[go: up one dir, main page]

SU1186738A1 - Method of erecting building or structure - Google Patents

Method of erecting building or structure Download PDF

Info

Publication number
SU1186738A1
SU1186738A1 SU833614263A SU3614263A SU1186738A1 SU 1186738 A1 SU1186738 A1 SU 1186738A1 SU 833614263 A SU833614263 A SU 833614263A SU 3614263 A SU3614263 A SU 3614263A SU 1186738 A1 SU1186738 A1 SU 1186738A1
Authority
SU
USSR - Soviet Union
Prior art keywords
mortar
piles
reinforcement
underground
basement
Prior art date
Application number
SU833614263A
Other languages
Russian (ru)
Inventor
Татьяна Геннадьевна Пестова
Игорь Николаевич Корюкин
Александр Иванович Сазонов
Original Assignee
Pestova Tatyana G
Koryukin Igor N
Sazonov Aleksandr
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pestova Tatyana G, Koryukin Igor N, Sazonov Aleksandr filed Critical Pestova Tatyana G
Priority to SU833614263A priority Critical patent/SU1186738A1/en
Application granted granted Critical
Publication of SU1186738A1 publication Critical patent/SU1186738A1/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

СПОСОБ ВОЗВЕДЕНИЯ ЗДАНИЯ , СООРУЖЕНИЯ, включающий разработку котлована дл  подвала или подполь , погружение в грунт свай с расположением верхних их торцов выше уровн  дна котлована , оголение арматуры свай путем срубки бетона, выполнение подготовки, установку арматуры растверка и его возведение, возведение стен подвала или подполь  с последующим возведением стен и перекрытий, отличающийс  тем, что, с целью ускорени  сроков строительства, при установке арматуры растверка ее прикрепл ют к арматуре свай, после чего осуществл ют возведение стен подвала или подполь  путем установки в котловане по обе стороны свай на рассто нии от них сборных элементов с креплением их к арматуре свай и растверка и расположением верхних торцов на уровне верхней поверхности растверка и заполнением пространства между сборными элементами и сва ми до уровн  нижней поверхности растверка строительным материалом, а возведение растверка осуществл ют после возведени  стен подвала или подполь  путем бетонировани  пространства между верхними част ми сборных элементов.METHOD OF CONSTRUCTION BUILDING, CONSTRUCTIONS, including the development of a pit for a basement or underground, immersion in soil of piles with the location of their upper ends above the level of the floor of the excavation, exposing reinforcement of piles by cutting the concrete, performing preparation, installing reinforcement mortar and its construction, erection of basement walls or underground with the subsequent erection of walls and floors, characterized in that, in order to speed up the construction time, when installing the reinforcement, the mortar is attached to the pile reinforcement, after which it is erected dividing basement walls or underground by installing prefabricated elements in a trench on both sides of the piles, fixing them to the reinforcement of piles and mortar and arranging the upper ends at the level of the upper surface of the mortar and filling the space between the precast elements and their edges to the level of the lower surface the mortar is a building material, and the mortar is erected after the erection of basement walls or underground by concreting the space between the upper parts of the prefabricated elements.

Description

ооoo

О)ABOUT)

00 0000 00

Изобретение относитс  к строительству, а именно к способам возведени  зданий, сооружений со свайным фундаментом и монолитным растверком, высоко расположенным над грунтом.The invention relates to the construction, in particular to methods for erecting buildings, structures with a pile foundation and a monolithic mortar high above the ground.

Цель изобретени  - ускорение сроков строительства.The purpose of the invention is to accelerate the construction time.

На чертеже изображен фрагмент здани , сооруженный с растверком свайного фундамента и стенкой, возводимого предлагаемым способом.The drawing shows a fragment of a building constructed with a mortar of a pile foundation and a wall erected by the proposed method.

Предлагаемый способ возведени  здани , сооружени  включает разработку котлована 1 дл  подвала или подполь , погружение в грунт свай 2 с расположением верхних из торцов 3 выше уровн  дна 4 котлована 1, оголение арматуры 5 свай 2 путем срубки бетона, выполнение подготовки (не показано), установку арматуры 6 растверка 7 с креплением ее к арматуре 5 свай 2. После этого в котловане 1 по обе стороны от свай 2 на рассто нии устанавливают сборные элементы 8 с креплением их к арматуре 5 свай 2 и к арматуре 6 растверка 7 и расположением верхних торцов на уровне верхней поверхности растверка 7, затем заполн ют пространство между сборными элементами 8 и сва ми 2 до уровн  нижней поверхности растверка строительным материалом 9, образу  стены подвала или подполь , причем после образовани  стен осуществл ют возведение растверка 7The proposed method of erecting a building includes the development of a foundation pit 1 or basement, piling 2 into the ground with the upper ends 3 above the bottom 4 of the foundation 1, exposing reinforcement 5 of piles 2 by cutting concrete, performing preparation (not shown), installing fittings 6 mortar 7 with its fastening to reinforcement 5 piles 2. After that, in the trench 1 on either side of the piles 2, prefabricated elements 8 are mounted with fastening them to the reinforcement 5 of the piles 2 and to the reinforcement 6 solution 7 and the location of the upper ends on level From the upper surface of the mortar 7, then fill the space between the precast elements 8 and its 2 to the level of the lower surface of the mortar with building material 9, forming the basement walls or underground, and after the formation of the walls, the mortar 7 is erected

путем бетонировани  пространства между верхними част ми 10 сборных элементов 8, после чего осуществл ют возведение стен 11 и перекрытий 12.by concreting the space between the tops 10 of the prefabricated elements 8, after which the walls 11 and the floors 12 are erected.

Возведение здани , сооружени  предлаемым способом обеспечивает сокращение сроков строительства за счет исключени  работ по возведению опалубки при возведении растверка, а за счет использовани  дл  возведени  стен подвала или подполь  любого строительного материала обеспечиваетс  экономи  цемента.The construction of the building, the construction of the proposed method provides a reduction in construction time by eliminating work on the construction of the formwork during the construction of the mortar, and by using to build the walls of the basement or underground of any building material, cement is saved.

Claims (1)

СПОСОБ ВОЗВЕДЕНИЯ ЗДАНИЯ, СООРУЖЕНИЯ, включающий разработку котлована для подвала или подполья, погружение в грунт свай с расположением верхних их торцов выше уровня дна котлована, оголение арматуры свай путем срубки бетона, выполнение подготовки, установку арматуры растверка и его возведение, возведение стен подвала или подполья с по- следующим возведением стен и перекрытий, отличающийся тем, что, с целью ускорения сроков строительства, при установке арматуры растверка ее прикрепляют к арматуре свай, после чего осуществляют возведение стен подвала или подполья путем установки в котловане по обе стороны свай на расстоянии от них сборных элементов с креплением их к арматуре свай и растверка и расположением верхних торцов на уровне верхней поверхности растверка и заполнением пространства между сборными элементами и сваями до уровня нижней поверхности растверка строительным материалом, а возведение растверка осуществляют после возведения стен подвала или подполья путем бетонирования пространства между верхними с частями сборных элементов. ®METHOD FOR BUILDING A BUILDING, STRUCTURES, including the development of a foundation pit for a basement or underground, dipping into the soil of piles with the location of their upper ends above the level of the bottom of the pit, exposing the reinforcement of piles by cutting down concrete, preparing, installing reinforcement mortar and erecting it, building basement or underground walls with the subsequent construction of walls and ceilings, characterized in that, in order to accelerate the construction time, when installing the reinforcement, the mortar is attached to the reinforcement of the piles, after which the construction basement or underground walls by installing prefabricated elements on both sides of piles on a pit on both sides of the pits with their fastening to piles and mortar reinforcement and arranging the upper ends at the level of the upper surface of the mortar and filling the space between the prefabricated elements and piles to the level of the lower surface of the mortar with building material and rastverka erection is carried out after the erection of the walls of the basement or underground by concreting space between upper portions with prefabricated elements. ® QOQO СО QOSO QO Γ186738Γ186738
SU833614263A 1983-07-04 1983-07-04 Method of erecting building or structure SU1186738A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU833614263A SU1186738A1 (en) 1983-07-04 1983-07-04 Method of erecting building or structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU833614263A SU1186738A1 (en) 1983-07-04 1983-07-04 Method of erecting building or structure

Publications (1)

Publication Number Publication Date
SU1186738A1 true SU1186738A1 (en) 1985-10-23

Family

ID=21071692

Family Applications (1)

Application Number Title Priority Date Filing Date
SU833614263A SU1186738A1 (en) 1983-07-04 1983-07-04 Method of erecting building or structure

Country Status (1)

Country Link
SU (1) SU1186738A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Линкович Л. Е. Расчет и конструирование частей гражданских зданий. - Киев: Будивельник, 1972, с. 283. *

Similar Documents

Publication Publication Date Title
US3184893A (en) Contact foundation method
US4328651A (en) Precast concrete constructions
US7500807B2 (en) Method of construction using sheet piling sections
CN110397278A (en) A method for synchronous construction of above-ground buildings and underground structures
JP3054635B2 (en) Construction method of attached structure
US10829924B2 (en) Composite wall and methods of constructing a composite wall
US5893254A (en) Brick wall on piers
RU2131496C1 (en) Underground structure constructed in foundation pit and method of concreting
SU1186738A1 (en) Method of erecting building or structure
RU2136818C1 (en) Method for building of multistory underground structure with simultaneous excavation of basin
JPS62288269A (en) Method for extending underground stair of building
JP3122850B2 (en) Construction method of building with basement floor with steel pipe pile foundation
SU868019A1 (en) Method of erecting a structure partly submerged in soil
JPH04330119A (en) Building foundation constructing method
RU2229557C1 (en) Screw reinforced concrete column and building method thereof
JPH07138972A (en) Construction method for underground skeleton
CN214657094U (en) Combine main part formula foundation ditch slope structure
RU34952U1 (en) Reinforced concrete drill string
JP3284009B2 (en) Building with basement
JPH08291529A (en) Basement floor construction method
RU2347867C2 (en) Method of constructing foundation slabs and floor slabs of subsurface parts of buildings
JPS6043529A (en) Mat foundation and its construction
JP2877881B2 (en) How to build a reinforced concrete basement
RU1789632C (en) Method of superstructing a building
SU1141164A1 (en) Method of constructing foundation with a sleeve