RU2769456C1 - Method and device for remote channelless monitoring of the operation of a generation source connected to an electrical network powered by a two-transformer substation - Google Patents
Method and device for remote channelless monitoring of the operation of a generation source connected to an electrical network powered by a two-transformer substation Download PDFInfo
- Publication number
- RU2769456C1 RU2769456C1 RU2021119619A RU2021119619A RU2769456C1 RU 2769456 C1 RU2769456 C1 RU 2769456C1 RU 2021119619 A RU2021119619 A RU 2021119619A RU 2021119619 A RU2021119619 A RU 2021119619A RU 2769456 C1 RU2769456 C1 RU 2769456C1
- Authority
- RU
- Russia
- Prior art keywords
- network
- generation source
- current
- section
- voltage
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J9/00—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
- H02J9/04—Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Description
Изобретение относится к автоматике электрических сетей и предназначено для дистанционного бесканального контроля снижения мощности и отключения источника генерации, подключенного к электрической сети, питающейся от двухтрансформаторной подстанции.The invention relates to the automation of electrical networks and is intended for remote channelless control of power reduction and shutdown of a generation source connected to an electrical network powered by a two-transformer substation.
Наиболее близким по технической сущности к предлагаемому изобретению является способ контроля успешного включения пункта АВР в кольцевой сети, питающейся от разных шин двухтрансформаторной подстанции, заключающийся в фиксации двух бросков тока и в отсчете времени между ними, начиная с момента появления первого увеличения тока короткого замыкания (к.з.) на шинах трансформатора основного источника питания, равного выдержке времени включения пункта АВР, в котором в момент окончания отсчета времени контролируют появление второго увеличения тока на шинах трансформатора резервного источника питания и если он больше нормального рабочего тока, но меньше тока к.з., то при его появлении устанавливают факт успешного включения пункта АВР (патент РФ №2214667, МПК7 Н02J 13/00, опубл. 20.10.2003, Бюл. №29).The closest in technical essence to the proposed invention is a method for monitoring the successful inclusion of an ATS point in a ring network powered by different buses of a two-transformer substation, which consists in fixing two current surges and counting the time between them, starting from the moment the first increase in short-circuit current (to .h.) on the transformer buses of the main power source, equal to the turn-on time delay of the ATS point, in which, at the end of the countdown, the appearance of a second increase in current on the buses of the backup power source transformer is controlled and if it is greater than the normal operating current, but less than the short-circuit current ., then when it appears, the fact of successful inclusion of the ABP item is established (RF patent No. 2214667, IPC 7 H02J 13/00, publ. 10.20.2003, Bull. No. 29).
Недостатком известного способа является недостаточная функциональность и достоверность, связанные с тем, что способ не предусматривает возможности контроля снижения мощности и отключения источника генерации, подключенного к электрической сети, питающейся от двухтрансформаторной подстанции и не учитывает, при осуществлении дистанционного контроля, значений напряжения в разных режимах работы контролируемой электрической сети.The disadvantage of the known method is the lack of functionality and reliability associated with the fact that the method does not provide for the ability to control power reduction and turn off the generation source connected to the electrical network powered by a two-transformer substation and does not take into account, when implementing remote control, voltage values in different operating modes controlled electrical network.
Задачей предлагаемого изобретения является расширение функциональных возможностей способа и повышение достоверности контроля путем обеспечения контроля снижения мощности и отключения источника генерации, подключенного к электрической сети, питающейся от двухтрансформаторной подстанции и учета, при осуществлении дистанционного контроля, значений напряжения в разных режимах работы контролируемой электрической сети.The objective of the invention is to expand the functionality of the method and increase the reliability of control by providing control of power reduction and shutdown of a generation source connected to an electrical network powered by a two-transformer substation and accounting, when performing remote monitoring, voltage values in different operating modes of a controlled electrical network.
В результате использования предлагаемого изобретения достигается расширение функциональных возможностей способа и повышение его достоверности контроля путем обеспечения контроля снижения мощности и отключения источника генерации, подключенного к электрической сети, питающейся от двухтрансформаторной подстанции и учета, при осуществлении дистанционного контроля, значений напряжения в разных режимах работы контролируемой электрической сети за счет того, что контролируют ток и напряжение в отходящих от разных шин двухтрансформаторной подстанции линиях, имеющих электрические связи с участком сети, к которому подключен источник генерации, фиксируют увеличения рабочего тока и снижения напряжения в контролируемых отходящих линиях, и интервалы времени между ними, сравнивают значения увеличения рабочего тока и снижения напряжения, интервалов между ними с заданными и на основании этого делают выводы о снижениях мощности и отключениях источника генерации, подключенного к электрической сети.As a result of using the proposed invention, it is possible to expand the functionality of the method and increase its reliability of control by providing control of power reduction and shutdown of a generation source connected to an electrical network powered by a two-transformer substation and accounting, when performing remote monitoring, voltage values in different modes of operation of a controlled electrical networks due to the fact that they control the current and voltage in the lines outgoing from different buses of the two-transformer substation, which have electrical connections with the section of the network to which the generation source is connected, they fix the increase in operating current and decrease in voltage in the controlled outgoing lines, and the time intervals between them, they compare the values of the increase in the operating current and the decrease in voltage, the intervals between them with the given ones, and on the basis of this, conclusions are drawn about the power reductions and disconnections of the generation source connected to the electrical network.
Вышеуказанный технический результат достигается тем, что в предлагаемом способе дистанционного бесканального контроля работы источника генерации, подключенного к электрической сети, питающейся от двухтрансформаторной подстанции, заключающемся в контроле бросков тока на двухтрансформаторной подстанции и измерении интервалов времени между ними, согласно изобретению, контролируют ток и напряжение в отходящих от разных шин двухтрансформаторной подстанции линиях, имеющих электрические связи с участком сети, к которому подключен источник генерации, фиксируют увеличение рабочего тока и снижения напряжения в отходящих линиях, имеющих электрические связи с участком сети, к которому подключен источник генерации (контролируемые отходящие линии), сравнивают значение увеличения тока и значение снижения напряжения, зафиксированных в одной из контролируемых отходящих линий, со значением тока, соответствующего току нагрузки первого участка сети, и значением напряжения, соответствующего рабочему напряжению первого участка сети, питаемого в нормальном режиме от источника генерации, фиксируют, через интервал времени, в той же контролируемой линии, увеличение тока, соответствующий по значению увеличения тока нагрузки второго участка сети, и снижение напряжения, вызванные подключением нагрузки второго участка сети, питаемого в нормальном режиме от источника генерации, если увеличения тока со значением, соответствующим значению тока нагрузки второго участка сети, и снижения напряжения, вызванного подключением нагрузки второго участка сети, питаемого в нормальном режиме от источника генерации, не будет зафиксировано, то делают вывод о снижении мощности источника генерации и отключении его от первого участка сети, питаемого в нормальном режиме от источника генерации, передают эту информацию диспетчеру и отображают средствами отображения, если увеличение тока, соответствующее значению тока нагрузки второго участка сети, и снижение напряжения, вызванное подключением нагрузки второго участка сети, питаемого в нормальном режиме от источника генерации, будут зафиксированы через интервал времени, соответствующий выдержке времени срабатывания автоматического включения резерва секционирующего пункта с функцией автоматического включения резерва, установленного между первым и вторым участком сети, питаемым в нормальном режиме от источника генерации, делают вывод об одновременном отключении источника генерации от всей нагрузки, передают эту информацию диспетчеру и отображают средствами отображения, если увеличение тока, соответствующее по значению току нагрузки второго участка сети, и снижение напряжения, вызванное подключением нагрузки второго участка сети, питаемого в нормальном режиме от источника генерации будут зафиксированы через больший интервал времени, чем выдержка времени срабатывания автоматического включения резерва секционирующего пункта с функцией автоматического включения резерва, установленного между первым и вторым участком сети, питаемым в нормальном режиме от источника генерации, делают вывод, что вначале произошло снижение мощности источника генерации, а позже произошло его отключение от всей нагрузки, передают эту информацию диспетчеру и отображают средствами отображения.The above technical result is achieved by the fact that in the proposed method for remote channelless control of the operation of a generation source connected to an electrical network powered by a two-transformer substation, which consists in monitoring current surges at a two-transformer substation and measuring the time intervals between them, according to the invention, the current and voltage in lines extending from different buses of a two-transformer substation, having electrical connections with the network section to which the generation source is connected, an increase in the operating current and a decrease in voltage in the outgoing lines, having electrical connections with the network section to which the generation source is connected (controlled outgoing lines), comparing the current increase value and the voltage decrease value recorded in one of the controlled outgoing lines with the current value corresponding to the load current of the first section of the network, and the voltage value corresponding to the operating voltage to the first section of the network, powered in the normal mode from the generation source, after a time interval, in the same controlled line, an increase in current corresponding to the increase in the load current of the second section of the network, and a decrease in voltage caused by the connection of the load of the second section of the network, powered by in normal mode from the generation source, if the increase in current with a value corresponding to the value of the load current of the second section of the network, and the decrease in voltage caused by the connection of the load of the second section of the network, powered in normal mode from the generation source, is not fixed, then a conclusion is made about a decrease in power generation source and disconnecting it from the first section of the network, powered in normal mode from the generation source, transmit this information to the dispatcher and display by means of display, if the increase in current corresponding to the value of the load current of the second section of the network, and the decrease in voltage caused by the connection of the load of the second section network, powered in normal mode from the generation source, will be fixed after a time interval corresponding to the time delay of the automatic switching on of the reserve of the separating point with the function of automatic switching on of the reserve, installed between the first and second section of the network, fed in normal mode from the generation source, make a conclusion about simultaneous disconnection of the generation source from the entire load, transmit this information to the dispatcher and display by display means, if the increase in current, corresponding in value to the load current of the second section of the network, and the decrease in voltage caused by the connection of the load of the second section of the network, powered in normal mode from the generation source, are fixed after a longer time interval than the response time of the automatic switching on of the reserve of the separating point with the function of automatic switching on of the reserve installed between the first and second section of the network, powered in normal mode from the generation source, they conclude that at first there was a decrease in the power of the generation source, and later it was disconnected from the entire load, they transmit this information to the dispatcher and display it by means of display.
Технический результат достигается также тем, что предлагаемое устройство дистанционного бесканального контроля работы источника генерации, подключенного к электрической сети, питающейся от двухтрансформаторной подстанции, включающее датчики тока, согласно изобретению, снабжено датчиками напряжения, установленными перед точками подключения выключателей отходящих от разных шин двухтрансформаторной подстанции линий, имеющих электрические связи с участком сети, к которому подключен источник генерации, датчиками тока, установленными перед точками подключения выключателей отходящих от разных шин двухтрансформаторной подстанции линий, имеющих электрические связи с участком сети, к которому подключен источник генерациии, блоком обработки и отображения информации, осуществляющим обработку информации, поступающей от датчиков тока и напряжения, выполняющим ее обработку, передающим и отображающим информацию, поступающую с датчиков тока и напряжения и результаты ее обработки.The technical result is also achieved by the fact that the proposed device for remote channelless monitoring of the operation of a generation source connected to an electrical network powered by a two-transformer substation, including current sensors, according to the invention, is equipped with voltage sensors installed in front of the connection points of the switches of the lines extending from different buses of the two-transformer substation, having electrical connections with the network section to which the generation source is connected, current sensors installed in front of the connection points of the switches of lines extending from different buses of the two-transformer substation, having electrical connections with the network section to which the generation source is connected, the information processing and display unit that processes information coming from current and voltage sensors, performing its processing, transmitting and displaying information coming from current and voltage sensors and the results of its processing.
Сущность предлагаемого способа и устройства поясняется чертежом, согласно которому: Т1 - силовой трансформатор, Т2 - силовой трансформатор, G3 - источник генерации, ВВ4 - вводной выключатель низкого напряжения трансформатора Т1, ВВ5 - вводной выключатель низкого напряжения трансформатора Т2, ВО6 - выключатель отходящей линии от секции шин, питаемой от трансформатора Т1, ВО7 - выключатель отходящей линии от секции шин, питаемой от трансформатора Т2, ВО8 - выключатель отходящей линии от источника генерации, ВС9 - выключатель секционный, СПАВР10 - секционирующий пункт, оснащенный функцией АВР, СПАВР11 - секционирующий пункт, оснащенный функцией АВР, СПАВР12 - секционирующий пункт, оснащенный функцией АВР, СПАВР13 - секционирующий пункт, оснащенный функцией АВР, S14 - электрическая нагрузка, S15 - электрическая нагрузка, S16 - электрическая нагрузка, S17 - электрическая нагрузка, S18 - электрическая нагрузка, ДТ19 - датчик тока, ДТ20 - датчик тока, ДН21 - датчик напряжения, ДН22 - датчик напряжения, БОиОИ23 - блок обработки и отображения информации.The essence of the proposed method and device is illustrated by the drawing, according to which: T1 is a power transformer, T2 is a power transformer, G3 is a generation source, BB4 is an input low voltage switch of transformer T1, BB5 is an input low voltage switch of transformer T2, BO6 is an outgoing line switch from section of the tires fed from the transformer T1, VO7 - switch of the outgoing line from the section of the tires fed from the transformer T2, VO8 - switch of the outgoing line from the generation source, BC9 - sectional switch, SPAVR10 - sectioning point equipped with the ATS function, SPAVR11 - sectioning point, equipped with the ATS function, SPAVR12 - sectioning point equipped with the ATS function, SPAVR13 - sectioning point equipped with the ATS function, S14 - electrical load, S15 - electrical load, S16 - electrical load, S17 - electrical load, S18 - electrical load, DT19 - sensor current, DT20 - current sensor, DN21 - voltage sensor, DN22 - n sensor voltage, BOiOI23 - block for processing and displaying information.
Способ реализуется следующим образом с помощью предлагаемого устройства.The method is implemented as follows using the proposed device.
С помощью датчиков тока ДТ19 и ДТ20 и датчиков напряжения ДН 21 и ДН 22 контролируют значения тока и напряжения в отходящих линиях, питающихся от трансформаторов Т1 и Т2 и имеющих электрические связи с участком сети, к которому подключен источник генерации G3. При этом в нормальном режиме от источника генерации питаются два участка сети, а именно участок между СПАВР10, СПАВР11 и СПАВР13 - первый участок сети, питаемый в нормальном режиме от источника генерации G3, и участок между ВО8 и СПАВР13 - второй участок сети, питаемый в нормальном режиме от источника генерации G3. В нормальном режиме датчик тока ДТ19 фиксирует ток, соответствующий по значению току нагрузки S14, и ДН21 фиксирует напряжение, значение которого обусловлено протеканием тока нагрузки S14, а датчик тока ДТ20 - фиксирует ток, соответствующий по значению суммарному току нагрузки S17 и S16, и датчик напряжения ДН22, фиксирует напряжение, значение которого обусловлено протеканием тока нагрузок S17 и S16. Информация с датчиков тока ДТ19 и ДТ20 и датчиков напряжения ДН21 и ДН22 передается в блок обработки и отображения информации БОиОИ23. Если блок БОиОИ23 зафиксирует информацию об увеличении рабочего тока, поступившую с ДТ19, или ДТ20, и снижении напряжения, поступившую с ДН21 и ДН22, причем значение увеличения тока и снижения напряжения будут соответствовать значениям, обусловленным подключением нагрузки S15, то есть нагрузки первого участка сети, питаемого в нормальном режиме от источника генерации G3, то БОиОИ23 включит отсчет времени, соответствующего выдержке времени срабатывания автоматического включения резерва СПАВР13. Увеличение тока и снижение напряжения будут вызваны тем, что отключится СПАВР13, отключая G3 от нагрузки S15, после чего на участке между СПАВР10, СПАВР11 и СПАВР13 исчезнет напряжение, что приведет к работе автоматического включения резерва СПАВР10, или СПАВР11 в зависимости от их настройки. Именно включение СПАВР 10, или СПАВР11 на нагрузку S15 и приведет к увеличению рабочего тока и снижению напряжения в соответствующей линии, питаемой от Т1, или Т2.With the help of current sensors DT19 and DT20 and voltage sensors DN 21 and DN 22, the values of current and voltage in the outgoing lines fed from transformers T1 and T2 and having electrical connections with the network section to which the generation source G3 is connected are monitored. In this case, in normal mode, two sections of the network are fed from the generation source, namely, the section between SPAVR10, SPAVR11 and SPAVR13 - the first section of the network, powered in normal mode from the generation source G3, and the section between BO8 and SPAVR13 - the second section of the network, fed in normal mode from the generation source G3. In normal mode, the current sensor DT19 captures the current corresponding in value to the load current S14, and DN21 captures the voltage, the value of which is due to the flow of load current S14, and the current sensor DT20 captures the current corresponding in value to the total load current S17 and S16, and the voltage sensor DN22, fixes the voltage, the value of which is due to the current flow of the loads S17 and S16. Information from current sensors DT19 and DT20 and voltage sensors DN21 and DN22 is transmitted to the block for processing and displaying information BOiOI23. If the BOiOI23 unit records information about the increase in operating current received from DT19 or DT20, and the decrease in voltage received from DN21 and DN22, and the value of the increase in current and decrease in voltage will correspond to the values due to the connection of the load S15, that is, the load of the first section of the network, powered in the normal mode from the generation source G3, then the BOiOI23 will turn on the countdown corresponding to the time delay of the operation of the automatic switching on of the SPAVR13 reserve. An increase in current and a decrease in voltage will be caused by the fact that the SPAVR13 will turn off, disconnecting G3 from the load S15, after which the voltage will disappear in the section between the SPAVR10, SPAVR11 and SPAVR13, which will lead to the automatic switching on of the reserve SPAVR10, or SPAVR11, depending on their settings. It is the inclusion of SPAVR 10, or SPAVR11 on the load S15 that will lead to an increase in the operating current and a decrease in voltage in the corresponding line powered by T1 or T2.
Увеличение тока и снижение напряжения, соответствующие подключению нагрузки S18 могут быть вызван тем, что отключится ВО8, отключая G3 от нагрузки S18, после чего на участке между ВО8 и СПАВР13 исчезнет напряжение, что приведет к работе автоматического включения резерва СПАВР13. Именно включение СПАВР13 на нагрузку S18 и приведет к увеличению рабочего тока и снижению напряжения, соответствующих подключению нагрузки S18 в соответствующей линии, питаемой от Т1, или Т2.An increase in current and a decrease in voltage, corresponding to the connection of load S18, can be caused by the fact that BO8 turns off, disconnecting G3 from load S18, after which voltage disappears in the section between BO8 and SPAVR13, which will lead to the automatic switching on of the reserve SPAVR13. It is the inclusion of the SPAVR13 on the load S18 that will lead to an increase in the operating current and a decrease in voltage corresponding to the connection of the load S18 in the corresponding line powered by T1 or T2.
Если увеличения тока со значением, соответствующим значению тока нагрузки S18, и снижения напряжения, обусловленного подключением нагрузки S18, то есть нагрузки второго участка сети, питаемого в нормальном режиме от источника генерации G3, не будет зафиксировано соответствующими датчикам ДТ19, или ДТ20, и ДН21, или ДН22, в момент окончания времени отсчета, то делается вывод о снижении мощности источника генерации и отключении его только от нагрузки S15. БОиОИ23 в этом случае фиксирует, передает и отображает данную информацию диспетчеру тем, или иным способом, в том числе с помощью средств сигнализации, отображения на щите, панели, экране и других средствах отображения информации.If the increase in current with a value corresponding to the value of the load current S18, and the decrease in voltage due to the connection of the load S18, that is, the load of the second section of the network, powered in normal mode from the generation source G3, is not recorded by the corresponding sensors DT19, or DT20, and DN21, or DN22, at the end of the countdown time, then it is concluded that the power of the generation source is reduced and it is disconnected only from the load S15. BOiOI23 in this case captures, transmits and displays this information to the dispatcher in one way or another, including using signaling means, display on a board, panel, screen and other means of displaying information.
Если увеличение тока, соответствующее значению тока нагрузки S18, и снижение напряжения, обусловленное подключением нагрузки S18, будут зафиксированы через интервал времени, соответствующий выдержке времени срабатывания автоматического включения резерва СПАВР13, делается вывод об одновременном отключении источника генерации от всей нагрузки, то есть от S15 и S18. БОиОИ23 в этом случае фиксирует, передает и отображает данную информацию диспетчеру тем, или иным способом, в том числе с помощью средств сигнализации, отображения на щите, панели, экране и других средствах отображения информации.If the increase in current corresponding to the value of the load current S18, and the decrease in voltage due to the connection of the load S18, are recorded after a time interval corresponding to the time delay of the automatic switching on of the reserve SPAVR13, it is concluded that the generation source is simultaneously disconnected from the entire load, that is, from S15 and S18. BOiOI23 in this case captures, transmits and displays this information to the dispatcher in one way or another, including using signaling means, display on a board, panel, screen and other means of displaying information.
Если увеличение тока, соответствующее по значению току нагрузки S18, и снижение напряжения, обусловленное подключением нагрузки S18, будут зафиксированы через больший интервал времени, чем выдержка времени срабатывания автоматического включения резерва СПАВР13, то делается вывод, что вначале произошло снижение мощности источника генерации, а позже произошло его отключение от всей нагрузки. БОиОИ23 в этом случае фиксирует, передает и отображает данную информацию диспетчеру тем, или иным способом, в том числе с помощью средств сигнализации, отображения на щите, панели, экране и других средствах отображения информации.If the increase in current, corresponding in value to the load current S18, and the decrease in voltage, due to the connection of the load S18, are recorded after a longer time interval than the time delay for the automatic switching on of the reserve SPAVR13, then it is concluded that at first there was a decrease in the power of the generation source, and later it was disconnected from the entire load. BOiOI23 in this case captures, transmits and displays this information to the dispatcher in one way or another, including using signaling means, display on a board, panel, screen and other means of displaying information.
Применение предлагаемого способа и устройства позволяет повысить наблюдаемость электрических сетей, к которым подключены источники генерации, посредством повышения достоверности получаемой информации и расширения функциональных возможностей способа за счет обеспечения возможности контроля снижения мощности и отключения источника генерации, подключенного к электрической сети, питающейся от двухтрансформаторной подстанции и учета, при осуществлении дистанционного контроля, значений напряжения в разных режимах работы контролируемой электрической сети.The use of the proposed method and device makes it possible to increase the observability of electrical networks to which generation sources are connected, by increasing the reliability of the information received and expanding the functionality of the method by providing the ability to control power reduction and turn off the generation source connected to the electrical network powered by a two-transformer substation and accounting , when implementing remote control, voltage values in different modes of operation of the controlled electrical network.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2021119619A RU2769456C1 (en) | 2021-07-05 | 2021-07-05 | Method and device for remote channelless monitoring of the operation of a generation source connected to an electrical network powered by a two-transformer substation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2021119619A RU2769456C1 (en) | 2021-07-05 | 2021-07-05 | Method and device for remote channelless monitoring of the operation of a generation source connected to an electrical network powered by a two-transformer substation |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2769456C1 true RU2769456C1 (en) | 2022-03-31 |
Family
ID=81075772
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2021119619A RU2769456C1 (en) | 2021-07-05 | 2021-07-05 | Method and device for remote channelless monitoring of the operation of a generation source connected to an electrical network powered by a two-transformer substation |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2769456C1 (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5825162A (en) * | 1994-07-25 | 1998-10-20 | Hitachi, Ltd. | Electric power flow controller |
RU2214667C2 (en) * | 2001-12-26 | 2003-10-20 | Орловский государственный аграрный университет | Method for power-up control of automatic load transfer center in ring mains |
EP2942855A1 (en) * | 2014-05-08 | 2015-11-11 | Rheinisch-Westfälisch-Technische Hochschule Aachen | Method and system for monitoring distribution systems |
RU188256U1 (en) * | 2018-12-24 | 2019-04-04 | Павел Владимирович Илюшин | Power supply control device for an industrial energy district with distributed generation sources during a short circuit on a redundant section of substation buses |
-
2021
- 2021-07-05 RU RU2021119619A patent/RU2769456C1/en active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5825162A (en) * | 1994-07-25 | 1998-10-20 | Hitachi, Ltd. | Electric power flow controller |
RU2214667C2 (en) * | 2001-12-26 | 2003-10-20 | Орловский государственный аграрный университет | Method for power-up control of automatic load transfer center in ring mains |
EP2942855A1 (en) * | 2014-05-08 | 2015-11-11 | Rheinisch-Westfälisch-Technische Hochschule Aachen | Method and system for monitoring distribution systems |
RU188256U1 (en) * | 2018-12-24 | 2019-04-04 | Павел Владимирович Илюшин | Power supply control device for an industrial energy district with distributed generation sources during a short circuit on a redundant section of substation buses |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101192483A (en) | Switchgear control apparatus | |
US6980911B2 (en) | Automatic transfer switch system with synchronization control | |
CN111555433B (en) | Bus coupler device of direct current system and control method thereof | |
JP5073002B2 (en) | DC circuit ground fault search device and DC circuit ground fault accident location search method | |
CN110780126A (en) | Phase sequence detection device and method and air conditioning equipment | |
US20220408187A1 (en) | Device for electroinically connecting and disconnecting portions of an electrical line, public address system, method for detecting a failure in an electrical line | |
JP2009232489A (en) | Device for testing ac voltage circuit of distribution board, and method thereof | |
RU2769456C1 (en) | Method and device for remote channelless monitoring of the operation of a generation source connected to an electrical network powered by a two-transformer substation | |
CN107677930B (en) | UPS direct current bus fuse state detection method and device | |
AU2010202580A1 (en) | Device and method for signalling electric faults, unit and electric panel comprising such a device | |
US7095240B2 (en) | Method of an apparatus for testing wiring | |
US8941265B2 (en) | Minimal interruption DC power supply | |
KR20120126583A (en) | System for detecting fault of capacitor linked with apparatus for automatically controlling a power factor | |
RU2768787C1 (en) | Method and device for remote channelless monitoring of the operation of a generation source connected to an electrical network powered by a single transformer substation | |
RU2755409C1 (en) | Method for remote channelless control of power reduction and disconnection of generation source connected to electrical network powered by two-transformer substation | |
CN111628526B (en) | Grid-connected control method based on multiple buses and multiple contactors | |
RU2711597C1 (en) | Method for disconnection of a switchgear of a transformer substation and for signaling and informing personnel of an electric grid organization at unauthorized supply of voltage from a low side of a transformer substation | |
CN210863900U (en) | Uninterrupted spare power automatic switching operation simulation calibration device | |
RU2760870C1 (en) | Method for remote channelless control of power reduction and disconnection of the generation source connected to the electrical network | |
CN108693861B (en) | Hot standby repeater, dual-computer hot standby system and control switching method | |
EP2595268B1 (en) | Minimal interruption DC power supply | |
RU2767519C1 (en) | Method and device for determining reasons for disconnection of consumers of a partitioned power transmission line | |
JPH09153396A (en) | Lighting monitoring system | |
US20060126240A1 (en) | AC power backfeed protection based on voltage | |
CN112803586B (en) | Automatic setting method and device for rated parameters of circuit breaker and circuit breaker |