RU2557284C1 - Method for development of dome oil formation at last operational stage - Google Patents
Method for development of dome oil formation at last operational stage Download PDFInfo
- Publication number
- RU2557284C1 RU2557284C1 RU2014140934/03A RU2014140934A RU2557284C1 RU 2557284 C1 RU2557284 C1 RU 2557284C1 RU 2014140934/03 A RU2014140934/03 A RU 2014140934/03A RU 2014140934 A RU2014140934 A RU 2014140934A RU 2557284 C1 RU2557284 C1 RU 2557284C1
- Authority
- RU
- Russia
- Prior art keywords
- water cut
- well
- injection
- pumping equipment
- change
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 7
- 238000011161 development Methods 0.000 title abstract description 6
- 230000015572 biosynthetic process Effects 0.000 title abstract 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 38
- 238000002347 injection Methods 0.000 claims abstract description 28
- 239000007924 injection Substances 0.000 claims abstract description 28
- 238000005086 pumping Methods 0.000 claims abstract description 16
- 230000000737 periodic effect Effects 0.000 claims abstract description 11
- 238000005259 measurement Methods 0.000 claims abstract description 8
- 239000003795 chemical substances by application Substances 0.000 claims description 4
- 238000011084 recovery Methods 0.000 abstract description 9
- 239000012530 fluid Substances 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract 1
- 238000000605 extraction Methods 0.000 abstract 1
- 239000000126 substance Substances 0.000 abstract 1
- 230000003116 impacting effect Effects 0.000 description 3
- 238000009825 accumulation Methods 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 239000004927 clay Substances 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
Landscapes
- Processing Of Solid Wastes (AREA)
Abstract
Description
Изобретение относится к нефтяной промышленности и может найти применение при разработке купольной нефтяной залежи на заключительной стадии эксплуатации.The invention relates to the oil industry and may find application in the development of a domed oil reservoir at the final stage of operation.
Известен способ разработки нефтяного месторождения, находящегося на завершающей стадии, в котором осуществляют доизвлечение нефти с использованием существующего фонда скважин. Для этого устанавливают на них отбор жидкости, кратно превосходящий предшествующий отбор. Этот форсированный отбор жидкости осуществляют на скважине. Ее выбирают из числа скважин, расположенных в зоне купольного поднятия, которая находится ближе других к предполагаемой максимальной абсолютной отметке на купольном поднятии. Устанавливают режим отбора жидкости, позволяющий создать градиент давления, который превышал бы предшествующий градиент давления (патент РФ №2120543, опубл. 20.10.1998).There is a method of developing an oil field, which is at the final stage, in which additional oil recovery is carried out using the existing well stock. For this, a liquid selection is established on them that is a multiple of the previous selection. This forced selection of fluid is carried out at the well. It is selected from the number of wells located in the area of the dome uplift, which is closer to the estimated maximum absolute mark on the dome uplift. Set the mode of fluid selection, which allows you to create a pressure gradient that would exceed the previous pressure gradient (RF patent No. 2120543, publ. 20.10.1998).
Наиболее близким к предложенному изобретению по технической сущности является способ доразработки нефтяного месторождения, находящегося на заключительной стадии эксплуатации, согласно которому при обводнении извлекаемой нефти закачку вытесняющего агента прекращают. Осуществляют промысловые испытания во всех скважинах, вскрывших продуктивный пласт. Это осуществляют путем замера суммарного количества нефти без воды в зависимости от времени накопления в скважинах при их простое. При этом выбирают скважины, где наблюдают увеличение количества нефти от времени ее накопления. Относят эти скважины к купольной части продуктивного пласта. Уточняют характер структуры его залегания и используют купольные части продуктивного пласта как основные объекты добычи нефти. Затем устанавливают периодический режим работы эксплуатационных скважин, перфорированных в купольных частях, при котором предполагают отбор нефти, без воды. Режим работы для каждой эксплуатационной скважины устанавливают индивидуально по промысловым испытаниям в зависимости от геолого-физических свойств призабойной зоны каждой скважины и ее расположения на структуре продуктивного пласта (патент РФ №2116436, опубл. 27.07.1998 - прототип).Closest to the proposed invention in technical essence is a method of further development of the oil field, which is at the final stage of operation, according to which when watering the extracted oil, the displacement agent is stopped. Field tests are carried out in all wells that have uncovered the reservoir. This is done by measuring the total amount of oil without water, depending on the accumulation time in the wells when they are idle. In this case, wells are selected where an increase in the amount of oil from the time of its accumulation is observed. These wells belong to the domed part of the reservoir. They clarify the nature of the structure of its occurrence and use the domed parts of the reservoir as the main objects of oil production. Then establish a periodic mode of operation of production wells perforated in the dome parts, which involve the selection of oil without water. The operating mode for each production well is set individually according to field tests, depending on the geological and physical properties of the bottom-hole zone of each well and its location on the structure of the reservoir (RF patent No. 21116436, publ. July 27, 1998 - prototype).
Общим недостатком известных технических решений является невысокая нефтеотдача, обусловленная отсутствием периодического контроля обводненности и своевременного реагирования на изменение обводненности добываемой пластовой продукции.A common disadvantage of the known technical solutions is the low oil recovery due to the lack of periodic monitoring of water cut and timely response to changes in water cut of produced reservoir products.
В предложенном изобретении решается задача повышения нефтеотдачи залежи.The proposed invention solves the problem of increasing oil recovery deposits.
Задача решается тем, что в способе разработки купольной нефтяной залежи на заключительной стадии эксплуатации, включающем отбор пластовой продукции через добывающие скважины и закачку рабочего агента через нагнетательные скважины, согласно изобретению, выбирают локальный участок залежи согласно разности гипсометрических отметок между по крайней мере одной добывающей и по крайней мере одной нагнетательной скважиной на величину от 3 м и более, в добывающей скважине производят замену стандартного глубинно-насосного оборудования на глубинно-насосное оборудование с возможностью эксплуатации по времени в течение суток, при обнаружении изменения обводненности на 10-15% производят ограничение по объему извлекаемой пластовой продукции за счет изменения времени работы насосного оборудования в течение суток, при этом на участке нагнетательной скважины производят ограничение закачки либо полную остановку скважины, производят периодические замеры изменения режима эксплуатации добывающей скважины по обводненности, при снижении обводненности продолжают эксплуатацию в упругом режиме, без запуска влияющей нагнетательной скважины, производят повторные периодические замеры обводненности и изменения забойного давления в добывающей скважине, при снижении забойного давления на 5% и более относительно первоначально замеренной величины производят запуск в работу нагнетательной скважины и продолжают контролировать изменение основных параметров по обводненности и забойному давлению в добывающей скважине.The problem is solved in that in the method for developing a domed oil reservoir at the final stage of operation, including selecting reservoir products through production wells and injecting a working agent through injection wells, according to the invention, a local reservoir section is selected according to the difference in hypsometric marks between at least one producing and at least one injection well for a value of 3 m or more, in the production well, the standard deep-well pumping equipment is replaced with a deep Bin-pumping equipment with the possibility of operation over time during the day, when a change in water cut of 10-15% is detected, a restriction is made on the volume of recoverable reservoir products due to a change in the operating time of the pumping equipment during the day, while the injection well is limited in injection complete shutdown of the well, periodically measure changes in the operating mode of the producing well by water cut, while reducing water cut, continue operating in Ohm mode, without starting the affecting injection well, repeated periodic water cut measurements and bottom-hole pressure changes in the producing well are carried out, while the bottom-hole pressure is reduced by 5% or more relative to the originally measured value, the injection well is put into operation and continue to monitor changes in the main parameters for water cut and bottomhole pressure in the producing well.
Сущность изобретенияSUMMARY OF THE INVENTION
На заключительной стадии разработки купольной нефтяной залежи особое внимание приобретает контроль за обводненностью добываемой пластовой продукции и своевременное реагирование на изменение обводненности. В известных технических решениях отсутствует периодический контроль обводненности и своевременное реагирования на изменение обводненности добываемой пластовой продукции. Вследствие этого нефтеотдача остается на невысоком уровне. В предложенном изобретении решается задача повышения нефтеотдачи залежи. Задача решается следующим образом.At the final stage of development of the domed oil reservoir, particular attention is paid to control over the water cut of the produced stratum products and timely response to changes in water cut. In the known technical solutions there is no periodic control of water cut and timely response to changes in water cut of produced stratum products. As a result, oil recovery remains at a low level. The proposed invention solves the problem of increasing oil recovery deposits. The problem is solved as follows.
При разработке купольной нефтяной залежи на заключительной стадии эксплуатации, когда текущая обводненность добываемой пластовой продукции достигает 80 и более % отбирают пластовую продукцию через добывающие скважины и закачивают рабочий агент через нагнетательные скважины. Выбирают локальный участок купольной залежи с расположенными на участке по крайней мере одной добывающей и по крайней мере одной нагнетательной скважиной и с разностью гипсометрических отметок между добывающей и нагнетательной скважиной от 3 м и более. Таким образом, интервал перфорации добывающей скважины оказывается выше интервала перфорации нагнетательной скважины на 3 и более м. В добывающей скважине производят замену стандартного глубинно-насосного оборудования, рассчитанного на обеспечение постоянного дебита, на глубинно-насосное оборудование с возможностью эксплуатации по времени в течение суток независимо от получающегося дебита. Эксплуатируют добывающую скважину с прежним дебитом. При увеличении обводненности на 10-15% производят ограничение по объему извлекаемой пластовой продукции за счет изменения времени работы насосного оборудования в течение суток. При этом на нагнетательной скважины производят ограничение закачки либо полную остановку скважины. Производят периодические замеры изменения режима эксплуатации добывающей скважины по обводненности. При получении результата по снижению обводненности продолжают эксплуатацию в упругом режиме, без запуска влияющей нагнетательной скважины. Производят повторные периодические замеры обводненности и забойного давления в добывающей скважине. При снижении забойного давления на 5% и более относительно первоначально замеренной величины производят запуск в работу нагнетательной скважины и продолжают контролировать изменение основных параметров по обводненности и забойному давлению в добывающей скважине. В результате удается снизить обводненность добываемой пластовой продукции и за счет этого повысить нефтеотдачу залежи.When developing a domed oil reservoir at the final stage of operation, when the current water cut of produced reservoir products reaches 80 or more%, reservoir products are taken through production wells and the working agent is pumped through injection wells. A local area of the domed deposit is selected with at least one production and at least one injection well located on the site and with a difference of hypsometric marks between the production and injection wells of 3 m or more. Thus, the perforation interval of the production well is higher than the perforation interval of the injection well by 3 m or more. In the production well, the standard deep-well pumping equipment, designed to ensure constant flow rate, is replaced by a deep-well pumping equipment with the ability to operate on time for a day independently from the resulting debit. Exploiting a production well with a previous flow rate. With an increase in water cut of 10-15%, a restriction is made on the volume of recoverable reservoir products by changing the operating time of pumping equipment during the day. At the same time, injection is limited at the injection well or the well is completely stopped. Produce periodic measurements of changes in the operating mode of the producing well by water cut. Upon receipt of the result to reduce water cut, they continue to operate in an elastic mode, without starting an impacting injection well. Repeated periodic measurements of water cut and bottomhole pressure in the producing well are made. When the bottomhole pressure is reduced by 5% or more relative to the initially measured value, the injection well is put into operation and the change in the main parameters for water cut and bottomhole pressure in the producing well is continued to be monitored. As a result, it is possible to reduce the water cut of the produced stratum products and thereby increase the oil recovery of the reservoir.
Пример конкретного выполненияConcrete example
Разрабатывают нефтяную залежь со следующими характеристиками: глубина 1800-1920 м, пластовое давление от 14,5 МПа, пластовая температура от 36°С, толщина пласта от 3 до 50 м, пористость не менее 18%, проницаемость от 200 до 1200 мДа, нефтенасыщенность не менее 75%, вязкость нефти не менее 15 мПа·с, плотность нефти 0,86 г/см3. Коллектор - песчаник - глинистый песчаник. Залежь находится в завершающей стадии разработки, текущая обводненность добываемой пластовой продукции составляет не менее 80%.An oil reservoir is developed with the following characteristics: depth 1800-1920 m, reservoir pressure from 14.5 MPa, reservoir temperature from 36 ° C, reservoir thickness from 3 to 50 m, porosity of at least 18%, permeability from 200 to 1200 mDa, oil saturation not less than 75%, oil viscosity not less than 15 MPa · s, oil density 0.86 g / cm 3 . Reservoir - sandstone - clay sandstone. The deposit is at the final stage of development, the current water cut of the produced stratum products is at least 80%.
Выбирают локальный участок купольной залежи с расположенными на участке одной добывающей и двумя нагнетательными скважинами с разностью гипсометрических отметок между добывающими и нагнетательными скважинами от 3 м и более. Таким образом, интервал перфорации добывающей скважины оказывается выше интервала перфорации нагнетательной скважины на 3 и более м. В добывающих скважинах производят замену стандартного глубинно-насосного оборудования, рассчитанного на обеспечение постоянного дебита, на глубинно-насосное оборудование с возможностью эксплуатации по времени в течение суток не зависимо от получающегося дебита. Насосное оборудование снабжают частотно регулируемым приводом и системой управления с реле давления. Эксплуатируют добывающие скважины с прежним дебитом, равным 50 м3/сут. Отмечают увеличение обводненности добываемой пластовой продукции. При увеличении обводненности на 10-15% производят ограничение по объему извлекаемой пластовой продукции за счет изменения времени работы насосного оборудования в течение суток от 5 до 30% относительно первоначального времени. При этом на нагнетательных скважинах производят ограничение закачки и/или полную остановку одной скважины. Производят периодические замеры изменения режима эксплуатации добывающей скважины по обводненности. При получении результата по снижению обводненности на 5-15% продолжают эксплуатацию в упругом режиме, т.е. без запуска влияющей нагнетательной скважины. Производят повторные периодические замеры обводненности и забойного давления в добывающей скважине. При снижении забойного давления на 5% и более относительно первоначально замеренной величины производят запуск в работу влияющей нагнетательной скважины и продолжают контролировать изменение основных параметров по обводненности и забойному давлению в добывающей скважине. Циклы повторяют. В результате удается снизить обводненность добываемой пластовой продукции и за счет этого повысить нефтеотдачу залежи на 2% с 34 до 36%.A local area of the domed deposit is selected with one production and two injection wells located on the site with a difference in hypsometric marks between production and injection wells of 3 m or more. Thus, the perforation interval of the production well is 3 or more meters higher than the perforation interval of the injection well. In production wells, standard deep-well pumping equipment, designed to ensure constant flow rate, is replaced with deep-well pumping equipment with the possibility of operation over time of one day depending on the resulting flow rate. Pumping equipment is equipped with a frequency-controlled drive and a control system with a pressure switch. Production wells are operated with a previous flow rate of 50 m 3 / day. An increase in water cut in produced stratum products is noted. With an increase in water cut of 10-15%, a restriction is made on the volume of recoverable reservoir products by changing the operating time of pumping equipment during the day from 5 to 30% relative to the initial time. In this case, injection wells restrict injection and / or complete shutdown of one well. Produce periodic measurements of changes in the operating mode of the producing well by water cut. Upon receipt of a result for reducing water cut by 5-15%, they continue to operate in elastic mode, i.e. without starting an impacting injection well. Repeated periodic measurements of water cut and bottomhole pressure in the producing well are made. When the bottomhole pressure is reduced by 5% or more relative to the originally measured value, the impacting injection well is put into operation and the control of changes in the main parameters for water cut and bottomhole pressure in the producing well is continued. Loops repeat. As a result, it is possible to reduce the water cut of the produced stratum products and thereby increase the oil recovery by 2% from 34 to 36%.
Применение предложенного способа позволит повысить нефтеотдачу залежи.The application of the proposed method will improve oil recovery deposits.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2014140934/03A RU2557284C1 (en) | 2014-10-10 | 2014-10-10 | Method for development of dome oil formation at last operational stage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2014140934/03A RU2557284C1 (en) | 2014-10-10 | 2014-10-10 | Method for development of dome oil formation at last operational stage |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2557284C1 true RU2557284C1 (en) | 2015-07-20 |
Family
ID=53611768
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2014140934/03A RU2557284C1 (en) | 2014-10-10 | 2014-10-10 | Method for development of dome oil formation at last operational stage |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2557284C1 (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1410596A1 (en) * | 1986-07-31 | 1994-06-30 | Всесоюзный научно-исследовательский геологоразведочный нефтяной институт | Gas-oil deposition with small water-floating oil contouring |
RU2116436C1 (en) * | 1996-09-06 | 1998-07-27 | Внедренческий научно-исследовательский инженерный центр "Нефтегазтехнология" | Method for final development of oil deposit at concluding stage of operation |
US6664101B2 (en) * | 1998-06-08 | 2003-12-16 | Werner Wild | Method for separating CO2 from waste gases, converting it to CH4 and storing same |
RU2282025C1 (en) * | 2005-11-01 | 2006-08-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Oil field development method |
RU2418943C1 (en) * | 2010-04-16 | 2011-05-20 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Procedure for development of oil deposit |
RU2463443C1 (en) * | 2011-05-05 | 2012-10-10 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Method of development of oil deposit |
RU2478773C2 (en) * | 2011-06-23 | 2013-04-10 | Открытое акционерное общество "Институт по проектированию и исследовательским работам в нефтяной промышленности "Гипровостокнефть" | Early identification method of natural fracturing of formations |
RU2506419C1 (en) * | 2012-07-27 | 2014-02-10 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Oil deposit development method |
-
2014
- 2014-10-10 RU RU2014140934/03A patent/RU2557284C1/en not_active IP Right Cessation
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1410596A1 (en) * | 1986-07-31 | 1994-06-30 | Всесоюзный научно-исследовательский геологоразведочный нефтяной институт | Gas-oil deposition with small water-floating oil contouring |
RU2116436C1 (en) * | 1996-09-06 | 1998-07-27 | Внедренческий научно-исследовательский инженерный центр "Нефтегазтехнология" | Method for final development of oil deposit at concluding stage of operation |
US6664101B2 (en) * | 1998-06-08 | 2003-12-16 | Werner Wild | Method for separating CO2 from waste gases, converting it to CH4 and storing same |
RU2282025C1 (en) * | 2005-11-01 | 2006-08-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Oil field development method |
RU2418943C1 (en) * | 2010-04-16 | 2011-05-20 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Procedure for development of oil deposit |
RU2463443C1 (en) * | 2011-05-05 | 2012-10-10 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Method of development of oil deposit |
RU2478773C2 (en) * | 2011-06-23 | 2013-04-10 | Открытое акционерное общество "Институт по проектированию и исследовательским работам в нефтяной промышленности "Гипровостокнефть" | Early identification method of natural fracturing of formations |
RU2506419C1 (en) * | 2012-07-27 | 2014-02-10 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Oil deposit development method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2331761C1 (en) | Low-permeable oil reservoir development method | |
RU2417306C1 (en) | Procedure for development of oil deposit | |
RU2336413C1 (en) | Method of oil pool development | |
RU2496979C1 (en) | Development method of deposit of high-viscosity oil and/or bitumen using method for steam pumping to formation | |
RU2433250C1 (en) | Method of oil development by using periodic operation of producer wells with operation portions varying with oil well fluid density variation | |
RU2439298C1 (en) | Method of development of massive oil field with laminar irregularities | |
CA2800443C (en) | Systems and methods for pressure-cycled stimulation during gravity drainage operations | |
RU2494236C1 (en) | Oil deposit development method | |
RU2474676C1 (en) | Multiformation oil deposit development method | |
RU2535545C1 (en) | Method of development of oil deposit | |
Pizzinelli et al. | Polymer injection: EOR application in North African field from lab analysis to project start-up | |
RU2453689C1 (en) | Oil deposit development method | |
RU2557284C1 (en) | Method for development of dome oil formation at last operational stage | |
RU2459938C1 (en) | Oil deposit development method | |
RU2382184C1 (en) | Oil field development method | |
RU2517674C1 (en) | Development method of non-homogeneous oil deposit | |
RU2716759C1 (en) | Method for nonstationary development of low-permeability reservoirs | |
RU2720848C1 (en) | Method for development of oil deposit with inter-formation flows | |
RU2527432C1 (en) | Method of oil deposit development by water and gas injection | |
RU2603867C1 (en) | Method for development of inhomogeneous oil deposit | |
RU2679423C1 (en) | Method of development of deposit of superhigh viscosity oil with water-bearing intervals | |
RU2657589C1 (en) | Method for developing the oil deposit | |
RU2425961C1 (en) | Well operation method | |
RU2676344C1 (en) | Method for waterflooding producing reservoirs of mature oil and gas pools | |
RU2481467C1 (en) | Oil deposit development method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20171011 |