日本鋼管株式会社 | Mooring device |
US4656961A (en) * | 1986-05-27 | 1987-04-14 | Gerrard Brothers, Incorporated | Articulated mooring device |
JP2681233B2 (en) * | 1991-04-16 | 1997-11-26 | 三菱農機株式会社 | Rear axle case structure for riding type work machine |
GB2328197B (en) * | 1997-08-12 | 1999-08-11 | Bluewater Terminal Systems Nv | Fluid transfer system |
NO308105B1 (en) * | 1998-01-06 | 2000-07-24 | Kvaerner Maritime As | Device for transferring very cold fluids from a platform to a vessel |
FR2813872B1 (en) * | 2000-09-14 | 2003-01-31 | Fmc Europe | ARTICULATED ARM FOR LOADING AND UNLOADING PRODUCTS, PARTICULARLY FLUID PRODUCTS |
FR2854156B1 (en) * | 2003-04-23 | 2007-03-09 | Fmc Technologies Sa | ARTICULATED-ARM ASSEMBLY COMPRISING A CONNECTING CABLE FOR LOADING AND UNLOADING PRODUCTS, IN PARTICULAR FLUID PRODUCTS |
RU2489303C2 (en) * | 2007-12-03 | 2013-08-10 | Сингл Бой Мурингс Инк. | Hydrocarbons transfer system with rotary jig |
FR2964093B1 (en) | 2010-09-01 | 2012-12-07 | Fmc Technologies Sa | LOADING ARM WITHOUT EMBASE |
NO20170158A1 (en) | 2017-02-01 | 2018-06-18 | Rolls Royce Marine As | Automated transportable mooring unit and a system comprising multiple automated transportable mooring units |
-
1976
- 1976-10-15 FR FR7631119A patent/FR2367700A1/en active Granted
-
1977
- 1977-10-07 GB GB41822/77A patent/GB1591646A/en not_active Expired
- 1977-10-12 DE DE2745890A patent/DE2745890C2/en not_active Expired
- 1977-10-12 CA CA288,533A patent/CA1086183A/en not_active Expired
- 1977-10-14 AR AR269584A patent/AR223308A1/en active
- 1977-10-14 SU SU772535796A patent/SU955850A3/en active
- 1977-10-14 ES ES463251A patent/ES463251A1/en not_active Expired
- 1977-10-14 NL NL7711310A patent/NL7711310A/en not_active Application Discontinuation
- 1977-10-14 BR BR7706879A patent/BR7706879A/en unknown
- 1977-10-14 NO NO773523A patent/NO157494C/en unknown
- 1977-10-15 JP JP52123988A patent/JPS6055400B2/en not_active Expired
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2455224C2 (en) * | 2006-07-13 | 2012-07-10 | Сосьете Еуропеенн Д'Инженери Механик-Еуродим | System to transfer natural liquefied gas from inshore tanker to floating or stationary storage |
Also Published As
Publication number | Publication date |
---|---|
FR2367700B1 (en) | 1979-03-23 |
NO157494B (en) | 1987-12-21 |
DE2745890C2 (en) | 1986-05-22 |
ES463251A1 (en) | 1978-07-16 |
JPS6055400B2 (en) | 1985-12-04 |
GB1591646A (en) | 1981-06-24 |
NO773523L (en) | 1978-04-18 |
AR223308A1 (en) | 1981-08-14 |
NO157494C (en) | 1988-03-30 |
CA1086183A (en) | 1980-09-23 |
BR7706879A (en) | 1978-07-11 |
FR2367700A1 (en) | 1978-05-12 |
DE2745890A1 (en) | 1978-04-20 |
NL7711310A (en) | 1978-04-18 |
JPS5349322A (en) | 1978-05-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU955850A3 (en) | Mooring and unloading device for oil carriers | |
RU2299848C2 (en) | System to transfer liquid product, such as liquefied natural gas between transport vehicle, such as vessel, and installation for reception or delivery of such product | |
US4867211A (en) | Open sea transfer of fluids | |
SU651683A3 (en) | Device for mooring and handling operations with combustibles | |
US5651708A (en) | Arrangement for buoy loading | |
US4393906A (en) | Stern to bow offshore loading system | |
US4262380A (en) | Buoy including a mooring device | |
NO141510B (en) | ONE POINT MORTGAGE AND LOAD TRANSFER SYSTEM FOR TANKERS | |
US3515182A (en) | One-point mooring system for loading or unloading a fluid into or from a ship | |
US4206782A (en) | Equipment for connecting oil-tankers to marine towers | |
US5749758A (en) | Vessel for production and/or loading/unloading and transport of hydrocarbons from offshore fields, and/or for carrying out well operations | |
JPS5828200B2 (en) | Handling arm for fluid transfer | |
CA1077801A (en) | Equipment serving to connect oil-tankers to marine towers | |
GB1600810A (en) | Marine loading arm | |
US4130076A (en) | Single point mooring apparatus | |
US3980037A (en) | Apparatus for mooring ships | |
US3922992A (en) | Single point vessel mooring system | |
EP3484762B1 (en) | Coupling system for transfer of hydrocarbons at open sea | |
JPS63199194A (en) | Mooring device for ocean floating structure body | |
DE202011051271U1 (en) | OFFSHORE LOADING SYSTEM | |
GB2328197A (en) | Fluid transfer system | |
EP1389580A1 (en) | Fluid transfer interface | |
SU826949A3 (en) | System for mooring and pumping liquid fuel from sea floating platform to tanker | |
US3547153A (en) | Single counterbalanced marine loading arm | |
US20050039802A1 (en) | Fluid transfer interface |