Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from SE0103637Aexternal-prioritypatent/SE0103637D0/en
Application filed by Tim FagrellfiledCriticalTim Fagrell
Priority to SE0203085ApriorityCriticalpatent/SE0203085D0/en
Publication of SE0203085D0publicationCriticalpatent/SE0203085D0/en
Priority to SE0302713Aprioritypatent/SE0302713D0/en
SE0203085A2001-11-012002-10-21
Process for the manufacture or manufacture of environmentally and energy-adapted plants for variable size areas
SE0203085D0
(en)