SU1224406A1 - Method of suspending working platform when sinking vertical mine shafts - Google Patents
Method of suspending working platform when sinking vertical mine shafts Download PDFInfo
- Publication number
- SU1224406A1 SU1224406A1 SU843771152A SU3771152A SU1224406A1 SU 1224406 A1 SU1224406 A1 SU 1224406A1 SU 843771152 A SU843771152 A SU 843771152A SU 3771152 A SU3771152 A SU 3771152A SU 1224406 A1 SU1224406 A1 SU 1224406A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- rope
- ropes
- shelf
- mass
- drum
- Prior art date
Links
Landscapes
- Warehouses Or Storage Devices (AREA)
Description
Изобретение относитс к шахтному .строительству,, в частности к повес- ке оборудовани при проходке и креплении вертикальных стволов.The invention relates to mine construction, in particular, to equipment sacking during penetration and fastening of vertical shafts.
Целью изобретени вл етс ... (снижение энергоемкости и канатоем- кости.The aim of the invention is ... (reduction of energy and cable).
На чертеже изображена технологическа схема подвески npoxoA lecKoro полка, продольный разрез по стволу.The drawing shows the technological scheme of the suspension of the npoxoA lecKoro shelf, a longitudinal section along the trunk.
Способ заключаетс в следующем.The method is as follows.
Канат 1 полностью навивают на барабан , например, лебедки 2. Свободный конец каната последовательно завод т в шкивы 3, установленные на копре 4, и шкивы 5, установленные на проходческом полке 6, и закрепл ют на барабане, например, лебедки 7. Затем 50-60% общей длины каната 1 наматывают на барабан лебедки 7, после чего производ т спускоподъем- ные операции полка 6 по стволу 8 до полного исчерпани канатоемкости лебедки 2 и достижени нат жени в верхней части каната, соответствующего его технической характеристике.The rope 1 is completely wound onto the drum, for example, the winch 2. The free end of the rope is successively inserted into the pulleys 3 installed on the scraper 4 and the pulleys 5 mounted on the driving shelf 6 and fixed to the drum, for example, the winch 7. Then 50 -60% of the total length of the rope 1 is wound on the drum of the winch 7, after which the lifting operation of the shelf 6 on the trunk 8 is performed until the rope capacity of the winch 2 is completely exhausted and tension is reached in the upper part of the rope corresponding to its technical characteristics.
Счаливание концов каната 1 с канатами 9 и 10 производ т поочередно. Бновь навиваемые на лебедки канаты 9 и 10 соедин ют с- концами каната 1 коуш-счалкой 11, которую на этот цериод укладывают на нулевую рамуThe joining of the ends of the rope 1 with the ropes 9 and 10 is carried out alternately. The winches 9 and 10, which are wound on the winch, are connected with the ends of the rope 1 to the pitcher 11, which is placed on the zero frame on this ceriod.
10ten
1515
244062244062
12 (на чертеже размещение канатов 9 и .коуш-счалки 11 изображено штрих- пунктирной линией). При счаливании конец каната 1 удерживает крепежное устройство 13, а спускоподъемные операции полка выполн ют с помощью лебедки 7.12 (in the drawing, the placement of the ropes 9 and the bow-coupling 11 is shown by a dash-dotted line). When joining, the end of the rope 1 holds the fastening device 13, and the lifting operation of the shelf is performed using a winch 7.
Завершают операцию по счаливанию одного конца каната 1 контрольным опробыванием надежности соединени , которое осуществл ют путем создани нат жени между лебедкой 2 и крепежным устройством 13.После этого крепежное устройство 13 снимают и перенос т дл счаливани второго конца каната 1, выполн емого аналогично описанному.Completing the operation of joining one end of the rope 1 with a test testing the reliability of the joint, which is carried out by creating tension between the winch 2 and the fastening device 13. Thereafter, the fastening device 13 is removed and transferred to the second end of the rope 1, performed in the same way as described.
В зависимости от глубины ствола, канатоемкости лебедок и технических данных канатов операции по счаливанию канатов могут быть повторены несколько раз. При этом площадь сечени каждого вновь навешиваемого каната дл одинаковых типов канатов и их материалов следует принимать больше, чем у предыдущего, причем приращение площади сечени вновь навешиваемого каната должно быть пропорционально его собственной массе 30 и обеспечивать примерное рав енство величин напр жений в верхних сечени х каждого из канатов.Depending on the depth of the trunk, the rope capacity of the winches and the technical data of the ropes, the mooring of the ropes can be repeated several times. At the same time, the cross-sectional area of each newly hung rope for identical types of ropes and their materials should be taken larger than the previous one, and the increment of the cross-sectional area of the newly hung rope should be proportional to its own weight 30 and provide an approximate equality of the stress values in the upper sections from ropes.
2020
2525
tZtZ
вниипиvniipi
Заказ 1898/28Order 1898/28
Производств.-полиграф, пред-е, г. Ужгород, ул. Проектна , 4Production.-polygraph, pre-e, Uzhgorod, st. Project, 4
Тираж 470Circulation 470
ПодписноеSubscription
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843771152A SU1224406A1 (en) | 1984-07-09 | 1984-07-09 | Method of suspending working platform when sinking vertical mine shafts |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843771152A SU1224406A1 (en) | 1984-07-09 | 1984-07-09 | Method of suspending working platform when sinking vertical mine shafts |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1224406A1 true SU1224406A1 (en) | 1986-04-15 |
Family
ID=21130856
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU843771152A SU1224406A1 (en) | 1984-07-09 | 1984-07-09 | Method of suspending working platform when sinking vertical mine shafts |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1224406A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2601647C2 (en) * | 2014-06-04 | 2016-11-10 | Александр Александрович Кисель | Method for erection of steel constructions of vertical mine opening shaft and armoring unit for implementation of the method |
-
1984
- 1984-07-09 SU SU843771152A patent/SU1224406A1/en active
Non-Patent Citations (1)
Title |
---|
Справочник инженера-шахтостроител . М.: Недра, т. 1, 1972, с. 300. Авторское свидетельство СССР № 177818, кл. Е 21 D 5/12, 1964. * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2601647C2 (en) * | 2014-06-04 | 2016-11-10 | Александр Александрович Кисель | Method for erection of steel constructions of vertical mine opening shaft and armoring unit for implementation of the method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU1224406A1 (en) | Method of suspending working platform when sinking vertical mine shafts | |
CN101487234A (en) | Construction method for transverse beam hoisting in-position of arch first and beam late tied-arch bridge | |
CN102344086B (en) | Method for replacing lifting ropes of multi-rope frictional geared winch | |
EP3816089B1 (en) | Method for roping an elevator | |
CN111155822A (en) | Steel strand installation method for wind driven generator support tower frame prestressed structure | |
CN217376990U (en) | Hoisting equipment for large steel structural part | |
RU2292458C1 (en) | Device for suspension of bridge during drilling of deep shafts | |
CN116281646B (en) | Automatic crane for bridge construction and working method thereof | |
CN205786142U (en) | A kind of pipeline coagulation soil weight coating impact test device | |
CN207528130U (en) | The means for loading of deep hole blasting tubular finished explosive products | |
SU1420174A1 (en) | Method of setting flexible roof bolt | |
SU800120A1 (en) | Method and apparatus for threading the rope of erecting tackle | |
RU2006447C1 (en) | Crane boom load hanger | |
JPH08100600A (en) | Method of carrying-in large-diameter steel pipe from shaft section to inclined shaft section | |
SU1114607A1 (en) | Multiple-rope mining hoist | |
SU1562278A1 (en) | Method of mounting spun ropes of mine hoists | |
US3531811A (en) | Method for erecting parallel-wire bridge strand | |
CN117007428B (en) | Rotation test method and test device for turret in FPSO | |
CN220811571U (en) | Hoisting tool for winding drum | |
SU1708738A1 (en) | Method for installation of traction ropes of mine hoists | |
CN209797349U (en) | small-size lifting machine | |
SU1742450A1 (en) | Method of erection of mast structures | |
SU771018A1 (en) | Method of testing load lifting masts and rigging equipment | |
SU861279A2 (en) | Load-gripping device | |
RU2048417C1 (en) | Shaft hoisting plant |