RU2681774C1 - Drill string circulation valve - Google Patents
Drill string circulation valve Download PDFInfo
- Publication number
- RU2681774C1 RU2681774C1 RU2018107161A RU2018107161A RU2681774C1 RU 2681774 C1 RU2681774 C1 RU 2681774C1 RU 2018107161 A RU2018107161 A RU 2018107161A RU 2018107161 A RU2018107161 A RU 2018107161A RU 2681774 C1 RU2681774 C1 RU 2681774C1
- Authority
- RU
- Russia
- Prior art keywords
- sleeve
- circulation
- spool
- drill string
- ports
- Prior art date
Links
- 239000012530 fluid Substances 0.000 claims abstract description 162
- 238000011144 upstream manufacturing Methods 0.000 claims abstract description 40
- 230000004913 activation Effects 0.000 claims abstract description 38
- 238000005086 pumping Methods 0.000 claims abstract description 22
- 239000007787 solid Substances 0.000 claims abstract description 22
- 238000004891 communication Methods 0.000 claims abstract description 10
- 238000003825 pressing Methods 0.000 claims abstract description 5
- 238000005553 drilling Methods 0.000 abstract description 94
- 230000000694 effects Effects 0.000 abstract description 5
- 239000011435 rock Substances 0.000 abstract description 3
- 230000000903 blocking effect Effects 0.000 abstract description 2
- 239000000126 substance Substances 0.000 abstract description 2
- 239000002689 soil Substances 0.000 abstract 1
- 239000000463 material Substances 0.000 description 41
- 239000004576 sand Substances 0.000 description 35
- 230000002706 hydrostatic effect Effects 0.000 description 18
- 239000004927 clay Substances 0.000 description 16
- 239000003795 chemical substances by application Substances 0.000 description 15
- 229920001971 elastomer Polymers 0.000 description 14
- 239000007790 solid phase Substances 0.000 description 13
- RAQDACVRFCEPDA-UHFFFAOYSA-L ferrous carbonate Chemical compound [Fe+2].[O-]C([O-])=O RAQDACVRFCEPDA-UHFFFAOYSA-L 0.000 description 11
- 239000000806 elastomer Substances 0.000 description 10
- 239000003209 petroleum derivative Substances 0.000 description 10
- 229910021646 siderite Inorganic materials 0.000 description 10
- 230000003628 erosive effect Effects 0.000 description 9
- 230000007246 mechanism Effects 0.000 description 7
- 238000000034 method Methods 0.000 description 6
- 230000008569 process Effects 0.000 description 6
- VTYYLEPIZMXCLO-UHFFFAOYSA-L Calcium carbonate Chemical compound [Ca+2].[O-]C([O-])=O VTYYLEPIZMXCLO-UHFFFAOYSA-L 0.000 description 5
- BVKZGUZCCUSVTD-UHFFFAOYSA-L Carbonate Chemical compound [O-]C([O-])=O BVKZGUZCCUSVTD-UHFFFAOYSA-L 0.000 description 5
- 238000010521 absorption reaction Methods 0.000 description 5
- TZCXTZWJZNENPQ-UHFFFAOYSA-L barium sulfate Chemical compound [Ba+2].[O-]S([O-])(=O)=O TZCXTZWJZNENPQ-UHFFFAOYSA-L 0.000 description 4
- 239000010428 baryte Substances 0.000 description 4
- 229910052601 baryte Inorganic materials 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 239000012071 phase Substances 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 230000003213 activating effect Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 241001317177 Glossostigma diandrum Species 0.000 description 1
- 239000000956 alloy Substances 0.000 description 1
- 229910045601 alloy Inorganic materials 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000011010 flushing procedure Methods 0.000 description 1
- 238000005194 fractionation Methods 0.000 description 1
- 238000002386 leaching Methods 0.000 description 1
- 238000003801 milling Methods 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- UONOETXJSWQNOL-UHFFFAOYSA-N tungsten carbide Chemical compound [W+]#[C-] UONOETXJSWQNOL-UHFFFAOYSA-N 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/14—Valve arrangements for boreholes or wells in wells operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/10—Valve arrangements in drilling-fluid circulation systems
- E21B21/103—Down-hole by-pass valve arrangements, i.e. between the inside of the drill string and the annulus
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Check Valves (AREA)
Abstract
Description
Изобретение относится к циркуляционным клапанам бурильной колонны, позволяющим многократно переключать поток текучей среды - бурового раствора, включающего кольматационные материалы, из внутреннего пространства бурильной колонны в затрубное, минуя все элементы компоновки низа бурильной колонны, находящиеся ниже клапана.The invention relates to circulation valves of the drill string, allowing multiple switching of the fluid flow - the drilling fluid, including mud materials, from the inner space of the drill string to the annulus, bypassing all the elements of the bottom of the drill string located below the valve.
Известен скважинный инструмент для циркуляции текучей среды в стволе скважины, содержащий трубчатый корпус с внешними отверстиями, поршень, установленный с возможностью скольжения внутри корпуса, внутреннее расходное отверстие, проходящее через корпус и поршень, через которое проходит первичная траектория движения текучей среды, при этом поршень имеет первое положение, в котором внешние отверстия выполнены перекрываемыми от первичной траектории движения текучей среды, и второе положение, в котором блокируется первичная траектория движения текучей среды и открываются внешние отверстия для обхода указанной траектории между внутренним расходным отверстием и кольцевым зазором ствола скважины, и делительный механизм, установленный между корпусом и поршнем для направления поршня между первым и вторым положениями (US 8844634 В2, 30.09.2014).A well-known downhole tool for circulating a fluid in a wellbore, comprising a tubular body with external holes, a piston slidably mounted inside the body, an internal flow hole passing through the body and the piston through which the primary fluid path passes, the piston having the first position in which the outer holes are made overlapped from the primary path of the fluid, and the second position in which the primary path is blocked izheniya fluid and external openings are opened to bypass said path between the internal bore and consumable annulus of the wellbore, and dividing mechanism mounted between the housing and the piston to the piston direction between first and second positions (US 8,844,634 B2, 09.30.2014).
В известном скважинном инструменте поршень установлен с возможностью перемещения между первым и вторым положениями неограниченное число раз за один цикл опускания в скважину, делительный механизм содержит шлицевую втулку и поворотное делительное кольцо, шлицевая втулка закреплена в корпусе, содержит скошенные выступы и внутренние шлицы, выполненные с возможностью захода поочередно в расположенные на поворотном делительном кольце длинные и короткие пазы.In a well-known downhole tool, a piston is mounted to move between the first and second positions an unlimited number of times per lowering cycle into the well, the dividing mechanism comprises a spline sleeve and a rotary dividing ring, the spline sleeve is fixed in the housing, contains beveled protrusions and internal slots made approach alternately in the long and short grooves located on the rotary dividing ring.
Известный скважинный инструмент включает сердечник, установленный в поршне, имеющий верхний конец, расположенный под верхним концом поршня, снабженным седлом для шарика и входным отверстием, в первом положении, включает шарик, установленный на седле с возможностью блокирования первичной траектории движения текучей среды и создания вторичной внутренней траектории движения текучей среды через внутреннее отверстие, при этом внутреннее отверстие расположено под верхним концом сердечника во втором положении для перекрытия внутренней траектории движения текучей среды и открытия внешних отверстий для обходной траектории движения текучей среды.A well-known downhole tool includes a core mounted in a piston having an upper end located below the upper end of the piston provided with a ball seat and an inlet, in a first position, includes a ball mounted on the seat with the ability to block the primary fluid path and create a secondary internal the path of the fluid through the inner hole, while the inner hole is located under the upper end of the core in the second position to overlap the inner the trajectory of movement of the fluid and the external opening holes for the bypass path of the fluid motion.
Циркуляционный переводник 105 выполнен с возможностью нахождения в различных положениях, в которых обеспечивается проход текучей среды по одной из траекторий.The circulation sub 105 is arranged to be in various positions in which the passage of fluid along one of the trajectories is provided.
В первом положении текучая среда проходит по траектории 130 от верхнего переводника 110 через циркуляционный переводник 105, расходное отверстие 135 к нижнему переводнику 120 и другим элементам, которые могут располагаться спереди по ходу скважины от нижнего переводника 120.In the first position, the fluid passes along the path 130 from the upper sub 110 through the circulation sub 105, the flow outlet 135 to the lower sub 120 and other elements that may be located upstream of the lower sub 120.
Когда циркуляционный переводник 105 находится во втором положении, текучая среда проходит по траектории 130 в верхнем переводнике 110 вокруг шарика 245 и через отверстия 260, и в конце возвращается в проходное отверстие 135 и вновь попадает на траекторию 130 к нижнему переводнику 120.When the circulation sub 105 is in the second position, the fluid passes along the path 130 in the upper sub 110 around the ball 245 and through the holes 260, and finally returns to the bore 135 and again enters the path 130 to the lower sub 120.
В еще одном положении, когда циркуляционный переводник 105 находится в третьем положении, текучая среда отклоняется от траектории 130 через траекторию 132 движения в циркуляционном переводнике 105 к кольцевому зазору 145 ствола скважины, расположенному между участком 100 бурильной колонны и окружающей породой 147.In yet another position, when the circulation sub 105 is in the third position, the fluid deviates from the path 130 through the path 132 of the movement in the circulation sub 105 to the annular gap 145 of the wellbore located between the section 100 of the drill string and the surrounding rock 147.
После попадания в кольцевой зазор 145 ствола скважины текучая среда возвращается на поверхность в обход нижнего переводника 120 и других элементов, которые могут располагаться спереди по ходу скважины от нижнего переводника 120.After falling into the annular gap 145 of the wellbore, the fluid returns to the surface, bypassing the lower sub 120 and other elements that may be located upstream of the lower sub 120.
Делительный механизм 165 обеспечивает перемещение циркуляционного переводника 105 между этими различными положениями.The dividing mechanism 165 allows the circulation sub 105 to move between these different positions.
Как изображено на фиг. 9, шарик 245 блокирует проход потока бурового раствора через впускное отверстие 257 клапанного поршня 170.As shown in FIG. 9, ball 245 blocks the passage of mud flow through inlet 257 of valve piston 170.
Смещенный вниз клапанный поршень 170 перекрывает внешние отверстия 140 и прерывает связь текучей средой между траекторией 130 движения текучей среды и кольцевым зазором 145 ствола скважины.A downwardly displaced valve piston 170 overlaps the external openings 140 and interrupts fluid communication between the fluid path 130 and the annular gap 145 of the wellbore.
Таким образом, буровой раствор обтекает шарик 245 и проходит через отверстия 260 на внутреннем диаметре (см. также фиг. 4) в клапанный поршень 170, определяя вторичный внутренний поток.Thus, the drilling fluid flows around the ball 245 and passes through the holes 260 on the inner diameter (see also Fig. 4) into the valve piston 170, determining the secondary internal flow.
После прохождения через отверстия 260 внутреннего диаметра буровой раствор проходит через расходное отверстие 135 циркуляционного переводника 105 к нижнему переводнику 120 и элементам, которые могут располагаться в скважине ниже нижнего переводника 120.After passing through the holes 260 of the inner diameter, the drilling fluid passes through the feed hole 135 of the circulation sub 105 to the lower sub 120 and the elements that may be located in the well below the lower sub 120.
При нахождении циркуляционного переводника 105 в проходном положении, обеспечивается прохождение бурового раствора от верхнего переводника 110 через инструмент 105 к нижнему переводнику 120.When the circulation sub 105 is in the through position, the drilling fluid is passed from the upper sub 110 through the tool 105 to the lower sub 120.
Недостатком известного скважинного инструмента является неадекватное переключение делительного механизма, установленного между корпусом и поршнем для направления поршня между первым, вторым или промежуточными положениями, при этом оператору трудно определить истинное расположение частей поршня в корпусе, при котором указанный поршень имеет второе положение, в котором блокируется первичная траектория движения текучей среды и открываются внешние отверстия для обхода указанной траектории между внутренним расходным отверстием и кольцевым зазором ствола скважины, или третье положение, при котором циркуляционный переводник может выборочно переводиться в проходное положение или в перепускное положение за счет прерывания и возобновления расхода бурового раствора, или четвертое положение, при котором изменяется второе или третье положение при достижении заданного расхода бурового раствора, или пятое положение, при котором изменяется второе или третье положение за счет достижения требуемого перепада давления бурового раствора.A disadvantage of the known downhole tool is the inadequate switching of the dividing mechanism installed between the housing and the piston for guiding the piston between the first, second or intermediate positions, while it is difficult for the operator to determine the true location of the piston parts in the housing in which said piston has a second position in which the primary is locked the path of the fluid and the outer holes open to bypass the specified path between the internal flow hole and the total clearance of the wellbore, or the third position, in which the circulation sub can selectively be moved to the passage position or to the bypass position by interrupting and resuming the flow of the drilling fluid, or the fourth position, in which the second or third position changes when the specified flow rate of the drilling fluid is reached, or a fifth position in which a second or third position is changed by achieving the desired pressure drop of the drilling fluid.
Другим недостатком известного скважинного инструмента является то, что привод поршня клапана и делительного механизма осуществляется за счет создания повышенного давления бурового раствора на устье скважины для передачи требуемого перепада давления на глубине установки циркуляционного клапана в компоновке низа бурильной колонны.Another disadvantage of the known downhole tool is that the valve piston and the dividing mechanism are driven by creating increased pressure of the drilling fluid at the wellhead to transmit the required pressure drop at the installation depth of the circulation valve in the layout of the bottom of the drill string.
Создание требуемого перепада давления осуществляется установкой в проточном канале поршня дополнительного гидравлического сопротивления, например, канала с критическим сечением, при этом на выходе из канала скорость потока увеличивается, давление падает, образуется зона пониженного давления, создается перепад давления на поршне, однако это вызывает потери гидравлической мощности, тем самым ограничиваются гидравлические возможности в данной скважине ввиду увеличенной требуемой мощности для циркуляции бурового раствора через скважинный инструмент, при этом на малых расходах бурового раствора, перепада давления на поршне недостаточно для создания необходимого усилия для его перемещения и переключения.The required pressure drop is created by installing additional hydraulic resistance in the piston flow channel, for example, a channel with a critical cross-section, and at the outlet of the channel, the flow rate increases, pressure drops, a low pressure zone forms, and the pressure drop on the piston is created, but this causes a loss of hydraulic power, thereby limiting the hydraulic capabilities in this well due to the increased required power for circulation of the drilling fluid through the wells nny tool, while at the low flow of drilling fluid, the piston differential pressure is not enough to create the necessary efforts to move it and change.
Вследствие того, что делительный механизм, установленный между корпусом и поршнем для направления поршня между первым и вторым положениями, меняет свое положение при достижении заданного расхода бурового раствора, не исключаются ложные срабатывания поршня, снабженного седлом для шарика и входным отверстием, в первом положении, включающем шарик, установленный на седле с возможностью блокировки первичной траектории движения текучей среды и создания вторичной внутренней траектории движения текучей среды через внутреннее отверстие.Due to the fact that the dividing mechanism installed between the housing and the piston for guiding the piston between the first and second positions changes its position upon reaching a predetermined drilling fluid flow rate, false triggering of the piston equipped with a ball seat and an inlet in the first position, including a ball mounted on the saddle with the ability to block the primary path of the fluid and create a secondary internal path of the fluid through the inner hole.
Другим недостатком известной конструкции является сложность определения оператором расположения делительного механизма и циркуляционных отверстий в альтернативном варианте, когда циркуляционный переводник 105 находится во втором или проходном положении, текучая среда проходит по траектории 130 в верхнем переводнике 110 вокруг шарика 245 и через отверстия 260, и в конце возвращается в проходное отверстие 135 и вновь попадает на траекторию 130 к нижнему переводнику 120 и другим нижним элементам, а также в еще одном возможном положении, когда циркуляционный переводник 105 находится в перепускном положении, при котором текучая среда отклоняется от траектории 130 через траекторию 132 движения в циркуляционном переводнике 105 к кольцевому зазору 145 ствола скважины, расположенному между участком 100 бурильной колонны и окружающей породой 147.Another disadvantage of the known design is the difficulty of the operator determining the location of the dividing mechanism and the circulation holes in the alternative, when the circulation sub 105 is in the second or passage position, the fluid passes along the path 130 in the upper sub 110 around the ball 245 and through the holes 260, and at the end returns to the bore 135 and again enters the path 130 to the lower sub 120 and other lower elements, as well as in another possible position, when the circuit yatsionny sub 105 is in the bypass position in which fluid is deflected from the path 130 via path 132 of motion in circulating sub 105 to the annulus of the wellbore 145 located between the portion 100 of the drill string and the surrounding formation 147.
Другим недостатком известной конструкции является неполная возможность повышения ресурса и надежности, что объясняется гидроабразивным размывом отверстий циркуляционных портов, а также смещенного вниз клапанного поршня 170, который перекрывает внешние отверстия 140 и прерывает связь текучей средой между траекторией 130 движения текучей среды и кольцевым зазором 145 ствола скважины при использовании буровых растворов, включающих кольматационные материалы, например, буровых растворов с пониженным содержанием твердой фазы (р=2,2 г/см3), в которых в качестве утяжелителя используют сидерит (карбонат железа), а размер фракции кольматационных материалов составляет 3÷5 мм.Another disadvantage of the known design is the incomplete possibility of increasing the resource and reliability, which is explained by waterjet erosion of the holes of the circulation ports, as well as a downwardly displaced valve piston 170, which overlaps the external holes 140 and interrupts the fluid connection between the fluid path 130 and the annular gap 145 of the wellbore when using drilling fluids, including mud materials, for example, drilling fluids with a low solids content (p = 2.2 g / cm 3 ), in Siderides (iron carbonate) are used as a weighting agent, and the fraction of colmatization materials is 3–5 mm.
Известно устройство, позволяющее контролировать скважины в процессе бурения, состоящее из трубчатого корпуса, который устанавливается внутрь бурильной колонны, смещаемой втулки, расположенной внутри и перемещаемой по отношению к указанному трубчатому корпусу, пружины, удерживающей указанную втулку в первом положении внутри трубчатого корпуса, отверстия в указанной втулке для прохождения через него потока жидкости, первого шара, который устанавливается в указанное отверстие для перекрытия отверстия и препятствования проходу жидкости через указанное отверстие для смещения втулки внутри трубчатого корпуса, при этом указанный шар является деформируемым под воздействием повышающегося давления жидкости для того, чтобы его можно было протолкнуть через указанное отверстие наружу (US 5499687 А, 19.03.1996).A device is known that allows you to control wells during drilling, consisting of a tubular body that is installed inside the drill string, a biased sleeve located inside and moved relative to the specified tubular body, a spring holding the specified sleeve in the first position inside the tubular body, holes in the specified a sleeve for passing through it a fluid flow, the first ball, which is installed in the specified hole to block the hole and prevent the passage of fluid and through said hole for displacing the sleeve inside the tubular body, wherein said ball is deformable under the influence of increasing fluid pressure so that it can be pushed out through said hole (US 5499687 A, March 19, 1996).
Известное устройство содержит расширяемый пакер и средства для расширения пакера, когда шар расположен внутри указанного отверстия.The known device contains an expandable packer and means for expanding the packer when the ball is located inside the specified hole.
Известное устройство содержит второй шар, отвод в указанном трубчатом корпусе для прохода жидкости через него, указанный второй шар для уплотнения указанного отвода для создания достаточного давления для деформирования его и проталкивания через указанное отверстие.The known device contains a second ball, a tap in the specified tubular body for passage of fluid through it, the specified second ball to seal the specified tap to create sufficient pressure to deform it and push through the specified hole.
Известное устройство содержит шароуловитель, предусмотренный для захвата первого шара после того, как он проталкивается через указанное отверстие, и устроенный таким образом, чтобы позволять проход жидкости через него.The known device includes a ball trap, designed to capture the first ball after it is pushed through the specified hole, and arranged in such a way as to allow the passage of fluid through it.
Недостатком известной конструкции является неполная возможность повышения ресурса и надежности, что объясняется гидроабразивным износом и высокой вероятностью прихвата смещаемой втулки, расположенной внутри трубчатого корпуса и перемещаемой по отношению к указанному трубчатому корпусу, при использовании буровых растворов, включающих кольматационные материалы, например, при использовании буровых растворов с карбонатным утяжелителем - фракционированной мраморной крошкой (р=1,8 г/см3) или при использовании буровых растворов с пониженным содержанием твердой фазы (р=2,2 г/см3), в которых в качестве утяжелителя используют барит или сидерит (карбонат железа), а размер фракции кольматационных материалов составляет 3÷5 мм.A disadvantage of the known design is the incomplete possibility of increasing the resource and reliability, which is explained by hydroabrasive wear and a high likelihood of sticking to the displaceable sleeve located inside the tubular body and moved relative to the specified tubular body when using drilling fluids, including mud materials, for example, when using drilling fluids with a carbonate weighting agent - fractionated marble chips (p = 1.8 g / cm 3 ) or when using drilling fluids with low solid content (p = 2.2 g / cm 3 ), in which barite or siderite (iron carbonate) are used as a weighting agent, and the fraction of colmatization materials is 3–5 mm.
Известно циркуляционное устройство для установки в составе бурильной колонны, которое может переключаться между неактивным режимом, при котором оно не препятствует потоку жидкости по бурильной колонне в ходе нормального процесса бурения, и активным режимом, когда необходимо прервать процесс бурения, состоящее из наружного корпуса, втулки, смещающейся по оси внутри корпуса, посадочного седла, соединенного с втулкой, необходимого для приема активирующего шара, когда шар приводится в движение потоком бурового раствора по направлению от поверхности к нижней части бурильной колонны, упомянутое посадочное седло смещает втулку по оси и приводит к переводу инструмента в активный режим циркуляции, и циркуляционного порта в корпусе, который закрыт втулкой, когда инструмент находится в неактивном режиме, и открыт и обеспечивает сообщение с внутренним пространством бурильной колонны, когда инструмент в активном режиме, указанный циркуляционный порт расположен выше по потоку от посадочного седла, таким образом, чтобы позволить запирающему шару, который запускается после того, как активирующий шар попадает в посадочное седло, частично блокировать циркуляционный порт, что приводит к вымыванию выбуренной породы из буровой колонны потоком промывочной жидкости через порт (US 7347288 В2, 25.03.2008).A circulation device is known for installation in a drill string, which can switch between an inactive mode, in which it does not impede fluid flow through the drill string during a normal drilling process, and an active mode, when it is necessary to interrupt a drilling process consisting of an outer casing, a sleeve, axially displaced inside the housing, the seat saddle connected to the sleeve necessary to receive the activating ball when the ball is driven by the flow of drilling fluid in the direction from surface to the bottom of the drill string, the mentioned seat saddle biases the sleeve along the axis and causes the tool to enter the active circulation mode, and the circulation port in the housing, which is closed by the sleeve when the tool is in inactive mode, and is open and communicates with the interior of the drill columns when the tool is in active mode, the specified circulation port is located upstream of the seat saddle, so as to allow a locking ball that starts after As the activating ball enters the seat, partially block the circulation port, which leads to leaching of cuttings out of the drill string with flushing fluid through the port (US 7347288 B2, 03/25/2008).
Недостатком известной конструкции является неполная возможность повышения ресурса и надежности, что объясняется гидроабразивным размывом и высокой вероятностью прихвата смещаемой втулки, расположенной внутри трубчатого корпуса и перемещаемой по отношению к указанному трубчатому корпусу, а также высокой активностью кавитационных процессов потока бурового раствора через отверстия циркуляционных портов, что приводит к скоротечному износу циркуляционных портов и нестабильному закрытию клапана при использовании буровых растворов, включающих кольматационные материалы, например, при использовании буровых растворов с карбонатным утяжелителем - фракционированной мраморной крошкой (р=1,8 г/см3) или при использовании буровых растворов с пониженным содержанием твердой фазы (р=2,2 г/см3), в которых в качестве утяжелителя используют барит или сидерит (карбонат железа), а размер фракции кольматационных материалов составляет 3÷5 мм.A disadvantage of the known design is the incomplete possibility of increasing the resource and reliability, which is explained by waterjet erosion and a high likelihood of sticking to the displaceable sleeve located inside the tubular body and moved relative to the specified tubular body, as well as the high activity of cavitation processes of the drilling fluid flow through the openings of the circulation ports leads to fleeting wear of the circulation ports and unstable valve closure when using drilling fluids, in Luciano colmatation materials, for example, using drilling fluids with carbonate weighting - fractional marble chips (p = 1.8 g / cm 3) or when using drilling fluids with low solids content (p = 2.2 g / cm 3) in which barite or siderite (iron carbonate) is used as a weighting agent, and the fraction of colmatizing materials is 3–5 mm.
Кольматант - твердое вещество, используемое для закупоривания пор породы на стенках скважины. Размер фракции кольматационных материалов не должен превышать 1/3 внутреннего диаметра циркуляционного порта. Содержание кольматанта в буровом растворе определяется возможностью поглощения жидкости в скважине. Применение кольматантов необходимо для утяжеления бурового раствора, которым заполняют стенки скважины, чтобы выровнять внутреннее давление.Colmatant is a solid substance used to plug rock pores on the walls of a well. The fraction of colmatization materials should not exceed 1/3 of the inner diameter of the circulation port. The content of colmatant in the drilling fluid is determined by the possibility of absorption of fluid in the well. The use of muds is necessary to weight the drilling fluid with which the walls of the well are filled in order to equalize the internal pressure.
Наиболее близким к заявляемому изобретению является циркуляционный клапан бурильной колонны, содержащий трубчатый корпус, золотниковую втулку, расположенную внутри корпуса, седло, расположенное в центральном канале золотниковой втулки, направляющее кольцо, расположенное во входной части корпуса, пружину, прижимающую золотниковую втулку к направляющему кольцу, через внутренние полости корпуса, направляющего кольца, седла и золотниковой втулки осуществляется насосная подача текучей среды, а также содержащий два закрепленных в корпусе циркуляционных порта с расходными отверстиями, циркуляционные порты закрыты золотниковой втулкой в неактивном режиме, при котором осуществляется насосная подача текучей среды по бурильной колонне, и открыты и обеспечивают сообщение с внутренним пространством бурильной колонны, когда циркуляционный клапан в активном режиме, а также содержащий сбрасываемый активационный шар, выполненный с возможностью деформации и прохождения через седло при движении текучей среды по бурильной колонне, а также содержащий два запирающих шара, сбрасываемых друг за другом, взаимодействующих с циркуляционными портами для блокирования потока текучей среды через указанные циркуляционные порты, а также содержащий скрепленный с корпусом резьбовой переводник с расположенным внутри него устройством для улавливания шаров, прошедших с потоком текучей среды через седло, а также содержащий гильзу, расположенную внутри трубчатого корпуса, золотниковая втулка выполнена сплошной, размещена с возможностью продольного перемещения внутри гильзы и снабжена собственными наружными уплотнениями, контактирующими с внутренней поверхностью гильзы, при этом в неактивном режиме, при котором циркуляционные порты закрыты золотниковой втулкой и осуществляется насосная подача текучей среды по бурильной колонне, указанные циркуляционные порты расположены ниже по потоку от седла, собственные наружные уплотнения золотниковой втулки расположены по разные стороны относительно циркуляционных портов, а в активном режиме, при котором циркуляционные порты открыты и обеспечивают сообщение с внутренним пространством бурильной колонны, верхний по потоку край золотниковой втулки расположен ниже по потоку от циркуляционных портов, при этом гильза выполнена со сквозными боковыми отверстиями, каждый циркуляционный порт выполнен с выступающим внутрь от внутренней поверхности корпуса краем, гильза зафиксирована каждым сквозным боковым отверстием относительно края направленного внутрь циркуляционного порта, а внутренний профиль входной части расходных отверстий циркуляционных портов выполнен конфузорным в направлении наружной поверхности трубчатого корпуса (RU 2599120 С1, 10.10.2016).Closest to the claimed invention is a circulation valve of the drill string containing a tubular body, a spool sleeve located inside the body, a seat located in the Central channel of the spool sleeve, a guide ring located in the inlet of the housing, a spring, pressing the spool sleeve to the guide ring, through internal cavities of the housing, the guide ring, the seat and the spool sleeve are pumped fluid, as well as containing two fixed in the housing circulation ports with flow openings, circulation ports are closed by the spool sleeve in an inactive mode, during which pump fluid is supplied through the drill string, and are open and communicate with the interior of the drill string when the circulation valve is in active mode and also contains a resettable activation ball made with the possibility of deformation and passage through the seat when the fluid moves along the drill string, and also containing two locking balls, dropping one after another, interacting with the circulation ports to block the flow of fluid through the specified circulation ports, as well as containing a threaded sub with a housing attached to it with a device for trapping balls passed with the fluid flow through the seat, and also containing a sleeve located inside the tubular body, the spool sleeve is solid, placed with the possibility of longitudinal movement inside the sleeve and provided with its own external seals, which interacting with the inner surface of the sleeve, while in the inactive mode, in which the circulation ports are closed by the spool sleeve and pumped fluid is supplied through the drill string, these circulation ports are located downstream of the seat, the own external spool sleeve seals are located on different sides relative to the circulation ports, and in active mode, in which the circulation ports are open and provide communication with the interior of the drill string, the top upstream, the spool sleeve edge is located downstream of the circulation ports, wherein the sleeve is made with through side holes, each circulation port is made with an edge protruding inward from the inner surface of the housing, the sleeve is fixed with each through side hole relative to the edge of the circulation port directed inward, and the inner the profile of the inlet of the supply openings of the circulation ports is made confuser in the direction of the outer surface of the tubular body (RU 2599120 C1, 10.10.2016).
В известной конструкции выходная часть гильзы выполнена с упорным буртом, контактирующим в активном режиме, при котором циркуляционные порты открыты, с торцом золотниковой втулки, с возможностью сообщения в неактивном режиме, при котором циркуляционные порты закрыты золотниковой втулкой, полости, в которой размещена пружина, образованной внутренним диаметром гильзы, наружным диаметром хвостовика золотниковой втулки, собственным наружным уплотнением золотниковой втулки и упорным буртом выходной части гильзы, с внутренней полостью трубчатого корпуса.In the known construction, the outlet part of the sleeve is made with a thrust collar in active mode, in which the circulation ports are open, with the end of the spool sleeve, with the possibility of communication in the inactive mode, in which the circulation ports are closed with the spool sleeve, of the cavity in which the spring formed the inner diameter of the sleeve, the outer diameter of the shank of the spool sleeve, its own outer seal of the spool sleeve and the thrust collar of the outlet of the sleeve, with an internal cavity bchatogo body.
В известной конструкции внутренний профиль направляющего кольца выполнен конфузорным в направлении входной части золотниковой втулки, при этом в неактивном режиме, при котором циркуляционные порты закрыты золотниковой втулкой, образующая конфузорной поверхности направляющего кольца расположена над внутренней поверхностью входной части золотниковой втулки.In the known construction, the inner profile of the guide ring is made confuser in the direction of the inlet part of the spool sleeve, while in the inactive mode, in which the circulation ports are closed by the spool sleeve, the confuser surface of the guide ring is located above the inner surface of the inlet part of the spool sleeve.
В известной конструкции внутренний профиль выходной части трубчатого корпуса выполнен диффузорным в направлении устройства для улавливания шаров, прошедших с потоком текучей среды через седло золотниковой втулки.In the known construction, the inner profile of the outlet part of the tubular body is made diffuser in the direction of the device for catching the balls that passed with the fluid flow through the seat of the spool sleeve.
Недостатком известной конструкции является неполная возможность повышения ресурса и надежности вследствие высокой активности кавитационных процессов потока гидроабразивной среды, что объясняется гидроабразивным размывом верхнего по потоку уплотнения - манжеты из эластомера в золотниковой втулке, находящейся в потоке, например, полимер-глинистого бурового раствора плотностью 2,2 г/см3, вязкостью 90 с, содержащего твердые фазы раствора - песка с размерами 0,15÷0,95 мм, содержание песка не более 1%, и до 5% нефтепродуктов, при гидростатическом давлении 25÷30 МПа, с расходом 25÷27 л/сек, при перемещении золотниковой гильзы с уплотнениями из эластомера через расходные отверстия циркуляционных портов, по существу, объясняется разрушением уплотнительных кромок переднего по потоку уплотнения (манжеты) при ее перемещении через расходные отверстия циркуляционных портов.A disadvantage of the known design is the incomplete possibility of increasing the resource and reliability due to the high activity of cavitation processes of the flow of the hydroabrasive medium, which is explained by the hydroabrasive erosion of the upstream seal - cuffs of elastomer in the spool sleeve in the flow, for example, polymer-clay mud with a density of 2.2 g / cm 3 , viscosity 90 s, containing solid phases of the solution - sand with dimensions of 0.15 ÷ 0.95 mm, sand content of not more than 1%, and up to 5% of oil products, with hydrostatic d the pressure of 25 ÷ 30 MPa, with a flow rate of 25 ÷ 27 l / s, when moving the spool sleeve with seals from elastomer through the flow openings of the circulation ports, is essentially explained by the destruction of the sealing edges of the upstream seal (cuff) when it moves through the flow openings of the circulation ports.
Другим недостатком известной конструкции является неполная возможность повышения ресурса и надежности, что объясняется гидроабразивным размывом верхнего по потоку уплотнения - манжеты из эластомера в золотниковой втулке, находящейся в потоке текучей среды при закачке кольматационных материалов в зоны поглощения бурового раствора, например, бурового раствора с карбонатным утяжелителем фракционированной мраморной крошкой (р=1,8 г/см3 ) или при использовании бурового раствора с пониженным содержанием твердой фазы (р=2,2 г/см3 ), в которых в качестве утяжелителя используют барит или сидерит (карбонат железа), а размер фракции кольматационных материалов составляет 3÷5 мм, а также при промывке бурильной колонны после закачки кольматационных материалов в зоны поглощения бурового раствора.Another disadvantage of the known design is the incomplete possibility of increasing the resource and reliability, which is explained by hydroabrasive erosion of the upstream seal — cuffs made of elastomer in the spool sleeve located in the fluid stream when injecting mud materials into the absorption zones of the drilling fluid, for example, a drilling fluid with a carbonate weighting agent fractionated marble chips (p = 1.8 g / cm 3 ) or when using drilling mud with a low solids content (p = 2.2 g / cm 3 ), in which barite or siderite (iron carbonate) are used as a weighting agent, and the fraction of colmatizing materials is 3–5 mm, and also when washing the drill string after injecting colmatizing materials into the mud absorption zones.
Это объясняется тем, что посадка сбрасываемого активационного шара в седло золотниковой втулки выполняется плавно, при этом время перемещения золотниковой втулки с уплотнениями из эластомера от начала ее движения до полного открытия расходных отверстий циркуляционных портов составляет, например, 10÷12 сек.This is explained by the fact that the resetting activation ball is inserted into the seat of the spool sleeve smoothly, while the movement time of the spool sleeve with seals from the elastomer from the beginning of its movement to the full opening of the flow openings of the circulation ports is, for example, 10-12 sec.
Операция плавной посадки сбрасываемого активационного шара необходима при работе циркуляционного клапана в скважине, что предотвращает возможность продавливания активационного шара под действием давления столба текучей среды - бурового раствора в скважине при достижении контакта активационного шара с седлом золотниковой втулки.The smooth landing operation of the discharged activation ball is necessary when the circulation valve is operating in the well, which prevents the activation ball from being pushed under the pressure of the fluid column - drilling mud in the well when the contact of the activation ball with the seat of the spool sleeve is reached.
Полученная начальная величина расхода текучей среды, например, полимер-глинистого бурового раствора плотностью 2,2 г/см3, вязкостью 90 с, содержащего твердые фазы раствора - песка с размерами 0,15÷0,95 мм, содержание песка не более 1%, и до 5% нефтепродуктов, при гидростатическом давлении 25÷30 МПа составляет 5÷7 л/сек, с последующим плавным увеличением расхода текучей среды, например, до 10÷12 л/сек, была рекомендована для эксплуатации известного циркуляционного клапана.The obtained initial flow rate of a fluid, for example, polymer-clay drilling mud with a density of 2.2 g / cm 3 , a viscosity of 90 s, containing solid phases of the solution - sand with dimensions of 0.15 ÷ 0.95 mm, sand content of not more than 1% , and up to 5% of petroleum products, with a hydrostatic pressure of 25 ÷ 30 MPa, is 5 ÷ 7 l / s, followed by a smooth increase in the flow rate of the fluid, for example, up to 10 ÷ 12 l / s, was recommended for the operation of the known circulation valve.
Недостатки известной конструкции объясняются тем, что кромки переднего по потоку уплотнения из эластомера в золотниковой втулке, расположенные против расходных отверстий циркуляционных портов, "затягиваются" (эжектируется) в расходные отверстия циркуляционных портов потоком текучей среды в неактивном режиме, при котором циркуляционные порты частично открыты золотниковой втулкой, а через внутренние полости корпуса, направляющего кольца, седла и золотниковой втулки осуществляется насосная подача текучей среды, например, при сбросе в скважину пачек кольматационных материалов и прокачке буровых растворов с карбонатным утяжелителем - фракционированной мраморной крошкой (р=1,8 г/см3) или при использовании буровых растворов с пониженным содержанием твердой фазы (р=2,2 г/см3), в которых в качестве утяжелителя используют барит или сидерит (карбонат железа), а размер фракции кольматационных материалов составляет 3÷5 мм, при гидростатическом давлении 25÷30 МПа, с расходом текучей среды 5÷7 л/сек, с последующим плавным увеличением расхода текучей среды, например, до 10÷12 л/сек, вследствие этого кромки уплотнения (манжеты) разрушаются потоком текучей среды через расходные отверстия циркуляционных портов клапана.The disadvantages of the known design are explained by the fact that the edges of the upstream seal of elastomer in the spool sleeve, located against the flow openings of the circulation ports, are “drawn” (ejected) into the flow openings of the circulation ports in an inactive mode, in which the circulation ports are partially open with the spool sleeve, and through the internal cavity of the housing, the guide ring, the seat and the spool sleeve, pumping fluid is supplied, for example, when discharged into a well of packs of colmatization materials and pumping of drilling fluids with a carbonate weighting agent — fractionated marble chips (p = 1.8 g / cm 3 ) or when using drilling fluids with a low solids content (p = 2.2 g / cm 3 ), in which barite or siderite (iron carbonate) are used as a weighting agent, and the size of the fractionation material is 3–5 mm, at a hydrostatic pressure of 25–30 MPa, with a flow rate of 5–7 l / s, followed by a smooth increase in the flow rate of the fluid, e.g. up to 10 ÷ 12 l / s; ue this sealing edge (cuff) disrupt the flow of fluid through the flow ports of the circulation valve ports.
Технической задачей, на решение которой направлено изобретение, является повышение ресурса и надежности циркуляционного клапана бурильной колонны при использовании буровых растворов, включающих кольматационные материалы, за счет предотвращения гидроабразивного размыва верхнего по потоку уплотнения - манжеты из эластомера в золотниковой втулке путем выполнения золотниковой втулки с увеличенной длиной ее входной цилиндрической части, расположенной между контактирующим с внутренней поверхностью гильзы ее верхним по потоку уплотнением и верхним по потоку торцом золотниковой втулки, а также за счет расположения уплотнений золотниковой втулки, каждого, ниже по потоку от расходных отверстий циркуляционных портов в положении перекрытия расходных отверстий циркуляционных портов увеличенной длиной входной цилиндрической части золотниковой втулки.The technical problem to which the invention is directed is to increase the resource and reliability of the drill string circulation valve when using drilling fluids, including mud materials, by preventing hydroabrasive erosion of the upstream seal — an elastomer cuff in the spool sleeve by making a spool sleeve with an increased length its inlet cylindrical part located between the upstream contacting the inner surface of the sleeve it and the upstream end face of the slide valve sleeve, and by arranging the slide valve sleeve seals, each downstream from said dispensing opening circulation ports in a position overlapping apertures consumable circulation inlet ports increased length of the cylindrical portion slide valve sleeve.
Сущность технического решения заключается в том, что в циркуляционном клапане бурильной колонны, содержащем трубчатый корпус, золотниковую втулку, размещенную внутри корпуса и имеющую седло, выполненное в центральном канале золотниковой втулки, направляющее кольцо, установленное во входной части корпуса, пружину, прижимающую золотниковую втулку к направляющему кольцу, через внутренние полости корпуса и седла золотниковой втулки осуществляется насосная подача текучей среды, а также содержащем два закрепленных в корпусе циркуляционных порта с расходными отверстиями, циркуляционные порты закрыты золотниковой втулкой в неактивном режиме, при котором осуществляется насосная подача текучей среды по бурильной колонне, и открыты и обеспечивают сообщение с внутренним пространством бурильной колонны, когда циркуляционный клапан в активном режиме, а также содержащем сбрасываемый активационный шар, выполненный с возможностью деформации и прохождения через седло золотниковой втулки при движении текучей среды по бурильной колонне, а также содержащем два запирающих шара, сбрасываемых друг за другом, взаимодействующих с циркуляционными портами для блокирования потока текучей среды через указанные циркуляционные порты, а также содержащем скрепленный с корпусом резьбовой переводник с расположенным внутри него устройством для улавливания шаров, прошедших с потоком текучей среды через седло золотниковой втулки, а также содержащем гильзу, расположенную внутри трубчатого корпуса, золотниковая втулка выполнена сплошной, размещена с возможностью продольного перемещения внутри гильзы и снабжена уплотнениями, контактирующими с внутренней поверхностью гильзы, при этом в неактивном режиме, при котором циркуляционные порты закрыты золотниковой втулкой и осуществляется насосная подача текучей среды по бурильной колонне, указанные циркуляционные порты расположены ниже по потоку от седла, а уплотнения золотниковой втулки расположены по разные стороны относительно циркуляционных портов, при этом в активном режиме, при котором циркуляционные порты открыты и обеспечивают сообщение с внутренним пространством бурильной колонны, верхний по потоку край золотниковой втулки расположен ниже по потоку от циркуляционных портов, при этом гильза выполнена со сквозными боковыми отверстиями, каждый циркуляционный порт выполнен с выступающим внутрь от внутренней поверхности корпуса краем, а гильза зафиксирована каждым сквозным боковым отверстием относительно края направленного внутрь циркуляционного порта, согласно изобретению золотниковая втулка выполнена с увеличенной длиной ее входной цилиндрической части, расположенной между ее верхним по потоку уплотнением, контактирующим с внутренней поверхностью гильзы, и верхним по потоку торцом золотниковой втулки, при этом минимальная длина упомянутой входной цилиндрической части золотниковой втулки, расположенной между ее верхним по потоку уплотнением и верхним по потоку торцом, равна расстоянию между уплотнениями золотниковой втулки, расположенными по разные стороны относительно циркуляционных портов в неактивном режиме, при котором циркуляционные порты закрыты золотниковой втулкой и осуществляется насосная подача текучей среды по бурильной колонне, а при достижении контакта с седлом золотниковой втулки сбрасываемого активационного шара, выполненного с возможностью деформации и прохождения через седло золотниковой втулки при движении текучей среды по бурильной колонне, золотниковая втулка выполнена с возможностью перемещения вместе с активационным шаром, сжимая пружину, таким образом, что в положении перекрытия расходных отверстий циркуляционных портов увеличенной длиной входной цилиндрической части золотниковой втулки уплотнения золотниковой втулки, контактирующие с внутренней поверхностью гильзы, расположены, каждое, ниже по потоку от расходных отверстий циркуляционных портов.The essence of the technical solution lies in the fact that in the circulation valve of the drill string containing a tubular body, a spool sleeve located inside the body and having a seat made in the Central channel of the spool sleeve, a guide ring installed in the input part of the body, a spring pressing the spool sleeve to the guide ring, through the internal cavity of the housing and the seat of the spool sleeve is pumped fluid, and also containing two circulating fixed in the housing x ports with flow openings, circulation ports are closed by a spool sleeve in an inactive mode, during which pump fluid is supplied through the drill string, and are open and communicate with the interior of the drill string when the circulation valve is in active mode and also contains a resettable activation ball made with the possibility of deformation and passing through the saddle of the spool sleeve when the fluid moves along the drill string, and also containing two locking balls, sat expanding one after another, interacting with the circulation ports to block the flow of fluid through the specified circulation ports, as well as containing a threaded sub with a housing attached to it with a device for trapping balls passed with the fluid flow through the seat of the spool sleeve, and also containing a sleeve located inside the tubular body, the spool sleeve is solid, placed with the possibility of longitudinal movement inside the sleeve and provided with seals, in contact with the inner surface of the sleeve, while in the inactive mode, in which the circulation ports are closed by the spool sleeve and pumped fluid is supplied through the drill string, these circulation ports are located downstream of the seat and the spool sleeve seals are located on opposite sides relative to the circulation ports while in the active mode, in which the circulation ports are open and provide communication with the internal space of the drill string, upstream to the spool sleeve paradise is located downstream of the circulation ports, wherein the sleeve is made with through side holes, each circulation port is made with an edge protruding inward from the inner surface of the housing, and the sleeve is fixed with each through side hole relative to the edge of the inwardly directed circulation port, according to the invention the sleeve is made with an increased length of its inlet cylindrical part located between its upstream seal in contact with the inside the front surface of the sleeve and the upstream end of the spool sleeve, while the minimum length of said inlet cylindrical part of the spool sleeve located between its upstream seal and the upstream end face is equal to the distance between the spool sleeve seals located on different sides relative to the circulation ports in an inactive mode, in which the circulation ports are closed by a spool sleeve and pumped fluid is supplied through the drill string, and when achieved and contact with the seat of the spool sleeve of a resettable activation ball configured to deform and pass through the seat of the spool sleeve when the fluid moves along the drill string, the spool sleeve is movable with the activation ball, compressing the spring, so that in the position of the consumables overlap openings of the circulation ports with an increased length of the inlet cylindrical part of the spool sleeve of the spool sleeve seal in contact with the inner surface threaded sleeves, each located downstream of the flow openings of the circulation ports.
В неактивном режиме, при котором циркуляционные порты закрыты золотниковой втулкой, через внутренние полости корпуса, направляющего кольца, седла и золотниковой втулки осуществляется насосная подача текучей среды, например, полимер-глинистого бурового раствора плотностью 2,2 г/см3, вязкостью 90 с, содержащего твердые фазы раствора - песка с размерами 0,15÷0,95 мм, содержание песка не более 1%, и до 5% нефтепродуктов, при гидростатическом давлении 25÷30 МПа, при этом в указанном режиме осуществляется бурение скважины винтовым героторным гидравлическим двигателем.In the inactive mode, in which the circulation ports are closed by a spool sleeve, pumping fluid is supplied through the internal cavities of the housing, guide ring, seat and spool sleeve, for example, polymer-clay drilling mud with a density of 2.2 g / cm 3 , viscosity 90 s, containing a solid phase of a solution - sand with dimensions of 0.15 ÷ 0.95 mm, sand content of not more than 1%, and up to 5% of oil products, with a hydrostatic pressure of 25 ÷ 30 MPa, while in this mode a well is drilled with a screw gerotor hydraulic Sky engine.
В активном режиме, при котором циркуляционные порты открыты, через входную часть корпуса циркуляционного клапана и циркуляционных портов осуществляется насосная подача текучей среды - бурового раствора, содержащего кольматационные материалы, например, при использовании бурового раствора с карбонатным утяжелителем - фракционированной мраморной крошкой (р=1,8 г/см3) или бурового раствора с пониженным содержанием твердой фазы (р=2,2 г/см3), в котором в качестве утяжелителя используют сидерит (карбонат железа), а размер фракции кольматационных материалов составляет 3÷5 мм.In the active mode, in which the circulation ports are open, the pumping fluid is supplied through the inlet part of the circulation valve body and the circulation ports - drilling fluid containing mud materials, for example, when using drilling fluid with a carbonate weighting agent - fractionated marble chips (p = 1, 8 g / cm 3) or mud with low solids content (p = 2.2 g / cm 3), wherein the weighting agent is used, siderite (iron carbonate), and the size fraction colmatation x material is 3 ÷ 5 mm.
Выполнение циркуляционного клапана бурильной колонны таким образом, что золотниковая втулка в нем выполнена с увеличенной длиной ее входной цилиндрической части, расположенной между ее верхним по потоку уплотнением, контактирующим с внутренней поверхностью гильзы, и верхним по потоку торцом золотниковой втулки, при этом минимальная длина упомянутой входной цилиндрической части золотниковой втулки, расположенной между ее верхним по потоку уплотнением и верхним по потоку торцом, равна расстоянию между уплотнениями золотниковой втулки, расположенными по разные стороны относительно циркуляционных портов в неактивном режиме, при котором циркуляционные порты закрыты золотниковой втулкой и осуществляется насосная подача текучей среды по бурильной колонне, а при достижении контакта с седлом золотниковой втулки сбрасываемого активационного шара, выполненного с возможностью деформации и прохождения через седло золотниковой втулки при движении текучей среды по бурильной колонне, золотниковая втулка выполнена с возможностью перемещения вместе с активационным шаром, сжимая пружину, таким образом, что в положении перекрытия расходных отверстий циркуляционных портов увеличенной длиной входной цилиндрической части золотниковой втулки уплотнения золотниковой втулки, контактирующие с внутренней поверхностью гильзы, расположены, каждое, ниже по потоку от расходных отверстий циркуляционных портов, обеспечивает повышение ресурса и надежности циркуляционного клапана бурильной колонны при использовании буровых растворов, включающих кольматационные материалы, путем предотвращения гидроабразивного размыва верхнего по потоку уплотнения - манжеты из эластомера в золотниковой втулке за счет расположения уплотнений золотниковой втулки, каждого, ниже по потоку от расходных отверстий циркуляционных портов в положении перекрытия расходных отверстий циркуляционных портов увеличенной длиной входной цилиндрической части золотниковой втулки.The execution of the circulation valve of the drill string so that the spool sleeve in it is made with an increased length of its inlet cylindrical part located between its upstream seal in contact with the inner surface of the sleeve and the upstream end of the spool sleeve, while the minimum length of the inlet sleeve the cylindrical part of the spool sleeve located between its upstream seal and the upstream end face is equal to the distance between the spool sleeve seals located on opposite sides with respect to the circulation ports in an inactive mode, in which the circulation ports are closed by the spool sleeve and pumped fluid is supplied through the drill string, and when contact is reached with the seat of the spool sleeve of the resetting activation ball, which is capable of deformation and passing through the spool seat bushings when the fluid moves along the drill string, the spool sleeve is movable together with the activation ball, compress having a spring, so that in the overlapping position of the supply ports of the circulation ports with the increased length of the inlet cylindrical part of the spool sleeve, the spool sleeve seals in contact with the inner surface of the sleeve are each located downstream of the flow ports of the circulation ports, which increases the life and reliability of the circulation drill string valves when using drilling fluids, including mud materials, by preventing waterjet milling va upstream seal - of the elastomer in the cuff slide valve sleeve by positioning the slide valve sleeve seals, each downstream from said dispensing opening circulation ports in a position overlapping apertures consumable circulation inlet ports increased length of the cylindrical portion slide valve sleeve.
Такое выполнение циркуляционного клапана позволяет многократно переключать поток бурового раствора, включающего кольматационные материалы, из внутреннего пространства бурильной колонны в затрубное, минуя все элементы компоновки низа бурильной колонны, находящиеся ниже клапана, посредством сбрасываемого активационного шара, выполненного с возможностью деформации и прохождения через седло, расположенное в центральном канале золотниковой втулки, при движении потока бурового раствора по бурильной колонне, а также при помощи двух сбрасываемых друг за другом запирающих шаров, взаимодействующих с циркуляционными портами для блокирования потока бурового раствора через циркуляционные порты, без выполнения спуско-подъемных операций бурильной колонны.This embodiment of the circulation valve allows you to repeatedly switch the flow of the drilling fluid, including mud materials, from the inner space of the drill string to the annulus, bypassing all the elements of the bottom of the drill string located below the valve, by means of a resettable activation ball made with the possibility of deformation and passage through the saddle located in the central channel of the spool sleeve, when the flow of drilling fluid along the drill string, as well as using two rigs one after another, locking balls interacting with the circulation ports to block the flow of drilling fluid through the circulation ports, without carrying out hoisting operations of the drill string.
Циркуляционный клапан бурильной колонны может быть применен в следующих случаях:Drill string circulation valve can be used in the following cases:
- для закачки всех типов кольматационных материалов в зоны поглощения бурового раствора.- for pumping all types of mud materials into the absorption zones of the drilling fluid.
- для улучшения очистки ствола скважины путем увеличения расхода бурового раствора, в частности - при бурении горизонтальных скважин и скважин с большим отходом забоя от вертикали.- to improve the cleaning of the wellbore by increasing the flow rate of the drilling fluid, in particular when drilling horizontal wells and wells with a large deviation of the bottomhole from the vertical.
- для восстановления параметров буровых растворов.- to restore the parameters of drilling fluids.
Ниже представлен циркуляционный клапан КЦ-120РС.801, предназначенный для бурильной колонны с героторным винтовым гидравлическим двигателем ДРУ3-120РС.800.Below is the KTs-120RS.801 circulation valve, designed for a drill string with a DRU3-120RS.800 gerotor screw hydraulic motor.
На фиг. 1 изображен циркуляционный клапан в неактивном режиме, осуществляется насосная подача бурового раствора через бурильную колонну.In FIG. 1 shows the circulation valve in an inactive mode, pumping the drilling fluid through the drill string.
На фиг. 2 изображен циркуляционный клапан в режиме плавной посадки активационного шара в седло золотниковой втулки. Время перемещения золотниковой втулки от начала ее движения до полного открытия расходных отверстий циркуляционных портов составляет 10÷12 сек.In FIG. 2 shows a circulation valve in a smooth fit mode of the activation ball in the seat of the spool sleeve. The movement time of the spool sleeve from the beginning of its movement to the complete opening of the flow openings of the circulation ports is 10 ÷ 12 sec.
На фиг. 3 изображен циркуляционный клапан в активном режиме, сбрасываемый активационный шар перекрыл седло золотниковой втулки, осуществляется перепуск бурового раствора, содержащего кольматационные материалы, через отверстия циркуляционных портов в затрубное пространство.In FIG. Figure 3 shows the circulation valve in the active mode, the discharged activation ball blocked the seat of the spool sleeve, and the drilling fluid containing mud materials is bypassed through the openings of the circulation ports into the annulus.
На фиг. 4 изображен циркуляционный клапан, два запирающих шара блокируют поток бурового раствора через отверстия циркуляционных портов.In FIG. 4 shows a circulation valve, two locking balls block the flow of drilling fluid through the openings of the circulation ports.
На фиг. 5 изображен циркуляционный клапан в неактивном режиме, два запирающих шара продавили активационный шар и движутся в устройство для улавливания шаров.In FIG. 5 shows the circulation valve in the inactive mode, two locking balls have pushed the activation ball and move into the device for trapping the balls.
На фиг. 6 изображен разрез А-А на фиг. 3 поперек отверстий циркуляционных портов и боковых отверстий гильзы, размещенной в корпусе.In FIG. 6 shows a section AA in FIG. 3 across the openings of the circulation ports and the side openings of the sleeve housed in the housing.
На фиг. 7 изображен разрез Б-Б на фиг. 3 поперек входной части устройства для улавливания шаров, прошедших через седло золотниковой втулки.In FIG. 7 shows a section BB in FIG. 3 across the inlet of the device for catching balls passing through the seat of the spool sleeve.
На фиг. 8 изображен элемент I на фиг. 1 внутреннего профиля направляющего кольца, выполненного конфузорным в направлении седла золотниковой втулки.In FIG. 8 shows element I in FIG. 1 of the inner profile of the guide ring, made embarrassing in the direction of the seat of the spool sleeve.
Циркуляционный клапан содержит трубчатый корпус 1 с внутренней резьбой 2 на краю 3, предназначенный для соединения с низом верхней части бурильной колонны (не показанной), а также с наружной резьбой 4 на краю 5 для соединения с резьбовым переводником 6, предназначенным для соединения резьбой 7, выполненной на краю 8 указанного резьбового переводника 6, с верхом нижней части бурильной колонны (не показанной), а также содержит золотниковую втулку 9, расположенную внутри корпуса 1, седло 10, выполненное в центральном канале 11 золотниковой втулки 9, направляющее кольцо 12, расположенное во входной части 13 корпуса 1, пружину 14, прижимающую золотниковую втулку 9 к направляющему кольцу 12, изображено на фиг. 1.The circulation valve comprises a
В неактивном режиме через внутренние полости корпуса 1, направляющего кольца 12, седла 10 и золотниковой втулки 9 осуществляется насосная подача текучей среды - бурового раствора 15, например, полимер-глинистого бурового раствора плотностью 2,2 г/см3, вязкостью 90 с, содержащего твердые фазы раствора - песка с размерами 0,15÷0,95 мм, содержание песка не более 1%, и до 5% нефтепродуктов, при гидростатическом давлении 25÷30 МПа, при этом в указанном режиме осуществляют бурение скважины винтовым героторным гидравлическим двигателем (не показанным), изображено на фиг. 1.In an inactive mode, through the internal cavities of the
Циркуляционный клапан содержит два закрепленных в корпусе циркуляционных порта 16 и 17 с расходными отверстиями, соответственно 18 и 19, изображено на фиг. 1, 5.The circulation valve contains two circulating
Циркуляционные порты 16 и 17 закрыты золотниковой втулкой 9 в неактивном режиме, при котором осуществляется насосная подача текучей среды - бурового раствора 15, например, полимер-глинистого бурового раствора плотностью 2,2 г/см3, содержащего твердые фазы раствора - песка с размерами 0,15÷0,95 мм, содержание песка не более 1%, и до 5% нефтепродуктов, при гидростатическом давлении 25÷30 МПа, изображено на фиг. 1.The
Циркуляционные порты 16 и 17 открыты и обеспечивают сообщение с внутренним пространством 20 бурильной колонны, когда циркуляционный клапан в активном режиме, изображено на фиг. 3, 6.The
Циркуляционный клапан содержит сбрасываемый в бурильную колонну активационный шар 21, выполненный, например, из резины ИРП-1226-5 (ТУ 2512-215-00149245-96), с возможностью деформации и прохождения через седло 10, расположенное в центральном канале 11 золотниковой втулки 9 при движении текучей среды 15 по бурильной колонне, а также содержит два запирающих шара 22, 23 одинакового диаметра, сбрасываемых в бурильную колонну друг за другом, взаимодействующих с циркуляционными портами 16, 17 для блокирования потока 15 текучей среды через указанные циркуляционные порты 16, 17, изображено на фиг. 2, 3, 4.The circulation valve contains an
Циркуляционный клапан содержит скрепленный резьбой 4 с корпусом 1 резьбовой переводник 6 с размещенным внутри него устройством 24 для улавливания шаров 21, 22, 23, прошедших через седло 10, расположенное в центральном канале 11 золотниковой втулки 9, изображено на фиг. 1, 2, 3, 4.The circulation valve comprises a threaded
Циркуляционный клапан содержит гильзу 25, расположенную внутри трубчатого корпуса 1, снабженную наружными уплотнениями 26, 27, контактирующими с внутренней поверхностью 28 корпуса 1, золотниковая втулка 9 выполнена сплошной, размещена с возможностью продольного перемещения внутри гильзы 25 и снабжена наружными уплотнениями: 29 (верхним по потоку) и 30 (нижним по потоку), контактирующими с внутренней поверхностью 31 гильзы 25, при этом седло 10 расположенное в центральном канале 11 золотниковой втулки 9, выполнено в виде единой детали с золотниковой втулкой 9, изображено на фиг. 1, 2, 3, 4, 8.The circulation valve contains a
В неактивном режиме, при котором циркуляционные порты 16, 17 закрыты золотниковой втулкой 9 и осуществляется насосная подача текучей среды - бурового раствора 15, например, полимер-глинистого бурового раствора плотностью 2,2 г/см3, содержащего твердые фазы раствора - песка с размерами 0,15÷0,95 мм, содержание песка не более 1%, и до 5% нефтепродуктов, при гидростатическом давлении 25÷30 МПа, по бурильной колонне, указанные циркуляционные порты 16, 17 расположены ниже по потоку текучей среды - бурового раствора 15 от седла 10, при этом наружные уплотнения 29, 30 золотниковой втулки 9 расположены по разные стороны, по существу, выше и ниже по потоку текучей среды - бурового раствора 15 относительно циркуляционных портов 16, 17, изображено на фиг. 1.In an inactive mode, in which the
В активном режиме через верхнюю часть бурильной колонны и упомянутый циркуляционный клапан осуществляется насосная подача текучей среды -бурового раствора 15, содержащего кольматационные материалы 31, например, при использовании бурового раствора с пониженным содержанием твердой фазы (р=2,2 г/см3), в котором в качестве утяжелителя используют сидерит (карбонат железа), а размер фракции кольматационных материалов составляет 3÷5 мм, изображено на фиг. 3, 6.In the active mode, a pumping fluid is supplied through the top of the drill string and to the
В активном режиме при котором циркуляционные порты 16, 17 открыты и обеспечивают сообщение с внутренним пространством 20 бурильной колонны, верхний по потоку край (торец) 32 золотниковой втулки 9 расположен ниже по потоку текучей среды - бурового раствора 15, содержащего указанные кольматационные материалы 31, при этом активационный шар 21 перекрывает седло 10 золотниковой втулки 9, вследствие этого снижается активность кавитационных процессов потока бурового раствора 15, содержащего кольматационные материалы 31, что предотвращает гидроабразивный размыв и прихват золотниковой втулки 9, изображено на фиг. 3, 6.In the active mode, in which the
Гильза 25 выполнена со сквозными боковыми отверстиями 33 и 34, каждый циркуляционный порт 16 и 17 выполнен с выступающим внутрь от внутренней поверхности 28 корпуса 1 краем 35 и 36, при этом гильза 25 зафиксирована в окружном и продольном направлении каждым сквозным боковым отверстием 33 и 34 относительно соответствующего края 35 и 36 направленного внутрь циркуляционного порта, соответственно 16 и 17, а внутренний профиль 37 и 38 входной части, соответственно 39 и 40 расходных отверстий 18 и 19 циркуляционных портов 16 и 17 выполнен конфузорным в направлении наружной поверхности 41 трубчатого корпуса 1, по существу, в направлении затрубного пространства 42 и стенки 43 скважины, изображено на фиг. 3, 6.The
Кроме того, на фиг. 6 изображено: поз. 44 - слой кольматации; поз. 45 - пластовая гидравлическая среда.In addition, in FIG. 6 shows: pos. 44 - layer of mudding; pos. 45 - reservoir hydraulic medium.
Внутри трубчатого корпуса 1 установлена упорная втулка 46 из твердого сплава (карбида вольфрама), задний торец 47 золотниковой втулки 9 расположен на расстоянии 48 от торца 49 упорной втулки 46 с возможностью сообщения полости 50, в которой размещена пружина 14, образованной нижним по потоку 15 наружным уплотнением 30 золотниковой втулки 9, внутренним диаметром 31 гильзы 25, наружным диаметром 51 хвостовика золотниковой втулки 9 и торцом 52 гильзы 25, с внутренней полостью 20 корпуса 1, через которую осуществляется насосная подача текучей среды, например, полимер-глинистого бурового раствора 45 плотностью 2,2-г/см3, вязкостью 90 с, содержащего твердые фазы раствора - песка с размерами 0,15÷0,95 мм, содержание песка не более 1%, и до 5% нефтепродуктов, при гидростатическом давлении, преимущественно 25÷30 МПа, изображено на фиг. 1, 2, 3, 8.A
Такое размещение пружины 14 в полости 50 уменьшает шламование полости 50, в которой размещена пружина 14, потоком текучей среды, например, полимер-глинистого бурового раствора 15 плотностью 2,2 г/см3, вязкостью 90 с, содержащего твердые фазы раствора - песка с размерами 0,15÷0,95 мм, содержание песка не более 1%, и до 5% нефтепродуктов, при гидростатическом давлении, преимущественно 25÷30 МПа, изображено на фиг. 1, 2, 3, 8.This placement of the
В активном режиме, при котором при котором циркуляционные порты 16 и 17 открыты, а через бурильную колонну осуществляется насосная подача текучей среды - бурового раствора 15, содержащего кольматационные материалы 31, например, при использовании бурового раствора с пониженным содержанием твердой фазы (р=2,2 г/см3), в котором в качестве утяжелителя используют сидерит (карбонат железа), а размер фракции кольматационных материалов составляет 3÷5 мм, торец 47 золотниковой втулки 9 прижат к упорному торцу 49 упорной втулки 46, при этом пружина 14 изолирована от воздействия потока текучей среды - бурового раствора 15, изображено на фиг. 3.In the active mode, in which the
Устройство 24 для улавливания шаров 21, 22, 23, прошедших через седло 10 и центральный канал 11 золотниковой втулки 9, содержит фильтрующую трубу 53 с щелевыми каналами 54, входную втулку 55 и выходную втулку 56, фильтрующая труба 53 соединена резьбой 57 с входной втулкой 55, а также соединена резьбой 58 с выходной втулкой 56, при этом входная втулка 55 выполнена с четырьмя направленными наружу ребрами 59 и телескопически соединена торцами 60 указанных ребер 59 с внутренним центрирующим поясом 61 внутри резьбового переводника 6, изображено на фиг. 1, 2, 3, 7.The
На фиг. 5 изображен циркуляционный- клапан в неактивном режиме, при котором циркуляционные порты 16, 17 закрыты золотниковой втулкой 9 и осуществляется насосная подача текучей среды - бурового раствора 15: два запирающих шара 22 и 23 под действием гидростатического давления 25÷30 МПа потока текучей среды 15, например, полимер-глинистого бурового раствора плотностью 2,2 г/см3, содержащего твердые фазы раствора - песка с размерами 0,15÷0,95 мм, содержание песка не более 1%, и до 5% нефтепродуктов, продавили сбрасываемый активационный шар 21, выполненный из резины ИРП-1226-5, с возможностью деформации и прохождения через седло 10, расположенное в центральном канале 11 золотниковой втулки 9 и движутся с потоком бурового раствора 15 в устройство 24 для улавливания шаров, при этом в устройстве 24 для улавливания шаров 21, 22, 23 может размещаться 5 активационных шаров 21, 5 запирающих шаров 22 и 5 запирающих шаров 23.In FIG. 5 shows a circulation valve in an inactive mode, in which the
Золотниковая втулка 9 выполнена с увеличенной длиной 62 ее входной цилиндрической части 63, расположенной между ее верхним по потоку 15 уплотнением 29, контактирующим с внутренней поверхностью 31 гильзы 25, и верхним по потоку торцом 32 золотниковой втулки 9, при этом минимальная длина 62 упомянутой входной цилиндрической части 63 золотниковой втулки 9, расположенной между ее верхним по потоку 15 уплотнением 29 и верхним по потоку 15 торцом 32, равна расстоянию 64 между уплотнениями 29 и 30, соответственно, золотниковой втулки 9, расположенными по разные стороны относительно циркуляционных портов 16 и 17 в неактивном режиме, при котором циркуляционные порты 16 и 17 закрыты золотниковой втулкой 9 и осуществляется насосная подача текучей среды 15 по бурильной колонне, изображено на фиг. 1, 2, 3, 8.The
При достижении контакта с седлом 10 золотниковой втулки 9 сбрасываемого активационного шара 21, выполненного с возможностью деформации и прохождения через седло 10 золотниковой втулки 9 при движении текучей среды 15, например, полимер-глинистого бурового раствора плотностью 2,2 г/см3, содержащего твердые фазы раствора песка c размерами 0,15÷0,95 мм, содержание песка не более 1%, и до 5% нефтепродуктов, при гидростатическом давлении 25÷30 МПа, по бурильной колонне, а также в режиме сброса в скважину кольматационных материалов, например, при использовании бурового раствора с пониженным содержанием твердой фазы (р=2,2 г/см3), в котором в качестве утяжелителя используют сидерит (карбонат железа), а размер фракции кольматационных материалов составляет 3÷5 мм, золотниковая втулка 9 выполнена с возможностью перемещения вместе с активационным шаром 21, сжимая пружину 14, таким образом, что в положении перекрытия расходных отверстий циркуляционных портов 16 и 17 увеличенной длиной 62 входной цилиндрической части 63 золотниковой втулки 9 уплотнения золотниковой втулки 29 и 30, контактирующие с внутренней поверхностью 31 гильзы 25, расположены, каждое, ниже по потоку текучей среды 15 от расходных отверстий циркуляционных портов 16 и 17, изображено на фиг. 2, 3, 8.Upon reaching contact with the seat 10 of the spool sleeve 9 of the discharged activation ball 21, which is capable of deformation and passing through the seat 10 of the spool sleeve 9 when the fluid 15, for example, polymer-clay drilling mud with a density of 2.2 g / cm 3 containing solid sand solution phases with dimensions of 0.15 ÷ 0.95 mm, sand content of not more than 1%, and up to 5% of oil products, at a hydrostatic pressure of 25 ÷ 30 MPa, along the drill string, as well as in the mode of discharge of mud materials into the well, for example when using and a drilling fluid with a low solids content (p = 2.2 g / cm 3 ), in which siderite (iron carbonate) is used as a weighting agent, and the size of the fraction of colmatizing materials is 3–5 mm, the spool sleeve 9 is movable together with the activation ball 21, compressing the spring 14, so that in the overlapping position of the flow openings of the circulation ports 16 and 17 with an increased length 62 of the inlet cylindrical part 63 of the spool sleeve 9 of the seal of the spool sleeve 29 and 30 in contact with the inner 31 overhnostyu sleeve 25 are disposed, each lower fluidly apertures 15 of consumable circulation ports 16 and 17, shown in FIG. 2, 3, 8.
Циркуляционный клапан КЦ-120РС.801, предназначенный для бурильной колонны с героторным винтовым гидравлическим двигателем ДРУ3-120РС.800, используют для закачки всех типов кольматационных материалов в зоны поглощения бурового раствора.The KC-120RS.801 circulation valve, designed for a drill string with a DRU3-120RS.800 gerotor screw hydraulic motor, is used to pump all types of mud materials into the mud absorption zones.
Циркуляционный клапан соединяют внутренней резьбой 2 трубчатого корпуса 1 с низом верхней части бурильной колонны (не показанной), а наружной резьбой 7, выполненной на краю 8 резьбового переводника 6, соединяют с верхом нижней части компоновки низа бурильной колонны (КНБК), включающей винтовой героторный гидравлический двигатель (не показанный), применяемой при бурении нефтяной скважины.The circulation valve is connected by an
Буровым насосом, например, УНБ-600, через колонну бурильных труб осуществляют насосную подачу текучей среды, например, полимер-глинистого бурового раствора 15, плотностью 2,2 г/см3, вязкостью 90 с, содержащего твердые фазы раствора - песка с размерами 0,15÷0,95 мм, содержание песка не более 1%, и до 5% нефтепродуктов, при гидростатическом давлении, преимущественно 25÷30 МПа, при этом указанный буровой раствор прокачивается через фильтр бурильной колонны.With a mud pump, for example, UNB-600, pumping fluid is supplied through a drill pipe string, for example, polymer-
Циркуляционные порты 16 и 17 при этом закрыты золотниковой втулкой 9 в неактивном режиме, изображено на фиг. 1.The
В указанном режиме осуществляют бурение скважины героторным винтовым гидравлическим двигателем ДРУ3-120РС.800, скрепленным с долотом.In this mode, a well is drilled with a DRU3-120RS.800 gerotor screw hydraulic engine, fastened with a bit.
Основным рабочим элементом циркуляционного клапана является золотниковая втулка 9, которая выполнена сплошной, размещена с возможностью продольного перемещения внутри гильзы 25 и снабжена собственными наружными уплотнениями 29, 30, контактирующими с внутренней поверхностью 31 гильзы 25, при этом седло 10, расположенное в центральном канале 11 золотниковой втулки 9, выполнено в виде единой детали с золотниковой втулкой 9, изображено на фиг. 1.The main working element of the circulation valve is a
В неактивном режиме, при котором циркуляционные порты 16, 17 закрыты золотниковой втулкой 9, осуществляют насосную подачу текучей среды - бурового раствора 15, например, полимер-глинистого бурового раствора плотностью 2,2 г/см3, содержащего твердые фазы раствора - песка с размерами 0,15÷0,95 мм, содержание песка не более 1%, и до 5% нефтепродуктов, при гидростатическом давлении 25÷30 МПа, по бурильной колонне, при этом указанные циркуляционные порты 16, 17 расположены ниже по потоку текучей среды - бурового раствора 15 от седла 10, а наружные уплотнения 29, 30 золотниковой втулки 9 расположены по разные стороны, по существу, выше и ниже по потоку текучей среды - бурового раствора 15 относительно циркуляционных портов 16, 17, изображено на фиг. 1.In an inactive mode, in which the
Останавливают насос и устанавливают бурильную колонну в клинья.Stop the pump and install the drill string in the wedges.
При остановке бурового насоса золотниковая втулка 9 под действием пружины 14 прижата до упора в торец направляющего кольца 12, размещенного во входной части 13 корпуса 1, циркуляционные порты 16, 17 закрыты, при этом предотвращается обратный переток бурового раствора 15 из затрубного пространства 42 скважины в полость 20 бурильной колонны.When the mud pump stops, the
Для активации циркуляционного клапана разъединяют бурильную колонну и бросают в бурильные трубы активационный шар 21, выполненный из резины ИРП-1226-5, далее соединяют бурильную колонну и прокачивают активационный шар 21 расчетным объемом бурового раствора 15 (без кольматационных материалов 31), изображено на фиг. 2.To activate the circulation valve, the drill string is disconnected and the
Когда активационный шар 21 садится в седло 10, расположенное в центральном канале 11 золотниковой втулки 9, золотниковая втулка 9 под действием избыточного трубного давления, например, 25÷30 МПа, сжимает пружину 14 и сдвигается вниз по потоку бурового раствора 15, при этом циркуляционные порты 16 и 17 открываются, циркуляционный клапан находится в активном режиме, производится перепуск бурового раствора 15 через отверстия циркуляционных портов 16 и 17, изображено на фиг. 3, 6.When the
Посадка сбрасываемого активационного шара 21 в седло 10 золотниковой втулки 9 выполняется плавно, при этом время перемещения золотниковой втулки 9 с уплотнениями 29, 30 из эластомера от начала ее движения до полного открытия расходных отверстий 18, 19 циркуляционных портов, соответственно 16, 17 составляет, например, 10÷12 сек.The resetting
Операция плавной посадки сбрасываемого активационного шара 21 в седло 10 золотниковой втулки 9 необходима при работе циркуляционного клапана в скважине, что предотвращает возможность продавливания активационного шара 21 под действием давления столба текучей среды - бурового раствора в скважине при достижении контакта активационного шара 21 с седлом 10 золотниковой втулки 9, изображено на фиг. 3, 6.The operation of smooth landing of the discharged
Полученная начальная величина расхода текучей среды 15, например, полимер-глинистого бурового раствора плотностью 2,2 г/см3, вязкостью 90 с, содержащего твердые фазы раствора - песка с размерами 0,15÷0,95 мм, содержание песка не более 1%, и до 5% нефтепродуктов, при гидростатическом давлении 25÷30 МПа составляет 5÷7 л/сек, с последующим плавным увеличением расхода текучей среды, например, до 10÷12 л/сек.The obtained initial flow rate of the fluid 15, for example, polymer-clay drilling mud with a density of 2.2 g / cm 3 , a viscosity of 90 s, containing solid phases of the solution - sand with dimensions of 0.15 ÷ 0.95 mm, sand content of not more than 1 %, and up to 5% of petroleum products, with a hydrostatic pressure of 25 ÷ 30 MPa is 5 ÷ 7 l / s, followed by a smooth increase in the flow rate of the fluid, for example, up to 10 ÷ 12 l / s.
Далее осуществляют насосную подачу бурового раствора 15, содержащего кольматационные материалы 31 (кольматационную пачку), например, бурового раствора с пониженным содержанием твердой фазы (р=2,2 г/см3), в котором в качестве утяжелителя используют сидерит (карбонат железа), при этом размер фракции кольматационных материалов составляет 3÷5 мм, а объем кольматационной пачки на 10÷15% превышает внутренний объем бурильной колонны, в затрубное пространство 42 скважины без остановок, при этом расход бурового раствора, содержащего кольматационные материалы 31, составляет 45 л/сек, изображено на фиг. 3, 6.Then carry out the pumping of the
Режим работы бурового насоса, например, УНБ-600, обеспечивает не менее величины заданного расхода бурового раствора 15, содержащего кольматационные материалы 31, что предотвращает гидроабразивный размыв циркуляционных портов 16 и 17 (при меньшем расходе бурового раствора 15 циркуляционные порты открываются частично).The operating mode of the mud pump, for example, UNB-600, provides at least the value of the specified flow rate of the
Во время выполнения указанной технологической операции через активированный циркуляционный клапан вращают и "расхаживают" бурильную колонну, циркуляция происходит через циркуляционные порты 16 и 17, минуя все элементы компоновки низа бурильной колонны, находящиеся ниже по потоку от клапана, изображено на фиг. 3, 6.During the execution of the indicated technological operation, the drill string is rotated and “paced” through the activated circulation valve, circulation takes place through the
В активном режиме, при котором циркуляционные порты 16, 17 открыты и обеспечивают сообщение с внутренним пространством 20 бурильной колонны, верхний по потоку край 32 золотниковой втулки 9 расположен ниже по потоку текучей среды - бурового раствора 15, содержащего указанные кольматационные материалы 31, при этом активационный шар 21 перекрывает седло 10 золотниковой втулки 9, вследствие этого снижается активность кавитационных процессов потока бурового раствора 15, содержащего кольматационные материалы 31, что предотвращает гидроабразивный размыв золотниковой втулки 9, изображено на фиг. 2, 3, 8.In the active mode, in which the
При достижении контакта с седлом 10 золотниковой втулки 9 сбрасываемого активационного шара 21, выполненного с возможностью деформации и прохождения через седло 10 золотниковой втулки 9 при движении текучей среды 15, например, полимер-глинистого бурового раствора плотностью 2,2 г/см3, содержащего твердые фазы раствора - песка с размерами 0,15÷0,95 мм, содержание песка не более 1%, и до 5% нефтепродуктов, при гидростатическом давлении 25÷30 МПа, по бурильной колонне, а также в режиме сброса в скважину кольматационных материалов, например, при использовании бурового раствора с пониженным содержанием твердой фазы (р=2,2 г/см3), в котором в качестве утяжелителя используют сидерит (карбонат железа), а размер фракции кольматационных материалов составляет 3÷5 мм, золотниковая втулка 9 перемещается вместе с активационным шаром 21, сжимая пружину 14, таким образом, что в положении перекрытия расходных отверстий циркуляционных портов 16 и 17 увеличенной длиной 62 входной цилиндрической части 63 золотниковой втулки 9 уплотнения золотниковой втулки 29 и 30, контактирующие с внутренней поверхностью 31 гильзы 25, расположены, каждое, ниже по потоку текучей среды 15 от расходных отверстий циркуляционных портов 16 и 17, изображено на фиг. 2, 3, 8.Upon reaching contact with the seat 10 of the spool sleeve 9 of the discharged activation ball 21, which is capable of deformation and passing through the seat 10 of the spool sleeve 9 when the fluid 15, for example, polymer-clay drilling mud with a density of 2.2 g / cm 3 containing solid the phases of the solution are sand with dimensions of 0.15 ÷ 0.95 mm, the sand content is not more than 1%, and up to 5% of petroleum products, at a hydrostatic pressure of 25 ÷ 30 MPa, along the drill string, as well as in the mode of dumping of mud materials into the well, for example when using ii mud with low solids content (p = 2.2 g / cm 3), wherein the weighting agent is used, siderite (iron carbonate), and the size colmatation materials fraction is 3 ÷ 5 mm, spool sleeve 9 moves together with the activation ball 21, compressing the spring 14, so that in the overlapping position of the flow openings of the circulation ports 16 and 17 with an increased length 62 of the input cylindrical portion 63 of the spool sleeve 9 of the seal of the spool sleeve 29 and 30 in contact with the inner surface 31 of the sleeve 25 are each located downstream of the fluid 15 from the flow openings of the circulation ports 16 and 17, shown in FIG. 2, 3, 8.
Такое выполнение циркуляционного клапана обеспечивает повышение ресурса и надежности циркуляционного клапана бурильной колонны при использовании буровых растворов, включающих кольматационные материалы, за счет предотвращения гидроабразивного размыва верхнего по потоку текучей среды 15 уплотнения 29 (манжеты из эластомера) в золотниковой втулке 9 за счет расположения уплотнений 29, 30 золотниковой втулки 9, каждого, ниже по потоку текучей среды 15 от расходных отверстий 18, 19 циркуляционных портов 16, 17 в положении перекрытия расходных отверстий 18, 19 циркуляционных портов 16, 17 увеличенной длиной 62 входной цилиндрической части 63 золотниковой втулки 9, изображено на фиг. 2, 3, 8.This embodiment of the circulation valve provides an increase in the life and reliability of the circulation valve of the drill string when using drilling fluids, including mud materials, by preventing hydroabrasive erosion of the
Далее осуществляют промывку бурильной колонны от указанных кольматационных материалов 31 при помощи насосной подачи бурового раствора 15, например, полимер-глинистого бурового раствора плотностью 2,2 г/см3, содержащего твердые фазы раствора - песка с размерами 0,15÷0,95 мм, содержание песка не более 1%, и до 5% нефтепродуктов, при гидростатическом давлении 25÷30 МПа, по бурильной колонне через открытые циркуляционные порты 16, 17, что необходимо для предотвращения попадания кольматационных материалов 31 в фильтр героторного винтового гидравлического двигателя, при этом активационный шар 21 перекрывает седло 10 золотниковой втулки 9, вследствие этого обеспечивается повышение ресурса и надежности циркуляционного клапана бурильной колонны при использовании упомянутого бурового раствора, также за счет предотвращения гидроабразивного размыва верхнего по потоку текучей среды 15 уплотнения 29 (манжеты из эластомера) в золотниковой втулке 9 за счет расположения собственных уплотнений 29, 30 золотниковой втулки 9, каждого, ниже по потоку текучей среды 15 от расходных отверстий 18, 19 циркуляционных портов 16, 17 в положении перекрытия расходных отверстий 18, 19 циркуляционных портов 16, 17 увеличенной длиной 62 входной цилиндрической части 63 золотниковой втулки 9, изображено на фиг. 2, 3, 8.Next, the drill string is flushed from the specified mud materials 31 using a pump feed of drilling mud 15, for example, a polymer-clay drilling mud with a density of 2.2 g / cm 3 containing solid phases of the mud - sand with dimensions of 0.15 ÷ 0.95 mm , the sand content is not more than 1%, and up to 5% of petroleum products, at a hydrostatic pressure of 25 ÷ 30 MPa, along the drill string through open circulation ports 16, 17, which is necessary to prevent the penetration of clogging materials 31 into the hydraulic gerotor screw filter the engine, while the activation ball 21 overlaps the seat 10 of the spool sleeve 9, thereby increasing the resource and reliability of the circulation valve of the drill string when using the above-mentioned drilling fluid, also by preventing hydroabrasive erosion of the upstream fluid 15 of the seal 29 (elastomer cuffs) in the spool sleeve 9 due to the location of its own seals 29, 30 of the spool sleeve 9, each, downstream of the fluid 15 from the flow openings 18, 19 are circulating ports 16, 17 at a position overlapping consumable holes 18, 19 of the circulation ports 16, 17 of increased length 62 of the cylindrical inlet part 63 of the slide valve sleeve 9 is shown in FIG. 2, 3, 8.
Останавливают насос и устанавливают бурильную колонну в клинья.Stop the pump and install the drill string in the wedges.
При остановке бурового насоса золотниковая втулка 9 под действием пружины 14 прижимается до упора в торец направляющего кольца 12, размещенного во входной части 13 корпуса 1, при этом циркуляционные порты 16, 17 закрываются, предотвращая обратный переток бурового раствора 15 из затрубного пространства 42 в полость 20 бурильной колонны.When the mud pump stops, the
После выполнения запланированных технологических операций, для деактивации циркуляционного клапана, разъединяют бурильную колонну и бросают в бурильные трубы два стальных шара 21 и 22 с интервалом 60÷120 сек, чтобы предотвратить их слипание и остановку в местах, где бурильные трубы намагничены, и прокачивают их расчетным объемом полимер-глинистого бурового раствора 15 плотностью 2,2 г/см3, вязкостью 90 с, содержащего твердые фазы раствора - песка с размерами 0,15÷0,95 мм, содержание песка не более 1%, и до 5% нефтепродуктов, при гидростатическом давлении, преимущественно 25÷30 МПа.After carrying out the planned technological operations, in order to deactivate the circulation valve, the drill string is disconnected and two
Внутренний профиль 37 и 38 входной части, соответственно 39 и 40 расходных отверстий 18 и 19 циркуляционных портов 16 и 17 выполнен конфузорным в направлении наружной поверхности 41 трубчатого корпуса 1, по существу, в направлении затрубного пространства 42 и стенки 43 скважины, изображено на фиг. 3,5.The
Два запирающих стальных шара 21, 22, сбрасываемых друг за другом, взаимодействуют с внутренним профилем 37 и 38 входной части, соответственно 39 и 40 расходных отверстий 18 и 19 циркуляционных портов, 16 и 17, перекрывают расходные отверстия 18 и 19 циркуляционных портов и блокируют поток текучей среды 15 через указанные циркуляционные порты 18, 19, изображено на фиг. 4.Two locking
Буровой насос продолжает работать, давление растет, происходит деактивация циркуляционного клапана, при этом активационный шар 21, выполненный из резины ИРП-1226-5, продавливается через посадочное седло 10, расположенное в центральном канале 11 золотниковой втулки 9 и направляется в устройство 24 для улавливания шаров 21, а также шаров 22, 23, прошедших через седло 10, расположенное в центральном канале 11 золотниковой втулки 9, содержащее фильтрующую трубу 53 с щелевыми каналами 54, входную втулку 55 и выходную втулку 56, изображено на фиг. 5.The mud pump continues to work, the pressure rises, the circulation valve is deactivated, while the
Золотниковая втулка 9 под действием пружины 14 прижимается к запорному кольцу 12, перекрывая расходные отверстия 18, 19 циркуляционных портов 18, 19 и возвращается в первоначальное положение, изображено на фиг. 1.The
Буровым насосом через колонну бурильных труб осуществляют насосную подачу полимер-глинистого бурового раствора 15 плотностью 2,2 г/см3, вязкостью 90 с, содержащего твердые фазы раствора - песка с размерами 0,15÷0,95 мм, содержание песка не более 1%, и до 5% нефтепродуктов, при гидростатическом давлении 25÷30 МПа, в указанном режиме продолжают бурение скважины.The mud pump through the drill pipe string carries out the pumping of polymer-
Изобретение повышает ресурс и надежность циркуляционного клапана в составе бурильной колонны без выполнения спуско-подъемных операций, при использовании буровых растворов, включающих кольматационные материалы, за счет расположения уплотнений золотниковой втулки ниже по потоку от расходных отверстий циркуляционных портов в положении перекрытия расходных отверстий циркуляционных портов увеличенной длиной входной цилиндрической части золотниковой втулки.The invention increases the resource and reliability of the circulation valve in the drill string without tripping, when using drilling fluids, including mud materials, due to the location of the spool sleeve seals downstream of the flow ports of the circulation ports in the overlapping position of the flow ports of the circulation ports of increased length input cylindrical part of the spool sleeve.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2018107161A RU2681774C1 (en) | 2018-02-26 | 2018-02-26 | Drill string circulation valve |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2018107161A RU2681774C1 (en) | 2018-02-26 | 2018-02-26 | Drill string circulation valve |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2681774C1 true RU2681774C1 (en) | 2019-03-12 |
Family
ID=65805822
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2018107161A RU2681774C1 (en) | 2018-02-26 | 2018-02-26 | Drill string circulation valve |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2681774C1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2743288C1 (en) * | 2020-07-08 | 2021-02-16 | Общество с ограниченной ответственностью "Гидробур-сервис" | Circulation valve |
RU2755981C2 (en) * | 2019-06-28 | 2021-09-23 | Закрытое акционерное общество "НГТ" | Circulation sub |
RU2774306C1 (en) * | 2021-04-05 | 2022-06-17 | Общество с ограниченной ответственностью "Фирма "Радиус-Сервис" | Circulation valve of a drill string |
CN115853466A (en) * | 2023-01-03 | 2023-03-28 | 西南石油大学 | A full-bore infinite-stage fracturing sleeve with repeatable opening and closing |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004022907A1 (en) * | 2002-09-03 | 2004-03-18 | Paul Bernard Lee | Ball operated by-pass tool for use in drillstring |
RU2440482C1 (en) * | 2007-11-20 | 2012-01-20 | Нэшенл Ойлвел Варко, эЛ.Пи. | Downhole tool for fluid medium circulation in well shaft, circulation system of fluid medium in well shaft and circulation method of fluid medium in well shaft (versions) |
RU155225U1 (en) * | 2014-11-06 | 2015-09-27 | Общество С Ограниченной Ответственностью "Вниибт-Буровой Инструмент" | DRILLING CIRCULATION ADAPTER |
RU2599120C1 (en) * | 2015-06-05 | 2016-10-10 | Общество с ограниченной ответственностью "Фирма "Радиус-Сервис" | Circulation valve of drill column |
RU2599119C1 (en) * | 2015-03-10 | 2016-10-10 | Общество с ограниченной ответственностью "Фирма "Радиус-Сервис" | Circulation valve of drill column |
RU166516U1 (en) * | 2016-04-27 | 2016-11-27 | Дмитрий Игоревич Сафонов | DRILLING CIRCULATION ADAPTER |
-
2018
- 2018-02-26 RU RU2018107161A patent/RU2681774C1/en active IP Right Revival
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004022907A1 (en) * | 2002-09-03 | 2004-03-18 | Paul Bernard Lee | Ball operated by-pass tool for use in drillstring |
RU2440482C1 (en) * | 2007-11-20 | 2012-01-20 | Нэшенл Ойлвел Варко, эЛ.Пи. | Downhole tool for fluid medium circulation in well shaft, circulation system of fluid medium in well shaft and circulation method of fluid medium in well shaft (versions) |
RU155225U1 (en) * | 2014-11-06 | 2015-09-27 | Общество С Ограниченной Ответственностью "Вниибт-Буровой Инструмент" | DRILLING CIRCULATION ADAPTER |
RU2599119C1 (en) * | 2015-03-10 | 2016-10-10 | Общество с ограниченной ответственностью "Фирма "Радиус-Сервис" | Circulation valve of drill column |
RU2599120C1 (en) * | 2015-06-05 | 2016-10-10 | Общество с ограниченной ответственностью "Фирма "Радиус-Сервис" | Circulation valve of drill column |
RU166516U1 (en) * | 2016-04-27 | 2016-11-27 | Дмитрий Игоревич Сафонов | DRILLING CIRCULATION ADAPTER |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2755981C2 (en) * | 2019-06-28 | 2021-09-23 | Закрытое акционерное общество "НГТ" | Circulation sub |
RU2743288C1 (en) * | 2020-07-08 | 2021-02-16 | Общество с ограниченной ответственностью "Гидробур-сервис" | Circulation valve |
RU2774306C1 (en) * | 2021-04-05 | 2022-06-17 | Общество с ограниченной ответственностью "Фирма "Радиус-Сервис" | Circulation valve of a drill string |
CN115853466A (en) * | 2023-01-03 | 2023-03-28 | 西南石油大学 | A full-bore infinite-stage fracturing sleeve with repeatable opening and closing |
CN115853466B (en) * | 2023-01-03 | 2024-05-24 | 西南石油大学 | A full-bore, infinite-stage fracturing sliding sleeve with repeatable opening and closing |
RU2835463C1 (en) * | 2023-10-11 | 2025-02-25 | Общество с ограниченной ответственностью "Фирма "Радиус-Сервис" | Drill string circulation valve |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2682271C1 (en) | Circulation valve of drill column | |
RU2599119C1 (en) | Circulation valve of drill column | |
RU2599120C1 (en) | Circulation valve of drill column | |
US10641052B2 (en) | Reverse circulation well tool | |
US10590737B2 (en) | Downhole sealing and actuation | |
US10024150B2 (en) | Bottom hole assembly for wellbore completion | |
US8931557B2 (en) | Wellbore servicing assemblies and methods of using the same | |
CA2361284C (en) | Flow-operated valve | |
US20090056952A1 (en) | Downhole Tool | |
CA2984951C (en) | Sliding sleeve having indexing mechanism and expandable sleeve | |
RU2681774C1 (en) | Drill string circulation valve | |
RU194815U1 (en) | DRILL CIRCULATION VALVE | |
RU181350U1 (en) | Drill string circulation valve | |
EP1332273B1 (en) | Downhole valve device | |
US7322432B2 (en) | Fluid diverter tool and method | |
RU2774306C1 (en) | Circulation valve of a drill string | |
RU2835463C1 (en) | Drill string circulation valve | |
RU2827461C1 (en) | System and method of controlling flow of fluid flowing into drilling engine | |
US12037885B1 (en) | Downhole separation system and method | |
RU2330151C1 (en) | Valve unit of screw-type well engine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20210227 |
|
NF4A | Reinstatement of patent |
Effective date: 20211208 |