RU92003678A - METHOD OF FIRMING BOOKMARK OF UNDERGROUND EXPOSURE BY METALURGICAL PRODUCTION WASTE AND DEVICE FOR ITS IMPLEMENTATION - Google Patents

METHOD OF FIRMING BOOKMARK OF UNDERGROUND EXPOSURE BY METALURGICAL PRODUCTION WASTE AND DEVICE FOR ITS IMPLEMENTATION

Info

Publication number
RU92003678A
RU92003678A RU92003678/03A RU92003678A RU92003678A RU 92003678 A RU92003678 A RU 92003678A RU 92003678/03 A RU92003678/03 A RU 92003678/03A RU 92003678 A RU92003678 A RU 92003678A RU 92003678 A RU92003678 A RU 92003678A
Authority
RU
Russia
Prior art keywords
pipeline
feeder
bunker
binder
blowing
Prior art date
Application number
RU92003678/03A
Other languages
Russian (ru)
Other versions
RU2044892C1 (en
Inventor
А.Е. Смолдырев
Original Assignee
Научно-исследовательский, проектный и конструкторский институт горного дела и металлургии цветных металлов
Filing date
Publication date
Application filed by Научно-исследовательский, проектный и конструкторский институт горного дела и металлургии цветных металлов filed Critical Научно-исследовательский, проектный и конструкторский институт горного дела и металлургии цветных металлов
Priority to RU92003678A priority Critical patent/RU2044892C1/en
Priority claimed from RU92003678A external-priority patent/RU2044892C1/en
Publication of RU92003678A publication Critical patent/RU92003678A/en
Application granted granted Critical
Publication of RU2044892C1 publication Critical patent/RU2044892C1/en

Links

Claims (1)

Изобретение относится к горному делу и металлургии и может найти применение в технологии добычи полезных ископаемых с закладкой подземных выработок отходами металлургического и смежных отраслей (энергетики, химии и др. ) производства. Оно направлено на повышение эффективности использования отходов производства в сложных горно-технических условиях. Цель предложения заключается в уменьшении затрат энергии, увеличении дальности подачи смеси по трубопроводам большой протяженности и повышении надежности работы оборудования. Способ твердеющей закладки подземных выработок отходами металлургического производства включает транспортно-складские операции с компонентами закладочных материалов, совместное их измельчение и накопление в бункере-питателе, разгрузку смеси в закладочный трубопровод, пневмотранспортирование и возведение искусственного массива. Для этого производят сухое смешение компонентов заполнителя и вяжущего в процессе сухого измельчения, аккумуляцию смеси в бункере-питателе непрерывного действия в количестве, равном часовой производительности закладочного комплекса, и пневмотранспортирование смеси с поддувом в трубы сжатого воздуха в местах резкого изменения давления. При этом совместное измельчение заполнителя с компонентами вяжущего производят в течение 5-7 мин, а загрузку вяжущего ведут без перерыва измельчения заполнителя. Кроме того, затворение вяжущего осуществляют в трубопроводе пневмотранспорта подачей воды в него за местом поддува сжатого воздуха. Устройство для осуществления способа твердеющей закладки подземных выработок отходами металлургического производства включает транспортно-складское оборудование, мельницу, бункер-питатель с герметичными емкостями и трубопровод с поддувом. Каждая емкость бункера-питателя с восходящей разгрузкой выполнена на объем, равный часовой производительности закладочного комплекса, бункер-питатель размещен над устьем закладочной скважины или другой, выходящей на поверхность, выработки; в днище каждой емкости находится коллектор с соплами сжатого воздуха, расположенными по осевым линиям на расстоянии 1,5-3 D один от другого и под углом 45-75° к выдачному патрубку, где D - диаметр вертикального выдачного патрубка. При этом протяженный пневмотранспортный трубопровод выполнен со ступенчатым увеличением диаметра труб по длине, причем отношение длины участка с трубами большего диаметра l к длине конечного участка, подлежащего замене, lо определяют из соотношения: l/lо = (D2/D1)5 - 1, , где D1 и D2 - соответственно диаметры заменяемого и нового участка труб, при этом длина начального участка трубопровода достигает 400-500 м. Кроме того, трубопровод с поддувом снабжен коленом с двумя патрубками, расположенным в одной из ступеней трубопровода. При этом трубопровод с поддувом на конце снабжен разгрузителем с патрубком и насосом.The invention relates to mining and metallurgy and may find application in the technology of mining with the laying of underground workings with waste metallurgical and related industries (energy, chemistry, etc.) production. It is aimed at improving the efficiency of waste production in complex mining and technical conditions. The purpose of the proposal is to reduce energy costs, increase the range of the mixture supply through long pipelines and increase the reliability of the equipment. The method of hardening laying of underground workings with metallurgical production wastes includes transport and storage operations with components of backfill materials, their joint grinding and accumulation in the bunker-feeder, unloading the mixture into the filling pipeline, pneumatic conveying and erection of an artificial array. To do this, the components of the aggregate and the binder are dry mixed during the dry grinding process, the mixture is accumulated in a continuous supply feeder in an amount equal to the hourly productivity of the filling complex, and the mixture is pneumatically transported with compressed air into the compressed air in places of sudden pressure changes. In this case, the joint grinding of the aggregate with the components of the binder is carried out within 5-7 minutes, and the loading of the binder is carried out without interruption of the grinding of the aggregate. In addition, the mixing of the binder is carried out in the pipeline of the pneumatic transport by supplying water to it beyond the point of blowing compressed air. A device for implementing the method of hardening laying of underground workings with metallurgical production wastes includes transport and storage equipment, a mill, a feeder bunker with hermetic containers and a pipeline with blowing. Each capacity of the bunker-feeder with the ascending discharge is made to a volume equal to the hourly productivity of the filling complex; the bunker-feeder is located above the mouth of the filling well or the other that goes to the surface and develops; at the bottom of each tank is a collector with compressed air nozzles located along the axial lines at a distance of 1.5-3 D from one another and at an angle of 45-75 ° to the dispensing nozzle, where D is the diameter of the vertical dispensing nozzle. When this extended pneumotransport pipeline is made with a stepwise increase in the diameter of the pipes along the length, and the ratio of the length of the section with pipes of larger diameter l to the length of the final section to be replaced, l о is determined from the relation: l / l о = (D 2 / D 1 ) 5 - 1, where D 1 and D 2 are, respectively, the diameters of the replaced and new pipe sections, while the length of the initial section of the pipeline reaches 400-500 m. In addition, the pipeline with blowing is equipped with a bend with two branch pipes located in one of the stages of the pipeline. In this case, the pipeline with blowing at the end is equipped with a discharger with a pipe and a pump.
RU92003678A 1992-11-15 1992-11-15 Method for filling underground workings with self-cementing metallurgical wastes and device for its realization RU2044892C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU92003678A RU2044892C1 (en) 1992-11-15 1992-11-15 Method for filling underground workings with self-cementing metallurgical wastes and device for its realization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU92003678A RU2044892C1 (en) 1992-11-15 1992-11-15 Method for filling underground workings with self-cementing metallurgical wastes and device for its realization

Publications (2)

Publication Number Publication Date
RU92003678A true RU92003678A (en) 1995-01-09
RU2044892C1 RU2044892C1 (en) 1995-09-27

Family

ID=20131454

Family Applications (1)

Application Number Title Priority Date Filing Date
RU92003678A RU2044892C1 (en) 1992-11-15 1992-11-15 Method for filling underground workings with self-cementing metallurgical wastes and device for its realization

Country Status (1)

Country Link
RU (1) RU2044892C1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102606206B (en) * 2012-04-01 2014-12-10 西安建筑科技大学 Mobile filling method for managing underground gobs
RU2507398C2 (en) * 2012-05-31 2014-02-20 Федеральное государственное бюджетное учреждение науки ИНСТИТУТ ПРОБЛЕМ КОМПЛЕКСНОГО ОСВОЕНИЯ НЕДР РОССИЙСКОЙ АКАДЕМИИ НАУК (ИПКОН РАН) Preparation method of porous hardening mixture for stowing of mined-out underground space
RU2724827C1 (en) * 2019-12-18 2020-06-25 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Device for underground workings filling
RU2724830C1 (en) * 2019-12-30 2020-06-25 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Method of pipeline delivery of hardening mixture to underground mine workings

Similar Documents

Publication Publication Date Title
CN103216248B (en) Wet type shotcrete machine
CN101392659A (en) Method for directly utilizing downhole gangue
US4726712A (en) Method of pipeline filling the interstices of controlled caving areas
CN103321675B (en) Pneumatic conveying and filling method and equipment for gangue in underground coal mine
RU92003678A (en) METHOD OF FIRMING BOOKMARK OF UNDERGROUND EXPOSURE BY METALURGICAL PRODUCTION WASTE AND DEVICE FOR ITS IMPLEMENTATION
CN106121694A (en) A kind of underground coal mine distance spraying system
CN203248168U (en) Spraying mechanism of wet type shotcrete machine
CN209875168U (en) Pump pipe for conveying concrete in long tunnel
CN101173734A (en) Discharge aiding method for pipe-line transportation
RU2044892C1 (en) Method for filling underground workings with self-cementing metallurgical wastes and device for its realization
CN203248169U (en) Wet type shotcrete machine
CN207986107U (en) A kind of dregs elevator
CN204277801U (en) A kind of sandblasting car that can carry out back-up sand operation continuously
CN108005715B (en) A multi-purpose vertical shaft pipeline material conveying system for mines
RU2055218C1 (en) Method for different strength backfills of underground drifts and device for implementation the same
CN201056419Y (en) Flexible axle feeder with slurry slag and powder as medium
CN103485799B (en) A kind of spiral sprayer for concrete
CN217626464U (en) Spiral automatic material conveying machine in narrow space
CN207327279U (en) A kind of all-tailing cemented filling accident tailings retracting device
CN220726369U (en) Full pipe unloader of filling drilling
CN219412598U (en) Multi-mode muck transporting device for shield
CN216518048U (en) Supercharging device of remote whitewashing
SU1603033A1 (en) Pneumatic filling installation for hardening mixes
CN103233750A (en) Injection mechanism for tidal concrete sprayer
CN218716843U (en) Wind pressure compensation device for underground roadway guniting pipeline