Method of protecting mine workings Download PDFInfo
- Publication number
- SU1051295A1 SU1051295A1 SU823471794A SU3471794A SU1051295A1 SU 1051295 A1 SU1051295 A1 SU 1051295A1 SU 823471794 A SU823471794 A SU 823471794A SU 3471794 A SU3471794 A SU 3471794A SU 1051295 A1 SU1051295 A1 SU 1051295A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- wells
- rows
- pairs
- lower rows
- mine
- Prior art date
Links
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
СПОСЮБ ОХРАНЫ ГОРНЫХ ВЫРАБОТОК, включающий бурение параппепьных между собой разгрузочных скважин в боках выработки по ппасту попезного ископаемого с .оставлением межскважинных цепиков, отличающийс тем, что, с цепью повышени устойчивости выработки и увеличени срока ее безремонтного поддержани , раз-. грузочные скважищз бур т параппепьными р дами и располагают их попарно в верхнем и нижнем р дах, при этом попарные . скважины верхнего и нижнего р дов располагают относительно друг друга в шахматном пор дке, а скважины в промежуточных р дах располагают по линии, дин ющей противоположные скважшш пар (Л верхнего и нижнего р дов. ел to со елTHE METHOD OF PROTECTION OF MINING DEVELOPMENTS, including the drilling of parapleptic discharge wells in the sides of the mine, along the surface of the mineral fossil with interwell drilling, with the chain of increasing the stability of mine development and extending the period of its maintenance-free development. cargo wells drilled with parappie rows and arranged in pairs in the upper and lower rows, and in pairs. the wells of the upper and lower rows are positioned relative to each other in a staggered order, and the wells in the intermediate rows are positioned along the line leading to the opposite well pairs (L of the upper and lower rows.
Description
Изобретение относитс к ixjpnoA щж мышпенносги и может быть испопьэовано ап поддержани горных выработок, преимущественно ппастопых (в том числе надрабатываемых и поарабатываемых) в сложных услови х поддержани , особенно в пучащих породах. Известен способ повышени устойчиво ти горных выработок путем бурени paisk грузочных скважин в боках выработки с оставлениектмежскважинного целика 1 . Наиболее бпизким к предлагаемому по технической сущности вл етс способ охраны горных выработок, включающий бурение параллельных между собой разгрузочных скважин в боках выработки по пласту полезного ископаемого с остав лением межскважинных целиков 2 J. Общий недостаток данных способов расположение скважин в одном р ду параллельно почве выработки, что дает эффект только в случае направлени плоскости разгрузки перпендикул рно направлению наибольших смещений, а это условие не всегда выполнимо в конкретных услови х отработки пласта полезного ископаемого, особенно при изменении направлени ведени очистных работ. Цель изобретени - повыщение устойчивости выработки и увеличение срока ее безремонтного поддержани . Поставленна цель достигаетс тем, что согласно способу охраны горных выработок , включающему бурение параллель ных между собой разгрузочных скважин в боках выработки по пласту полезного ископаемого с оставлением межскважинного целика, разгрузочные скважины бур т параллельными р дами и располага ют их попарно в верхнем и нижнем р дах при этом попарные скважины верхнего и нижнего р дов располагают относительно друг друга в шахматном пор дке, а скважины промежуточных р дах располагаю по линии, соедин ющей противоположньш скважины пар верхнего и нижнего р дов. На чертеже показан продольный разрез выработки, в боках которой находитс разгруженный скважинами пласт полез ного ископаемого. На чертеже обозначены участок 1 выработки с разгрузочными скважинами, пласт 2 полезного ископаемого, разгрузочные скважины 3, верхний р д 4 скважин , нижний р д 5 скважин, промежуточные р ды б скважин, условные линии 7, соедин ющие правые {по чертежу) скваж HI.I пар верхнего р да с левыми скважинами пар нижтего р да, такие же услоиные линии 8, соедин ющие левые скваж ны пар верхнего р да с правыми скваж нами пар нижнего р да, верхний 9 скважин, нижние пары 1О скважин. Способ реализуетс следующим обра- , зом. При обнаженном в боках выработки 1 пласте полезного ископаемого 2 размечают р ды будущих скважик и бур т скважины 3-6. Рассто ние между р дами выбирают, равным предельному значению межскважинного целика. Предельному значению межскважинного целика соответствуют такие его размеры, при которых напр жени , действующие в целике, превыс т критические, и цепик начнет разрушатьс раньще, чем массив на контуре выработки. По верхнему р ду 4 и нижнему р ду 5 бур т соответственно верхние 9 и нижние 1О пары скважин с тем же рассто нием между скважинами в паре, что и между р дами скважин. Парные скважины 10 нижнего р да смещены относительно пар скважин 9 верхнего р да в щахматном пор дке. Скважины в промежуточных р дах располагают по лини м 7 и 8, условно соедин ющим усть противоположных пар скважин верхнего и нижнего р дов . Все скважины 3-6 бур т перпендикул рно стенке выработки и параллельно между собой. При подходе очистных работ участок 1 охран емой выработки, попада в зону опорного давлени , начинает испытывать действие повышенных напр жений. . скольку величина и направление действи максимальных напр жений вне зоны и в зоне опорного давпешю. мен етс , то режим работы разгрузочных полостей будет следующий: вне зоны придостижении величины напр жений, равной рначешш, которое соответствует предельному (критическому ), в межскважинных цел1жах парных скважин начнетс разрушение. При приближении очистного забо последовательно будут подвергатьс разрушению межскважинные целики, расположенные по линии 7, наклонной в противололожную от забо сторону(условно прин то, что забой перемещаетс вдоль выработки справа налево почертежу).Их разрушению , будет также способствовать то, что ранее были разрущены межскважинные целики пар 9 и 1О. Целики по линии 7 подвергаютс действию напр жений, направленных близко к нормали рассматриваемой наклонной линии. Целики по линии 8, наклонной в сторону , посколькуThe invention relates to ixjpnoA schzh myshennosgi and can be used to support mine workings, mainly pasture (including worked and worked) in difficult conditions of support, especially in pulling rocks. There is a method of increasing the stability of mine workings by drilling paisk load wells in the sides of the mine with the remaining bore rear sight 1. The most important to the proposed technical essence is the method of protecting the mine workings, including the drilling of discharge wells parallel to each other in the sides of the mine working in the reservoir, leaving the interwell wells 2 J. The general lack of these methods is the location of the wells in one row parallel to the production soil, what gives effect only in the case of the direction of the unloading plane perpendicular to the direction of the greatest displacements, and this condition is not always feasible in specific conditions that the mineral, especially when changing the direction of extraction works. The purpose of the invention is to increase the sustainability of production and increase the duration of its maintenance-free maintenance. The goal is achieved by the fact that according to the method of protecting mine workings, including drilling parallel discharge wells in the sides of the mine, the discharge wells are drilled in parallel rows and in pairs in the upper and lower rows at the same time, the pairwise wells of the upper and lower rows are positioned relative to each other in a staggered order, and intermediate wells are positioned along the line connecting the opposite wells to p of the upper and lower rows. The drawing shows a longitudinal section of a mine, in the sides of which there is a mineral reservoir unloaded by wells. The drawing denotes a section 1 of production with relief wells, a reservoir 2 minerals, relief wells 3, an upper row of 4 wells, a lower row of 5 wells, intermediate rows of wells, conditional lines 7 connecting the right (according to the drawing) wells HI .I pairs of the upper row with the left wells of the lower row pairs, the same conditional lines 8, connecting the left wells of the upper row pairs with the right wells of the lower row pairs, the upper 9 wells, the lower pairs of 1O wells. The method is implemented as follows. When the mineral layer 2 is bare in the side of the mine, 2 marks the rows of future wells and boreholes 3-6. The distance between the rows is chosen equal to the limiting value of the interwell pillar. The limit value of the interwell pillar corresponds to such dimensions at which the stresses acting in the rear pillar exceed critical and the chain begins to collapse earlier than the array on the production contour. In the upper row 4 and the lower row 5, the upper 9 and lower 1O pairs of wells are drilled, respectively, with the same distance between the wells in the pair as between the rows of wells. The pair wells 10 of the lower row are shifted relative to the pair of wells 9 of the upper row in a shakhmatny order. The wells in the intermediate rows are arranged along lines 7 and 8, conventionally connecting the mouth of opposite pairs of wells of the upper and lower rows. All wells 3-6 are drilled perpendicular to the wall of the mine and parallel to each other. With the approach of the cleaning works, the section 1 of the protected excavation, falling into the zone of the reference pressure, begins to experience the effect of increased stresses. . How much is the magnitude and direction of the maximum stresses outside the zone and in the zone of the reference pressure? varies, the mode of operation of the discharge cavities will be the following: outside the zone of attaining the magnitude of stresses equal to the values that corresponds to the limiting (critical), fracture will begin in the interwell wells of the paired wells. When the clearing face approaches, the interwell wells of pillars along line 7, which are inclined in the opposite direction from the bottom, will be consistently destroyed (it is conditionally accepted that the bottomhole moves along the right-to-left hand drawing). pairs of pairs 9 and 1O. The lines on line 7 are subject to stresses directed close to the normal of the oblique line under consideration. Pillars on line 8, inclined to the side, because
эга пини почти совпадает с направпением MBKCHNianbiibix напр жений, будут разрушатьс незначительно. При поспедуюшем подвигании павь: направление максимальных напр жений 1Ш рассматриваемом участке выработки переходит к вертикапыюму и дапее измен етс на прот|ь вопопожное, поэтому разрушению будут поспеаоватепьно подвергатьс межсква 4 жинные цепики по пинии 8, плоскость которой теперь перпендикул рна к действию максимальных напр жений. IThis almost coincides with the direction of the MBKCHNianbiibix stresses, will be slightly destroyed. With a steady swing, pav: the direction of the maximum stresses of 1С to the considered section of the working goes to vertical and changes to the opposite direction, therefore, the intercapital chains on pine 8 will be destroyed, the plane of which is now perpendicular to maximum max. I
Таким образом, в любой период под держани выработки вне зоны и в зоне вли ни опорного давлени действующие напр жени будут близки к нормальным относительно плоскостей разгрузки (межскважннным иепикам). Так постепенно образуютс разгрузочные полости в бокахThus, at any period of maintaining the excavation outside the zone and in the zone of influence of the reference pressure, the effective voltages will be close to normal with respect to the unloading planes (interwell points). Thus, unloading cavities in the sides are gradually formed.
выработки, которые снимают повышенные напр жени вблизи нее, не допуска радрушени пород на контуре. ОспабленныЯ скважинами пласт полезного ископаемого5 при разрушении межскважинных иеликов становитс податливым за счет образовани полостей и предотвращает вспучивание пород в почве выработки, поскольку максимум действующих напр жений вбпвзвthe workings that relieve the increased stresses near it, not allowing radar rocks on the contour. A fractured hole in the minerals5 layer during fracture of the interwell wells becomes compliant due to the formation of cavities and prevents swelling of rocks in the soil of development, since the maximum of the existing stresses
10 выработки перемещаетс за разгруже ную область. При этом процесс разрушени межскважинных цепиков во времени весьма длительный, отсюда и разгрузка массива протекает более длительное10 output is moved beyond the relief area. At the same time, the process of destruction of downhole chains in time is very long, hence the discharge of the array takes a longer time.
15 врем , практически весь период воздействи повышенных напр жений -в зоне опорного давлени , поэтому процесс опускани пород кровли происходит менее интенсивно, что способствует пошшению15 time, almost the entire period of exposure to increased stresses, in the support pressure zone, therefore, the process of lowering the roof rocks occurs less intensively, which contributes to
20 устойчивости крепи.20 stability lining.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU823471794A SU1051295A1 (en) | 1982-07-20 | 1982-07-20 | Method of protecting mine workings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU823471794A SU1051295A1 (en) | 1982-07-20 | 1982-07-20 | Method of protecting mine workings |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1051295A1 true SU1051295A1 (en) | 1983-10-30 |
Family
ID=21022841
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU823471794A SU1051295A1 (en) | 1982-07-20 | 1982-07-20 | Method of protecting mine workings |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1051295A1 (en) |
-
1982
- 1982-07-20 SU SU823471794A patent/SU1051295A1/en active
Non-Patent Citations (1)
Title |
---|
1. Уголь Украины, 1975, № 1, с. 8-1О. . 2, Угопь, 1968, № 3, с. 31-34 (прототип). * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108625856A (en) | A kind of mining methods in the two neighboring one ore removal lane of stope of underground mine | |
US4458947A (en) | Mining method | |
SU1051295A1 (en) | Method of protecting mine workings | |
RU2083831C1 (en) | Method for treatment of impact-risky seams in difficult mining and geological conditions | |
RU2059810C1 (en) | Method for mining of steeply dipping mineral deposits | |
CN111594183A (en) | Coal seam deep hole blasting pressure relief method for improving blasting effect by using original pressure relief holes | |
SU1765438A1 (en) | Development working protection method | |
RU1796028C (en) | Method for reliving mine working from stresses | |
RU2134786C1 (en) | Method for saving sections of development workings | |
CN113266355B (en) | Gob-side entry driving method | |
SU1739040A1 (en) | Method for working contour compression relief | |
RU1828921C (en) | Method for working pillars in room-and-pillar mining system | |
RU2403387C1 (en) | Method for development of contiguous beds series | |
SU1643726A1 (en) | Method for tunneling mine workings under high rock pressure | |
SU1453025A1 (en) | Roof control method | |
SU1395833A1 (en) | Method of preventing the building of mine working soil | |
RU2122116C1 (en) | Method of safeguard of mine workings in beds | |
SU1726777A1 (en) | Method of protecting preliminary drift | |
RU2046948C1 (en) | Stratum main drifts protection method | |
SU1716145A1 (en) | Method of guard of development workings | |
SU1476145A1 (en) | Method of consolidating the roof of stope | |
RU2014396C1 (en) | Method for reducing adverse effect of underground workings on ground surface | |
SU1642012A1 (en) | Method of supporting a development working | |
RU94028321A (en) | Method for unloading marginal mine working and cumulative explosive charge for forming initial fractures | |
RU2068958C1 (en) | Method of formation of cutting hollow at sinking of mining workings |