SU1186738A1 - Method of erecting building or structure - Google Patents
Method of erecting building or structure Download PDFInfo
- Publication number
- SU1186738A1 SU1186738A1 SU833614263A SU3614263A SU1186738A1 SU 1186738 A1 SU1186738 A1 SU 1186738A1 SU 833614263 A SU833614263 A SU 833614263A SU 3614263 A SU3614263 A SU 3614263A SU 1186738 A1 SU1186738 A1 SU 1186738A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- mortar
- piles
- reinforcement
- underground
- basement
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 7
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 18
- 230000002787 reinforcement Effects 0.000 claims abstract description 14
- 238000010276 construction Methods 0.000 claims abstract description 13
- 239000004566 building material Substances 0.000 claims abstract description 4
- 239000004567 concrete Substances 0.000 claims abstract description 3
- 239000002689 soil Substances 0.000 claims abstract 2
- 238000007598 dipping method Methods 0.000 claims 1
- 238000002360 preparation method Methods 0.000 abstract description 2
- 238000009412 basement excavation Methods 0.000 abstract 1
- 238000007654 immersion Methods 0.000 abstract 1
- 101150054854 POU1F1 gene Proteins 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 239000012634 fragment Substances 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
СПОСОБ ВОЗВЕДЕНИЯ ЗДАНИЯ , СООРУЖЕНИЯ, включающий разработку котлована дл подвала или подполь , погружение в грунт свай с расположением верхних их торцов выше уровн дна котлована , оголение арматуры свай путем срубки бетона, выполнение подготовки, установку арматуры растверка и его возведение, возведение стен подвала или подполь с последующим возведением стен и перекрытий, отличающийс тем, что, с целью ускорени сроков строительства, при установке арматуры растверка ее прикрепл ют к арматуре свай, после чего осуществл ют возведение стен подвала или подполь путем установки в котловане по обе стороны свай на рассто нии от них сборных элементов с креплением их к арматуре свай и растверка и расположением верхних торцов на уровне верхней поверхности растверка и заполнением пространства между сборными элементами и сва ми до уровн нижней поверхности растверка строительным материалом, а возведение растверка осуществл ют после возведени стен подвала или подполь путем бетонировани пространства между верхними част ми сборных элементов.METHOD OF CONSTRUCTION BUILDING, CONSTRUCTIONS, including the development of a pit for a basement or underground, immersion in soil of piles with the location of their upper ends above the level of the floor of the excavation, exposing reinforcement of piles by cutting the concrete, performing preparation, installing reinforcement mortar and its construction, erection of basement walls or underground with the subsequent erection of walls and floors, characterized in that, in order to speed up the construction time, when installing the reinforcement, the mortar is attached to the pile reinforcement, after which it is erected dividing basement walls or underground by installing prefabricated elements in a trench on both sides of the piles, fixing them to the reinforcement of piles and mortar and arranging the upper ends at the level of the upper surface of the mortar and filling the space between the precast elements and their edges to the level of the lower surface the mortar is a building material, and the mortar is erected after the erection of basement walls or underground by concreting the space between the upper parts of the prefabricated elements.
Description
ооoo
О)ABOUT)
00 0000 00
Изобретение относитс к строительству, а именно к способам возведени зданий, сооружений со свайным фундаментом и монолитным растверком, высоко расположенным над грунтом.The invention relates to the construction, in particular to methods for erecting buildings, structures with a pile foundation and a monolithic mortar high above the ground.
Цель изобретени - ускорение сроков строительства.The purpose of the invention is to accelerate the construction time.
На чертеже изображен фрагмент здани , сооруженный с растверком свайного фундамента и стенкой, возводимого предлагаемым способом.The drawing shows a fragment of a building constructed with a mortar of a pile foundation and a wall erected by the proposed method.
Предлагаемый способ возведени здани , сооружени включает разработку котлована 1 дл подвала или подполь , погружение в грунт свай 2 с расположением верхних из торцов 3 выше уровн дна 4 котлована 1, оголение арматуры 5 свай 2 путем срубки бетона, выполнение подготовки (не показано), установку арматуры 6 растверка 7 с креплением ее к арматуре 5 свай 2. После этого в котловане 1 по обе стороны от свай 2 на рассто нии устанавливают сборные элементы 8 с креплением их к арматуре 5 свай 2 и к арматуре 6 растверка 7 и расположением верхних торцов на уровне верхней поверхности растверка 7, затем заполн ют пространство между сборными элементами 8 и сва ми 2 до уровн нижней поверхности растверка строительным материалом 9, образу стены подвала или подполь , причем после образовани стен осуществл ют возведение растверка 7The proposed method of erecting a building includes the development of a foundation pit 1 or basement, piling 2 into the ground with the upper ends 3 above the bottom 4 of the foundation 1, exposing reinforcement 5 of piles 2 by cutting concrete, performing preparation (not shown), installing fittings 6 mortar 7 with its fastening to reinforcement 5 piles 2. After that, in the trench 1 on either side of the piles 2, prefabricated elements 8 are mounted with fastening them to the reinforcement 5 of the piles 2 and to the reinforcement 6 solution 7 and the location of the upper ends on level From the upper surface of the mortar 7, then fill the space between the precast elements 8 and its 2 to the level of the lower surface of the mortar with building material 9, forming the basement walls or underground, and after the formation of the walls, the mortar 7 is erected
путем бетонировани пространства между верхними част ми 10 сборных элементов 8, после чего осуществл ют возведение стен 11 и перекрытий 12.by concreting the space between the tops 10 of the prefabricated elements 8, after which the walls 11 and the floors 12 are erected.
Возведение здани , сооружени предлаемым способом обеспечивает сокращение сроков строительства за счет исключени работ по возведению опалубки при возведении растверка, а за счет использовани дл возведени стен подвала или подполь любого строительного материала обеспечиваетс экономи цемента.The construction of the building, the construction of the proposed method provides a reduction in construction time by eliminating work on the construction of the formwork during the construction of the mortar, and by using to build the walls of the basement or underground of any building material, cement is saved.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833614263A SU1186738A1 (en) | 1983-07-04 | 1983-07-04 | Method of erecting building or structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833614263A SU1186738A1 (en) | 1983-07-04 | 1983-07-04 | Method of erecting building or structure |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1186738A1 true SU1186738A1 (en) | 1985-10-23 |
Family
ID=21071692
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU833614263A SU1186738A1 (en) | 1983-07-04 | 1983-07-04 | Method of erecting building or structure |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1186738A1 (en) |
-
1983
- 1983-07-04 SU SU833614263A patent/SU1186738A1/en active
Non-Patent Citations (1)
Title |
---|
Линкович Л. Е. Расчет и конструирование частей гражданских зданий. - Киев: Будивельник, 1972, с. 283. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3184893A (en) | Contact foundation method | |
US4328651A (en) | Precast concrete constructions | |
US7500807B2 (en) | Method of construction using sheet piling sections | |
CN110397278A (en) | A method for synchronous construction of above-ground buildings and underground structures | |
JP3054635B2 (en) | Construction method of attached structure | |
US10829924B2 (en) | Composite wall and methods of constructing a composite wall | |
US5893254A (en) | Brick wall on piers | |
RU2131496C1 (en) | Underground structure constructed in foundation pit and method of concreting | |
SU1186738A1 (en) | Method of erecting building or structure | |
RU2136818C1 (en) | Method for building of multistory underground structure with simultaneous excavation of basin | |
JPS62288269A (en) | Method for extending underground stair of building | |
JP3122850B2 (en) | Construction method of building with basement floor with steel pipe pile foundation | |
SU868019A1 (en) | Method of erecting a structure partly submerged in soil | |
JPH04330119A (en) | Building foundation constructing method | |
RU2229557C1 (en) | Screw reinforced concrete column and building method thereof | |
JPH07138972A (en) | Construction method for underground skeleton | |
CN214657094U (en) | Combine main part formula foundation ditch slope structure | |
RU34952U1 (en) | Reinforced concrete drill string | |
JP3284009B2 (en) | Building with basement | |
JPH08291529A (en) | Basement floor construction method | |
RU2347867C2 (en) | Method of constructing foundation slabs and floor slabs of subsurface parts of buildings | |
JPS6043529A (en) | Mat foundation and its construction | |
JP2877881B2 (en) | How to build a reinforced concrete basement | |
RU1789632C (en) | Method of superstructing a building | |
SU1141164A1 (en) | Method of constructing foundation with a sleeve |