SU1618867A1 - Method of constructing wells - Google Patents
Method of constructing wells Download PDFInfo
- Publication number
- SU1618867A1 SU1618867A1 SU884449991A SU4449991A SU1618867A1 SU 1618867 A1 SU1618867 A1 SU 1618867A1 SU 884449991 A SU884449991 A SU 884449991A SU 4449991 A SU4449991 A SU 4449991A SU 1618867 A1 SU1618867 A1 SU 1618867A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- permeable
- casing
- cement
- additional portion
- wells
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 5
- 239000000463 material Substances 0.000 claims abstract description 26
- 239000004568 cement Substances 0.000 claims abstract description 10
- 239000012530 fluid Substances 0.000 claims abstract description 9
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 6
- 238000005755 formation reaction Methods 0.000 claims abstract description 6
- 238000002347 injection Methods 0.000 claims abstract description 6
- 239000007924 injection Substances 0.000 claims abstract description 6
- 238000004519 manufacturing process Methods 0.000 claims description 5
- 238000007711 solidification Methods 0.000 claims 2
- 230000008023 solidification Effects 0.000 claims 2
- 238000003825 pressing Methods 0.000 claims 1
- 238000005553 drilling Methods 0.000 abstract description 2
- 239000011435 rock Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Изобретение относитс к бурению скважин и прецн-азначено дл цементировани . Цель - повышение герметичности скважин за счет предотвращени деформаций обсадной колонны против продуктивных пластов. После закачки проницаемого тампона ж ного материала закачивают последовательно нетвердеющую рабочую жидкость и дополнительную порцию тампонажного материала со сроками схватывани , превышающими врем на проведение всех операций в скважине до гидроразрыва продуктивного горизонта включительно. Затем создают избыточное давление на теле скважины на врем затруднени дополнительной порции тампонажного материала. Это обеспечивает создание равномерной зоны повышенного давлени в среде рабочей жидкости за обсадной колонной. При необходимости повышени давлени в самой колонне имеетс ресурс по несущей способности колонны за счет внешнего подпорного давлени . ил ю (ЛThe invention relates to the drilling of wells and is intended for cementing. The goal is to increase the well tightness by preventing deformations of the casing against productive formations. After injection of permeable plugging material, a non-hardening working fluid and an additional portion of plugging material with a setting time longer than the time required to perform all operations in the well before the hydraulic fracturing of the productive horizon is injected. Then, an overpressure is created on the body of the well for the time when the additional portion of cement material is difficult. This ensures the creation of a uniform pressure zone in the working fluid behind the casing. If it is necessary to increase the pressure in the column itself, there is a resource on the bearing capacity of the column due to external retaining pressure. il yu (L
Description
Изобретение относитс к бурению скважин за счет предотвращени деформаций обсадной колонны против продуктивных пластов .The invention relates to the drilling of wells by preventing deformation of the casing against productive formations.
На чертеже изображена схема, иллюстрирующа способ.The drawing shows a diagram illustrating the method.
Способ осуществл ют следующим образом .(The method is carried out as follows. (
В скважину ,спускают обсадную колонну 1, перекрывающую проницаемый продуктивный горизонт 2. Затем закачивают изол ционный 3 и проницаемый 4 тампонаж- ный материал. Последний имеет более замедленные сроки схватывани в сравнении с изол ционным тампонажным материалом 3.The casing 1, which overlaps the permeable production horizon 2, is lowered into the well. Then insulating 3 and permeable 4 cementing material are injected. The latter has a slower setting time in comparison with insulating grouting material 3.
После закачки проницаемого тампонажного материала 4 закачивают последовательно нетвердеющую рабочую жидкость 5 и дополнительную порцию тампонажного материала 6 со сроками схватывани , превышающими врем на проведение всех операций в скважине до гидроразрыва продуктивного горизонта включительно.After the permeable backfill material 4 is pumped, a non-hardening working fluid 5 and an additional portion of backfill material 6 are pumped in with a setting time exceeding the time required to carry out all operations in the well before the hydraulic fracturing of the production horizon, inclusive.
После этого о щос «ЛЯКУ собственно гидроразрыв (ППОКЧЦЬРМЫМ тампонажным материалом) продуктивных пластов Затем создают избыточное давление на стье скважины на врем затвердевани дополнительной порции тампонажного материала.After that, the hydraulic fracture proper (FIDDED grouting material) of the productive strata of the LACU is then pressurized at the wellbore for the time it hardens the additional portion of the grouting material.
Порцию изол ционного тампонажного материала 3 принимают в объеме заколон- ного пространства скважины выше продуктивного пласта. Порцию проницаемого тампонажного материала 4 принимают в объеме, необходимом дл гидроразрыва пород и заполнени трещины гидроразрыва (до спуска колонны провод т исследовани по определению приемистости и давлени гидроразрыва пород).A portion of the insulating grouting material 3 is received in the volume of the wellbore space above the productive formation. A portion of the permeable grouting material 4 is received in the volume necessary for fracturing the rocks and filling the fracture fracture (prior to descent of the column, studies are carried out to determine the fracture response and fracture pressure of the rocks).
Порцию нетвердеющей рабочей жидкости 5 закачивают в объеме заколонного пространства скважины против продуктивногоA portion of the non-hardening working fluid 5 is pumped into the volume of the well annulus against the productive
оэoh
00 00 О5 300 00 O5 3
горизонта. Дополнительную порцию тампо- нажного материала 6 принимают в объеме заколонного пространства скважины ниже продуктивного горизонта и объеме цементного стакана в обсадной колонне.horizon. An additional portion of the plug-in material 6 is received in the volume of the well annulus below the production horizon and the volume of cement glass in the casing string.
После закачки всех порций жидкости в скважину осуществл ют их продавку с помощью продавочной жидкости 7. Процесс продавки останавливают после выхода изол ционного тампонажного материала 3 из усть .After injection of all the fluid portions into the well, they are pumped through the pressurized fluid 7. The slip process is stopped after the insulating cement material 3 leaves the well.
После этого скважину оставл ют на ожидание затвердевани цемента (ОЗЦ). После ОЗЦ продолжают продавку до гидроразрыврем газонефтепро влений имеетс ресурс по несущей способности колонны за счет внешнего подпорного давлени . Это в целом .увеличивает устойчивость колонны и предот- вращает ее деформацию (разрыв).Thereafter, the well is left to wait for the cement to set (RFQ). After RFQ, the displacement continues until hydraulic fracturing of the gas and oil pipelines has a resource on the bearing capacity of the column due to external retaining pressure. This generally increases stability of the column and prevents its deformation (rupture).
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU884449991A SU1618867A1 (en) | 1988-05-17 | 1988-05-17 | Method of constructing wells |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU884449991A SU1618867A1 (en) | 1988-05-17 | 1988-05-17 | Method of constructing wells |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1618867A1 true SU1618867A1 (en) | 1991-01-07 |
Family
ID=21385321
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU884449991A SU1618867A1 (en) | 1988-05-17 | 1988-05-17 | Method of constructing wells |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1618867A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108533213A (en) * | 2018-05-28 | 2018-09-14 | 长江岩土工程总公司(武汉) | It is a kind of to block the device and its method for blocking for disclosing the drilling of coating artesian water |
-
1988
- 1988-05-17 SU SU884449991A patent/SU1618867A1/en active
Non-Patent Citations (1)
Title |
---|
Мищевич В. И. и др. Справочник инженера по бурению. - М.: Недра 1973 с. 395. Авторское свидетельство СССР № 1164397, кл. Е 21 В 33/13, 1985. * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108533213A (en) * | 2018-05-28 | 2018-09-14 | 长江岩土工程总公司(武汉) | It is a kind of to block the device and its method for blocking for disclosing the drilling of coating artesian water |
CN108533213B (en) * | 2018-05-28 | 2023-06-23 | 长江岩土工程有限公司 | A device for plugging a borehole exposed to pressurized water in an overburden and a plugging method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4549608A (en) | Hydraulic fracturing method employing special sand control technique | |
US4005750A (en) | Method for selectively orienting induced fractures in subterranean earth formations | |
US2970645A (en) | Producing multiple fractures in a well | |
US4221433A (en) | Retrogressively in-situ ore body chemical mining system and method | |
CA1246438A (en) | Hydraulic fracturing and gravel packing method employing special sand control technique | |
US3587743A (en) | Explosively fracturing formations in wells | |
US3118501A (en) | Means for perforating and fracturing earth formations | |
EP1509675B1 (en) | Method for construction and completion of injection wells | |
US9938191B2 (en) | Establishing control of oil and gas producing wellbore through application of self-degrading particulates | |
US11091994B2 (en) | Method of refracturing in a horizontal well | |
CN101835953A (en) | Well drilling with small lateral wells | |
CN110965979B (en) | Deep combustion and explosion fracturing method in radial slim hole | |
US3712379A (en) | Multiple fracturing process | |
US4386806A (en) | Well repair for in situ leaching | |
US4903772A (en) | Method of fracturing a geological formation | |
US3517745A (en) | Well perforating method | |
US3674089A (en) | Method for stimulating hydrocarbon-bearing formations | |
SU1618867A1 (en) | Method of constructing wells | |
RU2095542C1 (en) | Method for isolation of beds in well | |
SU1546612A1 (en) | Method of isolating formation water in well | |
US3630279A (en) | Explosive fracturing method | |
RU2046926C1 (en) | Method of casing strings sealing in boreholes | |
RU2100569C1 (en) | Method of cementing of wells with abnormally high formation pressure | |
SU1145160A1 (en) | Method of degassing top-worked wide seam | |
RU2183260C2 (en) | Process of development of oil field at late stage of its operation |