[go: up one dir, main page]

SU767286A1 - Method of dismantling piles - Google Patents

Method of dismantling piles Download PDF

Info

Publication number
SU767286A1
SU767286A1 SU782624032A SU2624032A SU767286A1 SU 767286 A1 SU767286 A1 SU 767286A1 SU 782624032 A SU782624032 A SU 782624032A SU 2624032 A SU2624032 A SU 2624032A SU 767286 A1 SU767286 A1 SU 767286A1
Authority
SU
USSR - Soviet Union
Prior art keywords
piles
pile
cutting
parts
dismantling
Prior art date
Application number
SU782624032A
Other languages
Russian (ru)
Inventor
Магомед Гаджиевич Ахмедханов
Анатолий Федорович Барабаш
Назим Алиевич Алиев
Original Assignee
За витель
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by За витель filed Critical За витель
Priority to SU782624032D priority Critical patent/SU767287A1/en
Priority to SU782624032A priority patent/SU767286A1/en
Application granted granted Critical
Publication of SU767286A1 publication Critical patent/SU767286A1/en

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

(54) СПОСОБ ДЕМОНТАЖА СВАЙ(54) WAY OF DISMOUNTING PILES

Claims (2)

Изобретение относитс  к строитель ству, в частности к демонтажу свай, преимущественно свайных эстакгод. Известен способ демонтажа свай, содержащий срезку свай и извлечение их из-под воды flj . Недостатком этого способа  вл етс  то, что в процессе резани  тела сваи ее необходимо поддерживать, в противном случае отрезанна  часть сваи падает, что создает определей .ные неудобства по извлечению сваи из-под воды.. Наиболее близким к изобретению по технической сущности и достигаемому результату  вл етс  способ демонтажа свай преимущественно в свайных эстакадах ,включающий срезку свай с оставлением перемычки между част ми каж дой сваи и отламывание, надрезанных частей свай 2 , Недостатком этого способа  вл етс  .то,что при отламывании.надрезанны частей свай необходимо прикладывать к ним значительные усили . Це.пь изобретени  - снижение усилий отламывани . Эта цель достигаетс  тем, что -в способе демонтажа свай, включающе срезку свай с оставлением перемычки между част ми каждой сваи и отла1«В:1вание налрезанных частей свай, срезку свай эст.акады осуществл ют на разной по высоте отметке,с последующим одновременным отламыванием всех надрезанных частей свай. На фиг.1 изображена свайна  эстакада; на фиг.2 - то же, в плане. Способ демонтажа осуществл етс  следук им образом. Свай 1,2,3 и 4 эстакады или ее части надрезают с помощью устройства дл  срезки свай на разной по высоте отметке, затем строп т часть эстакады за петли 5 настила б к грузоподъемному средству и создают стрелой боковое усилие в результате чегопоследовательно будут разрушатьс  переьички сначала на свае 1, а затем на сва х 2,3 и 4. Таким образом, отламывание всех надрезанных частей свай осуществл ют практически одновременно созданием боковых усилий стрелой грузоподъемного средства. Затем часть эстакады поднимают и груз т на транспортное средство. - При осуществлении такого способа дл  отламывани  надрезанных частей свай надо приложить значительно меньшие усили  отламывани , чем при надрезке свай ва одном уровне. Формула изобретени  Способ демонтажа свай преимущественно в свайных эстакадах, включающий срезку свай с оставлением перемьгцки между част ми кгикдой сваи и дфлш ванйе надрезанных чгютей свай, отличающийс  тем, что, с целью снижени  усилий отлакФаЬани ,The invention relates to the construction, in particular to the dismantling of piles, mainly pile embankments. There is a method of dismantling piles, containing cutting piles and removing them from under the water flj. The disadvantage of this method is that it is necessary to maintain it in the process of cutting the pile body, otherwise the cut part of the pile falls, which creates certain inconveniences in removing the pile from under the water .. The closest to the invention is by technical essence and the achieved result is a method of dismantling the piles mainly in pile ramps, which includes cutting the piles, leaving a jumper between each part of the pile and breaking it off, notched parts of the pile 2. The disadvantage of this method is that i.nadrezanny of the pile must be applied to them considerable effort. The purpose of the invention is to reduce the effort of breaking off. This goal is achieved by the fact that in the method of dismantling the piles, including cutting the piles, leaving a bridge between the parts of each pile and the B: B: 1 cutting of the cut parts of the piles, cutting the piles of the Estonian pile is performed at a different height mark, followed by simultaneous breaking off all incised parts of piles. Figure 1 shows a pile overpass; figure 2 - the same in the plan. The dismantling method is carried out in the following manner. Piles 1,2,3 and 4 racks or its parts are notched using a device for cutting piles at different elevations, then sling part of the ramp for loop 5 of the floor b to the load-lifting means and create lateral force by the boom as a result of which the pereichnik first will collapse on pile 1, and then on pile x 2, 3 and 4. Thus, the breaking off of all the cut parts of the piles is carried out almost simultaneously by creating lateral forces with the boom of the lifting means. Then a part of the overpass is lifted and loaded onto the vehicle. - When implementing this method for breaking off the notched parts of the piles, it is necessary to apply significantly less breaking forces than when cutting the pile at the same level. The invention of the method of dismantling piles mainly in pile ramps, including cutting of piles with re-shifting between parts of the pile of the pile and drilling of cuts of the pile of piles, characterized in that, in order to reduce the efforts of flooding, (put.t срезку свай эстакады осуществл ют на разной по высоте отметке с последую-. щим одновременным отламыванием всех надрезанных частей свай. Источники информации, прин тые во внимание при экспертизе 1.Авторское свидетельство СССР 275002, кл. Е 02 D 9/04, 1969. (put.t cutting of overpasses is carried out at a different height mark with the subsequent simultaneous breaking off of all the cut parts of the piles. Sources of information taken into account during the examination 1. USSR author's certificate 275002, cl. Е 02 D 9/04 1969. 2.Авторское свидетельство СССР № 307157, кл. Е 02 D 9/00, 1969.2. USSR author's certificate number 307157, cl. E 02 D 9/00, 1969. Ф ФF f ОABOUT 4 л4 l м иm and
SU782624032A 1978-06-02 1978-06-02 Method of dismantling piles SU767286A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
SU782624032D SU767287A1 (en) 1978-06-02 1978-06-02 Pile cutter
SU782624032A SU767286A1 (en) 1978-06-02 1978-06-02 Method of dismantling piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU782624032A SU767286A1 (en) 1978-06-02 1978-06-02 Method of dismantling piles

Publications (1)

Publication Number Publication Date
SU767286A1 true SU767286A1 (en) 1980-09-30

Family

ID=20768201

Family Applications (2)

Application Number Title Priority Date Filing Date
SU782624032D SU767287A1 (en) 1978-06-02 1978-06-02 Pile cutter
SU782624032A SU767286A1 (en) 1978-06-02 1978-06-02 Method of dismantling piles

Family Applications Before (1)

Application Number Title Priority Date Filing Date
SU782624032D SU767287A1 (en) 1978-06-02 1978-06-02 Pile cutter

Country Status (1)

Country Link
SU (2) SU767287A1 (en)

Also Published As

Publication number Publication date
SU767287A1 (en) 1980-09-30

Similar Documents

Publication Publication Date Title
DE69004683D1 (en) METHOD AND DEVICE FOR SETTING UP PILE, ASSOCIATED WITH THE ESTABLISHMENT OF AN OFFSHORE PLATFORM BASED ON PILE.
CA2133836A1 (en) Method and apparatus for transporting and using a drilling or crane apparatus from a movable vessel
DE3888928D1 (en) Method for suppressing the formation of polymer crusts.
SU767286A1 (en) Method of dismantling piles
NO992759L (en) Löftefartöy and method for positioning, lifting and handling a platform tire and platform chassis
NO930451D0 (en) PROCEDURE FOR DISTRIBUTING LOADS GENERATED BETWEEN A SHIP AND A BEARING DRY DOCK
DE69009539D1 (en) Method for suppressing the formation of polymer crusts during the polymerization.
DE3889709D1 (en) Trench etching method.
DE68919193D1 (en) Method for suppressing the formation of polymer crusts.
JPS5536147A (en) Method of constructing structure on sea-surface
US4907312A (en) Bridge and method of installing prefabricated bridges and bridge structure
DE3762343D1 (en) METHOD FOR POLYMERIZING CHLOROPRENE.
DE58909168D1 (en) Method and device for lifting, lowering and / or aligning a building.
SU623779A1 (en) Method and apparatus for lifting underwater object
JPS5771926A (en) Treatment of extra-banking concrete at head of pile driven at site
JPS5748011A (en) Assembling method for frame body of silt protector floating on water
US3052191A (en) Transportation apparatus
SU965881A1 (en) Anchor arrangement
JPS5555725A (en) Pile driving boat
ATE80195T1 (en) METHOD OF REALIZING A CONCRETE STRUCTURE LIKE BRIDGE SHEETS AND DEVICE FOR APPLICATION.
JPS628886A (en) Spud driving height adjusting device
JPS5511465A (en) Loading method of heavy cargo
DE557944C (en) Bucket excavator for removing the sludge from the sludge basin
JPS6080620A (en) Float for dewatering work of sludge
JPS59228515A (en) Fixation of working platform on the water