[go: up one dir, main page]

SU1025888A1 - Method of preventing sudden short-duration shifting of structures built above an excavatied space - Google Patents

Method of preventing sudden short-duration shifting of structures built above an excavatied space Download PDF

Info

Publication number
SU1025888A1
SU1025888A1 SU813262893A SU3262893A SU1025888A1 SU 1025888 A1 SU1025888 A1 SU 1025888A1 SU 813262893 A SU813262893 A SU 813262893A SU 3262893 A SU3262893 A SU 3262893A SU 1025888 A1 SU1025888 A1 SU 1025888A1
Authority
SU
USSR - Soviet Union
Prior art keywords
wells
hard
space
roof
drilled
Prior art date
Application number
SU813262893A
Other languages
Russian (ru)
Inventor
Сергей Аркадьевич Медянцев
Original Assignee
Украинский Филиал Всесоюзного Научно-Исследовательского Института Горной Геомеханики И Маркшейдерского Дела
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Украинский Филиал Всесоюзного Научно-Исследовательского Института Горной Геомеханики И Маркшейдерского Дела filed Critical Украинский Филиал Всесоюзного Научно-Исследовательского Института Горной Геомеханики И Маркшейдерского Дела
Priority to SU813262893A priority Critical patent/SU1025888A1/en
Application granted granted Critical
Publication of SU1025888A1 publication Critical patent/SU1025888A1/en

Links

Landscapes

  • Earth Drilling (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

1.СПОСОБ ПРЕДОТВРАЩЕНИЯ ВНЕЗАПНОГО КРАТКОВРЕМЕННОГО СДВИЖЕНИЯ ОСНОВАНИЙ СООРУЖЕНИЙ, СТРОЯЩИХСЯ НАД ВЫРАБОТАННЫМ ПРОСТРАНСТЮМ путем предварительного обрушени  труднообрушаемой кровли, включающий буренке врубовых скважин и скважин основного зар да с поверхности в труднообрушаёмый слой кровли над вы-. работкой, размещение в них зар дов ВВ и взрывание последних, отличающийс  тем, что, с целью повышени  эффективности предотвращени  внезапного кратковременного сдвижени  оснований сооружений, стро щихс  над выработанным пространством , взрывные скважины бур т в зоны сжимающих горизонтальных напр женийЕ труднообрушаемого сло  кровли, при этом врубовые скважины бур т по периметру выработки, а скважины основного зар да бур т вдоль ее длинной стороны в середине выработанного пространства. 2. Способ ПОП.1, отличающий с   тем, что врубовые скважины бур т с недобуром до выработайного пространства , равным 0,2 (Л 0,3 мощности труднообрушаемого сло  кровли, а скважины основного зар да .бур т с недобуром до выработанного Iпространства, равным 0,7-0,8 мощности труднообрушаемого сло  кровли.1.SPOSOB prevent sudden short-term MOVEMENT OF BASE CONSTRUCTIONS being built over the open PROSTRANSTYUM by pre trudnoobrushaemoy roof collapse, rock drill comprising Burenko wells and the base charge from the surface layer trudnoobrushaomy You are a roof above. processing, placing explosives in them and blasting the latter, characterized in that, in order to increase the effectiveness of preventing sudden short-term displacement of the foundations of structures built over the developed space, the explosive wells are drilled into the zones of compressive horizontal stresses of the hard-wearing roofing layer, Mud holes are drilled around the perimeter of the mine, and the main charge wells are drilled along its long side in the middle of the worked out space. 2. Method POP.1, characterized in that the drilling wells drill with a shortage of up to a working space equal to 0.2 (L 0.3 thickness of a hard-to-break roofing layer, and the main charge wells with a drill to the developed I space, equal to 0.7-0.8 power hard-to-break layer of the roof.

Description

о сдabout sd

00 00 00 Изобретение относитс  к горному делу и предназначено дл  предотвращ ни  внезапного кратковременного сдвижени  оснований сооружений, стр  щихс  на подработанной территории. Известен способ предотвращени  внезапного кратковременного сдвижени  оснований сооружений, стро щи} (с  над выработанным пространством путем предварительного обрушени труднообрушаемой kpoвли,включающий бурение врубовых скважин и скважин jacHOBHoro зар да с поверхности в тр нообрушаемый слой кровли над вырабо кой, размещение в них зар дов ВВ и взрьгаание последних ,tlJ|. Однако данный способ недостаточно эффективен. Цель изобретени  - повышение эффективности предотвращени  внезапно кратковременного сдвижени  основаНИИ сооружейий, стро щихс  на подработанной территории. Поставленна  цель достигаетс  те что в известном способе предотвращени  внезапног-о кратковременного сдвижени  оснований сооружений, стро щихс  над выработанным пространством путем предварительного обрушени  труднообрушаемой кровли, включающем бурение врубовьЬс скважин и скважин основного зар да с по верхности в труднообрушаёмый слой кровли над выработкой, размещение в них зар дов ВВ и взрывание послед них, взрывные скважины бур т в зоны сжимак цих горизонтальных напр жений труднообрушаемого сло  кровли, при этом врубовые скважины бур т, по периметру выработки, а скважины основ ного зар да бур т вдоль ее длинной стороны в середине выработанного пространства. Врубовые скважины бур т с .недобу ром до выработанного пространства, равным 0,2-0,3 мощности труднообруги емого сло  кровли, а скважины основ ного зар да бур т с недобуром до вы работанного пространства, равнь& 0,7-0,8 мощности труднообрушаемого сло  кровли. Способ осуществл етс  следующим образом. Взрывные врубовые скважины бур т по периметру выработки с недобуром до выработанного пространства 0,2-0,3 мощности труднообрушаемого сло  кровли, т.е. в зону возникновени  горизонтальных сжимающих напр жений . Максимальные сжимающие горизонтальные напр жени  возникают в середине пролета труднообрушаемого сло  в верхней его части, поэтому скважины основного .зар да бур т в . середине .короткого пролета кровли с интервалом 5-8 м и располагают в виде , ориенти|рованного в направлении большего размера выработки . Забои скважин основного зар да располагают на рассто нии 07-08 мощности труднообрушаемого сло  от выработанного пространства, т.е. в зоне возникновени  максимальных сжимающих горизонтальных напр жений. В начале производ т взрыв зар дов во врубовых скважинах о Взрыв . этих зар дов производитс  одновременно, поэтому в направлений, перпендикул рном -к линии между зар дами, будут действовать увеличенные, по сравнению с одиночным взрыванием,,, раст гивающие напр жени , что вызовет усиленное действие взрыва и образование у нижней поверхности труднообрушаемого сло  сплошной врубовой полости , расположенной по периметру выработки . С помощью врубовых полост тей достигаютс  следующие результаты: устран ютс  опорные реакции (силы горизонтального распора) со стороны массива, создаетс  возможность дл  поворота нижней части сло  в сторону массива и дальнейшего развити  вертикальныэ{ трещин в пород- / ном мосте. Затем с коротким замедлением вьзполи юТ взрыв основных зар дов. Данный способ позвол ет значите.льно повысить эффективность предотвр.ащени  внезапного кратковременного сдвижени  оснований сооружений стро щихс  над выработанным пространством .00 00 00 The invention relates to mining and is intended to prevent a sudden short-term displacement of the foundations of structures located in the undermined area. There is a method of preventing sudden short-term displacement of building bases, building} (with over the developed space by preliminary collapse of a hard-to-crush layer, including drilling of cutting wells and jacHOBHoro wells from the surface into a fractured roof layer above the development, placing explosives and explosive charges vzryganiya last, tlJ |. However, this method is not sufficiently effective. The purpose of the invention is to increase the effectiveness of preventing a sudden short-term displacement of the foundation of structures The aim is to achieve that in the known method of preventing sudden-on short-term displacement of the foundations of structures built above the developed space by pre-breaking the hard-to-collapse roof, including drilling the main well and the well of the main charge from the surface to the hard-to-break roof layer explosives, the placement of explosive charges and the blasting of the latter, the explosive wells are drilled into zones of compression of horizontal stresses on the roof, wherein the coal-cutting wells drilled around the perimeter generation, and well bases Nogo charge drilled along its long side to the middle of the gob. Mud holes are drilled with a boom to an open space of 0.2-0.3 times the power of a hard-to-breakable roofing layer, and the main charge wells are drilled with a drill to the mastered space, equals & 0.7-0.8 power hard-to-break layer of the roof. The method is carried out as follows. Blast hole wells drill around the perimeter of production with a shortage of up to the open space of 0.2–0.3 thickness of the hard-to-break roofing layer, i.e. to the zone of occurrence of horizontal compressive stresses. Maximum compressive horizontal stresses occur in the middle of the span of a hard-to-break layer in the upper part of it, therefore, the main charge is drilled in. The middle of the short span of the roof with an interval of 5-8 m and is placed in the form oriented towards the larger size of the excavation. The bottom holes of the main charge wells are located at a distance of 07-08 of the thickness of the hard-to-break layer from the developed space, i.e. in the zone of occurrence of maximum compressive horizontal stresses. At the beginning of the explosion of charges in the dry holes of the explosion. these charges are produced simultaneously, therefore, in directions perpendicular to the line between the charges, there will be increased, as compared with a single blasting ,,, tensile stress, which will cause an increased effect of the explosion and the formation of a solid cut stone at the bottom surface of the hard-to-break cavity located on the perimeter of production. The following results are achieved with the help of the cut-in holes: the support reactions (horizontal expansion forces) from the side of the massif are eliminated, it is possible to rotate the lower part of the layer to the side of the massif and further develop vertical cracks in the rock bridge. Then, with a short deceleration, the explosion of the main charges. This method makes it possible to significantly increase the effectiveness of preventing the sudden short-term displacement of the foundations of structures built above the developed space.

Claims (2)

1.Способ предотвращения1.Prevention - ВНЕЗАПНОГО КРАТКОВРЕМЕННОГО СДВИЖЕНИЯ ОСНОВАНИЙ СООРУЖЕНИЙ, СТРОЯЩИХСЯ НАД ВЫРАБОТАННЫМ ПРОСТРАНСТВОМ путем предварительного обрушения труднообрушаемой кровли, включающий бурение врубовых скважин и скважин основного заряда с поверхности в труднообрушаёмый слой кровли над вы-, работкой, размещение в них зарядов - A SUDDEN SHORT-TERM MOVEMENT OF THE BASES OF THE STRUCTURES BUILDING OVER THE DEVELOPED SPACE by preliminary collapse of the hard-to-collapse roof, including drilling of log holes and wells of the main charge from the surface into the hard-to-break roof layer, above them, the charge above ВВ и взрывание последних, отличающийся тем, что, с целью повышения эффективности предотвращения внезапного кратковременного сдвижения оснований сооружений, строящихся над выработанным пространством, взрывные скважины бурят в зоны сжимающих горизонтальных напряжений труднообрушаемого слоя кровли, при этом врубовые скважины бурят по периметру выработки, а скважины основного заряда бурят вдоль ее длинной стороны в середине выработанного пространства.Explosives and explosives of the latter, characterized in that, in order to increase the effectiveness of preventing sudden short-term movement of the foundations of structures under construction over the worked-out space, blast holes are drilled into the zones of compressive horizontal stresses of the hard-to-collapse layer of the roof, while the cut holes are drilled along the perimeter of the output, and the wells of the main charge drilled along its long side in the middle of the developed space. 2. Способ по п.1, отличающий с я тем, что врубовые скважины бурят с недобуром до выработанного пространства , равным 0,20,3 мощности труднообрушаемого слоя кровли, а скважины основного заряда бурят с недобуром до выработанного ίпространства, равным 0,7-0,8 мощности труднообрушаемого слоя кровли.2. The method according to claim 1, characterized in that the cut holes are drilled with a hole to the worked out space equal to 0.20.3 of the power of the hard-to-collapse layer of the roof, and the wells of the main charge are drilled with a hole to the worked out space 0,7 0.7- 0.8 power of the hard-to-break roof layer. SU ,.„102SU,. „102 Си □О □о □о >C □ O □ o □ o>
SU813262893A 1981-03-16 1981-03-16 Method of preventing sudden short-duration shifting of structures built above an excavatied space SU1025888A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813262893A SU1025888A1 (en) 1981-03-16 1981-03-16 Method of preventing sudden short-duration shifting of structures built above an excavatied space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813262893A SU1025888A1 (en) 1981-03-16 1981-03-16 Method of preventing sudden short-duration shifting of structures built above an excavatied space

Publications (1)

Publication Number Publication Date
SU1025888A1 true SU1025888A1 (en) 1983-06-30

Family

ID=20948575

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813262893A SU1025888A1 (en) 1981-03-16 1981-03-16 Method of preventing sudden short-duration shifting of structures built above an excavatied space

Country Status (1)

Country Link
SU (1) SU1025888A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Мартынов А.Ф. и др. Нетиповые взрывные работы в угольных шахтах. М., Недра, 1969, с. 28 (прототип). *

Similar Documents

Publication Publication Date Title
US4135450A (en) Method of underground mining
SU1025888A1 (en) Method of preventing sudden short-duration shifting of structures built above an excavatied space
SU1555422A1 (en) Method of constructing water outlet tunnel
SU1263868A1 (en) Method of controlling the strained state of rock about mine working
SU1490285A1 (en) Method of producing counter-seepage curtain inwertical mine working
RU2154254C1 (en) Method for drilling and blasting operations in open cuts
SU1364726A1 (en) Method of mining gently-sloping ore deposits
SU629347A1 (en) Mine working roof support
SU1643726A1 (en) Method for tunneling mine workings under high rock pressure
SU1585538A1 (en) Method of controlling gas emission in excavation of protective undermined bed
SU1372045A1 (en) Method of recovering materials from thick underground formations
SU1048118A1 (en) Method of excavating a pillar
SU1634784A1 (en) Method for sealing off mine workings
SU817253A1 (en) Method of driving a mine working
RU2203419C2 (en) Process of underground development of thick ore deposits
SU1265338A1 (en) Method of mining ore deposits
SU730965A1 (en) Method of breaking-out blowout-hazardous rock
RU1770571C (en) Method for making raise mine working
SU1125373A1 (en) Method of mining unstable ores
SU1747705A1 (en) Method of erection of underground structure
SU1435799A1 (en) Method of damping shock waves in mine working
SU1469161A1 (en) Method of supporting a mine working
RU1802140C (en) Method for driving raises
SU1666725A1 (en) Method for construction of protective wall made of ore blocks
SU898080A1 (en) Mine shaft sinking method