[go: up one dir, main page]

SU1048237A1 - Boiler plant - Google Patents

Boiler plant Download PDF

Info

Publication number
SU1048237A1
SU1048237A1 SU823387431A SU3387431A SU1048237A1 SU 1048237 A1 SU1048237 A1 SU 1048237A1 SU 823387431 A SU823387431 A SU 823387431A SU 3387431 A SU3387431 A SU 3387431A SU 1048237 A1 SU1048237 A1 SU 1048237A1
Authority
SU
USSR - Soviet Union
Prior art keywords
boiler
economizer
control valves
reserve
drum
Prior art date
Application number
SU823387431A
Other languages
Russian (ru)
Inventor
Евгений Михайлович Марченко
Альбина Антоновна Дранченко
Булат Гарифович Тувальбаев
Алексей Яковлевич Антонов
Валерий Михайлович Марченко
Original Assignee
Всесоюзный Заочный Политехнический Институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Заочный Политехнический Институт filed Critical Всесоюзный Заочный Политехнический Институт
Priority to SU823387431A priority Critical patent/SU1048237A1/en
Application granted granted Critical
Publication of SU1048237A1 publication Critical patent/SU1048237A1/en

Links

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

КОТЕЛЬНАЯ УСТАНОВКА,содержа11 (&  работающий и резервный котлы. EfFrttJ s Vi.V.,-;rj-jiiSs. . ; n . . гг --. -ч is;,i, i-v| .,. Т ;ггг;к: А; Вй&ЛМОТБ А каждый из которых снабжен барабаном подключенным к экономайзеру, опуск1ными и подъемными трубами - к йиж-. нему коллектору, отличающа с  тем, что, с целью повышени  надежности путем снижени  термических напр жений в резервуа ном котле, входной участок экономайзера резервного котла подключен дополнительшам трубопроводе с регулирую1кей арматурой к выходнс 4у участку экономайзера работаквцего котла, подсоединенного , в свою очередь, дополнительными лини ми с регулирующей арматурой и насосом к нижне ,му коллектору резервного котла ,. - BOILER INSTALLATION, containing 11 (& working and backup boilers. EfFrttJ s Vi.V., -; rj-jiiSs.; N. .Yy - -h is;, i, iv |.,. T; yyy; k: A; Vy & LMOTB A each of which is equipped with a drum connected to an economizer, lowering pipes and lifting pipes - to a collector provided with it, in order to increase reliability by reducing thermal stresses in the reservoir nominal boiler, the input section of the economizer of the reserve boiler is connected to an additional pipeline with control valves to the outlet of the 4th section of the economizer of the boiler, In turn, additional lines with control valves and a pump to the lower collector of the reserve boiler, -

Description

Изобретение относитс  к энерге тике и может быть использовано на тепловых электрических станци х при останове части паровых котлов и переводе их в гор чий резерв. Известна .котельна  установка, содержаща  основной и вспомогательный котлы, поверхности нагрева первого из которых сообщены трубопровр дами с барабаном вспомогательного котла.| Недостатком такой котельной уста новки  вл етс  пониженна  экономичность так как дл  нагрева остановленного в резерв основного котла ис пользуетс  весь пар или вода, вы- . рабатываемые вспомогательным котлом и которые не могут быть использованы дл  основных технологических целей . Наиболее близким.к предлагаемому по техническому решению  вл етс  котельна  установка, содержаща  рабочий и резервный котлы, каждый из которых снабжен барабаном, подключенным к экономайзеру и опускными и подъемными трубами к нижнему коллектору 2 . Однако данна  установка характеризуетс  пониженной надежностью изза термических напр жений в резервном котле, обусловленной остыванием его за врем  останова и .необходимым затем, быстрым прогревом при пуске. Целью изобретени   вл етс  повыР1ение надежности котельнЬй установки путем снижени  термических напр жений в резервуарном котле. Поставленна  цель дЬстигаетс  те что в котельной установке, содержащей работающий и резервный котлы, каждай из.которых снабжен .барабаном подключенным к экономайзеру и опуск ными и подъемными трубами - к нижнему коллектору, входной участок экономайзера резервного котла подключен дополнительным трубопроводом с регулирующей арматурой к выхбдному участку экономайзера работающего котла, подсоединенного, в свою очередь, дополнительными лини ми с регулирующей арматурой и насосом к нижнему коллектору резерв ного котла. На чертеже схематично изображена предлагаема  котельна  установ ка. Котельна  установка содержит работающий и резервный котлы 1 и 2. Работающий котел 1 снабжен барабаном 3, подключенным к экономайзеру 4 /эпускными и подъемными трубами 5 ,6 - к нижнему коллектору 7.Реаервный котел 2 снабжен барабаном 8, (подключенным к экономайзеру 9,опуск ньми и подъемными трубами 10 и 11 к нижнему коллектору 12. Входной участок экономайзера 9 резервного котла 2 подключен трубопроводом 13 с регулирующей арматурой 14 к выходному участку экономайзера 4 работающего котла 1,. подсоединенного, в свою очередь, лини ми 15 - 18 с регулирующей арматурой 19 - 22 и насосом 23 If, нижнему коллектору 12 резервного котла 2. Экономайзер 4 котла 1 соединен с барабаном 3 через арматуру 24. Пароперегреватели 25 и 26 служат дл  перегрева пара соответственно в котлах 1 и 2. Котельна  установка работает следующим образом., В номинальном режиме работы котелгной установки питательную воду подают в экономайзеры 4 и 9 котлов 1 и 2, где ее подогревают. Подогретую воду направл ют в барабаны 3 и 8,куда поступает также паровод на  смесь из подъемных труб б и 11.соответственно .. Из барабанов 3 и 8 пар направл ют непосредственно потребителю или. пр едварительно в пароперегрева;Тели и 26. При переводе в гор чий резерв кот /la 2 вс  или часть гор чей воды с выхода экономайзера 4 работакицего котла 1 по трубопроводу 13 с регулирующей арматурой 14 подаетс  на вход экономайзера 9 котла 2. Гор ча  вода с выхода экономайзера 9 подводитс  к барабану 8, опускным трубам 10 и испарительным подъемным трубам 11 котла 2 и отводитс  из нижнего коллектора 12.. Насосом 23 гор ча  вода по лини м 15 и 17 с регулирующей арматурой 19 и 21 соответственно подводитс  в рассечку вод ного экономайзера 4 котла 1. При этом через ступени экономайзера 4, расположенные по ходу воды после подсоединени  линии 17, проходит повышенный расход воды, что способствует уменьшению паросодержани  на выходе из экономайзера и, следовательно , повышению его надежности, а также дополнительному съему в указанных.ступен х.тепла и.соответствующему уменьшению потерь с.уход щими дымовыми-газами. Такой режим эксплуатации особенно целесообразен при пониженной нагрузке работающего котла 1, котора  имеет место при прохождении тепловой электростанцией минимума электрической на-г грузки. Во врем  эксплуатации работающего котла при номинальной нагрузке насосом 23 гор ча  вода по лини м 15 и .16 и регулирующей арматурой 19 и 20 соответственно подводитс  к барабану 3 котла 1.. При этом расход абочей срелы через любую поверхность отла 1 сохран етс  при заданной паопрриэврдительности котла. 1 и не змен етс  при подсоединении (илиThe invention relates to power engineering and can be used in thermal power plants when stopping part of steam boilers and transferring them to a hot reserve. A well-known boiler plant contains the main and auxiliary boilers, the heating surfaces of the first of which are communicated by conduits to the drum of the auxiliary boiler. | The disadvantage of such a boiler plant is its reduced efficiency, since all the steam or water used for heating the main boiler stopped in the reserve is exhausted. operated by an auxiliary boiler and which cannot be used for basic technological purposes. The closest to the proposed technical solution is a boiler plant, containing working and reserve boilers, each of which is equipped with a drum connected to an economizer and a stand-by and lifting pipes to the lower manifold 2. However, this installation is characterized by reduced reliability due to thermal stresses in the reserve boiler, due to its cooling during the shutdown time and then necessary, by rapid heating during start-up. The aim of the invention is to improve the reliability of the boiler plant by reducing the thermal stresses in the tank boiler. The goal is achieved in those in the boiler plant containing operating and reserve boilers, each of which is equipped with a drum connected to the economizer and lowering and lifting pipes to the lower collector, the input section of the economizer of the reserve boiler is connected by an additional pipeline with control valves to the outlet section an economizer of a working boiler, connected in turn by additional lines with control valves and a pump to the lower collector of the reserve boiler. The drawing shows schematically the proposed boiler installation. The boiler plant contains operating and reserve boilers 1 and 2. Working boiler 1 is equipped with a drum 3 connected to economizer 4 / ejector and lifting pipes 5, 6 - to the lower manifold 7. Reserv boiler 2 is equipped with drum 8 (connected to economizer 9, lowering Nmi and lifting pipes 10 and 11 to the lower manifold 12. The inlet section of economizer 9 of backup boiler 2 is connected by pipeline 13 with regulating valves 14 to the outlet section of economizer 4 of operating boiler 1, connected in turn by lines 15-18 with regulating valves. matra 19 - 22 and pump If If, lower collector 12 of the backup boiler 2. Economizer 4 of boiler 1 is connected to drum 3 via valve 24. Superheaters 25 and 26 serve to superheat steam in boilers 1 and 2, respectively. The boiler plant operates as follows., In the nominal mode of operation of the boiler plant, feedwater is fed to economizers 4 and 9. Boilers 1 and 2 are heated, and heated water is directed to drums 3 and 8, where the steam line also enters the mixture of lifting pipes B and 11. Accordingly. drums 3 and 8 pairs are sent directly dstvenno or consumer. Teli and 26. When transferring a cat / la 2 to a hot reserve, all or part of the hot water from the economizer 4 outlet of the operating boiler 1 through conduit 13 with control valves 14 is fed to the economizer 9 of the boiler 2. 2. Hot water from the outlet of the economizer 9 is supplied to the drum 8, standpipe pipes 10 and evaporative lifting pipes 11 of the boiler 2 and discharged from the lower manifold 12. By pumping 23 hot water through lines 15 and 17 with regulating valves 19 and 21 respectively economizer 4 boiler 1. At the same time cutting the economizer stage 4, located along the water flow after connecting the line 17, passes an increased water consumption, which contributes to a reduction in the steam content at the outlet from the economizer and, consequently, to increase its reliability, as well as to an additional removal in these steps of heat. losses by flue gases. Such a mode of operation is especially useful at a reduced load of the operating boiler 1, which occurs when a thermal power plant passes a minimum of electrical over-load. During operation of the operating boiler at rated load, pump 23 hot water through lines 15 and .16 and regulating valves 19 and 20, respectively, is supplied to drum 3 of boiler 1. the boiler. 1 and does not change when connected (or

отсоединении) открытием, арматуры 14 19 и 20 к котлу 1 котла .,disconnecting) by opening, fittings 14 19 and 20 to boiler 1 of the boiler.,

В случае низкой температуры питательной воды перед экономайзером 4, например при низких нагрузках турбогенератора с отключением системы регенеративного подогрева воды высокого давлени , всю или часть гор чей воды насосом 23 по лини м 15,17 и 18 подают на вход экономайзера 4, что способствует повышению надежности эксплуатации экономайзера 4, а таТ:же уменьшёнию коррозии и загр знени  конвективных поверхностей котла 1..In case of low feedwater temperature before the economizer 4, for example, at low loads of the turbogenerator with disconnection of the system of regenerative heating of high pressure water, all or part of the hot water is supplied to the economizer 4 with a pump 23 through lines 15,17 and 18, which increases reliability economizer operation 4, and the same: reduction of corrosion and contamination of the convective surfaces of the boiler 1 ..

При охлаждении-металла пароперегревател  26 до температуры насыщени  при давлении в котле 2 через него можно пропускать пар, отделившийс  от воды в барабане 8, в случае если за экономайзером 9 образуетс  паровод на  смесь. Пар в барабане 8 может также образовыватьс  при некотором снижении давлени  в котле 2,. .When the metal-superheater 26 is cooled to saturation temperature under pressure in the boiler 2, steam can be passed through it, separated from the water in the drum 8, if there is a steam supply to the mixture behind economizer 9. Steam in drum 8 may also be formed with some decrease in pressure in boiler 2 ,. .

1one

Такое устройство котельной установки позвол ет поддерживать резервный котел в течение всего времени останова в гор чем состо нии, что снижает в нем термические напр жени  в пусковых режимах и тем самым, повышает надежность котельной установки .Such a device of a boiler plant allows the standby boiler to be maintained during the entire stopping time in a hot condition, which reduces the thermal stresses in it in start-up modes and thereby increases the reliability of the boiler plant.

Claims (1)

КОТЕЛЬНАЯ УСТАНОВКА,содержащая работающий и резервный котлы, каждый из которых снабжен барабаном, подключенным к экономайзеру, опуσκι ными и подъемными трубами — к ниж~.A BOILER PLANT containing operating and standby boilers, each of which is equipped with a drum connected to an economizer, and lowered and riser pipes to the bottom ~. нему коллектору, отличающаяся тем, что, с целью повышения надежности путем снижения термических напряжений в резервуарном котле, входной участок экономайзера резервного котла подключен дополнительным трубопроводе»» с регулирующей арматурой к выходному участку экономайзера работающего котла, подсоединенного, в свою очередь, дополнительными ‘ линиями с регулирующей арматурой и насосом к нижнему коллектору резервного кот- Q ла. $to the collector, characterized in that, in order to increase reliability by reducing thermal stresses in the tank boiler, the input section of the economizer of the backup boiler is connected with an additional pipeline "" with control valves to the output section of the economizer of the working boiler, which is connected, in turn, with additional lines with control valves and pump to the lower collector of the backup boiler - Q la. $
SU823387431A 1982-01-20 1982-01-20 Boiler plant SU1048237A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823387431A SU1048237A1 (en) 1982-01-20 1982-01-20 Boiler plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823387431A SU1048237A1 (en) 1982-01-20 1982-01-20 Boiler plant

Publications (1)

Publication Number Publication Date
SU1048237A1 true SU1048237A1 (en) 1983-10-15

Family

ID=20994293

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823387431A SU1048237A1 (en) 1982-01-20 1982-01-20 Boiler plant

Country Status (1)

Country Link
SU (1) SU1048237A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3415816B1 (en) 2017-05-10 2020-10-28 Valmet Technologies Oy A method and a system for extending the load range of a power plant comprising a boiler supplying steam to a steam turbine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1.Авторское свидетельство СССР 687310 кл. F 22 В 1/18, 1971. 2. Лукиицкий В.В.Тепловые электрические станции проквлаленных предпри -. тий. М.-Л.-, Тосэнергонздат, 1953, с. 214, фиг. 11-3. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3415816B1 (en) 2017-05-10 2020-10-28 Valmet Technologies Oy A method and a system for extending the load range of a power plant comprising a boiler supplying steam to a steam turbine

Similar Documents

Publication Publication Date Title
EP0281151B1 (en) Waste heat recovery system
RU2152527C1 (en) Method of operation of gas-and-steam turbine plant and plant operating according to this method
JP4191894B2 (en) Method of operating gas / steam combined turbine facility and gas / steam combined turbine facility for implementing the method
EP0615061A1 (en) Combined cycle power plant and method of operating it
US10167743B2 (en) Method for controlling a steam generator and control circuit for a steam generator
JPS6239648B2 (en)
US4402183A (en) Sliding pressure flash tank
RU2107826C1 (en) Steam-gas plant with deaerator-evaporator
JPS6214047B2 (en)
SU1048237A1 (en) Boiler plant
US4336105A (en) Nuclear power plant steam system
CN212157107U (en) Take heat supply function's once-through boiler to start hydrophobic waste heat utilization equipment
JPH05248604A (en) Waste heat recovery boiler
RU2144994C1 (en) Combined-cycle plant
JP3222035B2 (en) Double pressure type waste heat recovery boiler feeder
JPH11148603A (en) Controller for coal/residual oil gassifying combined power generation plant
JPS6124906A (en) Steam generator
JP2971629B2 (en) Waste heat recovery boiler
RU1815343C (en) Method of generation of additional power at power-and-heat supply plant with network heaters
SU1449760A1 (en) Boiler plant
JP3068972B2 (en) Combined cycle power plant
SU1333952A1 (en) Method of preventing break-down of feed of power-generating unit
SU390301A1 (en) SYSTEM OF STARTING AND RESETTING THE LOAD OF THE BOILER BLOCK — TURBINE
SU1719770A1 (en) Two-circuit plant
CN119933821A (en) A high-parameter industrial steam supply system suitable for large coal-fired units