SU881352A1 - Method of erecting artificial support - Google Patents
Method of erecting artificial support Download PDFInfo
- Publication number
- SU881352A1 SU881352A1 SU792853759A SU2853759A SU881352A1 SU 881352 A1 SU881352 A1 SU 881352A1 SU 792853759 A SU792853759 A SU 792853759A SU 2853759 A SU2853759 A SU 2853759A SU 881352 A1 SU881352 A1 SU 881352A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- formwork
- space
- additional
- mixture
- main
- Prior art date
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Description
Изобретение относится к горной промышленности и может быть использовано при подземной разработке месторождений полезных ископаемых с возведением искусственных опор в выработанном пространстве.The invention relates to the mining industry and can be used in underground mining of mineral deposits with the construction of artificial supports in the worked out space.
Известен способ возведения искусственной опоры в выработанном пространстве, ·заключающийся в возведении по углам квадрата бетонных опор и заполнении пространства между опорами пустой породой £1].A known method of erecting an artificial support in the worked out space, · consisting in the construction of the corners of the square of concrete supports and filling the space between the supports with empty rock £ 1].
Недостаток указанного способа - вывысокая трудоемкость возведения опоры. 15 The disadvantage of this method is the high complexity of the construction of the support. fifteen
Кроме того, известен способ возведения искусственной опоры в открытом очистном пространстве, заключающийся в монтаже опалубки и поочередном поднятии ее до кровли выработки по мере заполнения твердеющей смесью внутреннего пространства опалубки и затвердевания твердеющей смеси, при этом производится возведение оплошного монолитного целика из твердеющей смеси [21Недостатком указанного способа является большой расход дефицитной твердеющей смеси при значительных диаметрах опор. 30In addition, there is a known method of erecting an artificial support in an open treatment space, which consists in installing the formwork and alternately lifting it to the working roof as the hardening mixture fills the inner space of the formwork and hardens the hardening mixture, while the continuous monolithic pillar is erected from the hardening mixture [21 the method is a large consumption of scarce hardening mixture with significant diameters of the supports. thirty
Цель изобретения - снижение расхода твердеющей смеси.The purpose of the invention is to reduce the consumption of hardening mixture.
Поставленная цель достигается тем, что внутри основной опалубки на заданном расстоянии от ее стенок монтируют дополнительную опалубку, пространство между основной и дополнительной опалубками заполняют твердеющей смесью, а внутреннюю полость допол нительной· опалубки - горной породой, причем первоочередно производят заполнение пространства внутри дополнительной опалубки, затем после заполнения твердеющей смесью пространства между основной и дополнительной опалубками до уровня горной породы, размещенной внутри дополнительной опалубки, последнюю поднимают и производят виброуплотнение твердеющей смеси, при этом с целью увеличения прочности опоры между основной и дополнительной опалубками устанавливают арматуру .The goal is achieved by the fact that inside the main formwork at a specified distance from its walls, additional formwork is mounted, the space between the main and additional formwork is filled with a hardening mixture, and the internal cavity of the additional formwork is filled with rock, and the space inside the additional formwork is primarily filled, then after filling with the hardening mixture the space between the main and additional formwork to the level of rock placed inside the additional opal barrels, the latter is lifted and vibrocompaction of the hardening mixture is made, while in order to increase the strength of the support, reinforcement is installed between the main and additional formwork.
На чертеже изображена возводимая искусственная опора, вертикальный разрез .The drawing shows a constructed artificial support, a vertical section.
Воздействие искусственной опоры осуществляется следующим образом.The impact of artificial support is as follows.
Искусственную опору 1 возводят с помощью двух опалубок. Внутри основ3 ной 2 (наружной) опалубки на заданном расстоянии от ее стенок монтируют дополнительную 3 (внутреннюю) опалубку. Опалубки монтируют на подготовленной почве выработки. Внутреннюю опалубку снабжают гидродомкратами 4 и гидродомкратными стержнями 5, а на- 5 ружную опалубку 3 - гидродомкратами 6, распорными кольцами 7 i В первую очередь за внутреннюю опалубку 3 до определенного уровня укладывают горную породу 8, затем пространство между внутренней опалубкой 3 и наружной заполняют до уровня горной породы твердеющей смесью 9, после чего производят? подъем внутренней опалубки с одновременным виброуплотнением 15 твердеющей смеси 9. Подъем наружной опалубки осуществляют по мере схватывания твердеющей смеси 9. После возведения опоры 1 под кровлю выработки демонтируют внутреннюю опалубку 3 jq и довозведение осуществляют с наружной опалубки 2.Artificial support 1 is erected using two formwork. Inside the main 2 (external) formwork, an additional 3 (internal) formwork is mounted at a predetermined distance from its walls. The formwork is mounted on the prepared working soil. An inner shuttering are provided with hydraulic jacks 4 and the rods 5 gidrodomkratnymi and HA 5 ruzhnuyu formwork 3 - hydraulic jacks 6, the spacer rings 7 i Primarily for the inner formwork 3 is placed to a certain level 8 the rock, then the space between the inner and the outer formwork 3 is filled to rock level with a hardening mixture of 9, and then produce? lifting of the inner formwork with simultaneous vibration compaction 15 of the hardening mixture 9. The lifting of the outer formwork is carried out as the hardening mixture is set 9. After the support 1 is erected under the roof, the inner formwork 3 jq is removed and the additional formwork is carried out from the outer formwork 2.
Данный способ возведения искусственных опор позволяет в сжатые сроки с помощью известных и легкоизготавливаемых устройств и с наименьшими на & данный период трудозатратами производить возведение искусственных опор под кровлю выработки в открытом очист ном пространстве.This method of erecting artificial supports allows in a short time using known and easily manufactured devices and with the least labor costs for this period to erect artificial supports under the roof of the mine in an open treatment space.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU792853759A SU881352A1 (en) | 1979-11-05 | 1979-11-05 | Method of erecting artificial support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU792853759A SU881352A1 (en) | 1979-11-05 | 1979-11-05 | Method of erecting artificial support |
Publications (1)
Publication Number | Publication Date |
---|---|
SU881352A1 true SU881352A1 (en) | 1981-11-15 |
Family
ID=20865271
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU792853759A SU881352A1 (en) | 1979-11-05 | 1979-11-05 | Method of erecting artificial support |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU881352A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111075505A (en) * | 2019-12-17 | 2020-04-28 | 天地科技股份有限公司 | Coal mine fully-mechanized coal mining face segmented filling mining method |
-
1979
- 1979-11-05 SU SU792853759A patent/SU881352A1/en active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111075505A (en) * | 2019-12-17 | 2020-04-28 | 天地科技股份有限公司 | Coal mine fully-mechanized coal mining face segmented filling mining method |
CN111075505B (en) * | 2019-12-17 | 2021-03-16 | 天地科技股份有限公司 | Coal mine fully-mechanized coal mining face segmented filling mining method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SE7512573L (en) | SET AND DEVICE FOR REPAIR AND REINFORCEMENT OF PILLARS | |
CN103603508A (en) | Plugging, pouring and reinforcing construction method of pile foundation in underground air-raid shelter | |
CN112302661B (en) | Long-distance small-section tunnel construction process | |
CN110821500B (en) | Large-section tunnel excavation and support construction method for penetrating through earth-rock boundary stratum | |
CN110700860B (en) | Construction method of soil-stone boundary tunnel crossing loess valley | |
RU2375521C1 (en) | Method of erecting piled foundation designed for high loads | |
SU881352A1 (en) | Method of erecting artificial support | |
CN108149707A (en) | A kind of basement building structure and its construction method | |
RU2229557C1 (en) | Screw reinforced concrete column and building method thereof | |
RU2251608C1 (en) | Slot-like reinforced concrete column and erection method | |
RU2209267C1 (en) | Process of earth fixing | |
CN207891910U (en) | A kind of basement building structure | |
RU2289694C1 (en) | Method for reclamation of limestone quarries during construction of industrial structures | |
US1644572A (en) | Ant ville | |
CN118207884B (en) | Existing building dismantling and newly-built building foundation pit supporting cross comprehensive construction method | |
JPH09151470A (en) | Underground structure construction method | |
RU173169U1 (en) | Reinforced concrete pile column | |
JPH0336370B2 (en) | ||
SU1694779A1 (en) | Method for consolidating subsiding soil | |
JPS61186623A (en) | Method of building foundation of building | |
SU983197A1 (en) | Method of erecting a retaining wall | |
SU905379A1 (en) | Method of constructing subterranean structures | |
SU1689521A1 (en) | Method for construction of open caisson | |
SU1168718A1 (en) | Method of constructing monolithic lining | |
SU1097754A1 (en) | Void former |