SA519410032B1 - نظم وطرق لتصميم وسيلة تحكم في تدفق داخلي مؤتمتة - Google Patents
نظم وطرق لتصميم وسيلة تحكم في تدفق داخلي مؤتمتةInfo
- Publication number
- SA519410032B1 SA519410032B1 SA519410032A SA519410032A SA519410032B1 SA 519410032 B1 SA519410032 B1 SA 519410032B1 SA 519410032 A SA519410032 A SA 519410032A SA 519410032 A SA519410032 A SA 519410032A SA 519410032 B1 SA519410032 B1 SA 519410032B1
- Authority
- SA
- Saudi Arabia
- Prior art keywords
- control device
- inflow control
- device designs
- data
- designing
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 4
- 230000015572 biosynthetic process Effects 0.000 abstract 1
- 238000005553 drilling Methods 0.000 abstract 1
- 238000005755 formation reaction Methods 0.000 abstract 1
- 229930195733 hydrocarbon Natural products 0.000 abstract 1
- 150000002430 hydrocarbons Chemical class 0.000 abstract 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/17—Mechanical parametric or variational design
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
- E21B47/07—Temperature
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/02—Down-hole chokes or valves for variably regulating fluid flow
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geometry (AREA)
- Geophysics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Feedback Control In General (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
يتعلق بنماذج لتوفير نظام وطريقة لتصميم وسائل تحكم في تدفق automated inflow control devices داخلي مؤتمتة لاستخدامها في استخراج هيدروكربونات hydrocarbons من تكوينات تحت أرضية. وفقاً للنموذج يشتمل النظام على وحدة نمطية لمعالجة بيانات data processing module في زمن حقيقي مهيأة لجمع ومعالجة بيانات بئر process well data ، وبيانات البئر تشمل بيانات تسجيل أثناء حفر وبيانات مدخلة بمستخدم، ووحدة نمطية لتقييد حقل ذكية intelligent field restriction module تولد تصميم وسيلة تحكم في تدفق داخلي أنسب ما يكون واحد أو أكثر بالاعتماد على بيانات البئر المجمعة والمعالجة بواسطة الوحدة النمطية لمعالجة بئر في الزمن الحقيقي. يشتمل النظام أيضاً على وحدة نمطية لوسيلة تحكم في تدفق داخلي مهيأة لإقران واحد أو أكثر من تصميمات وسيلة التحكم في تدفق داخلي أنسب ما يكون من الوحدة النمطية لتقييد حقل الذكية مع سيناريو واحد أو أكثر لإنشاء مجموعة من تصميمات وسيلة تحكم في تدفق داخلي أنسب ما يكون مرتبة، يختار من بينها مستخدم تصميم وسيلة تحكم في تدفق inflow control device designs داخلي أنسب ما يكون مفضل بالاعتماد على أهداف جعل
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US15/471,498 US10891407B2 (en) | 2017-03-28 | 2017-03-28 | System and method for automated-inflow control device design |
PCT/US2018/022391 WO2018182975A1 (en) | 2017-03-28 | 2018-03-14 | Systems and methods for automated–inflow control device design |
Publications (1)
Publication Number | Publication Date |
---|---|
SA519410032B1 true SA519410032B1 (ar) | 2024-11-06 |
Family
ID=61837869
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SA519410032A SA519410032B1 (ar) | 2017-03-28 | 2019-09-03 | نظم وطرق لتصميم وسيلة تحكم في تدفق داخلي مؤتمتة |
Country Status (5)
Country | Link |
---|---|
US (1) | US10891407B2 (ar) |
EP (1) | EP3601723A1 (ar) |
CN (1) | CN110475942B (ar) |
SA (1) | SA519410032B1 (ar) |
WO (1) | WO2018182975A1 (ar) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019152912A1 (en) * | 2018-02-02 | 2019-08-08 | Schlumberger Technology Corporation | Method for obtaining unique constraints to adjust flow control in a wellbore |
US11499423B2 (en) | 2019-05-16 | 2022-11-15 | Saudi Arabian Oil Company | Automated production optimization technique for smart well completions using real-time nodal analysis including comingled production calibration |
US11441395B2 (en) | 2019-05-16 | 2022-09-13 | Saudi Arabian Oil Company | Automated production optimization technique for smart well completions using real-time nodal analysis including real-time modeling |
US11326423B2 (en) * | 2019-05-16 | 2022-05-10 | Saudi Arabian Oil Company | Automated production optimization technique for smart well completions using real-time nodal analysis including recommending changes to downhole settings |
US12260158B2 (en) * | 2019-06-03 | 2025-03-25 | Schlumberger Technology Corporation | Flow control device openings for completion design |
US11821289B2 (en) | 2019-11-18 | 2023-11-21 | Saudi Arabian Oil Company | Automated production optimization technique for smart well completions using real-time nodal analysis |
US20220235628A1 (en) * | 2021-01-28 | 2022-07-28 | Saudi Arabian Oil Company | Controlling fluid flow through a wellbore tubular |
US11708732B2 (en) | 2021-04-09 | 2023-07-25 | Kyle Collins | Drilling fluid flowback tracking system and method |
US12164270B2 (en) | 2021-10-19 | 2024-12-10 | International Business Machines Corporation | Process optimization with joint-level inflow model |
Family Cites Families (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020177955A1 (en) | 2000-09-28 | 2002-11-28 | Younes Jalali | Completions architecture |
US20020049575A1 (en) | 2000-09-28 | 2002-04-25 | Younes Jalali | Well planning and design |
NO313895B1 (no) | 2001-05-08 | 2002-12-16 | Freyer Rune | Anordning og fremgangsmÕte for begrensning av innströmning av formasjonsvann i en brönn |
CN101233527B (zh) | 2005-07-27 | 2012-07-04 | 埃克森美孚上游研究公司 | 与从地下岩层抽取碳氢化合物相关的井建模 |
MX2007016595A (es) | 2005-07-27 | 2008-03-04 | Exxonmobil Upstream Res Co | Modelaje de pozo asociado con extraccion de hidrocarburos a partir de yacimientos subterraneos. |
MX2007016574A (es) | 2005-07-27 | 2008-03-04 | Exxonmobil Upstream Res Co | Modelaje de pozo asociado con extraccion de hidrocarburos a partir de yacimientos subterraneos. |
WO2008004875A1 (en) | 2006-07-07 | 2008-01-10 | Norsk Hydro Asa | Method for flow control and autonomous valve or flow control device |
US20080041588A1 (en) | 2006-08-21 | 2008-02-21 | Richards William M | Inflow Control Device with Fluid Loss and Gas Production Controls |
US8025072B2 (en) | 2006-12-21 | 2011-09-27 | Schlumberger Technology Corporation | Developing a flow control system for a well |
WO2009139949A1 (en) | 2008-05-13 | 2009-11-19 | Exxonmobil Upstream Research Company | Modeling of hydrocarbon reservoirs using design of experiments methods |
US8260595B2 (en) | 2008-09-02 | 2012-09-04 | Schlumberger Technology Corporation | Intelligent completion design for a reservoir |
US20120278053A1 (en) | 2011-04-28 | 2012-11-01 | Baker Hughes Incorporated | Method of Providing Flow Control Devices for a Production Wellbore |
US10450860B2 (en) * | 2011-11-01 | 2019-10-22 | Schlumberger Technology Corporation | Integrating reservoir modeling with modeling a perturbation |
US9341060B2 (en) | 2012-11-14 | 2016-05-17 | Kuwait Oil Company | Method and system for permeability calculation using production logs for horizontal wells |
US9341557B2 (en) | 2012-11-14 | 2016-05-17 | Kuwait Oil Company (K.S.C.) | Method and system for permeability calculation using production logs for horizontal wells, using a downhole tool |
US9816353B2 (en) * | 2013-03-14 | 2017-11-14 | Schlumberger Technology Corporation | Method of optimization of flow control valves and inflow control devices in a single well or a group of wells |
US9611709B2 (en) | 2013-06-26 | 2017-04-04 | Baker Hughes Incorporated | Closed loop deployment of a work string including a composite plug in a wellbore |
CA2930235C (en) | 2013-11-15 | 2018-09-04 | Landmark Graphics Corporation | Optimizing flow control device properties on a producer well in coupled injector-producer liquid flooding systems |
GB2528384A (en) * | 2014-06-24 | 2016-01-20 | Logined Bv | Completion design based on logging while drilling (LWD) data |
CA2990838C (en) | 2015-07-31 | 2020-07-07 | Landmark Graphics Corporation | System and method to reduce fluid production from a well |
CN105422050B (zh) * | 2015-12-11 | 2017-11-28 | 北京大业嘉成科技有限公司 | 井下自主供电含油饱和度控制智能控流采油管 |
US10109122B2 (en) * | 2016-04-22 | 2018-10-23 | Hitachi, Ltd. | System for maintenance recommendation based on maintenance effectiveness estimation |
-
2017
- 2017-03-28 US US15/471,498 patent/US10891407B2/en active Active
-
2018
- 2018-03-14 WO PCT/US2018/022391 patent/WO2018182975A1/en unknown
- 2018-03-14 CN CN201880022326.0A patent/CN110475942B/zh not_active Expired - Fee Related
- 2018-03-14 EP EP18714941.4A patent/EP3601723A1/en not_active Withdrawn
-
2019
- 2019-09-03 SA SA519410032A patent/SA519410032B1/ar unknown
Also Published As
Publication number | Publication date |
---|---|
WO2018182975A1 (en) | 2018-10-04 |
US10891407B2 (en) | 2021-01-12 |
CN110475942B (zh) | 2021-11-02 |
US20180285515A1 (en) | 2018-10-04 |
CN110475942A (zh) | 2019-11-19 |
EP3601723A1 (en) | 2020-02-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SA519410032B1 (ar) | نظم وطرق لتصميم وسيلة تحكم في تدفق داخلي مؤتمتة | |
Wang et al. | Stability analysis and error estimates of local discontinuous Galerkin methods with implicit–explicit time-marching for nonlinear convection–diffusion problems | |
PH12017500471A1 (en) | Systems and methods for automated data analysis and customer relationship management | |
GB2535039A (en) | Method and analysis for holistic casing design for planning and real-time | |
GB2563523A (en) | Electromagnetic (EM) defect detection methods and systems employing deconvolved raw measurements | |
EA201492038A1 (ru) | Способы и системы мониторинга и обработки скважинных данных в режиме реального времени | |
RU2016132217A (ru) | Оптимизация многоступенчатого проекта нефтяного месторождения в условиях неопределенности | |
EA201890924A1 (ru) | Сеть обработки информации на основе выпуска единого кода, способ обработки информации и устройство распознавания для доступа | |
NO20171659A1 (en) | Systems and methods for characterizing materials external of a casing | |
MX376265B (es) | Automatizacion de la perforacion utilizando control optimo estocastico. | |
GB2538370A (en) | Designing wellbore completion intervals | |
EA200800435A1 (ru) | Моделирование скважины, связанное с добычей углеводородов из подземных формаций | |
MX2015017867A (es) | Determinacion de la calidad de terminacion geomecánica. | |
MX2016014193A (es) | Caracterizacion de entorno del interior del pozo mediante el uso de coeficientes de rigidez. | |
GB2536560A (en) | Creating virtual production logging tool profiles for improved history matching | |
GB2544699A (en) | Methods and systems for modeling an advanced 3-dimensional bottomhole assembly | |
MX2015016991A (es) | Analisis de yacimientos usando analisis de fluidos. | |
GB2566649A (en) | Methods and systems for downhole telemetry employing chemical tracers in a flow stream | |
Li et al. | On exponential stability of integral delay systems | |
GB2545292A (en) | Planning drilling operations using models and rig market databases | |
GB2556770A (en) | Well placement plan optimization | |
GB2422222B (en) | Determining formation properties from downhole data | |
GB2564265A (en) | Seismic well ties using blocking schemes | |
GB2533710A (en) | Object-based well correlation | |
TR201818952T4 (tr) | Site-Bazlı Sunucu Seçimi |