RU94030130A - Method for recuperation of earth reservoirs - Google Patents
Method for recuperation of earth reservoirsInfo
- Publication number
- RU94030130A RU94030130A RU94030130/03A RU94030130A RU94030130A RU 94030130 A RU94030130 A RU 94030130A RU 94030130/03 A RU94030130/03 A RU 94030130/03A RU 94030130 A RU94030130 A RU 94030130A RU 94030130 A RU94030130 A RU 94030130A
- Authority
- RU
- Russia
- Prior art keywords
- recuperation
- reclamation
- fluidity
- eliminated
- completion
- Prior art date
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
FIELD: artificial landscape development on completion a well. SUBSTANCE: fluidity of coagulums of spent mud is eliminated by peat that is filled up with mineral soil. EFFECT: artificial landscape development.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU94030130A RU2109031C1 (en) | 1994-08-10 | 1994-08-10 | Method of restoring earth reservoirs |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU94030130A RU2109031C1 (en) | 1994-08-10 | 1994-08-10 | Method of restoring earth reservoirs |
Publications (2)
Publication Number | Publication Date |
---|---|
RU94030130A true RU94030130A (en) | 1996-06-10 |
RU2109031C1 RU2109031C1 (en) | 1998-04-20 |
Family
ID=20159674
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU94030130A RU2109031C1 (en) | 1994-08-10 | 1994-08-10 | Method of restoring earth reservoirs |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2109031C1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2691797C1 (en) * | 2018-11-09 | 2019-06-18 | Ооо "Мещерский Научно-Технический Центр" | Method for reclamation of sludge pits under conditions of warm periods |
RU2702184C1 (en) * | 2018-11-12 | 2019-10-04 | Ооо "Мещерский Научно-Технический Центр" | Method of reclamation of drilling sludge culvert |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2470721C2 (en) * | 2010-12-08 | 2012-12-27 | Геннадий Николаевич Позднышев | Method of eliminating slime pits and recovery of oil-bearing wastes |
-
1994
- 1994-08-10 RU RU94030130A patent/RU2109031C1/en active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2691797C1 (en) * | 2018-11-09 | 2019-06-18 | Ооо "Мещерский Научно-Технический Центр" | Method for reclamation of sludge pits under conditions of warm periods |
RU2702184C1 (en) * | 2018-11-12 | 2019-10-04 | Ооо "Мещерский Научно-Технический Центр" | Method of reclamation of drilling sludge culvert |
Also Published As
Publication number | Publication date |
---|---|
RU2109031C1 (en) | 1998-04-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2288492A1 (en) | Unconsolidated zonal isolation and control | |
CN106688408B (en) | A self-propelled variable depth variable fertilizer applicator for orchards | |
IT1250875B (en) | PROCEDURE AND SYSTEM FOR PERFORMING DRILLING OPERATIONS IN THE OPEN SEA. | |
KR100469079B1 (en) | Tree planting method of vigorous tree | |
DK0497802T3 (en) | Method for mounting pipelines in the underground | |
CN104303950A (en) | Method for promoting growth of new roots of large tree | |
DE69804834D1 (en) | ARCH BAUTRÄGER STRUCTURE | |
RU94030130A (en) | Method for recuperation of earth reservoirs | |
BR0302409A (en) | Apparatus for transferring material and cement in a wellbore, and methods for transferring material in a wellbore and for transferring material into a circular crown defined between a wellbore and an inner liner in a soil formation. | |
CN108435784A (en) | A kind of in-situ remediation method of heavy metal cadmium soil | |
KR100331202B1 (en) | A vigorous planting method for trees | |
HU9403603D0 (en) | Process for carrying out civil engineering works | |
CN215164290U (en) | Auxiliary tool for civil engineering | |
ATE115233T1 (en) | METHOD OF LIMITING SETTLEMENT DURING UNDERGROUND CURVES. | |
SU1694774A1 (en) | Method for forming hole for subsoil irrigation | |
SU699100A1 (en) | Method of erecting prop in soil | |
RU97108757A (en) | METHOD FOR OIL DEPOSIT DEVELOPMENT | |
RU2144112C1 (en) | Method for construction of collecting pit | |
JPH054430B2 (en) | ||
JPS57140424A (en) | Construction work of reinforced soil | |
SU1773019A1 (en) | Method of underground storage of industrial wastes in salt rocks | |
JPS5639239A (en) | Hollow concrete block for afforestation | |
RU95113069A (en) | METHOD FOR TREATING JOINT DISEASES | |
RU99126054A (en) | METHOD FOR DEVELOPING OIL DEPOSIT AT THE LATE STAGE OF ITS OPERATION | |
CN108316933A (en) | A kind of method that native case bankets in balancing earth-pressure shielding machine simulated experiment |