SU773270A1 - Solid roof control method - Google Patents
Solid roof control method Download PDFInfo
- Publication number
- SU773270A1 SU773270A1 SU792741995A SU2741995A SU773270A1 SU 773270 A1 SU773270 A1 SU 773270A1 SU 792741995 A SU792741995 A SU 792741995A SU 2741995 A SU2741995 A SU 2741995A SU 773270 A1 SU773270 A1 SU 773270A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- roof
- control method
- clearing
- roof control
- solid roof
- Prior art date
Links
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Earth Drilling (AREA)
Description
(54) СПОСОБ УПРАВЛЕНИЯ ТРУДНООБРУШАЕМОЙ КРОВЛЕЙ(54) METHOD OF MANAGING WRONG BLOOD ROOF
1one
Изобретение относитс к горной промышленности и может быть использовг, но npii разработке пологих и наклонных угольных пластов с труднообрушаемой кровлей.The invention relates to the mining industry and can be used, but npii develop flat and inclined coal seams with a hard-to-break roof.
Известен способ управлени труднообрушаемой кровлей, включающий бурение скважин в породы труднообрушаемой кровли, зар жание указанных скважин зар дами ВВ и взрывание зар дов до подхода очистного забо 1.There is a known method of controlling a hard-to-collapse roof, which includes drilling wells in the rock of a hard-to-collapsing roof, charging these wells with explosives and blasting charges before the approach of the clearing hole 1.
Однако данный способ характеризуетс значительной трудоемкостью работ по управлению кровлей.However, this method is characterized by a considerable amount of work on roofing.
Известен также способ управлени труднообрушаемой кровлей, включающий обруше 1ие кровли, участками путем расположени линии очистного забо под углом к подготовительным выработкам, оконтуривающим выемочный столб 2.There is also known a method of controlling a hard-to-damage roof, which includes the collapse of one roof, sections by positioning the clearing flank line at an angle to the preparatory workings, which outlines the extraction column 2.
Однако данный способ недостаточно эффективен .However, this method is not effective enough.
Цель изобретени - повышение эффективности управлени кровлей.The purpose of the invention is to increase the efficiency of roof management.
Поставленна цель достигаетс тем, что линию забо попеременно разворачивают относительно то одной, то другой подготовительной выработки с центром разворота уThe goal is achieved by the fact that the line of the slab is alternately deployed relative to one or the other preparatory development with a turning center at
сопр жени очистного забо с подготовительной выработкой, причем разворот осуществл ют до достижени предельного пролета обрушени кровли на участке не менее , чем 1/3 и не более, чем 1/2 длины очистного забо .the clearing of the clearing flank with the preparatory development, and the turn is carried out until reaching the limiting span of the caving of the roof at a site of not less than 1/3 and not more than 1/2 the length of the clearing flank.
Способ заключаетс в следующем.The method is as follows.
При разработке пологого и наклонного пласта полезного ископаемого, преимущественно угл , линию очистного забо , оснащенного механизированным комплексом, попеременно разворачивают относительно то одной подготовительной выработки, окоьтуривающей выемочный столб, то другой. Разворот очистного забо осуществл ют до достижени предельного пролета обрушени кровли на участке не менее, чем Г/3 и не более, чем 1/2 длины очистного забо .When developing a flat and inclined stratum of a mineral, mainly coal, the line of the clearing slab, equipped with a mechanized complex, is alternately deployed with respect to one preparatory development, which surrounds the extraction column, then another. The turn of the clearing bottom is carried out until the maximum span of the roof collapse at the site is not less than G / 3 and not more than 1/2 the length of the clearing face.
Указанный способ позвол ет повысить эффективность управлени труднообрушаемой кровлей.This method makes it possible to increase the efficiency of management of the hard-to-damage roof.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU792741995A SU773270A1 (en) | 1979-03-26 | 1979-03-26 | Solid roof control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU792741995A SU773270A1 (en) | 1979-03-26 | 1979-03-26 | Solid roof control method |
Publications (1)
Publication Number | Publication Date |
---|---|
SU773270A1 true SU773270A1 (en) | 1980-10-23 |
Family
ID=20817485
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU792741995A SU773270A1 (en) | 1979-03-26 | 1979-03-26 | Solid roof control method |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU773270A1 (en) |
-
1979
- 1979-03-26 SU SU792741995A patent/SU773270A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111780633B (en) | Step-type rapid excavation method for IV-V-level surrounding rock lower step of double-track tunnel | |
SU773270A1 (en) | Solid roof control method | |
RU2177546C1 (en) | Method of controlling difficult-to-cave roof | |
SU783472A1 (en) | Method of solid rood control | |
SU912935A1 (en) | Method of mining thick sloping coal beds | |
RU2136886C1 (en) | Method for control of unstable roof in long stoping faces | |
SU1125373A1 (en) | Method of mining unstable ores | |
SU1089265A1 (en) | Method of protecting mine workings for water break-ins | |
SU825962A1 (en) | Method of controlling hard-to-cave roofs | |
SU787656A1 (en) | Solid roof control method | |
SU815298A2 (en) | Method of conducting stripping work | |
RU2038476C1 (en) | Coal deposit exploitation method | |
SU773271A1 (en) | Solid roof control method | |
SU1682568A1 (en) | Method for working thick steep and inclined fire hazardous coal seams | |
SU909179A1 (en) | Method of working extra-thin gently sloping coal beds | |
SU1761953A1 (en) | Method of working steep coal bed | |
SU1642007A1 (en) | Method of rock pressure control in mining of a mineral bed | |
SU1696699A1 (en) | Method of mine drainage | |
SU1314066A1 (en) | Method of mining ore bodies | |
SU866192A1 (en) | Method of controlling solid roof | |
SU617600A1 (en) | Method of excavating mineral deposits | |
SU817261A1 (en) | Method of controlling a solid roof | |
SU1717823A1 (en) | Method of ore mining under complicated mining and geological conditions | |
SU1177484A1 (en) | Method of controlling solid roof prior to primary settling in mining sloping coal beds | |
SU883439A1 (en) | Solid roof control method |