Method of safeguarding bed-type adjoining mine workings Download PDFInfo
- Publication number
- SU1559156A1 SU1559156A1 SU884459401A SU4459401A SU1559156A1 SU 1559156 A1 SU1559156 A1 SU 1559156A1 SU 884459401 A SU884459401 A SU 884459401A SU 4459401 A SU4459401 A SU 4459401A SU 1559156 A1 SU1559156 A1 SU 1559156A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- protected
- lava
- adjacent
- excavation
- rocks
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims 2
- 230000003245 working effect Effects 0.000 title claims 2
- 238000009412 basement excavation Methods 0.000 claims abstract description 18
- 239000011435 rock Substances 0.000 claims abstract description 18
- 230000003313 weakening effect Effects 0.000 claims abstract description 6
- 239000002689 soil Substances 0.000 claims abstract description 3
- 238000004519 manufacturing process Methods 0.000 claims description 4
- 230000004888 barrier function Effects 0.000 abstract description 2
- 238000004140 cleaning Methods 0.000 abstract 1
- 229910052500 inorganic mineral Inorganic materials 0.000 abstract 1
- 239000011707 mineral Substances 0.000 abstract 1
- 238000003307 slaughter Methods 0.000 abstract 1
- 238000009434 installation Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000005422 blasting Methods 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
Изобретение относитс к разработке месторождений полезных ископаемых. Цель - повышение производительности и безопасности работ в очистном забое за счет исключени на сопр жении окунтуривающей выемочный участок выработки (В) и лавы одновременного выполнени операций по очистной выемке, упрочнению и отрезке пород кровли. Дл этого параллельно охран емой В оформл ют щель ослаблени . Проход т охран емую В вприсечку к выработанному пространству (ВП) смежной лавы с отставанием от очистного забо . При этом щель ослаблени располагают на границе охран емой В со смежным выемочным участком с опережением очистного забо в нем. Над оконтуривающей В смежной лавы в ее кровле формируют упрочненную полосу пород с опережением по отношению к оформлению щели ослаблени и зоны опорного давлени . Отдел ют указанную полосу пород от массива и обрушают ее блоками на почву пласта выемочного участка со стороны ВП, смежной по отношению к охран емой В лавы. Таким образом независимо от кинематики движени при обрушении блоки из упрочненных пород кровли укладываютс параллельно охран емой пластовой присечной В, обеспечива надежное ограждение от ВП и ее охрану. 3 ил.This invention relates to the development of mineral deposits. The goal is to increase the productivity and safety of work in the working face by eliminating, at the materation, a deluge excavation site (B) and lava, simultaneously performing cleaning seizure, hardening and cutting of roof rocks. For this, parallel-guarded B is provided with a loosening slot. Pass through the protected inlet to the developed space (VP) of adjacent lava with a lag from the clearing of the slaughter. At the same time, the weakening slot is located at the border of protected B with the adjacent excavation site ahead of the clearing slab in it. Above the contouring In adjacent lava, in its roof, a reinforced strip of rocks is formed in advance with respect to the clearance of the weakening gap and the zone of supporting pressure. This band of rocks is separated from the massif and they collapse it into blocks on the soil of the seam of the excavation site on the side of the airspace adjacent to the protected lava. Thus, irrespective of the kinematics of motion during the collapse, blocks of reinforced roof rocks are laid parallel to the protected seam cross-section B, providing a reliable barrier against the airspace and its protection. 3 il.
Description
производ т упрочнение пород кровли над выработкой, например, установкой анкеров, дл чего бур т р ды шпуров 5, затем в пробуренные шпуры устанавливают анкера 6, например, с механическим или химическим закреплением. Упрочнению подвергают полосу пород кровли выработки 2 на всю ее ширину, но не менее высоты выработки,причем глубина упрочнени полосы пород кровли равна высоте выработки.Последующее отделение упрочненной кровли выработки 2 от массива горных пород со стороны выработки 7 производ т путем образовани параллельно охран емой выработке щели 8 ослаблени с последующим самообрушением блоков 9, Щель 8 ослаблени образуют на границе выработки 7 со смежным вые- мочным участком с опережением очистного в нем, например, взрыванием р да шпуров 10.roofing rocks are strengthened over the production, for example, installation of anchors, for which holes are drilled 5, then anchor 6 is installed in the drilled holes, for example, with mechanical or chemical fastening. The strip of roof rocks of the excavation 2 over its entire width, but not less than the height of excavation, is reinforced, the depth of reinforcement of the strip of roof rocks equal to the height of excavation. The subsequent separation of the reinforced roof of excavation 2 from the rock mass from the side of excavation 7 is performed by forming parallel protected excavation loosening slits 8 with subsequent self-destruction of blocks 9, loosening slit 8 is formed at the border of excavation 7 with the adjacent outgrowth area ahead of the clearing in it, for example, by blasting a number of boreholes 10.
Таким образом, по мере подвигани очистного забо 3 создаетс полоса упрочненных пород кровли смежна с охран емой выработкой со стороны выработанного пространства, ограниченна со стороны выработки 7 щелью 8 ослаблени . Крепь 1I сопр жени при распоре ее и разгрузке помогает отделить упрочненные блоки от вышележащих пород. При этом упрочненные породы кровли обрушаютс за секци ми (на почву пласта выемочного участка) в форме породных блоков 9 или 12 в зависимости от кинематики их обрушени . Обрушение в форме блоков 9 происходит , если образуетс консоль значительной длины. В этом случае блок 9 ложитс на почву сначала концевой частью, а по мере движени крепи 11 сопр жени полностью ложитс на почву, не .мен своего положени , при этом блок служит ограждением вЫр ботки 7 от выработанного пространства .Thus, as the clearing hole 3 moves, a strip of hardened roof rocks is created adjacent to the protected excavation from the developed space, limited from the generation side 7 by the weakening slot 8. The support of the 1I mate during the expansion and unloading helps to separate the reinforced blocks from the overlying rocks. At the same time, reinforced roof rocks collapse behind sections (on the soil of the excavation layer) in the form of rock blocks 9 or 12, depending on the kinematics of their collapse. The collapse in the form of blocks 9 occurs if a console of considerable length is formed. In this case, the block 9 lays on the ground first with the end part, and as it moves, the mating 11 completely lays on the ground, not its position, while the block serves as a barrier for the opening of the gap from the developed space.
Обрушение в форме блоков 12 происходит , если длина консоли невелика, В этом случае блок 12, отдел сь от полосы, во врем падени может перевернутьс в сторону выработанного прстранства , но вследствие того, что ширина упрочнени не менее высоты выработки , в этом случае блок обеспечиThe collapse in the form of blocks 12 occurs if the length of the cantilever is small. In this case, block 12, separated from the strip, may fall over toward the developed space, but due to the fact that the width of the reinforcement is not less than the height of the output, in this case the block
Q $ 0 Q $ 0
5 О Q з 5 About Q h
Q ,Q,
5five
вает ограждение выработки 7 от выработанного пространства, С отставанием от линии очистного забо 3 на рассто ние , равное не менее 70-80 м,где отсутствуют интенсивные деформации пород массива, проводитс горна выработка 7 непосредственно по контакту с обрушенными блоками 9 и 12 впри- сечку к выработанному пространству смежной лавы. Проводимую выработку креп т согласно паспорта креплени , например, с установкой арочной или трапециевидной податливой крепи 13. Таким образом, независимо от кинематики движени при обрушении блоки из упрочненных пород кровли укладываютс параллельно охран емой пластовой присечной выработке,обеспечива надежное ограждение от выработанного пространства и ее охрану,Fence generation 7 from the open space, With a lag from the clearing slab line 3 at a distance of not less than 70-80 m, where there are no intensive deformations of the rocks of the massif, mining equipment 7 is carried out directly after contact with the collapsed blocks 9 and 12 to the developed space of adjacent lava. Carrying out the production is fixed according to the fastening passport, for example, with the installation of arched or trapezoidal flexible lining 13. Thus, regardless of the kinematics of motion during the collapse, blocks of reinforced roof rocks are laid in parallel to the protected reservoir secondary working, ensuring reliable protection from the developed space and protecting it ,
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU884459401A SU1559156A1 (en) | 1988-07-17 | 1988-07-17 | Method of safeguarding bed-type adjoining mine workings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU884459401A SU1559156A1 (en) | 1988-07-17 | 1988-07-17 | Method of safeguarding bed-type adjoining mine workings |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1559156A1 true SU1559156A1 (en) | 1990-04-23 |
Family
ID=21389240
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU884459401A SU1559156A1 (en) | 1988-07-17 | 1988-07-17 | Method of safeguarding bed-type adjoining mine workings |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1559156A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2514933C1 (en) * | 2013-02-13 | 2014-05-10 | Федеральное государственное бюджетное учреждение науки Институт угля Сибирского отделения Российской академии наук (ИУ СО РАН) | Method of layer mining of high steeply inclined coal bed with extraction of coal from bedding pack |
-
1988
- 1988-07-17 SU SU884459401A patent/SU1559156A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР 687240, кл. Е 21 D 19/02, 1977. Авторское свидетельство СССР № 1033758, кл. Е 21 D 20/00, 1982. * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2514933C1 (en) * | 2013-02-13 | 2014-05-10 | Федеральное государственное бюджетное учреждение науки Институт угля Сибирского отделения Российской академии наук (ИУ СО РАН) | Method of layer mining of high steeply inclined coal bed with extraction of coal from bedding pack |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU1559156A1 (en) | Method of safeguarding bed-type adjoining mine workings | |
RU2178526C1 (en) | Method of mining flat and inclined coal seams | |
SU1710746A1 (en) | Method of working protection | |
SU1033758A1 (en) | Method of protecting seam-type mine workings | |
RU2176734C2 (en) | Method of mining medium-thickness gently sloping and inclined coal seams | |
SU1384755A1 (en) | Method of mining gently-sloping and sloping ore bodies | |
RU2310753C2 (en) | Method for thick ore deposit development | |
SU836364A1 (en) | Method of preventing dynamic phenomena at working of coal beds | |
SU1795100A1 (en) | Method for mining thick steeply dipping coal seams | |
SU863862A1 (en) | Method of mining thick ore bodies | |
SU1684511A1 (en) | Method for protecting seam working | |
SU1652562A1 (en) | Method for roof control in outburst-risky seams | |
SU1544985A1 (en) | Method of supporting mine workings | |
SU1672106A1 (en) | Method of protection of mine workings | |
SU1458574A1 (en) | Method of mining ore bodies | |
RU2471990C1 (en) | Method to mine sloping and inclined coal beds of average capacity | |
SU973856A1 (en) | Method of safeguarding preparotary workings | |
RU2187647C1 (en) | Method of softening of surface layer of opencast benches in seasonal ground freezing | |
SU1191582A1 (en) | Method of solid roof composition | |
SU1032187A1 (en) | Method of working neighrour coal seams | |
SU1093828A1 (en) | Method of working thick coal seams susceptible to gas-dynamic phenomena | |
SU1467183A1 (en) | Method of safeguarding mine workings | |
RU2090757C1 (en) | Method of prevention of sudden outbursts of salt and gas | |
SU1765438A1 (en) | Development working protection method | |
SU1691524A1 (en) | Method for supporting joint between stoping face and adjoining gallery |