RU93057042A - METHOD OF MANUFACTURING PUNCHED PILED - Google Patents

METHOD OF MANUFACTURING PUNCHED PILED

Info

Publication number
RU93057042A
RU93057042A RU93057042/33A RU93057042A RU93057042A RU 93057042 A RU93057042 A RU 93057042A RU 93057042/33 A RU93057042/33 A RU 93057042/33A RU 93057042 A RU93057042 A RU 93057042A RU 93057042 A RU93057042 A RU 93057042A
Authority
RU
Russia
Prior art keywords
well
discharger
construction
working
new
Prior art date
Application number
RU93057042/33A
Other languages
Russian (ru)
Other versions
RU2039156C1 (en
Inventor
Г.Н. Гаврилов
В.И. Борисенков
В.С. Евдокимов
Д.Г. Гаврилов
Original Assignee
Индивидуальное частное предприятие "Рита-I"
Filing date
Publication date
Application filed by Индивидуальное частное предприятие "Рита-I" filed Critical Индивидуальное частное предприятие "Рита-I"
Priority to RU93057042A priority Critical patent/RU2039156C1/en
Priority claimed from RU93057042A external-priority patent/RU2039156C1/en
Application granted granted Critical
Publication of RU2039156C1 publication Critical patent/RU2039156C1/en
Publication of RU93057042A publication Critical patent/RU93057042A/en

Links

Claims (1)

Способ относится к строительству, в частности к технологии изготовления набивной сваи, и может быть использован при сооружении свайных фундаментов в процессе усиления и реконструкции существующих или строительства новых зданий и инженерных сооружений. Изобретение позволяет изготавливать набивные сваи различной формы поперечного и продольного сечения в зависимости от грунтовых условий и требуемой несущей способности при гарантированном качестве пяты и ствола сваи. Способ изготовления набивной сваи включает проходку цилиндрической скважины, заполнение ее электропроводным твердеющим материалом, выполнение в нем высоковольтных электрических разрядов рабочим разрядником и его подъем по высоте скважины. Новым является то, что при проходке скважины обеспечивают устойчивость ее стенок от обрушения и оплывания путем, например затирки стенок скважины буровым снарядом при его медленном подъеме от забоя и при вращении снаряда с малой скоростью, затем рабочий разрядник опускают в скважину соосно до забоя и при проходке через шлам выполняют высоковольтные электрические разряды, а электропроводный твердеющий материал подают под давлением в скважину после достижения разрядником ее забоя, причем высоковольтные разряды выполняют в нем не ранее полного вытеснения им шлама выше рабочего разрядника. Новым также является совмещение операций по опусканию в скважину арматурного каркаса с расположенным внутри него отцентрированным рабочим разрядником, который в дальнейшем при формировании сваи перемещается по продольным стержням каркаса как по направляющим.The method relates to the construction, in particular to the technology of manufacturing ramming piles, and can be used in the construction of pile foundations in the process of strengthening and reconstruction of existing or construction of new buildings and engineering structures. The invention allows to produce ramming piles of various shapes of cross-section and longitudinal section depending on the soil conditions and the required bearing capacity with guaranteed quality of the heel and pile shaft. A method of manufacturing ramming piles includes drilling a cylindrical well, filling it with an electrically conductive hardening material, performing high-voltage electrical discharges in it by a working arrester and lifting it along the height of the well. What is new is that when a well is drilled, its walls are resistant to collapse and gumming by, for example, grinding the well walls with a drill when it is slowly rising from the bottom and when the projectile rotates at low speed, then the discharger is lowered into the well coaxially to the bottom and during the drilling high-voltage electrical discharges are performed through the slurry, and the electrically conductive hardening material is fed under pressure into the well after the discharge reaches the bottom of the well, and high-voltage discharges are performed therein not earlier than full displacement of sludge by them above the working discharger. New is also a combination of operations for lowering the reinforcement cage into a well with a centered working discharger located inside it, which later during the formation of the pile moves along the longitudinal rods of the cage as along guides.
RU93057042A 1993-12-22 1993-12-22 Method for producing cast-in-place piles RU2039156C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU93057042A RU2039156C1 (en) 1993-12-22 1993-12-22 Method for producing cast-in-place piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU93057042A RU2039156C1 (en) 1993-12-22 1993-12-22 Method for producing cast-in-place piles

Publications (2)

Publication Number Publication Date
RU2039156C1 RU2039156C1 (en) 1995-07-09
RU93057042A true RU93057042A (en) 1996-05-20

Family

ID=20150593

Family Applications (1)

Application Number Title Priority Date Filing Date
RU93057042A RU2039156C1 (en) 1993-12-22 1993-12-22 Method for producing cast-in-place piles

Country Status (1)

Country Link
RU (1) RU2039156C1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2470115C1 (en) * 2011-05-20 2012-12-20 Петр Олегович Александров Method for electrohydraulic deformation of pile shaft
RU2654097C1 (en) * 2017-05-31 2018-05-16 Дмитрий Геннадьевич Самарин Method of pile production

Similar Documents

Publication Publication Date Title
EP0170503B1 (en) Ground treatment
DE2011823A1 (en) Method of creating watertight barriers
US4100750A (en) Method for the production of piles cast in the ground and hollow auger for implementing the method
RU93057042A (en) METHOD OF MANUFACTURING PUNCHED PILED
RU2193625C2 (en) Method of cast-in-place pile making
GB1110410A (en) A method of erecting subterranean structures
DE69615912T2 (en) Method and device for extracting a mineral resource from a deposit
EP0109397B1 (en) Hollow foundation element and manufacturing method thereof
Abelev Compacting loess soils in the USSR
GB2129856A (en) A method of and an apparatus for producing in-situ concrete piles with enlarged bases
EP0481079B1 (en) Method and tool for producing a pile
RU2100525C1 (en) Method of production of cast-in-place pile
RU2318960C2 (en) Method for cast-in-place pile erection
RU2039156C1 (en) Method for producing cast-in-place piles
US3423944A (en) Method for forming end bearing concrete piles
SU1677180A1 (en) Method of manufacturing reinforced cast-in-place pile
RU2654097C1 (en) Method of pile production
CN217206314U (en) Drill bit for salvaging stone slag block
RU2389849C1 (en) Method of drilled pile manufacturing
RU2753295C1 (en) Method for pile construction in macro-porous soils
RU2256029C1 (en) Cast-in-place pile forming method
DE489271C (en) Method and device for sinking and lining round concrete shafts
RU94023187A (en) METHOD OF MANUFACTURING PUNCHED PILED
RU2686788C1 (en) Method of piled construction in transient soils under conditions of dense urban building
SU827692A1 (en) Method of providing foundation under existing buildings and structures