[go: up one dir, main page]

RU92012949A - METHOD OF DEVELOPMENT OF ORE DEPOSITS - Google Patents

METHOD OF DEVELOPMENT OF ORE DEPOSITS

Info

Publication number
RU92012949A
RU92012949A RU92012949/03A RU92012949A RU92012949A RU 92012949 A RU92012949 A RU 92012949A RU 92012949/03 A RU92012949/03 A RU 92012949/03A RU 92012949 A RU92012949 A RU 92012949A RU 92012949 A RU92012949 A RU 92012949A
Authority
RU
Russia
Prior art keywords
output
release
layer
development
ore
Prior art date
Application number
RU92012949/03A
Other languages
Russian (ru)
Other versions
RU2102600C1 (en
Inventor
Д.В. Зырянов
Original Assignee
Д.В. Зырянов
Filing date
Publication date
Application filed by Д.В. Зырянов filed Critical Д.В. Зырянов
Priority to RU92012949A priority Critical patent/RU2102600C1/en
Priority claimed from RU92012949A external-priority patent/RU2102600C1/en
Publication of RU92012949A publication Critical patent/RU92012949A/en
Application granted granted Critical
Publication of RU2102600C1 publication Critical patent/RU2102600C1/en

Links

Claims (1)

Использование: в подземной разработке месторождений полезных ископаемых средней и большой мощности. Сущность: интенсивный выпуск вертикального слоя ведется на две или четыре парные выработки выпуска и после выпуска слоя руды, выработки выпуска перекрываются целиком на всю мощность выпускаемого слоя, сохраняя выработку доставки и погрузки и обеспечивая нормальное проветривание при отработке последующих слоев на эту выработку и использование ее для обуривания нижележащих запасов, что расширяет возможность применения систем с выпуском руды вертикальными слоями на подэтаж и сокращает объемы горнопроходческих работ по выемке полезного ископаемого.Usage: in the underground mining of medium and high power mineral deposits. Essence: an intensive release of the vertical layer is carried out on two or four double output openings and after the release of the ore layer, the output generation overlaps entirely with the entire thickness of the output layer, keeping the delivery and loading output and ensuring normal ventilation during the subsequent layers development lowering the reserves, which expands the possibility of using systems with the release of ore by vertical layers to the sub-floor and reduces the volume of mining works on excavation fossil.
RU92012949A 1992-12-21 1992-12-21 Device for development of ore deposits RU2102600C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU92012949A RU2102600C1 (en) 1992-12-21 1992-12-21 Device for development of ore deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU92012949A RU2102600C1 (en) 1992-12-21 1992-12-21 Device for development of ore deposits

Publications (2)

Publication Number Publication Date
RU92012949A true RU92012949A (en) 1995-05-20
RU2102600C1 RU2102600C1 (en) 1998-01-20

Family

ID=20133965

Family Applications (1)

Application Number Title Priority Date Filing Date
RU92012949A RU2102600C1 (en) 1992-12-21 1992-12-21 Device for development of ore deposits

Country Status (1)

Country Link
RU (1) RU2102600C1 (en)

Similar Documents

Publication Publication Date Title
SU750108A1 (en) Method of degassing coal bed satellites
IT8223376A0 (en) IMPROVED PROCEDURE FOR FRACTURING UNDERGROUND FORMATIONS.
FI941641A0 (en) Vesisäiliökonstruktio
CN115875079A (en) Compressed air energy storage artificial underground gas storage
RU92012949A (en) METHOD OF DEVELOPMENT OF ORE DEPOSITS
ES8204497A1 (en) Floating platform for use in deep waters, and method of installation
Huntzinger et al. Simulation of Ground-Water Movement in the' 1, 500- and 1, 700-foot' Aquifer of the Baton Rouge Area, Louisiana
Stow et al. Acidizing boreholes
NL167461B (en) METHOD FOR DRILLING A WELL IN AN UNDERGROUND FORMATION USING A CIRCULATING DRILLING FLUID.
JPS56107399A (en) Parity check system
ITBA940041A0 (en) CONSTRUCTION TECHNOLOGY OF EXCAVATION AND CONSTRUCTION OF UNDERGROUND ENVIRONMENTS OF SMALL AND LARGE SURFACES AND DEPTH FOR THE CONSTRUCTION OF CAR PARKS, LARGE MINING TUNNELS, ETC. WHETHER OR NOT THERE IS GROUNDWATER.
RU93002059A (en) METHOD OF MANAGEMENT OF MOUNTAIN PRESSURE DURING DEVELOPMENT OF POWERFUL RIGHT TUBES
Anderson Geology and Ground-water Resources of the Rahway Area, New Jersey
Davies Waulsortian Reefs, Alberta, Canada local and regional perspectives
Loer et al. Water management concepts and engineering design of the Schmalwasser dam
BE747139A (en) PREFABRICATED WALL BLOCK CONTAINING A CHASSIS INTENDED TO RECEIVE THE INSTALLATION DUCTS OF A CONSTRUCTION, IN PARTICULAR OF A RESIDENTIAL HOUSE
SU676728A1 (en) Method of excavating thick coal seams displaying tendency to mine shocks
Hardy Jr Microseismic techniques applied to coal mine safety
Gadinski Groundwater Monitoring Strategies of the Wyoming Valley, Anthracite Region of Pennsylvania
Smith A mining museum for Johannesburg
IT8622100A0 (en) SUITABLE FOR THE PASSAGE OF VEHICLES OF CONSTRUCTION METHOD OF A TRANSPORT AND EQUIPPED WITH AN UNDERGROUND OR UNDERWATER TUNNEL, ANTI-SEISMIC STRUCTURES, AS WELL AS THE TUNNEL SO OBTAINED.
Heitfeld et al. Importance of sulphate karst for the flood retention structure at Salzerhelden
SU1764352A1 (en) Method for development of oil pool
ES8704840A2 (en) Improvements introduced to the main patent n¿ 532312. Energy storage system, for its subsequent conversion in electric energy (Machine-translation by Google Translate, not legally binding)
Adler Source rock analysis of oil shale in the Green River Formation, Bridger Basin, Wyoming