SU1537812A1 - Method of mining mineral deposits - Google Patents
Method of mining mineral deposits Download PDFInfo
- Publication number
- SU1537812A1 SU1537812A1 SU884372991A SU4372991A SU1537812A1 SU 1537812 A1 SU1537812 A1 SU 1537812A1 SU 884372991 A SU884372991 A SU 884372991A SU 4372991 A SU4372991 A SU 4372991A SU 1537812 A1 SU1537812 A1 SU 1537812A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- ore
- layer
- supports
- crusts
- artificial
- Prior art date
Links
- 229910052500 inorganic mineral Inorganic materials 0.000 title claims abstract description 7
- 239000011707 mineral Substances 0.000 title claims abstract description 7
- 238000000034 method Methods 0.000 title claims abstract description 5
- 238000005065 mining Methods 0.000 title claims description 7
- 206010039509 Scab Diseases 0.000 claims abstract description 17
- 230000003245 working effect Effects 0.000 claims abstract description 9
- 238000004140 cleaning Methods 0.000 claims abstract description 8
- 238000009412 basement excavation Methods 0.000 claims abstract description 7
- 239000000203 mixture Substances 0.000 claims abstract description 7
- 238000005728 strengthening Methods 0.000 claims abstract description 3
- 239000000463 material Substances 0.000 claims description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005422 blasting Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
Изобретение относитс к разработке руд с закладкой выработанного пространства. Цель - повышение эффективности разработки за счет увеличени пролета очистных выработок при обеспечении безопасности работ. В массиве полезного ископаемого сначала возвод т искусственные опоры на всю высоту блока. Затем послойно отрабатывают запасы, причем выемку ведут одновременно несколькими сло ми и осуществл ют послойно закладку выработанного пространства твердеющими смес ми, укрепл тем самым искуственные опоры закладкой. В процессе очистной выемки по периметру опор в каждом слое формируют рудные корки на высоту отрабатываемого сло . Затем до осуществлени закладки производ т выемку рудных корок в р дах опор параллельных линий очистного фронта, в каждом р ду рудную корку отрабатывают сначала с одной, а затем с другой стороны опоры, с увеличением при этом пролета очистных выработок до проектной величины с опережением в каждом последующем слое по отношению к предыдущему. 3 ил.The invention relates to the development of ores with the laying of the goaf. The goal is to increase the efficiency of development by increasing the span of clearing workings while ensuring the safety of work. In the mineral massif, artificial supports were first erected over the entire height of the block. Then, the reserves are worked out in layers, and the excavation is carried out simultaneously by several layers and layering the developed space in layers with hardening mixtures, thereby strengthening the artificial supports with a padding. In the process of clearing the notches around the perimeter of the supports in each layer form ore crusts to the height of the working layer. Then, prior to laying, ore crusts are made in rows of supports of parallel lines of the cleaning front, in each row the ore crust is worked out first from one and then from the other side of the support, with the increase in the span of clearing workings to the design value with advance in each subsequent layer in relation to the previous one. 3 il.
Description
Изобретение относитс к горной промышленности и может быть использовано при подземной разработке месторождении полезных ископаемых с закладкой выработанного пространства,The invention relates to the mining industry and can be used in the underground mining of mineral deposits with the laying of the goaf,
Цепь изобретени - повышение эффективности разработки за счет увеличени i почета очистных выработок при обеспечении безопасности работ.The chain of the invention is to increase the efficiency of development by increasing the i honor of the cleaning workings while ensuring the safety of work.
На фиг. 1 покачан план горных работ при нь.смке сто и пор цок отработки ручных корок; нч фиг. 2 - разрез А-А на фиг. 1; на фиг. 3 - разрез Б-Б на фиг. 1FIG. 1 shook the plan of mining operations at the basement of the manual crusts; LF FIG. 2 shows section A-A in FIG. one; in fig. 3 shows a section BB in FIG. one
На фиг. 1-3 обозначено: наклонный съезд 1, искусственные опоры 2, слои 3 руды, заходки 4, просечки 5, рудные корки 6, закладочный массив 7, рудный массив 8, перемычки 9.FIG. 1-3 are designated: inclined exit 1, artificial supports 2, layers 3 ore, stoppers 4, notches 5, ore crusts 6, backfill array 7, ore massif 8, jumpers 9.
Способ осуществл етс следующим образом.The method is carried out as follows.
В пределах блока (выемочного участка) проход т откаточные, под- этажные и вентил ционно-закладочны выработки (не показаны), а также наклонный съезд 1, из которого ocvnu- ствп ют развитие работ в блоке. Вн i- чале в пределах выемочного учлггктWithin the block (excavation section), the haulage, sub-floor and vent and backfill workings (not shown), as well as an inclined congress 1, from which the development of works in the block is located, pass. OU i- chale within the site site
елate
со Jwith J
00 ND00 ND
возвод т искусственные опоры 2 на всю высоту блока. Размеры поперечного сечени искусственных опор 2 в конкретных горно-геологических и горно-технических услови х выбирают в зависимости от прин той прочности материала искусственных опор 2, высоты отрабатываемого сло и действующей нагрузки, котора определ етс пролетом подработки. Рассто ние между р дами искусственных опор 2 и между опорами в р ду соответствует проектному пролету очистных выработок .Artificial supports 2 were raised to the full height of the block. The cross-sectional dimensions of the artificial supports 2 in specific mining-geological and mining-technical conditions are chosen depending on the strength of the material of the artificial supports 2, the height of the layer being worked and the effective load, which is determined by the underworking flight. The distance between the rows of artificial supports 2 and between the supports in the series corresponds to the design span of the clearing workings.
Рассто ние между искусственными опорами 2 принимают в пределах 0,7- 0,8 предельного пролета при условии выполнени следующих меропри тий.The distance between the artificial supports 2 is within the range of 0.7-0.8 times the maximum span, subject to the following measures.
Искусственные опоры 2 располагают так, чтобы длинна сторона их поперечного сечени была ориентирована по направлению действи максимальных горизонтальных напр жений. В результате этого повышаетс устойчивость и несуща способность опор.Artificial supports 2 are positioned so that the long side of their cross section is oriented in the direction of maximum horizontal stresses. As a result, the stability and bearing capacity of the supports is increased.
После образовани искусственных опор 2 по всей площади выемочного участка и набора твердеющей смесью необходимой прочности приступают к послойной выемке запасов полезного ископаемого между искусственными опорами 2. Слои 3 отрабатывают сверху вниз или снизу вверх отдельными секци ми , выемку руды в которых ведут камерно-столбовой или сплошной системами с использованием высокопроизводительного самоходного оборудовани . Отработка слоев 3 может производитьс и с применением обычного переносного оборудовани . Очистные работы ведут в две стадии. Вначале осуществл ют выемку заходок 4 и просечек 5 с оставлением на контакте с искусственными опорами 2 с двух трех или четырех сторон рудных корок 6 на высоту отрабатываемого сло 3. При этом пролеты очистных выработок не превышают допустимые (безопасные), которые составл ют 0,5- 0,6 предельных пролетов. Затем в от- - ступающем пор дке от одного р да искусственных опор 2 к другому в направлении от закладочного .7 к рудному массиву 8 осуществл ют выемку рудных корок 6. При этом в каждом р ду искусственных опор 2 рудные корки 6 отбивают вначале с одной, а затем с другой стороны с увеличением ПРОЛРAfter the formation of artificial supports 2 over the entire area of the excavation site and a set of hardening mixture of necessary strength, they proceed to the layer-by-layer excavation of mineral reserves between the artificial supports 2. Layers 3 are worked from top to bottom or bottom to top in separate sections, the excavation of ore in which are chamber-pillar or solid systems using high-performance self-propelled equipment. The testing of layers 3 can also be carried out using conventional portable equipment. Cleaning work is carried out in two stages. Initially, excavations of the 4 and notches 5 are made, leaving on contact with the artificial supports 2 from two three or four sides of the ore crusts 6 to the height of the working layer 3. At the same time, the clearances of the clearing workings do not exceed the allowable (safe) ones - 0.6 maximum spans. Then, in the order from one row of artificial supports 2 to the other, in the direction from the backfill .7 to the ore massif 8, ore crusts 6 are excavated. At the same time, in each row of artificial supports 2, ore crusts 6 are beaten off first and then on the other hand with increasing prill
10ten
1515
2020
2525
ЗТST
3535
4040
4545
5050
5555
та очистных выработок до проектной величины с опережением в каждом последующем р ду по отношению к предыдущему .that cleaning workings to the design size with advancing in each subsequent row in relation to the previous.
За счет отработки рудных корок 6 пролеты заходок 4 и просечек 5 возрастают до 0,7-0,8 предельного пролета . На этой стадии очистных работ достигаетс наибольша производительность труда забойных рабочих, так как широкий фронт очистных работ позвол ет осуществить организацию труда по процессам, а услови отбойки при двух плоскост х обнажени , обуславливают повышение эффективности буровзрывных работ, что в конечном итоге позвол ет повысить эффектов-. ность разработки.Due to the mining of ore crusts 6, the spans of the penetrations 4 and the gaps 5 increase to 0.7–0.8 of the maximum span. At this stage of the cleaning works, the labor productivity of the downhole workers is achieved as the wide front of the cleaning works allows the organization of labor according to the processes, and the breaking conditions at the two outcrop planes cause an increase in the efficiency of drilling and blasting, which ultimately increases the effects . ness of development.
Безопасность работ на заключительной стадии обеспечиваетс высокой интенсивностью очистной выемки и прин тым пор дком отработки рудных ко- рок 6. В зависимости от конкретных условий глубину фронта очистных работ принимают в пределах 2-4 р дов искусственных опор 2. В этом случае один-два р да ближайших к рудному массиву 8 комбинированных опор (искусственные опоры 2 с рудными корка-,, ми 6) воспринимают нагрузку в упругой и упруго-пластической стади х, харак - теризующихс полной устойчивостью и положительной отпорностью, а один- два р да ближайших к закладочному массиву искусственных опор 2 воспринимают нагрузку в стадии пластического деформировани , характеризующейс нулевой отпорностью. При этом жесткость комбинированных и искусственных опор 2 уменьшаетс в направлении от рудного к закладочному массиву, что и обуславливает возможность перераспределени нагрузок на ненарушенный горными выработками рудный массив и создает предпосылки дл управлени горным давлением. Закладку выработанного пространства осуществл ют послойно твердеющими смес ми, укрепл тем самым искусственные опоры.The safety of work at the final stage is ensured by a high intensity of the clearing recess and the adopted order of mining of the ore crust 6. Depending on the specific conditions, the depth of the front of the clearing work is within 2-4 rows of artificial supports 2. In this case, one or two And 8 combined supports closest to the ore massif (artificial supports 2 with ore crusts, mi 6) perceive the load in the elastic and elastic-plastic stages, characterized by full stability and positive resistance, and one- two p and bl The artificial supports 2 that are closest to the backfill array perceive the load in the plastic deformation stage, which is characterized by zero resistance. At the same time, the rigidity of the combined and artificial supports 2 decreases in the direction from the ore to the backfill massif, which makes it possible to redistribute the loads on the ore mass that is not disturbed by the mine workings and creates prerequisites for controlling the rock pressure. Laying out of the developed space is carried out in layers, hardening mixtures, thereby strengthening the artificial supports.
В случае возможных задержек в подаче твердеющей смеси в выработанное пространство сло 3 рудные корки 6 временно не отрабатывают. Благодар , наличию рудных корок 6 искусственна или естественна кровл может длительное врем поддерживатьс комбинированными опорами в устойчивом состо нии .In the case of possible delays in the supply of hardening mixture into the developed space of the layer 3, the ore crusts 6 are temporarily not worked. Due to the presence of ore crusts 6, an artificial or natural roof can be maintained for a long time by combined supports in a steady state.
515378515378
Заполнение выработанного пространства твердеющей смесью осуществл ют после полной отработки запасов руды в секции выемки рудных корок 6 и установки перемычек 9. После твердени смеси приступают к отработке очередной секции. В зависимости от конкретных условий в блоке одновременно отрабатывают два-три сло . Дл ю обеспечени полноты заполнени выработанного пространства твердеющей смесью каждому слою 3 придают наклон 3-7°.Filling the developed space with a hardening mixture is carried out after the ore reserves in the section have been fully mined, the ore crusts 6 are excavated and the jumpers 9 are installed. Depending on the specific conditions in the block, two or three layers are worked out simultaneously. In order to ensure that the developed space is completely filled with a hardening mixture, each layer 3 is given a slope of 3-7 °.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU884372991A SU1537812A1 (en) | 1988-02-02 | 1988-02-02 | Method of mining mineral deposits |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU884372991A SU1537812A1 (en) | 1988-02-02 | 1988-02-02 | Method of mining mineral deposits |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1537812A1 true SU1537812A1 (en) | 1990-01-23 |
Family
ID=21353449
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU884372991A SU1537812A1 (en) | 1988-02-02 | 1988-02-02 | Method of mining mineral deposits |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1537812A1 (en) |
-
1988
- 1988-02-02 SU SU884372991A patent/SU1537812A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 1090072, кл. Е 21 С 41/06, 1982. Авторское свидетельство СССР К 863863, кл. Е 21 Г 41/06, 1979. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2454540C1 (en) | Rock pressure control method | |
US3466094A (en) | Blasting arrangement for oil shale mining | |
RU2209972C2 (en) | Method of mining of jointly occurring steep thin ore bodies in stable and medium-stable rocks | |
CN110219650B (en) | Deep hole subsequent filling mining method in environment reconstruction stage | |
CA1044708A (en) | Method for mining of rock or ore according to the block caving principle in massive formations | |
CN1195149C (en) | Roof bolt protection and sectioned empty field method for phosphorate rock mining | |
RU2449125C1 (en) | Method to mine large sloping ore bodies | |
RU2322583C2 (en) | Development method for steep and inclined deposit having low and medium thickness | |
SU1537812A1 (en) | Method of mining mineral deposits | |
RU2248448C1 (en) | Method for extraction of steep-falling deposits of weak ores | |
RU2768251C1 (en) | Method for development of steeply dipping ore bodies with unstable ores | |
RU2755287C1 (en) | Method for developing thin and low-powered steel-falling ore bodies | |
RU2384708C2 (en) | Removal method of powered mining face complexes | |
RU2743162C1 (en) | Method for forming a dismantling chamber when developing slim coal beds | |
SU1239336A1 (en) | Method of mining thick mineral deposits | |
SU1155757A1 (en) | Method of mining mineral deposits | |
AU9285598A (en) | R.b. yun's method for the combined exploitation of mining fields | |
RU2790648C1 (en) | Method for underground development of steeping ore bodies in descenting order with chamber system | |
RU2762170C1 (en) | Method for developing thin and low-powered steel-falling ore bodies | |
SU1032840A1 (en) | Method of excavating steep ore bodies | |
SU1219806A1 (en) | Method of mining thick gently-sloping ore deposits | |
RU2215145C1 (en) | Method of mineral deposit underground mining in strips | |
RU1789737C (en) | Method for formation of vertical working | |
SU825964A1 (en) | Method of working thick steeply-inclined ore bodies | |
SU1643726A1 (en) | Method for tunneling mine workings under high rock pressure |