SU109819A1 - Combined method of developing a powerful coal steeply dipping seam with two inclined layers - Google Patents
Combined method of developing a powerful coal steeply dipping seam with two inclined layersInfo
- Publication number
- SU109819A1 SU109819A1 SU551929A SU551929A SU109819A1 SU 109819 A1 SU109819 A1 SU 109819A1 SU 551929 A SU551929 A SU 551929A SU 551929 A SU551929 A SU 551929A SU 109819 A1 SU109819 A1 SU 109819A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- developing
- combined method
- steeply dipping
- inclined layers
- coal
- Prior art date
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Description
Способы разработки мощных угольных крутопадающих пластов двум наклонными сло ми с применением гибкого металлического перекрыти , вл ющегос средством разделени обрушенных или закладочных пород от угл нижнего сло , известны.Methods for developing heavy coal steeply dipping layers by two inclined layers using flexible metal overlap, which is a means of separating the collapsed or backfill from the coal of the lower layer, are known.
Особенностью описываемого способа разработки могпных крутопадающих пластов вл етс выемка монтажной П1,ели у вис щего бока пласта, осуп1ествл ема сдвоенным баром врубовой машины или струговым агрегатом. Высота монтажной щели равна 0,3 м: Крепление подэтажных и промежуточных штреков у вис щего бока пласта производитс специальной металлическо крепью.A special feature of the described method of developing grape-type steeply dipping seams is the recess of the mounting P1, spruce at the hanging side of the reservoir, located on the double bar of the cutting machine or plow unit. The height of the mounting gap is 0.3 m: The sublevel and intermediate drifts at the hanging side of the reservoir are fastened with a special metal support.
На фиг. 1 изображен разрез по АА на фиг. 3; на фиг. 2-разрез по ББ на фиг. I; на фиг. 3- разрез по ВВ на фиг. 1.FIG. 1 shows a section along AA in FIG. 3; in fig. 2-section along BB in FIG. I; in fig. 3 is a section along the explosive in FIG. one.
Крець / состоит из аркообразного верхн ка, одной стойки и анкерного болта 2. Укладка гибкого металлического перекрыти в монтажHoii П1,е.1и 3 производитс механизированным способом с ПОМОП1,ЬЮ специального станка 4.Kretz / consists of an arcuate top, one rack and an anchor bolt 2. The installation of a flexible metal ceiling in the installation of Hoii P1, e.1 and 3 is carried out in a mechanized way with POMOP1, U of a special machine 4.
Предмет изобретени Subject invention
Комбинированны способ разработки ,Horo угольного крутопада 0 1 ,его пласта двум наклонными сло ми, с выемкой верхнего сло у вис чего бока пласта лавой, с последую 1,им разделение. обрущенн х или закладочных пород от угл нижнего сло гибким металлическим терекрытием, отлич а ю , и и с тем, что, с целью механизации выемки верхнего монтажного сло , осу,ествл ют у вис щего бока пласта выемку сдвоенным баром врубовой мащины или струговым агрегатом монтажной щ&.ш высотой около 0,3 м с установкой 1 олуарочной крепи и последуюпхей укладкой гибкогоThe method of working out is combined, Horo coal steepness 0 1, its reservoir with two inclined layers, with a notch of the upper layer hanging from the side of the reservoir with lava, followed by 1, and their separation. The collapsed or backfilling rocks from the bottom of the bottom layer with a flexible metal terekryty, different, and with the fact that, in order to mechanize the excavation of the upper mounting layer, the core was installed at the hanging side of the reservoir u & выс height of about 0.3 m with installation of 1 luarochnoy lining and subsequent laying of flexible
переплетеперекрыти из лент с нием их в peiHCTKy. Разрез по RR 5cover with ribbons with them in peiHCTKy. RR 5 cross section
Фиг. 1 FIG. one
5U5U
Фмг. 2Fmg 2
Разрез по 8888 section
.зpEз по Bi} .zpEz on Bi}
Фиг. 3FIG. 3
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU551929A SU109819A1 (en) | 1956-04-09 | 1956-04-09 | Combined method of developing a powerful coal steeply dipping seam with two inclined layers |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU551929A SU109819A1 (en) | 1956-04-09 | 1956-04-09 | Combined method of developing a powerful coal steeply dipping seam with two inclined layers |
Publications (1)
Publication Number | Publication Date |
---|---|
SU109819A1 true SU109819A1 (en) | 1956-11-30 |
Family
ID=48382815
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU551929A SU109819A1 (en) | 1956-04-09 | 1956-04-09 | Combined method of developing a powerful coal steeply dipping seam with two inclined layers |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU109819A1 (en) |
-
1956
- 1956-04-09 SU SU551929A patent/SU109819A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU109819A1 (en) | Combined method of developing a powerful coal steeply dipping seam with two inclined layers | |
US4216998A (en) | Method of underground mining by pillar extraction | |
SU391275A1 (en) | SECTION OF MECHANIZED STRIPS | |
SU134649A1 (en) | The method of excavation of coal under a flexible metal ceiling | |
SU71696A1 (en) | The way to develop cleansing faces | |
SU612041A1 (en) | Anchor roof support grip | |
SU899953A1 (en) | Method of mining thick sloping coal beds in horizontal layers | |
SU143761A1 (en) | The system for the development of heavy coal seams with pillars in the fall | |
SU693017A1 (en) | Method of mining mineral deposits | |
SU875044A1 (en) | Method of working thick mineral deposits | |
SU114049A1 (en) | Method of mechanized development of thin gently dipping layers by long pillars for the uprising | |
SU125787A1 (en) | Method for developing thin and low-powered steeply dipping seams | |
SU1684511A1 (en) | Method for protecting seam working | |
SU95492A1 (en) | Development system of high-grade steeply dipping seams with horizontal layers | |
SU732533A1 (en) | Method for mining ore deposits | |
SU117733A1 (en) | The way to develop powerful flat and inclined falling seams | |
SU827790A1 (en) | Method of working thick gently sloping mineral deposits | |
SU520442A1 (en) | The method of extraction of very thin steeply dipping veins | |
SU640030A1 (en) | Method of opening and developing slightly inclined and inclined seams of minerals | |
SU825961A1 (en) | Method of working thick coal seams | |
SU1707200A1 (en) | Method of mining flat stratified deposits | |
SU564422A1 (en) | Method for mining thick gently sloping beds | |
SU691565A1 (en) | Method for the open mining of steep formations of minerals | |
SU114578A1 (en) | Dual bessektsionny shield with advanced protective lining for the development of powerful steeply dipping seams with jetting machines | |
SU1296720A1 (en) | Method of mining a suit of thin gas-bearing steep coal seams |