SU878876A1 - Method of winning wall blocks of natural stone - Google Patents
Method of winning wall blocks of natural stone Download PDFInfo
- Publication number
- SU878876A1 SU878876A1 SU792786565A SU2786565A SU878876A1 SU 878876 A1 SU878876 A1 SU 878876A1 SU 792786565 A SU792786565 A SU 792786565A SU 2786565 A SU2786565 A SU 2786565A SU 878876 A1 SU878876 A1 SU 878876A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- natural stone
- blocks
- wall blocks
- carried out
- hardening
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 4
- 239000004575 stone Substances 0.000 title claims 2
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 238000005553 drilling Methods 0.000 claims 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
Landscapes
- Processing Of Stones Or Stones Resemblance Materials (AREA)
Description
На фиг. 1 схематически представлена разметка блоков и шпуров в забое, вид в плане; на фиг. 2 - забой, вид спереди; на фит. 3 изображен стеновой блок в разрезе .FIG. 1 shows schematically the marking of blocks and holes in the bottomhole, plan view; in fig. 2 - face, front view; on fit. 3 shows a wall block section.
Способ осуществл ют следующим образом .The method is carried out as follows.
В забое (по кровле) производ т разметку блоков 1 и вертикальных шпуров 2, которые затем пробуривают с опережением на несколько циклов. На уровне подошвы забо выполн ют горизонтальный пропил 3, из щели которого в шпур 2 устанавливают армирующий стержень 4 с голозкой 5 на нижнем конце и резьбой на верхнем его конце. Из щели горизонтального пропила 3 на головку 5 стержн 4 насаживают разрезную шайбу 6. Полости шпуров заполн ют укрепл ющим раствором 7. Носле чего на верхний конец армирующего стержн 4 насаживают опорную шайбу 8, гайку 9 и нроизвод т обжатие блока. Затем осуществл ют вертикальный и тыльный пропил 10 и извлекают блок до затвердевани укрепл ющего раствора.In the bottom (on the roof), blocks 1 and vertical bore holes 2 are marked, which are then drilled several times ahead. At the level of the bottom, horizontal cutting is made 3, from the slot of which a reinforcing rod 4 is installed into the hole 2 with a hollow 5 at the lower end and a thread at its upper end. A horizontal washer 6 is placed on the head 5 of the rod 4 from the horizontal kerf 3 slit. The holes are filled with reinforcing mortar 7. Then, the support washer 8, the nut 9 and the block are pressed onto the upper end of the reinforcing rod 4. Then, vertical and rear cutting is carried out 10 and the block is removed before the reinforcing solution hardens.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU792786565A SU878876A1 (en) | 1979-06-25 | 1979-06-25 | Method of winning wall blocks of natural stone |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU792786565A SU878876A1 (en) | 1979-06-25 | 1979-06-25 | Method of winning wall blocks of natural stone |
Publications (1)
Publication Number | Publication Date |
---|---|
SU878876A1 true SU878876A1 (en) | 1981-11-07 |
Family
ID=20836471
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU792786565A SU878876A1 (en) | 1979-06-25 | 1979-06-25 | Method of winning wall blocks of natural stone |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU878876A1 (en) |
-
1979
- 1979-06-25 SU SU792786565A patent/SU878876A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ATA267287A (en) | DRILL RODS FOR IMPACT DRILLING | |
PT89399B (en) | COMPOUND HOUSING | |
BR8701803A (en) | PROCESS AND APPARATUS FOR THE INVESTIGATION OF A GROUND FORMATION PENETRATED BY A DRILLING HOLE | |
SU878876A1 (en) | Method of winning wall blocks of natural stone | |
ATE27839T1 (en) | RETAINING WALL RENOVATION PROCEDURE. | |
ES379452A1 (en) | Apparatus and method for obtaining core samples from soil and rock masses | |
ATE59073T1 (en) | PROCEDURE FOR SECURING RETAINING WALLS. | |
SE8003905L (en) | DRILLING HEAD | |
ATE35717T1 (en) | CUTTING HEAD FOR DRIVING PREFABRICATED CONCRETE PIPES FOR THE PRODUCTION OF STALLS OR TUNNELS. | |
FR2371549A1 (en) | Cracked concrete highway slab repair system - with steel bars set in drilled holes by epoxy resin | |
BG30178A3 (en) | Method and apparatus for holes boring | |
SU934012A1 (en) | Method of winning limestone blocks | |
SU658276A1 (en) | Method of winning stone blocks | |
FR2265920A1 (en) | Underground drainage wall construction - uses set of interconnected holes formed by bladed vibratory tool filled with cement | |
SU1379460A1 (en) | Method of winning stone blocks and small stones underground | |
DE58900890D1 (en) | METHOD AND DEVICE FOR BREAKING OUT AND FINISHING TUBES, TUNNELS, SHAFTS OD. DGL. | |
SU1364658A2 (en) | Method of producing soil anchor | |
SU1681004A1 (en) | Method for protection of development workings | |
SU1069746A1 (en) | Apparatus for drilling holes in the ice | |
AT378035B (en) | METHOD FOR CONTINUOUSLY DETERMINING THE STONE CHARACTERISTICS IN A DRILL HOLE TO BE DRILLED | |
SU390277A1 (en) | METHOD OF PASSAGE OF VERTICAL MINING OPERATIONS IN COMPLEX HYDROGEOLOGICAL CONDITIONS | |
SU781352A1 (en) | Method of winning stone pieces under subterranean conditions | |
SU768969A1 (en) | Method of undergroung delivering of blocks | |
SU623970A1 (en) | Method of pillarless developing of winning columns | |
SU1420175A1 (en) | Method of erecting prestrained anchor-like support |