RU2758636C1 - Method for development of deposits of high-viscosity oil or bitumen - Google Patents
Method for development of deposits of high-viscosity oil or bitumen Download PDFInfo
- Publication number
- RU2758636C1 RU2758636C1 RU2021110627A RU2021110627A RU2758636C1 RU 2758636 C1 RU2758636 C1 RU 2758636C1 RU 2021110627 A RU2021110627 A RU 2021110627A RU 2021110627 A RU2021110627 A RU 2021110627A RU 2758636 C1 RU2758636 C1 RU 2758636C1
- Authority
- RU
- Russia
- Prior art keywords
- steam
- wells
- new
- injection
- production
- Prior art date
Links
- 238000011161 development Methods 0.000 title claims abstract description 17
- 238000000034 method Methods 0.000 title claims abstract description 17
- 239000010426 asphalt Substances 0.000 title claims abstract description 12
- 238000004519 manufacturing process Methods 0.000 claims abstract description 49
- 238000002347 injection Methods 0.000 claims abstract description 41
- 239000007924 injection Substances 0.000 claims abstract description 41
- 238000010276 construction Methods 0.000 claims abstract description 18
- 238000010438 heat treatment Methods 0.000 claims abstract description 16
- 238000010793 Steam injection (oil industry) Methods 0.000 claims abstract description 12
- 238000000605 extraction Methods 0.000 claims abstract description 8
- 239000007788 liquid Substances 0.000 claims abstract description 5
- 238000012544 monitoring process Methods 0.000 claims description 7
- 230000015572 biosynthetic process Effects 0.000 claims description 6
- 238000005086 pumping Methods 0.000 claims description 6
- 238000012423 maintenance Methods 0.000 claims 1
- 230000008030 elimination Effects 0.000 abstract 1
- 238000003379 elimination reaction Methods 0.000 abstract 1
- 238000011084 recovery Methods 0.000 abstract 1
- 239000000126 substance Substances 0.000 abstract 1
- 238000010792 warming Methods 0.000 abstract 1
- 230000018109 developmental process Effects 0.000 description 14
- 239000002826 coolant Substances 0.000 description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 239000004568 cement Substances 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 230000003247 decreasing effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 239000012530 fluid Substances 0.000 description 2
- 229920006395 saturated elastomer Polymers 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- 239000004215 Carbon black (E152) Substances 0.000 description 1
- 230000001174 ascending effect Effects 0.000 description 1
- 230000033558 biomineral tissue development Effects 0.000 description 1
- 244000309464 bull Species 0.000 description 1
- 229930195733 hydrocarbon Natural products 0.000 description 1
- 150000002430 hydrocarbons Chemical class 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000009827 uniform distribution Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
- E21B33/138—Plastering the borehole wall; Injecting into the formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Geophysics (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
Abstract
Description
Изобретение относится к нефтяной промышленности и может быть использовано для разработки залежей углеводородных флюидов, в частности, при добыче высоковязкой нефти или битума.The invention relates to the oil industry and can be used to develop deposits of hydrocarbon fluids, in particular, in the production of high-viscosity oil or bitumen.
Известен способ разработки залежи высоковязкой нефти или битума (патент RU № 2657307, МПК E21B 43/24, E21B 07/04, E21B 49/00, опубл. 13.06.2018 Бюл. № 17), включающий геофизические исследования залежи, строительство выше водонефтяного контакта горизонтальных скважин с дополнительными стволами, последовательную закачку теплоносителя и отбор продукции из горизонтальных скважин, причем геофизическими исследованиями и по данным отбора керна определяют среднюю нефтенасыщенную толщину залежи, выделяют участки с начальной нефтенасыщенной толщиной более 10% выше средней по залежи, выбирают из этих участков те, которые находятся на расстоянии от горизонтального ствола не более 90% расстояния между соседними горизонтальными скважинами, а дополнительные стволы бурят со вскрытием выбранных участков, причем зенитный угол дополнительных стволов выбирают в зависимости от плотности закачиваемого теплоносителя.A known method of developing a deposit of high-viscosity oil or bitumen (patent RU No. 2657307, IPC E21B 43/24, E21B 07/04, E21B 49/00, publ. 13.06.2018 Bul. No. 17), including geophysical research of the deposit, construction above the oil-water contact horizontal wells with additional boreholes, sequential injection of coolant and production of products from horizontal wells, and geophysical studies and coring data determine the average oil-saturated thickness of the reservoir, select areas with an initial oil-saturated thickness of more than 10% above the average for the reservoir, select from these areas those, which are located at a distance from the horizontal wellbore no more than 90% of the distance between adjacent horizontal wells, and additional wellbores are drilled with the opening of selected sections, and the zenith angle of additional wellbores is selected depending on the density of the injected coolant.
Недостатками данного способа являются узкая область применения, так как возможно осуществление только на новых месторождениях при отборе кернов, и невозможность увеличения охвата залежи в зависимости от выработки.The disadvantages of this method are a narrow area of application, since it is possible to carry out only in new fields during the selection of cores, and the impossibility of increasing the coverage of the deposit, depending on the development.
Известен также способ разработки высоковязкой нефти (патент RU № 2657307, МПК E21B 43/24, E21B 07/04, опубл. 07.08.2018 Бюл. № 22), включающий строительство пар расположенных друг над другом горизонтальных добывающих и нагнетательных скважин, а также вертикальных наблюдательных скважин, закачку теплоносителя через нагнетательные скважины с прогревом продуктивного пласта и созданием паровой камеры, отбор продукции за счет парогравитационного дренажа через добывающие скважины и контроль за состоянием паровой камеры, при этом разработку ведут с регулированием текущего размера паровой камеры путем изменения объемов закачки теплоносителя в нагнетательные скважины и отбора жидкости из добывающих скважин с контролем объема паровой камеры, строительство в зонах наименьшего прогрева между добывающими скважинами выше подошвы пласта или уровня водонефтяного контакта - ВНК не менее чем на 2 м дополнительной скважины, через которую производят закачку теплоносителя до создания термодинамической связи с ближайшими парами горизонтальных скважин с последующим переводом на отбор продукции, причем выше дополнительной скважины в зоне наименьшего прогрева, но на расстоянии, исключающем прорыв теплоносителя, строят дополнительную нагнетательную скважину, через которую осуществляют закачку теплоносителя после начала отбора из дополнительной скважины в объеме, обеспечивающем равномерное распространение паровой камеры вокруг скважин и поддержание необходимой температуры для отбора продукции в дополнительной скважине.There is also known a method for the development of high-viscosity oil (patent RU No. 2657307, IPC E21B 43/24, E21B 07/04, publ. 07.08.2018 Bull. No. 22), including the construction of pairs of horizontal production and injection wells located one above the other, as well as vertical observation wells, pumping a coolant through injection wells with heating the productive formation and creating a steam chamber, product selection due to steam-gravity drainage through production wells and monitoring the state of the steam chamber, while development is carried out with the current size of the steam chamber being regulated by changing the volume of coolant injection into the injection wells. wells and fluid withdrawal from production wells with control of the volume of the steam chamber, construction in the zones of the least warm-up between production wells above the bottom of the formation or the level of water-oil contact - OWC for at least 2 m of an additional well, through which the coolant is injected until a thermodynamic connection is created and with the nearest pairs of horizontal wells with the subsequent transfer to production selection, and above the additional well in the zone of least heating, but at a distance excluding the breakthrough of the coolant, an additional injection well is built, through which the coolant is injected after the start of the extraction from the additional well in a volume that provides uniform distribution of the steam chamber around the wells and maintaining the required temperature for product selection in an additional well.
Недостатками данного способа являются большие материальные, финансовые и временные затраты, связанные с необходимостью строительства новых горизонтальных скважин и введения дополнительных мощностей парогенераторов для прогрева дополнительных скважин.The disadvantages of this method are large material, financial and time costs associated with the need for the construction of new horizontal wells and the introduction of additional capacities of steam generators to warm up additional wells.
Наиболее близким по технической сущности является способ разработки залежи сверхвязкой нефти на поздней стадии (патент RU № 2675114, МПК E21B 43/24, E21B 07/04, E21B 47/06, опубл. 17.12.2018 Бюл. № 35), включающий строительство пар расположенных друг над другом горизонтальных добывающих и нагнетательных скважин, оснащенных в горизонтальной части соответствующими фильтрами-хвостовиками, прогрев залежи закачкой теплоносителя - пара в обе скважины с прогревом продуктивного пласта и созданием паровой камеры, закачку пара через нагнетательные скважины, отбор продукции за счет парогравитационного дренажа через добывающие скважины и контроль состояния паровой камеры, причем после выработки участка залежи в одной из пар скважин останавливают закачку пара и отбор жидкости, после снижения температуры в добывающей скважине ниже 80°С из остывшей добывающей скважины извлекают фильтр-хвостовик, из добывающей скважины производят бурение нового горизонтального ствола, оснащаемого впоследствии фильтром-хвостовиком, в направлении не охваченных разработкой участков, производят закачку пара в обе скважины для получения гидродинамической связи между стволами и поддержания необходимой температуры, закачивают пар через нагнетательную скважину и осуществляют отбор продукции за счет парогравитационного дренажа через новый ствол добывающей скважины с контролем состояния паровой камеры.The closest in technical essence is a method of developing a super-viscous oil deposit at a late stage (patent RU No. 2675114, IPC E21B 43/24, E21B 07/04, E21B 47/06, publ. 17.12.2018 Bul. No. 35), including the construction of steam horizontal production and injection wells located one above the other, equipped in the horizontal part with appropriate liner filters, heating the deposit by pumping a coolant - steam into both wells with heating the productive formation and creating a steam chamber, injection of steam through injection wells, product withdrawal due to steam-gravity drainage through production wells and monitoring the state of the steam chamber, and after the development of a section of the deposit in one of the pairs of wells, steam injection and liquid withdrawal are stopped, after the temperature in the production well has dropped below 80 ° C, a liner filter is removed from the cooled production well, a new one is drilled from the production well horizontal borehole, subsequently equipped with a filter - with the liner, in the direction of the areas not covered by development, steam is injected into both wells to obtain a hydrodynamic connection between the boreholes and maintain the required temperature, steam is injected through the injection well and product selection is carried out due to steam-gravity drainage through a new production wellbore with control of the state of the steam chamber ...
Недостатками данного способа являются узкая область применения, так как необходима гидродинамическая связь между скважинами (обычно не более 15 м на месторождениях Республики Татарстан – РТ), потому что при отсутствии связи нового горизонтального ствола добывающей скважины и нагнетательной скважинной невозможна реализация паро-гравитационного дренажа (ПГД – SAGD), при этом после бурения нового горизонтального ствола при изменении зенитного угла (восходящий - ˃ 90º на нисходящий - ˂ 90º или наоборот) на переходе от старого ствола к горизонтальному участку затруднен ввод в него хвостовика с фильтром и скважинного оборудования (насоса, температурных датчиком, при необходимости пакера и т.п.), а извлечение фильтра-хвостовика трудоемкий и затратный процесс и существует риск аварийных ситуаций с высокой вероятностью (свыше 50% на залежах РТ).The disadvantages of this method are a narrow field of application, since a hydrodynamic connection between wells is required (usually no more than 15 m in the fields of the Republic of Tatarstan - RT), because in the absence of a connection between a new horizontal wellbore of a production well and an injection well, it is impossible to implement steam-gravity drainage (PGD - SAGD), while after drilling a new horizontal wellbore when the zenith angle changes (ascending - ˃ 90º to descending - ˂ 90º or sensor, if necessary, a packer, etc.), and the extraction of the liner filter is a laborious and costly process and there is a risk of emergency situations with a high probability (over 50% in the deposits of the Republic of Tatarstan).
Технической задачей предполагаемого изобретения является создание способа разработки залежи высоковязкой нефти или битума, позволяющего производить SAGD на остаточные запасы нефти в залежи для их извлечения при любом расстоянии от соответствующих старых горизонтальных скважин за счет строительства новых парных боковых стволов, облегчить ввод хвостовика и скважинного оборудования за счет строительства нисходящего участка бокового ствола перед переходом в горизонтальный участок этого ствола и исключить аварийные ситуации, связанные с извлечением фильтров-хвостовиков.The technical objective of the proposed invention is to create a method for the development of a reservoir of high-viscosity oil or bitumen, which makes it possible to produce SAGD for residual oil reserves in the reservoir for their extraction at any distance from the corresponding old horizontal wells due to the construction of new paired sidetracks, to facilitate the introduction of the liner and downhole equipment due to construction of a descending section of a sidetrack before transition to the horizontal section of this wellbore and to exclude emergencies associated with the extraction of liner filters.
Техническая задача решается способом разработки залежи высоковязкой нефти или битума, включающим строительство пар расположенных друг над другом горизонтальных добывающих и нагнетательных скважин, оснащенных в горизонтальной части соответствующими фильтрами-хвостовиками, прогрев залежи закачкой теплоносителя - пара в обе скважины с прогревом продуктивного пласта и созданием паровой камеры, закачку пара через нагнетательные скважины, отбор продукции за счет паро-гравитационного дренажа через добывающие скважины и контроль состояния паровой камеры, после выработки участка залежи в одной из пар скважин производят остановку закачки пара и отбора жидкости, после снижения температуры в добывающей скважине ниже 80°С, строительство из добывающей, оснащаемого впоследствии фильтрами-хвостовиками, в направлении не охваченных разработкой участков, закачку пара в обе скважины для получения гидродинамической связи между стволами и поддержания необходимой температуры, закачивают пар через нагнетательную скважину и осуществляют отбор продукции за счет паро-гравитационного дренажа через новый ствол добывающей скважины с контролем состояния паровой камеры.The technical problem is solved by the method of developing a deposit of high-viscosity oil or bitumen, including the construction of pairs of horizontal production and injection wells located one above the other, equipped in the horizontal part with appropriate liner filters, heating the deposit by pumping a coolant - steam into both wells with heating the productive formation and creating a steam chamber , steam injection through injection wells, product withdrawal due to steam-gravity drainage through production wells and monitoring the state of the steam chamber, after the development of a section of the deposit in one of the pairs of wells, steam injection and liquid withdrawal are stopped, after the temperature in the production well drops below 80 ° C, construction from the production, subsequently equipped with liner filters, in the direction of the areas not covered by development, injection of steam into both wells to obtain a hydrodynamic connection between the boreholes and maintain the required temperature, steam is injected through a blower well and carry out the selection of products due to steam-gravity drainage through a new production wellbore with control of the state of the steam chamber.
Новым является то, что в выработанной паре добывающей и нагнетательной скважин производят изоляцию ствола соответствующей скважины, расположенного ниже уровня выхода дополнительного ствола, под которым в соответствующей скважине устанавливают клин-отклонитель для вырезки окна и строительства новых стволов с горизонтальными участками из обоих скважин, причем из нагнетательной скважины строительство нового ствола производят с горизонтальным участком над новым горизонтальным участком добывающей скважины на расстоянии, обеспечивающим гидродинамическую связь между стволами после прогрева, но исключающем прорыв пара, оснащение перед закачкой пара нового горизонтального участка нагнетательной скважины фильтром-хвостовиком, при этом выход новых стволов из скважин располагают выше соответствующих горизонтальных участков новых стволов для обеспечения нисходящих участков между скважинами и новыми горизонтальными участками.The novelty is that in the depleted pair of production and injection wells, the wellbore of the corresponding well is isolated, located below the exit level of the additional wellbore, under which a whipstock is installed in the corresponding well to cut out a window and build new wellbores with horizontal sections from both wells, and from of the injection well, the construction of a new wellbore is carried out with a horizontal section above the new horizontal section of the production well at a distance that provides a hydrodynamic connection between the wells after heating, but excludes steam breakthrough, equipping the new horizontal section of the injection well with a liner filter before steam injection, while the new wellbores exit from the wells are positioned above the corresponding horizontal sections of the new boreholes to provide descending sections between the wells and the new horizontal sections.
На фиг. 1 изображена схема реализации способа (вид сбоку).FIG. 1 shows a diagram of the implementation of the method (side view).
На фиг. 2 изображена схема реализации способа (вид сверху).FIG. 2 shows a diagram of the implementation of the method (top view).
Способ разработки залежи 1 (фиг. 1) высоковязкой нефти или битума включает строительство пар расположенных друг над другом горизонтальных добывающих 2 и нагнетательных 3 скважин, оснащенных в горизонтальной части соответствующими фильтрами-хвостовиками 4 и 5, прогрев залежи закачкой теплоносителя - пара в обе скважины 2 и 3 с прогревом продуктивного пласта залежи 1 и созданием паровой камеры (не показана), закачку пара через нагнетательные скважины 3, отбор продукции за счет паро-гравитационного дренажа (SAGD) через добывающие скважины 2 и контроль состояния паровой камеры (температурой отбираемой нефти или битума, минерализацией воды в добываемой продукции, контроль температуры датчиками(не показаны), спущенными в скважины 2 и 3 или т.п. – авторы на это не претендуют). После выработки участка залежи 1 в одной из пар скважин 2 и 3 производят остановку закачки пара и отбора жидкости. Ожидают снижения температуры в добывающей скважине ниже 80°С, после чего выработанной паре добывающей 2 и нагнетательной 3 скважин производят изоляцию ствола соответствующей скважины 2 и 3, расположенного ниже уровня соответствующего выхода 6 и 7 нового дополнительного ствола 8 и 9 Под соответствующем выходе 6 и 7 в соответствующей скважине 2 и 3 устанавливают клин-отклонитель 10 и 11. Изоляцию скважин 2 и 3 производят, например, заливкой цемента для герметичного перекрытия интервала фильтров-хвостовиков 4 и 5 с последующей установкой клиньев-отклонителей 10 и 11, установкой клиньев-отклонителей 10 и 11 с якорями и глухими пакерами или т.п. – авторы на это не претендуют. Перед установкой клиньев-отклонителей 10 и 11 производят геофизические исследования для определения расположения не охваченных разработкой участков 12 (фиг. 2), чтобы правильно сориентировать установку клиньев-отклонителей 10 (фиг. 1) и 11 и разместить выходы 6 и 7 выше горизонтальных участков 13 и 14 новых стволов 8 и 9. При помощи клиньев-отклонителей 10 и 11 фрезой (не показана) вырезают окна (не показаны) в фильтрах-хвостовиках 4 и 5 или в обсадных колоннах (не показаны) в стенках скважин 2 и 3, образуя выходы 6 и 7 стволов 8 и 9. После чего при помощи клиньев-отклонителей 10 и 11 в выходы 6 и 7 вводят бурильный инструмент и бурят дополнительные стволы 8 и 9. Сначала нисходящие (зенитный угол ˂ 90º) участки 15 и 16, переходящие в горизонтальные участки 13 и 14 соответственно в не охваченном разработкой участке 12 (фиг. 2). Причем расстояние L горизонтальных участков 13 и 14 новых стволов 8 и 9 от скважин 2 и 3 может быть любым, а горизонтальный участок 14 (фиг. 1) ствола 9 нагнетательной скважины 3 должен располагаться над горизонтальным участком 13 ствола 8 добывающей скважины 2 на расстоянии H (определено эмпирическим путем), обеспечивающим гидродинамическую связь между стволами 8 и 9 после прогрева, но исключающем прорыв пара из нагнетательной скважины 3 в добывающую 2. Горизонтальные стволы 8 и 9 добывающей 2 и нагнетательной скважины оснащают новыми фильтрами-хвостовиками 17 и 18 соответственно. После чего осуществляют закачку пара в обе скважины 2 и 3 для получения гидродинамической связи между стволами 8 и 9 и поддержания необходимой температуры, закачивают пар через новый ствол 9 нагнетательной скважины 3 и осуществляют отбор продукции за счет паро-гравитационного дренажа через новый ствол 8 добывающей скважины 2 с контролем состояния паровой камеры.The method of developing deposits 1 (Fig. 1) of high-viscosity oil or bitumen includes the construction of pairs of
Пример конкретного выполнения способаAn example of a specific implementation of the method
На Ашальчинском месторождении залежей битума РТ, находящемся на глубине 90 м, расположена залежь 1 (фиг. 1) толщиной 20-30 м, пластовой температурой 8°С, давлением 0,5 МПа, нефтенасыщенностью 0,7 д.ед., пористостью 30 %, проницаемостью 2,65 мкм2, плотностью битума в пластовых условиях 960 кг/м3, вязкостью 22000 мПа•с пробурили пару расположенных друг над другом горизонтальных добывающую 2 и нагнетательную 3 скважин на расстоянии H = 5 – 7 м, оснащенных в горизонтальной части соответствующими фильтрами-хвостовиками 4 и 5 (диаметром 168 мм, длиной 700 м и 710 м), осуществили прогрев залежи закачкой теплоносителя - пара в обе скважины 2 и 3 с прогревом продуктивного пласта залежи 1 и созданием паровой камеры. После чего через нагнетательные скважины 3 продолжили закачку пара, а отбор продукции за счет паро-гравитационного дренажа (SAGD) стали осуществлять через добывающие скважины 2 с контроль состояния паровой камеры (обводненности продукции в пределах 86 – 92%). После 15 лет эксплуатации и выработки участка залежи 1 одной из пар скважин 2 и 3 снизился дебит нефти в 2,5 раза, а обводненнсть продукции составила более 96 % и продолжала увеличиваться, показывая, что на этом участке залежи 1 произошла полная выработка запасов нефти. На этом участке произвели геофизические исследования с использованием аэрофотосъемки тепловизором (для определения участков с наименьшей температурой) и геолого-гидродинамического моделирования произвели определение не охваченного разработкой участка 12 (фиг. 2), который оказались расположенными от скважин 2 и 3 на расстоянии L = 60 – 80 м. После чего остановили закачку пара через нагнетательную скважину 3 (фиг. 1), а после снижения температуры в добывающей скважине 2 произвели изоляцию скважин 2 и 3 заливкой цементного раствора в интервале фильтров-хвостовиков 4 и 5. После технологической выдержки, достаточной для схватывания (отверждения) цементного раствора, в скважина 2 и 3 установили клинья-отклонители 10 и 11 на расстоянии 35 и 40 м с контролем ориентации выше фильтров-хвостовиков 4 и 5 соответствующих скважин 2 и 3 для обеспечения нисходящих участков 15 и 16 новых стволов 8 и 9 и направления в сторону не охваченного разработкой участка 12 (фиг. 2) для вскрытия. На испытательных скважинах 2 (фиг. 1) и 3 использовались клинья-отклонители 10 и 11 изготовленные по патентам RU №№ 2390615 и 2568454 (возможно использование и других аналогичных конструкций). В обсадных колоннах (диаметром 245 мм) скважин 2 и 3 при помощи произвели вырезку фрезой (диаметром 220 мм) мм окон с образованием выходов 6 и 7 дополнительных стволов 8 и 9, через которые долотом (диаметром 215,9 мм) произвели бурение дополнительных стволов 8 и 9 с соответствующими нисходящими участками 15 и 16 и горизонтальными участками 13 и 14, которыми вскрыли не охваченный разработкой участок 12 (фиг. 2) на расстоянии L = 69 – 72 м. Причем для исключения прорыва пара и качественного прогрева не охваченного разработкой участка 12 между горизонтальными участками 13 (фиг. 1) и 14 выдержали расстояние Н = 6 – 8 м. Дополнительные стволы 8 и 9 оснастили фильтрами-хвостовиками 17 и 18 (диаметром 146 мм, длиной 810 м и 820 м). В дополнительные стволы 8 и 9 скважин 2 и 3 спустили насосно-компрессорные труб (НКТ – не показаны, диаметром 73 мм), через которые в обе скважины 2 и 3 нагнетали пар температурой 190 - 200ºС до получения гидродинамической связи (определяется изменением давления в скважине 2 или 3 при изменении давления в скважине 3 или 2). После чего из добывающей скважины 2 извлекли НКТ и спустили в дополнительный ствол 8 НКТ с насосом, датчиками температуры и давления (не показаны) для контроля за состоянием паровой камеры. Закачку пара в нагнетательную скважинку 3 продолжили, осуществляя отбор продукции залежи 1 насосным оборудованием из добывающей скважины 2. Ни одного прихвата (застревания) в скважинах 2 и 3 НКТ и скважинного оборудования при спускоподъемных операциях не наблюдалось, а нагрузки на НКТ не превышали допустимые. В результате дебит добываемой продукции восстановился, а обводненность продукции снизилась до 82 – 86%. При этом стоимость строительства дополнительных стволов 8 и 9 оказалась в более чем в 2 раза меньше, чем при строительстве новых скважин.At the Ashalchinskoye field of RT bitumen deposits, located at a depth of 90 m, there is deposit 1 (Fig. 1) 20-30 m thick,
Предлагаемого способ разработки залежи высоковязкой нефти или битума позволяет производить паро-гравитационной дренирование остаточных запасов нефти в залежи для их извлечения при любом расстоянии от соответствующих старых горизонтальных скважин за счет строительства из них новых парных боковых стволов, облегчает ввод хвостовика и скважинного оборудования за счет строительства нисходящего участка бокового ствола перед переходом в горизонтальный участок этого ствола и исключает аварийные ситуации, связанные с извлечением фильтров-хвостовиков.The proposed method for the development of high-viscosity oil or bitumen deposits allows for steam-gravity drainage of residual oil reserves in the reservoir for their extraction at any distance from the corresponding old horizontal wells due to the construction of new paired sidetracks from them, facilitates the introduction of the liner and downhole equipment due to the construction of the descending section of the sidetrack before the transition to the horizontal section of this borehole and eliminates emergencies associated with the extraction of liner filters.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2021110627A RU2758636C1 (en) | 2021-04-15 | 2021-04-15 | Method for development of deposits of high-viscosity oil or bitumen |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2021110627A RU2758636C1 (en) | 2021-04-15 | 2021-04-15 | Method for development of deposits of high-viscosity oil or bitumen |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2758636C1 true RU2758636C1 (en) | 2021-11-01 |
Family
ID=78466710
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2021110627A RU2758636C1 (en) | 2021-04-15 | 2021-04-15 | Method for development of deposits of high-viscosity oil or bitumen |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2758636C1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2803347C1 (en) * | 2023-04-20 | 2023-09-12 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Method for developing superviscous oil deposits |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013170356A1 (en) * | 2012-05-17 | 2013-11-21 | Ben Nzekwu | Steam assisted gravity drainage system and method |
RU2657307C1 (en) * | 2017-09-26 | 2018-06-13 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Method for development of deposit of highly viscous oil or bitumen |
RU2663532C1 (en) * | 2017-10-23 | 2018-08-07 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Method for developing high-viscosity oil |
RU2675114C1 (en) * | 2018-02-05 | 2018-12-17 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Method of super-viscous oil field development |
RU2719882C1 (en) * | 2019-09-30 | 2020-04-23 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Development method of super-viscous oil deposit at late stage |
-
2021
- 2021-04-15 RU RU2021110627A patent/RU2758636C1/en active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013170356A1 (en) * | 2012-05-17 | 2013-11-21 | Ben Nzekwu | Steam assisted gravity drainage system and method |
RU2657307C1 (en) * | 2017-09-26 | 2018-06-13 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Method for development of deposit of highly viscous oil or bitumen |
RU2663532C1 (en) * | 2017-10-23 | 2018-08-07 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Method for developing high-viscosity oil |
RU2675114C1 (en) * | 2018-02-05 | 2018-12-17 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Method of super-viscous oil field development |
RU2719882C1 (en) * | 2019-09-30 | 2020-04-23 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Development method of super-viscous oil deposit at late stage |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2808285C1 (en) * | 2023-04-05 | 2023-11-28 | Публичное акционерное общество "Татнефть" имени В.Д.Шашина | Method for developing super-viscous oil deposits at a late stage |
RU2803347C1 (en) * | 2023-04-20 | 2023-09-12 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Method for developing superviscous oil deposits |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5131471A (en) | Single well injection and production system | |
CA1070611A (en) | Recovery of hydrocarbons by in situ thermal extraction | |
US10815761B2 (en) | Process for producing hydrocarbons from a subterranean hydrocarbon-bearing reservoir | |
US7422063B2 (en) | Hydrocarbon recovery from subterranean formations | |
US5215149A (en) | Single horizontal well conduction assisted steam drive process for removing viscous hydrocarbonaceous fluids | |
RU2328590C1 (en) | Separate maintenance process for injection or production well and implementation variants | |
US5014787A (en) | Single well injection and production system | |
CA2031814C (en) | Method of recovering hydrocarbons using single well injection/production system | |
RU2387819C1 (en) | Method to develop sticky oil and bitumen accumulation | |
RU2582251C1 (en) | Development method of layer-by-zonal heterogeneous superviscous oil or bitumen | |
RU2582529C1 (en) | Development method of layer-by-zonal heterogeneous superviscous oil or bitumen | |
RU2626845C1 (en) | High-viscosity oil or bitumen recovery method, using hydraulic fractures | |
RU2506417C1 (en) | Development method of high-viscosity oil deposit | |
RU2758636C1 (en) | Method for development of deposits of high-viscosity oil or bitumen | |
RU2719882C1 (en) | Development method of super-viscous oil deposit at late stage | |
RU2693055C1 (en) | Method for development of high-viscosity oil deposit with water-saturated zones | |
RU2618542C1 (en) | Method for development of oil deposits by hydraulic fracturing fractures | |
RU2584467C1 (en) | Method of developing high-viscosity oil field | |
RU2690586C1 (en) | Method for development of high-viscosity oil deposit with water-saturated zones | |
CA2963459A1 (en) | The method of thermal reservoir stimulation | |
RU2739013C1 (en) | Method for development of high-viscosity oil deposit with water-saturated zones | |
RU2803347C1 (en) | Method for developing superviscous oil deposits | |
RU2757836C1 (en) | Method for development of a zonal-heterogeneous oil reservoir | |
RU2808285C1 (en) | Method for developing super-viscous oil deposits at a late stage | |
RU2803344C1 (en) | Method for developing superviscous oil deposits |