SU1544891A1 - Method of constructing cement-earth pile - Google Patents
Method of constructing cement-earth pile Download PDFInfo
- Publication number
- SU1544891A1 SU1544891A1 SU884420119A SU4420119A SU1544891A1 SU 1544891 A1 SU1544891 A1 SU 1544891A1 SU 884420119 A SU884420119 A SU 884420119A SU 4420119 A SU4420119 A SU 4420119A SU 1544891 A1 SU1544891 A1 SU 1544891A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- well
- pile
- cavity
- components
- soil
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 6
- 239000002689 soil Substances 0.000 claims abstract description 9
- 239000000945 filler Substances 0.000 claims abstract description 6
- 238000004519 manufacturing process Methods 0.000 claims abstract description 5
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 4
- 238000005516 engineering process Methods 0.000 claims abstract description 3
- 239000004568 cement Substances 0.000 claims description 2
- 238000009792 diffusion process Methods 0.000 claims 1
- 238000000926 separation method Methods 0.000 claims 1
- 239000000463 material Substances 0.000 abstract description 6
- 238000010276 construction Methods 0.000 abstract description 4
- 239000000203 mixture Substances 0.000 description 2
- 238000000605 extraction Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Изобретение относитс к строительству и используетс при устройстве свайных фундаментов путем перемешивани местного грунта с в жущими материалами. Цель изобретени - повышение качества изготавливаемой сваи и упрощение технологии изготовлени . Это достигаетс путем образовани в грунте лидерной скважины с радиальными продольными полост ми 5,6 и заполнени каждого из компонентов наполнител 8,9 в соответствующую из полостей после отделени последних друг от друга с помощью инвентарной диафрагмы 7. Затем инвентарна диафрагма 7 извлекаетс и производитс формирование ствола сваи перемешиванием компонентов с грунтом ненарушенной структуры в зоне с радиусом, равным сумме величин радиуса лидерной скважины и длины полости. 4 ил.The invention relates to the construction and is used in the construction of pile foundations by mixing local soil with ground materials. The purpose of the invention is to improve the quality of the pile being made and to simplify the manufacturing technology. This is achieved by forming a leader well in the soil with radial longitudinal cavities 5.6 and filling each of the components of the filler 8.9 into the corresponding cavity after separating them from each other using an inventory diaphragm 7. Then the inventory diaphragm 7 is removed and the formation of a shaft piles mixing components with soil undisturbed structure in the zone with a radius equal to the sum of the values of the radius of the leader well and the length of the cavity. 4 il.
Description
5five
слcl
Јь 4ь4
0000
соwith
Фиг. 2FIG. 2
Изобретение относитс к строительству и.может быть использовано при устройстве свайных фундаментов путем перемешивани местного грунта с в жущими материалами.The invention relates to the construction and. Can be used in the construction of pile foundations by mixing local soil with a live material.
Цель изобретени - повышение качества изготавливаемой сваи и упрощение технологии изготовлени .The purpose of the invention is to improve the quality of the pile being made and to simplify the manufacturing technology.
На фиг. 1 изображена схема обра- овани скважины рабочим органом в момент его извлечени ; на фиг. 2 - скважина с установленной инвентарной диафрагмой, раздел ющей полости, заполненные компонентами наполнител , поперечный разрез; на фиг. 3 то же в момент перемешивани компонентов наполнител с грунтом, продольный разрез; на фиг. k - разрез А-А на фиг. 3.FIG. Figure 1 shows a scheme for the formation of a well by a working body at the time of its extraction; in fig. 2 - well with installed inventory diaphragm dividing cavities, filled with filler components, cross section; in fig. 3 the same at the time of mixing the filler components with the soil, a longitudinal section; in fig. k is a section A-A in FIG. 3
Способ изготовлени цементогрун- товой сваи включает образование ли- дерной скважины 1, например, при помощи снабженного ребрами 2 погружаемого в грунт 3 рабочего органа k, образующего радиальные продольные полости 5 и 6. После извлечени рабочего органа 4 по оси скважины устанавливают инвентарную диа фрагму 7, раздел ющую полости одна от другой, в которые раздельно подают компоненты наполнител , например в жущий 8 и инертный 9 материалы. После заполнени полостей 5 и 6 инвентарную диафрагму извлекают. При помощи буро смесител 10 в зоне, радиус которой равен суммарной величине радиуса ли- дерной скважины и длины полости, производ т разбуривание грунта 3 ненарушенной структуры с перемешиванием его с в жущим 8 и инертным 9 материалами . Так как размеры полостей 5 и 6 подбираютс из услови , чтобы объем их строго соответствовал объему помещаемого в каждую полость одного из компонентов наполнител , то при ее наполнении соответствующим компонентом происходит его дозировкаA method for manufacturing a cement pile includes forming a leader well 1, for example, using a working body k, immersed in soil 3, equipped with ribs 2, forming radial longitudinal cavities 5 and 6. After removing the working body 4 along the axis of the well, set an accessory diaphragm 7 separating the cavities from one another, into which the components of the filler are fed separately, for example, in the tare 8 and inert 9 materials. After filling the cavities 5 and 6, the inventory diaphragm is removed. Using a drill mixer 10 in a zone whose radius is equal to the total size of the leader well radius and cavity length, soil 3 of the undisturbed structure is drilled with its interfacing 8 and inert 9 materials. Since the dimensions of the cavities 5 and 6 are selected from the condition that their volume strictly corresponds to the volume of one of the filler components placed in each cavity, when it is filled with the corresponding component, its dosage occurs
89148914
Придава .полост м различную форму, можно при необходимости увеличивать процентное содержание, например, в жущего на периферии или, наоборот, по оси симметрии будущей сваи, т.е. мен ть прочность материала сваи по ее горизонтальному сечению. Число полостей определ етс в зависимости от количества компонентов, присутствующих в смеси. В грунтах с пониженным содержанием влаги способ предусматривает возможность подачи воды любым из известных приемов.If cavities are given a different shape, it is possible, if necessary, to increase the percentage, for example, of a perimeter at the periphery or, on the contrary, along the axis of symmetry of a future pile, i.e. vary the strength of the pile material over its horizontal section. The number of cavities is determined depending on the number of components present in the mixture. In soils with low moisture content, the method provides for the possibility of water supply by any of the known methods.
10ten
Способ позвол ет производить качественное перемешивание многокомпонентной цементогрунтовой смеси, в том числе с крупным заполнителем, непосредственно в скважине, исключа при этом предварительное перемешивание , а также необходимость переноса в жущего и инертного материалов от центра к периферии.The method allows high-quality mixing of a multicomponent cement-ground mix, including with coarse aggregate, directly in the well, eliminating preliminary mixing, as well as the need to transfer to the inert and inert materials from the center to the periphery.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU884420119A SU1544891A1 (en) | 1988-05-03 | 1988-05-03 | Method of constructing cement-earth pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU884420119A SU1544891A1 (en) | 1988-05-03 | 1988-05-03 | Method of constructing cement-earth pile |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1544891A1 true SU1544891A1 (en) | 1990-02-23 |
Family
ID=21372787
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU884420119A SU1544891A1 (en) | 1988-05-03 | 1988-05-03 | Method of constructing cement-earth pile |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1544891A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1313681C (en) * | 2005-02-28 | 2007-05-02 | 王凯 | Binding anti-slide pile structure and construction method |
-
1988
- 1988-05-03 SU SU884420119A patent/SU1544891A1/en active
Non-Patent Citations (1)
Title |
---|
Добровольский В. Фундаменты из цементогрунта дл домов усадебного типа. - На стройках России, 1986, № 3, с.24-25. * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1313681C (en) * | 2005-02-28 | 2007-05-02 | 王凯 | Binding anti-slide pile structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH06146267A (en) | Stirring device for ground improvement and method thereof | |
SU1544891A1 (en) | Method of constructing cement-earth pile | |
DE4130339A1 (en) | Improving foundation soil by constructing pillars - with volume of added gravel, etc. regulated relative to vibrator drawing process and compacting intervals | |
JPS5631928A (en) | Constructing method for soil pile | |
SU1170044A1 (en) | Pile | |
JP2819025B2 (en) | Soft ground improvement method | |
DE19602604A1 (en) | Floor mortar | |
SU1677180A1 (en) | Method of manufacturing reinforced cast-in-place pile | |
RU2224068C1 (en) | Method of cement-soil pile forming | |
SU1491962A1 (en) | Method of constructing cast-in-place shell pile | |
SU975897A1 (en) | Method of constructing cement-soil piles | |
JPS6051220A (en) | Improvement work of ground | |
JPS5847527B2 (en) | Anti-forming method using soil condensation | |
SU1606613A1 (en) | Method of errecting cast-in-place pile | |
JP2018193716A (en) | Strength estimation method | |
SU97752A1 (en) | The method of manufacture of concrete piles | |
RU2205262C2 (en) | Method of pile construction | |
JPH11293660A (en) | Composition design method of stabilized soil | |
SU796467A1 (en) | Method of compacting the external walls of artificial rock body | |
JPS63197717A (en) | Construction method for on-site piles | |
SU889780A1 (en) | Method of constructing an earth-fill structure | |
JPS6117973B2 (en) | ||
SU1294918A1 (en) | Base under foundation | |
JPS57158423A (en) | Combined pile | |
SU898078A1 (en) | Method of constructing the bottom of a vertical mine working |