[go: up one dir, main page]

SU1714148A1 - Lining of pit workings - Google Patents

Lining of pit workings Download PDF

Info

Publication number
SU1714148A1
SU1714148A1 SU894732573A SU4732573A SU1714148A1 SU 1714148 A1 SU1714148 A1 SU 1714148A1 SU 894732573 A SU894732573 A SU 894732573A SU 4732573 A SU4732573 A SU 4732573A SU 1714148 A1 SU1714148 A1 SU 1714148A1
Authority
SU
USSR - Soviet Union
Prior art keywords
additional
lining
workings
array
nodes
Prior art date
Application number
SU894732573A
Other languages
Russian (ru)
Inventor
Вячеслав Борисович Миллер
Георгий Георгиевич Евграфов
Алексей Аронович Френкель
Original Assignee
Государственный научно-исследовательский, проектно-конструкторский и проектный угольный институт с экспериментальным заводом
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Государственный научно-исследовательский, проектно-конструкторский и проектный угольный институт с экспериментальным заводом filed Critical Государственный научно-исследовательский, проектно-конструкторский и проектный угольный институт с экспериментальным заводом
Priority to SU894732573A priority Critical patent/SU1714148A1/en
Application granted granted Critical
Publication of SU1714148A1 publication Critical patent/SU1714148A1/en

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

Изобретение относитс  к горному делу и м.б. использовано дл  креплени  выработок. Цель - снижение металлоемкости крепи. Крепь состоит из стоек (С) 9, соединенных с основным верхн ком (В) 1 узлами податливости 10. С основным В 1 узлами 6 св зан дополнительный составной В 2 с изогнутыми концами 4. Со стороны выработанного пространства 8 В 2 установлен с возможностью взаимодействи  его торца с торцом С 9, а со стороны массива торец дополнительного В 2 по отношению к С 9 имеет зазор. За лавой конец 4 В 2 упираетс  в С 9. В результате сопротивление крепи возрастает. 3 ил.i у^The invention relates to mining and m. used for fixing workings. The goal is to reduce metal lining. The support consists of racks (C) 9 connected to the main upper cum (B) 1 of the nodes of compliance 10. The main B 1 by the nodes 6 is connected to an additional composite B 2 with curved ends 4. From the developed space, 8 B 2 is interoperable its end face with end face C 9, and from the side of the array the end face of additional В 2 has a gap in relation to C 9. Behind the lava, the end of the 4 B 2 abuts on C 9. As a result, the resistance of the lining increases. 3 y. I y ^

Description

Изобретение относитс  к горной промышленности , в частности к креплению выемочных выработок.The invention relates to the mining industry, in particular to the fastening of excavation workings.

Известна металлическа  арочна  крепь, состо ща  из установленных со стороны выработанного пространства и массива стоек и соединенных с ними узлами податливости верхн ков.The known metal arch support consists of racks installed on the side of the worked-out space and an array, and the upper parts connected to them by the nodes of compliance.

Недостатком данной крепи  вл етс  несоответствие ее конструкции характеру про влени  горного давлени  на границе с выработанным пространством, что приводит к увеличению материальных и трудовых затрат на крепление и поддержание выработок .The disadvantage of this support is the incompatibility of its structure with the nature of the manifestation of rock pressure at the border with the developed space, which leads to an increase in the material and labor costs for fixing and maintaining workings.

Наиболее близким по технической сущности к изобретению  вл етс  крепь, состо ща  из рам. включающих пару верхн ков.The closest in technical essence to the invention is a support consisting of frames. including a pair of top kov.

концы которых со сторрны массива объединены и закреплены на одной стойке, установленной в промежутке между двум  стойками со стороны выработанного пространства , и узлов податливости, соедин ющих стойки с верхн ками.the ends of which from the array side are combined and fixed on one rack, installed in the interval between the two columns on the side of the worked-out space, and the nodes of compliance that connect the columns with the tops.

Известна  креПь по сравнению с аналогом по своим конструктивным особенност м более соответствует характеру про влени  горного давлени  на границе с выработанным пространством.Compared to the analogue, the CrePic is more consistent with the design features of the manifestation of rock pressure at the boundary with the developed space.

Однако недостатком такой крепи  вл етс  ее больша  металлоемкость, обусловленна  необходимостью устанавливать стойки со стороны выработанного пространства с плотностью в два раза большей чем со сторЬны массива.However, the disadvantage of such a support is its large metal consumption, due to the need to install racks on the side of the developed space with a density twice as large as on the side of the array.

Цель изобретени  - снижение металлоемкости крепи.The purpose of the invention is to reduce metal lining.

Поставленна  цель достигаетс  тем, что в крепи выемочной выработки, включающей рамы металлической крепи, состо щие из установленных по обе стороны от оси выработки со стороны выработанного простран: ства и массива стоек, которые объединены узлами податливости с верхн ком, и хомуты , каждый верхн к рамы металлической крепи снабжен дополнительным верхн ком , концы которого Ориентированы относительно хомутов по обе стороны от оси выработок, при этом высота установки хомутов со стороны массива превышает высоту установки хомутов со стороны выработанного пространства, а дополнительный верхн к выполнен из двух частей с дополнительным хомутом, который расположен между хомутами креплени  дополнительного верхн ка с верхн ком рамы металлической крепи.The goal is achieved in that in support of excavation workings, including metal support frames, consisting of installed on both sides of the production axis from the side of the developed space: and an array of struts, which are combined by nodes of compliance with the top one, and clamps, each top The metal support frames are provided with an additional upper part, the ends of which are Oriented relative to the clamps on either side of the axis of the workings, and the height of the installation of the clamps on the side of the array exceeds the height of the installation of the clamps from the side s gob and additional to the upper is made of two parts with an additional collar which is arranged between the fastening collar ka additional upper frame with the upper metal lining com.

Сопоставительный анализ с прототипом показывает, что предлагаема  крепь отличаетс , тем, что каждый аерхн к рамы металлической крепи снабжен дополнительным верхн ком, концы которого ориентированы относительно хомутов по обе стороны отоси выработки, при этом высота установки хомутов со стороны массива превышает высоту установки хомутов со стороны выраб.отанного пространства, а дополнительный верхн к выполнен из двух частей с дополнительным хомутом, который расположен между хомутами креплени  дополнительного верхн ка с верхн ком рамы металлической крепи.Comparative analysis with the prototype shows that the proposed lining is different in that each aerial to the metal lining frame is provided with an additional upper lug, the ends of which are oriented relative to the clamps on either side of the axle of the mine, with the height of the clamps being installed on the side of the array exceeding the height of the clamps from the side The selected space, and the additional upper part is made of two parts with an additional collar, which is located between the fastening clamps of the additional upper part with the upper metal support frame.

Сравнение предлагаемого решени  не только с прототипом, но и с другими техническими решени ми в данной области техники не позволило вы вить в них признаки, отличающие предлагаемое решение от прототипа , что позвол ет сделать вывод о соответствии критерию существенные отличи .Comparison of the proposed solution not only with the prototype, but also with other technical solutions in the field of technology did not allow them to identify features that distinguish the proposed solution from the prototype, which allows us to conclude that the criterion meets significant differences.

На фиг. 1 показана крепь выемочных выработок, общий вид; на фиг. 2 - крепь выемочных выработок, когда конец дополнительного верхн ка контактирует со стойкрй , установленной со стороны выработанного пространства: на фиг. 3 крепь выемочных выработок, когда концы дополнительного верхн ка контактирует со стойками, установленнь1ми как со стороны выработанного пространства, так и со стороны массива.FIG. 1 shows the lining of excavation workings, general view; in fig. 2 - lining of excavation workings, when the end of the additional top is in contact with a rack installed on the side of the goaf: in FIG. 3 lining of excavation workings, when the ends of the additional top are in contact with racks installed both from the side of the worked out space and from the side of the massif.

Крепь вь1|емочных выработок состоит из верхн ка Т, дополнительного верхн ка 2,The bolt v1 | capacious workings consists of a top cap T, an additional top cap 2,

состо щего из двух частей 3, концы 4 которых расположены по обе стороны от оси 5 и скреплены с верхн ком 1 хомутами 6, расположенными нд высоте Н со стороны массиваconsisting of two parts 3, the ends 4 of which are located on both sides of the axis 5 and fastened to the top 1 of the clamps 6, located at the height H from the side of the array

7 и на высоте h со стороны выработанного пространства 8, стоек 9, скрепленных узлами податливости 10 с верхн ком 1. Части 3 дополнительного верхн ка 2 соединены между собой дополнительным хомутом 11.7 and at a height h on the side of the worked-out space 8, the uprights 9, fastened with the nodes of compliance 10 and the top 1. Parts 3 of the additional top 2 are interconnected by an additional collar 11.

Крепь работает следующим образом.The support works as follows.

В первоначальный период (с момента установки крепи до подхода лавы) (фиг. 1) под действием сил горного давлени  верхн к 1с дополнительным верхн ком 2 одновременно смещаютс  относительно стоек 9. За лавой (фиг. 2) конец 4 части 3 дополнительного верхн ка 2 начинает раньше взаимодействовать со стойками 9, установленной со стороны выработанногоIn the initial period (from the moment of installation, the lining until the lava approaches) (Fig. 1) under the action of rock pressure forces top to 1c, the additional top 2 is simultaneously displaced relative to the uprights 9. Behind the lava (Fig. 2) end 4 of part 3 is an additional top 2 begins to interact earlier with racks 9, installed by the developed

пространства 8 вследствие того, что высота h меньше высоты Н, в результате чего сопротивление крепи возрастает за счет подпора, создаваемого частью 3 дополнительного верхн ка2 верхн ку 1.space 8 due to the fact that the height h is less than the height H, as a result of which the support of the lining increases due to the backwater created by part 3 of the additional top c2 top 1.

В зоне опорного давлени  второй лавы (фиг. 3) конец 4 части 3 дополнительного верхн ка 3 начинает взаимодействовать со стойкой 9. установленной со стороны массива 7, вследствие чего сопротивление рамыIn the zone of the reference pressure of the second lava (Fig. 3), the end 4 of part 3 of the additional top 3 begins to interact with the resistant 9. installed from the side of the array 7, as a result of which the frame resistance

увеличитс  за счет двойного подпора верхн ка 1 дополнительным верхн ком 2. Этим достигаетс  увеличение сопротивлени  крепи и снижение ее металлоемкости.will increase due to the double back-pressure of the top 1 by the additional top 2. This results in an increase in the resistance of the support and a decrease in its metal intensity.

Таким образом, предлагаема  конструкци  крепи позволит за счет прдпора, создаваемого дополнительным верхн ком,Thus, the proposed lining design will allow due to the prdpor created by an additional top c.

сохранить заданную несущую способностьmaintain the specified bearing capacity

крепи и снизить металлоемкость, креплени lining and reduce metal consumption, fastening

is среднем на 30%, что с учетом технологичности конструкции составит экономию в услови х шахт ПО Воркутауголь около 660 тыс.руб. в год или 14 руб. на одну раму крепи.is an average of 30%, which, taking into account the manufacturability of the structure, will constitute savings in the conditions of the Vorkutaugol mines of about 660 thousand rubles. per year or 14 rubles. on one frame lining.

Фор мул а изобретени Formula of invention

Крепь выемочных выработок, включающа  установленные со стороны выработанного пространства и массива стойки, объединенный со стойками узлами податливости основной верхн к и соединенный сThe support of the excavation workings, including the stands installed from the side of the worked-out space and the massif, combined with the supports by the main upper nodes and connected with

ним изогнутыми концами дополнительный составной верхн к, отличающа с  тем, что, с целью снижени  металлоемкости крепи , дополнительный верхн к со стороны выработанного пространства соединен сthe curved ends of the additional composite upper, characterized in that, in order to reduce the metal lining, the additional upper to the side of the developed space is connected to

основным верхн ком с возможностью взаимодействи  его торца с торцом стойки, а со стороны массива установлен по отношению к торцу стойки с зазором.the main top with the ability to interact its end with the end of the rack, and from the side of the array is installed relative to the end of the rack with a gap.

чаcha

(ABOUT

(.(.

Claims (1)

Формула изобретенияClaim Крепь выемочных выработок, включающая установленные со стороны выработанного пространства и массива стойки, объединенный со стойками узлами податливости основной верхняк и соединенный с ним изогнутыми концами дополнительный составнойверхняк,отличающаяся тем, что, с целью снижения металлоемкости крепи, дополнительный верхняк со стороны выработанного пространства соединен с основным верхняком с возможностью взаимодействия его торца с торцом стойки, а со стороны массива установлен по отношению к торцу стойки с зазором.The support of the excavation workings, including the main upper unit installed on the sides of the worked-out space and the array of racks, the main upper and connected to the racks by the nodes of flexibility, the additional composite overhead, characterized in that, in order to reduce the metal consumption of the lining, the additional upper is connected to the main topside with the possibility of interaction of its end with the end of the rack, and from the side of the array is installed in relation to the end of the rack with a gap. х Составитель Л.Березкинаx Compiled by L. Berezkin
SU894732573A 1989-07-10 1989-07-10 Lining of pit workings SU1714148A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU894732573A SU1714148A1 (en) 1989-07-10 1989-07-10 Lining of pit workings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU894732573A SU1714148A1 (en) 1989-07-10 1989-07-10 Lining of pit workings

Publications (1)

Publication Number Publication Date
SU1714148A1 true SU1714148A1 (en) 1992-02-23

Family

ID=21467442

Family Applications (1)

Application Number Title Priority Date Filing Date
SU894732573A SU1714148A1 (en) 1989-07-10 1989-07-10 Lining of pit workings

Country Status (1)

Country Link
SU (1) SU1714148A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР • •№ 1382968. кл. Е 21 D 11/14, 1988.Патент nHPtvfe102083, кл. Е 21 D 11/14, опубл. 1981.'2 *

Similar Documents

Publication Publication Date Title
GB1418075A (en) Self advancing support device for coal and ore extraction works
SU1714148A1 (en) Lining of pit workings
GB1481155A (en) Mineral mining installations
US3906733A (en) Device for shielding ground workings with means for controlling the dust
US4312609A (en) Mine roof support system
US3505823A (en) Hydraulic support systems for mine workings
FR2410125A1 (en) Mine support behind face conveyor - has screen behind conveyor formed by horizontal tubes with suspension chains
GB1312386A (en) Hydraulic roof-support frame
ES2037939T3 (en) SYSTEM TO CONTROL POSSIBLE DISPLACEMENTS OF STRUCTURAL FACADE PANELS.
GB1424276A (en) Shield type self advancing roof support system for supporting the roof of a longwall face in a mine
SU1219818A1 (en) Power roof support unit
SU1110904A1 (en) Device for supporting mining workings in stoping zone
RU1803576C (en) Lining of rock workings
GB966592A (en) Improvements in or relating to mine shoring
SU355881A1 (en) Cantilever overhead structure of mine roof support
SU609904A1 (en) Powered roof support set
SU877040A1 (en) Yielding frame-type roof support
SU1150370A1 (en) Method of supporting mine working with annular roof support
SU977798A1 (en) Yieldable unit for roof support of special section
SU1370256A1 (en) Mining unit
SU1305361A1 (en) Method of supporting mine workings
SU717354A1 (en) Trapezoidal frame-type roof support
SU688639A1 (en) Complete roof support set section
SU1765436A1 (en) Reinforced support
SU759726A1 (en) Double-row roof support