SU1495557A1 - Method of constructing pipeline section on stationary off-shore platform - Google Patents
Method of constructing pipeline section on stationary off-shore platform Download PDFInfo
- Publication number
- SU1495557A1 SU1495557A1 SU874222370A SU4222370A SU1495557A1 SU 1495557 A1 SU1495557 A1 SU 1495557A1 SU 874222370 A SU874222370 A SU 874222370A SU 4222370 A SU4222370 A SU 4222370A SU 1495557 A1 SU1495557 A1 SU 1495557A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- pipeline section
- platform
- pipeline
- stationary
- connection
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 5
- 238000003466 welding Methods 0.000 claims abstract description 3
- 238000007654 immersion Methods 0.000 claims abstract 2
- 210000003127 knee Anatomy 0.000 claims abstract 2
- 241000289659 Erinaceidae Species 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Изобретение позвол ет повысить надежность креплени участка трубопровода (ТП) к морской стационарной платформе. Вне платформы изготавливают изогнутое в вертикальной плоскости колено (К) ТП, которое поэтапно спускают на дно посредством шарнирного присоединени к тележке, перемещающейс по направл ющей, с наращиванием верхнего и нижнего участков К. На вертикальной части участка ТП равномерно закрепл ют неподвижные хомуты, которые соедин ют с тележками по мере погружени этого участка. Монтажное соединение хомутов с тележками выполн ют подвижным и поворотным в плоскости К. Перед погружением соединение с помощью сварки выполн ют неподвижным, что позвол ет исключить труд водолаза и сократить сроки сооружени ТП. 1 з.п. ф-лы, 2 ил.The invention makes it possible to increase the reliability of fastening a pipeline section (TP) to a fixed offshore platform. Outside the platform, a vertically curved knee (K) of the TP is made, which is gradually lowered to the bottom by means of a hinged connection to the carriage moving along the rail with the upper and lower sections K increasing. On the vertical part of the TP section, fixed clamps evenly fasten with trolleys as this area is immersed. The mounting connection of the collars with the carriages is made movable and pivotal in the plane K. Before immersion, the connection is made stationary by welding, which makes it possible to eliminate the work of the diver and shorten the construction time of the transformer substation. 1 hp f-ly, 2 ill.
Description
Изобретение относитс к строительству и может найти применение при сооружении морских магистральных трубопроводов.The invention relates to the construction and can be used in the construction of offshore pipelines.
Цель изобретени - повышение надежности креплени участка трубопровода к платформе.The purpose of the invention is to increase the reliability of securing the pipeline section to the platform.
На фиг. 1 изображены этапы реализации способа; на фиг. 2 - сечение А-А на фиг. I.FIG. 1 shows the stages of the implementation of the method; in fig. 2 is a section A-A in FIG. I.
Способ осуществл ют следующим образом .The method is carried out as follows.
Изготавливают участок трубопровода, состо щий из вертикальной части I, колена 2 длиной 100-120 м и горизонтальной части 3 длиной 2000-3000 м вне платформы 4.A pipeline section is made up consisting of a vertical part I, an elbow 2 with a length of 100-120 m and a horizontal part 3 with a length of 2000-3000 m outside platform 4.
На вертикальной части 1 на рассто нии 20-30 м неподвижно закрепл ют хомуты 5. Участок трубопровода оснащают понтонами 6 и транспортируют к платформе 4, на которой предварительно закрепл ют направл ющую 7. Перед спуском участка трубопровода на дно соедин ют над зеркалом зоды хомут 5 посредством оси 8 с размещенной н.а направл ющей 7 спусковойOn the vertical part 1, clamps 5 are fixedly fixed at a distance of 20–30 m. A pipeline section is equipped with pontoons 6 and transported to platform 4, onto which a guide 7 is pre-attached. Before the pipeline reaches the bottom, zooms 5 by means of axis 8 with a trigger 7 placed on the guide.
//
тележкой 9, снабженной втулкой 10. Соединение оси 8 и втулки 10 выполнено подвижным и поворотным вдоль общей оси, что обеспечивает необходимое положение вертикальной части 1, после чего ось 8 посредством сварки соедин ют с втулкой 10. Отсоединив часть поплавков 6, перевод т вертикальную часть 1 в проектное положение и погружают участок трубопровода при помощи крана 11 до следующего хомута, который также над зеркалом воды соедин ют с другой спусковой тележкой. По мере спуска участка трубопровода отсоедин ют поплавки 6, удерживающие на плаву горизонтальную часть 3.a carriage 9 fitted with a sleeve 10. The connection of the axis 8 and the sleeve 10 is made movable and rotatable along a common axis, which ensures the required position of the vertical part 1, after which the axis 8 is connected with the sleeve 10 by welding. After disconnecting part of the floats 6, the vertical part is transferred 1 into the design position and the pipeline section is immersed by means of a crane 11 until the next clamp, which is also connected to another trigger car above the water mirror. As the pipeline section is lowered, the floats 6 are detached, keeping the horizontal part 3 afloat.
Использование изобретени позвол ет исключить труд водолазов при закреплении вертикальной части участка трубопровода на платформе 4, а также повысить его надежность креплени в услови х штормовой погоды. Кроме того, отпадает необходимость /наращивани горизонтальной части, что сокращает сроки сооружени трубопровода.The use of the invention makes it possible to eliminate the work of divers when fixing the vertical part of the pipeline section on platform 4, as well as to increase its reliability of fastening in conditions of stormy weather. In addition, there is no need to / increase the horizontal part, which reduces the time required for the construction of the pipeline.
4 СО СП4 SO SP
елate
СПSP
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU874222370A SU1495557A1 (en) | 1987-03-17 | 1987-03-17 | Method of constructing pipeline section on stationary off-shore platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU874222370A SU1495557A1 (en) | 1987-03-17 | 1987-03-17 | Method of constructing pipeline section on stationary off-shore platform |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1495557A1 true SU1495557A1 (en) | 1989-07-23 |
Family
ID=21295553
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU874222370A SU1495557A1 (en) | 1987-03-17 | 1987-03-17 | Method of constructing pipeline section on stationary off-shore platform |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1495557A1 (en) |
-
1987
- 1987-03-17 SU SU874222370A patent/SU1495557A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 761779, кл. F 16 L 1/04, 1978. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2140595C1 (en) | Unit for vertical laying of pipe line in water basin (versions) | |
CN113155830B (en) | Bridge pier underwater structure detection device and method integrated with self-propelled fixed platform | |
RU94040089A (en) | Device for nearly vertical laying of pipe line | |
NZ508980A (en) | Underwater pipe-laying vessels and methods | |
US4051688A (en) | Offshore structure and method | |
ATE313478T1 (en) | METHOD AND APPARATUS FOR LIFTING OFFSHORE PLANT SUPPORT STRUCTURES | |
SU1495557A1 (en) | Method of constructing pipeline section on stationary off-shore platform | |
US5380129A (en) | Method for laying tubular conduits | |
DK149718B (en) | PROCEDURE AND SUPPORT FOR PUBLISHING UNDER THE WATER OF A CROWD CROSSING OBSTACLES | |
SU1303486A1 (en) | Method for docking semi-submersible drilling rig and device for effecting same | |
SU1373627A1 (en) | Slipway of floating type for vessel | |
FR2396127A1 (en) | METHOD FOR IMPLEMENTING A TORCHER SUPPORT STRUCTURE FOR OIL PLATFORM | |
CN221974941U (en) | Ladder type H-ADCP fixing device of coastal wall structure | |
SU482536A1 (en) | The method of underwater installation of support columns of floating installations | |
SU1190129A1 (en) | Method of mounting upright of underwater pipeline within zone of sea stationary platform | |
SU1126762A1 (en) | Arrangement for alignment of underwater pipelines suspended | |
CN219343065U (en) | Quick cable releasing device of marine auxiliary ship | |
RU98102336A (en) | METHOD OF MARINE GAS TRANSPORTATION BY PIPELINE | |
SU621608A1 (en) | Device for underwater mounting of slip rail tracks | |
SU897635A1 (en) | Method of extending the length of pontoon floating dock | |
SU740600A1 (en) | Ship lift | |
SU1291674A1 (en) | Arrangement for mounting offshore drilling platforms | |
SU1743988A1 (en) | Apparatus for launching self-rising floating platform from waterside slipway | |
WO1995018907A1 (en) | Procedure and device for installing a riser pipe on a submarine buoy | |
SU1145202A1 (en) | Arrangement for laying pipeline on water reservoir bottom |