SU129994A1 - Arochna dam - Google Patents
Arochna damInfo
- Publication number
- SU129994A1 SU129994A1 SU641807A SU641807A SU129994A1 SU 129994 A1 SU129994 A1 SU 129994A1 SU 641807 A SU641807 A SU 641807A SU 641807 A SU641807 A SU 641807A SU 129994 A1 SU129994 A1 SU 129994A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- dam
- arch
- arochna
- construction
- passage
- Prior art date
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Description
Известные конструкции арочных плотин требуют п.ри нроизводстке работ по их возведению предварительной пробивки строительного тоннел дл отвода воды и устройства перемычек, что удорожает стоимость и удлин ет сроки строительства.Known designs of arched dams require the manufacturing of works for their erection of preliminary punching of a construction tunnel for draining water and making jumpers, which increases the cost and lengthens construction time.
В предлагаемой арочной плотине этот недостаток устран етс тем, что основанием плотины служит подплотинна арка, включаема в тело плотины. Отверстие арки используетс в гУериод строительства длл пропуска воды.In the proposed arched dam, this disadvantage is eliminated by the fact that the base of the dam is a sub-arch, which is incorporated into the body of the dam. The arch hole is used in the construction of the water passage dll.
На фиг. 1 изображена арочна плотина, вид с нижнего бьефа; на фиг- 2 - то же, в плане; на фиг. 3 - плотина в поперечном разрезе после заделки подплотинного отверсти .FIG. 1 shows an arched dam, view from the downstream; in FIG. 2 - the same in terms of; in fig. 3 - dam in cross section after the seal of the sublap hole.
Арочна плотина 1 возводитс на специально устраиваемом основании в виде горизонтальной арки 2, перекрывающей пусло реки. Отверстие 3 арки используетс дл пропуска воды в период строительства.The arch dam 1 is erected on a specially arranged base in the form of a horizontal arch 2 spanning the river bed. Hole 3 is used for the passage of water during construction.
Отметка п т подплотинной арки и ее стрела выбираютс таким образом , чтобы пропуск воды в период строительства проходил под плотиной . Сама арочна плотина возводитс насухо на бетонной постели 4, выравнивающей верх подплотинной арки 2 и берегов. Во избежание передачи недопустимых больших горизонтальных нагрузок арочной плотины иа подплотипную арку верхн плоскость 5 покрываетс изол ционным слоем, обеспечивающим низкий коэффициент трени (асфальтобитумные покрыти , графитова смазка и т. п.).Mark p m of the dam arch and its arrow are chosen so that the passage of water during the construction period takes place under the dam. The arched dam itself is erected dry on a concrete bed 4, leveling the top of the dam arch 2 and the banks. In order to avoid the transfer of unacceptable large horizontal loads of the arch dam and the subplotty arch, the upper plane 5 is covered with an insulating layer providing a low coefficient of friction (asphalt-bitumen coatings, graphite grease, etc.).
По заверщению строительства плотины и дерривации, а также при необходимости водосбросных устройств производитс перекрытие русла реки иод подплотинной аркой. .В зависимости от характера каньона и пропуска воды осуществление перекрыти русла может быть различным: с вспомогательными кессонами, сва ми, металлическими затворами и т. д.Upon completion of the dam construction and construction, as well as the need for spillway devices, the iodine arch is blocked. . Depending on the nature of the canyon and the passage of water, the implementation of blocking of the channel may be different: with auxiliary caissons, its own, metal gates, etc.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU641807A SU129994A1 (en) | 1959-10-22 | 1959-10-22 | Arochna dam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU641807A SU129994A1 (en) | 1959-10-22 | 1959-10-22 | Arochna dam |
Publications (1)
Publication Number | Publication Date |
---|---|
SU129994A1 true SU129994A1 (en) | 1959-11-30 |
Family
ID=48401129
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU641807A SU129994A1 (en) | 1959-10-22 | 1959-10-22 | Arochna dam |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU129994A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2638186C1 (en) * | 2017-03-16 | 2017-12-12 | Акционерное общество "Проектно-изыскательский и научно-исследовательский институт "Гидропроект" им. С.Я. Жука" | Method of concrete dam construction in river canyon |
-
1959
- 1959-10-22 SU SU641807A patent/SU129994A1/en active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2638186C1 (en) * | 2017-03-16 | 2017-12-12 | Акционерное общество "Проектно-изыскательский и научно-исследовательский институт "Гидропроект" им. С.Я. Жука" | Method of concrete dam construction in river canyon |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU129994A1 (en) | Arochna dam | |
SU135413A1 (en) | The method of construction of concrete dams without drainage device | |
Harrison | Deglaciation and proglacial drainage: North Bay-Mattawa region, Ontario | |
SU104320A1 (en) | Deep Reper | |
SU453469A1 (en) | HYDROELECTRIC POWER STATION '% / g;:' ^ '= ...; „^ ^ LPG" ^ -.--- :: ± ^ -i ^ i®, | |
THOMPSON | Strengthening of John Hollis Bankhead Dam | |
DK132237C (en) | PROCEDURE FOR THE LAYING AND FOUNDATION OF A BUILDING CONSTRUCTION UNDER WATER AND THE MEANS OF EXERCISING THIS PROCEDURE | |
DK139440B (en) | Method of forming a foundation for a building component in water. | |
SU487206A1 (en) | Foundation construction method | |
KURIBAYASHI | On the Relation between the Location of Settlements and the Types of Flood Damage in the River Basin of the Kano | |
HATTORI | ON THE FLOODS OF THE RIVER SENDAI SOUTH KYUSHU AND THE EFFECT OF TSURUTA DAM | |
SU417573A1 (en) | ||
GB364160A (en) | Improved method of constructing tunnels under water, together with bridges above said tunnels | |
SU718533A1 (en) | Weir structure | |
SU394498A1 (en) | Footwell | |
SU64553A1 (en) | Mounting device berets | |
RU99022U1 (en) | HIGH GROUND WEIR | |
SU31375A1 (en) | Massive water holding dam | |
Petrov et al. | Dam of the Kolyma hydroelectric power plant | |
SU142209A1 (en) | Dam of local materials | |
SU129548A1 (en) | Reservoir reinforced concrete dam, mainly from prefabricated elements | |
HENRY | LARGE RIVER DAMS(FRENCH) | |
DK84902C (en) | Procedure for foundation of structures at great water depth. | |
PADOAN et al. | PROTECTIVE REVETMENT OF RIVER EMBANKMENTS(IN FRENCH) | |
Swaminathan et al. | A method for estimating the ultimate load capacity of arch dams |