RU2536895C1 - Development of oil deposit by multihole horizontal wells - Google Patents
Development of oil deposit by multihole horizontal wells Download PDFInfo
- Publication number
- RU2536895C1 RU2536895C1 RU2013150953/03A RU2013150953A RU2536895C1 RU 2536895 C1 RU2536895 C1 RU 2536895C1 RU 2013150953/03 A RU2013150953/03 A RU 2013150953/03A RU 2013150953 A RU2013150953 A RU 2013150953A RU 2536895 C1 RU2536895 C1 RU 2536895C1
- Authority
- RU
- Russia
- Prior art keywords
- well
- water
- injection
- wells
- borehole
- Prior art date
Links
- 238000011161 development Methods 0.000 title description 11
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 46
- 238000002347 injection Methods 0.000 claims abstract description 34
- 239000007924 injection Substances 0.000 claims abstract description 34
- 239000004927 clay Substances 0.000 claims abstract description 27
- 238000000034 method Methods 0.000 claims abstract description 18
- 239000011148 porous material Substances 0.000 claims abstract description 16
- 238000004519 manufacturing process Methods 0.000 claims abstract description 14
- 239000002245 particle Substances 0.000 claims abstract description 14
- 239000007787 solid Substances 0.000 claims abstract description 12
- 230000008961 swelling Effects 0.000 claims abstract description 9
- 238000005553 drilling Methods 0.000 claims abstract description 6
- 230000015572 biosynthetic process Effects 0.000 claims description 30
- 239000013505 freshwater Substances 0.000 claims description 12
- 238000009533 lab test Methods 0.000 claims description 7
- 239000000243 solution Substances 0.000 claims description 5
- 238000013461 design Methods 0.000 claims description 3
- 239000000126 substance Substances 0.000 abstract description 3
- 230000033558 biomineral tissue development Effects 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 abstract description 2
- 239000008398 formation water Substances 0.000 abstract description 2
- 235000009508 confectionery Nutrition 0.000 abstract 2
- 238000004458 analytical method Methods 0.000 abstract 1
- 230000003247 decreasing effect Effects 0.000 abstract 1
- 230000000694 effects Effects 0.000 abstract 1
- 238000000605 extraction Methods 0.000 abstract 1
- 238000005755 formation reaction Methods 0.000 description 27
- 230000018109 developmental process Effects 0.000 description 10
- 238000011084 recovery Methods 0.000 description 10
- 239000000725 suspension Substances 0.000 description 5
- 239000000463 material Substances 0.000 description 4
- 230000035699 permeability Effects 0.000 description 4
- 230000004888 barrier function Effects 0.000 description 3
- 239000003795 chemical substances by application Substances 0.000 description 3
- 238000004140 cleaning Methods 0.000 description 3
- 239000000839 emulsion Substances 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000003921 oil Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Landscapes
- Treatment Of Liquids With Adsorbents In General (AREA)
Abstract
Description
Изобретение относится к нефтедобывающей промышленности и может найти применение при разработке обводненных неоднородных глинистых продуктивных пластов.The invention relates to the oil industry and may find application in the development of flooded heterogeneous clay productive formations.
Известен способ разработки нефтяных пластов с послойной неоднородной проницаемостью, включающий ввод в пласт оторочки глинистой суспензии, в зависимости от объема пор, с допущением перемещения глинистой суспензии в пласте вокруг скважины с кольматацией поровых каналов дисперсными частицами глины и преобразованием введенной оторочки глинистой суспензии в потокоотклоняющий барьер, согласно изобретению, выбирают обводнившуюся закачиваемой в пласт водой добывающую скважину с соотношением проницаемостей коллекторов в перфорированной части пласта 1,5 и больше, в радиусе 25 м вокруг скважины в интервале пласта с проницаемостью, превышающей среднее значение параметра для перфорированной части, вводят в количестве 0,5 объема пор глинистую суспензию с концентрацией глины 30-60 кг/м3 с допущением ее равномерного радиального перемещения в пласте, а для преобразования введенной оторочки глинистой суспензии в потокоотклоняющий барьер добывающую скважину закрывают, при этом потокоотклоняющий барьер деформируют и уплотняют под напором движущегося от взаимодействующей нагнетательной скважины фронта закачиваемой воды (патент РФ 2157884, кл. E21B 43/20, опубл. 20.10.2000).A known method for the development of oil reservoirs with layer-by-layer heterogeneous permeability, including introducing clay suspension rims into the formation, depending on the pore volume, allowing clay suspension to move around the well with mud blocking the pore channels with dispersed clay particles and converting the introduced clay suspension rim into a flow-deflecting barrier, according to the invention, a production well watered with water injected into the formation is selected with a ratio of permeability of reservoirs in perforated parts of the formation 1.5 and more, in a radius of 25 m around the well in the interval of the formation with a permeability exceeding the average value of the parameter for the perforated part, a clay suspension with a clay concentration of 30-60 kg / m 3 is introduced in an amount of 0.5 pore volume with the assumption its uniform radial movement in the formation, and for converting the introduced rim of the clay suspension into a flow-deflecting barrier, the production well is closed, while the flow-deflecting barrier is deformed and compacted under the pressure of a moving from the interacting pump noy front well injection water (RF Patent 2157884, cl. E21B 43/20, publ. 10/20/2000).
Наиболее близким по технической сущности к предлагаемому способу является способ разработки нефтяной залежи, включающий отбор добываемой продукции через добывающие скважины, закачку рабочего агента при рабочем давлении и расходе через нагнетательные скважины. В качестве рабочего агента используют пластовую воду, очищенную до наличия твердых взвешенных частиц не более 60 мг/л и нефтяной эмульсии не более 50 мг/л. Проводят повышение давления закачки при потере приемистости вследствие кольматации прискважинной зоны нагнетательной скважины твердыми взвешенными частицами и нефтяной эмульсией. В нагнетательную скважину закачивают воду без кольматирующих веществ при повышенном давлении, при котором скважина принимает в объеме, достаточном для распределения кольматирующих веществ в пласте и увеличения приемистости нагнетательной скважины. При непрерывной закачке переходят к закачке рабочего агента на вновь установленном рабочем давлении и расходе (Патент РФ №2394980, опубл. 20.07.2010 - прототип).Closest to the technical nature of the proposed method is a method of developing an oil reservoir, including the selection of produced products through production wells, pumping a working agent at operating pressure and flow rate through injection wells. As a working agent, produced water is used, purified to the presence of suspended solids of not more than 60 mg / l and an oil emulsion of not more than 50 mg / l. An increase in injection pressure is carried out with a loss of injectivity due to the clogging of the borehole zone of the injection well with solid suspended particles and an oil emulsion. Water is injected into the injection well without collimating substances at an elevated pressure, at which the well receives in a volume sufficient to distribute the clogging substances in the formation and increase the injectivity of the injection well. With continuous injection proceed to the injection of the working agent at the newly set operating pressure and flow rate (RF Patent No. 2394980, publ. 07.20.2010 - prototype).
Общим недостатком известных способов является быстрая обводняемость добываемой продукции и соответственно невысокая нефтеотдача нефтяной залежи.A common disadvantage of the known methods is the rapid water cut of the produced products and, accordingly, the low oil recovery of the oil reservoir.
В предложенном изобретении решается задача снижения обводненности добываемой продукции и повышения нефтеотдачи нефтяной залежи.In the proposed invention solves the problem of reducing the water content of the extracted products and increase oil recovery of oil deposits.
Задача решается тем, что в способе разработки нефтяной залежи многозабойными горизонтальными скважинами, включающем отбор добываемой продукции через добывающие скважины, закачку пластовой воды через нагнетательные скважины, согласно изобретению, в многозабойных горизонтальных добывающих скважинах при бурении в конструкции предусматривают технические решения, обеспечивающие открытие и закрытие каждого ствола, с помощью чего определяют обводнившийся горизонтальный ствол, проводят лабораторные исследования на керне разрабатываемого пласта, керн предварительно обводняют, отдельно определяют набухаемость глинистых составляющих в пресной воде и забивание пор пласта твердыми взвешенными частицами при открытом обводненном стволе и закрытых других, в скважину закачивают пресную воду с минерализацией не более 1,5 г/л и содержанием твердых взвешенных частиц не более 40 мг/л в объеме, равном 1-10% объема порового пространства призабойной зоны пласта рассматриваемого горизонтального ствола, проводят выдержку в течение времени, достаточного для набухания глинистых составляющих коллектора, после чего закачивают воду с содержанием твердых взвешенных частиц 70-200 мг/л, которые берут из продукции скважин, добываемой из данного пласта, до падения приемистости не менее чем в два раза от первоначальной, затем закачку прекращают и скважину запускают в эксплуатацию.The problem is solved in that in the method of developing an oil field by multilateral horizontal wells, including selecting produced products through production wells, injecting produced water through injection wells, according to the invention, in multilateral horizontal production wells during drilling, the design includes technical solutions that ensure the opening and closing of each the trunk, with the help of which the horizontal watered trunk is determined, laboratory tests are carried out on the core about the formation, the core is pre-flooded, the swelling of clay components in fresh water and clogging of the pores of the formation with solid suspended particles with an open flooded well and closed others are separately determined, fresh water is pumped into the well with a salinity of not more than 1.5 g / l and the content of suspended solids not more than 40 mg / l in a volume equal to 1-10% of the pore space volume of the bottomhole formation zone of the considered horizontal wellbore, hold for a time sufficient for the clay component to swell collectors, after which water with a content of suspended solids of 70-200 mg / l, which is taken from the products of wells extracted from a given formation, is injected until the injectivity drops at least twice from the initial one, then the injection is stopped and the well is put into operation .
Сущность изобретенияSUMMARY OF THE INVENTION
На нефтеотдачу терригенного нефтяного пласта, разрабатываемого многозабойными горизонтальными скважинами, существенное влияние оказывает время работы скважин до полного обводнения. Существующие технические решения не в полной мере позволяют выполнить данную задачу. Коллекторы практически всегда неоднородны, что приводит к обводнению скважин. Вода по более проницаемым участкам пласта фильтруется к забоям скважин и в связи с разницей в вязкости нефти и воды вода занимает в потоке жидкости из скважины значительно большую часть. Как известно, терригенные коллекторы представлены в основном песчаниками, аллевролитами и глинами. Известное свойство набухания глинистых частиц под действием пресной воды не всегда позволяет полностью ограничить водоприток из обводнившегося участка, что связано с неоднородностью пласта. Поэтому после использования технологии закачки, при которой происходит набухание глин, целесообразно закачивать воду с твердыми взвешенными частицами (ТВЧ) для забивания пор пласта (загрязнения пласта). Это значительно повышает эффективность ограничения водопритока. Также следует отметить, что проведение исследований по определению обводнившегося интервала в каждом стволе - довольно сложный технический и технологический процесс, который не всегда удается реализовать.The oil recovery of a terrigenous oil reservoir developed by multilateral horizontal wells is significantly affected by the operating time of the wells until they are completely flooded. Existing technical solutions do not fully allow to perform this task. The reservoirs are almost always heterogeneous, which leads to watering the wells. Water in more permeable sections of the reservoir is filtered towards the bottom of the wells and, due to the difference in the viscosity of oil and water, water occupies a significantly larger part in the fluid flow from the well. As is known, terrigenous reservoirs are mainly represented by sandstones, siltstones and clays. The well-known property of clay particles swelling under the influence of fresh water does not always completely limit water inflow from the irrigated area, which is associated with heterogeneity of the formation. Therefore, after using injection technology, in which clay swells, it is advisable to pump water with solid suspended particles (HDTV) to clog the pores of the formation (formation contamination). This greatly increases the efficiency of water restriction. It should also be noted that conducting studies to determine the waterlogged interval in each barrel is a rather complicated technical and technological process, which is not always possible to implement.
Предлагаемое техническое решение последовательного использования закачки пресной и «загрязненной» воды позволяет упростить процесс и повысить эффективность снижения обводненности. В предложенном изобретении решается задача повышения нефтеотдачи нефтяной залежи посредствам максимально длительной работы скважин до полного обводнения. Задача решается следующим образом.The proposed technical solution for the consistent use of fresh and "contaminated" water injection can simplify the process and increase the efficiency of reducing water cut. The proposed invention solves the problem of increasing oil recovery of oil deposits by means of as long as possible well operation until complete flooding. The problem is solved as follows.
Способ реализуют следующим образом.The method is implemented as follows.
Участок нефтяного пласта, представленный терригенным типом коллектора и чисто нефтяной зоной толщиной, вскрыт многозабойной горизонтальной скважиной с открытыми горизонтальными стволами. При бурении такой скважины в конструкции предусматривают технические решения, обеспечивающие открытие и закрытие каждого ствола как в отдельности, так и всех вместе, либо нескольких - так называемые «шторки». Управление данными «шторками» осуществляют с устья скважины.A section of the oil reservoir, represented by the terrigenous type of reservoir and a purely oil zone of thickness, was opened by a multilateral horizontal well with open horizontal trunks. When drilling such a well in the design, technical solutions are provided that provide for the opening and closing of each well, individually, or all together, or several — the so-called “shutters”. Management of these "shutters" is carried out from the wellhead.
В процессе разработки пласта происходит прорыв воды от соседних нагнетательных скважин в горизонтальный ствол, в результате скважина обводняется.In the process of developing the formation, a breakthrough of water from neighboring injection wells into the horizontal well occurs, as a result, the well is flooded.
Поочередным открытием одного ствола и закрытием остальных при работающей скважине определяют обводнившийся горизонтальный ствол.By alternately opening one trunk and closing the others while the well is running, a horizontal horizontal waterlogged well is determined.
При бурении рассматриваемой скважины был отобран керн пласта. До проведения мероприятий по ограничению водопритока проводят лабораторные исследования на керне.During the drilling of the considered well, the core of the formation was selected. Prior to the measures to limit water inflow, laboratory studies on the core are carried out.
В одном из кернов выделяют кусочек глинистого материала. Определяют время t набухания глинистых частиц посредствам контакта данного глинистого материала с пресной водой с минерализацией не более 1,5 г/л.In one of the cores, a piece of clay material is isolated. The time t of the swelling of the clay particles is determined by the contact of this clay material with fresh water with a salinity of not more than 1.5 g / l.
Далее проводят лабораторные исследования на керне по заводнению его водой с концентрацией ТВЧ в пределах 70-200 мг/л. Его предварительно обводняют. ТВЧ, добавляемые в закачиваемую воду, берут с того же пласта, отобранные в процессе добычи продукции скважины и ее очистки. Определяют оптимальную концентрацию ТВЧ в закачиваемой воде, которая приводит к забиванию пор пласта, т.е. его загрязнению в указанных пределах.Next, laboratory tests are carried out on the core for water flooding with a concentration of HDTV in the range of 70-200 mg / l. It is pre-flooded. HDTVs added to the injected water are taken from the same reservoir, selected during the production of the well and its cleaning. The optimal concentration of HDTV in the injected water is determined, which leads to clogging of the pores of the formation, i.e. its pollution within the specified limits.
Исследованиями было установлено, что для абсолютного большинства терригенных коллекторов минерализация воды более 1,5 г/л снижает эффективность набухания глинистых частиц. Для эффективного ограничения водопритока глинистые частицы должны увеличиваться в объеме не менее чем в 2 раза.Studies have found that for the vast majority of terrigenous reservoirs, salinity of more than 1.5 g / l reduces the efficiency of clay particles swelling. To effectively limit water inflow, clay particles should increase in volume by at least 2 times.
В результате лабораторных исследований закачки воды с ТВЧ через керн прокачали объем воды
Далее скважину глушат. Закрывают «шторками» все стволы, кроме обводненного. В скважину закачивают пресную воду с минерализацией не более 1,5 г/л и концентрацией ТВЧ не более 40 мг/л в объеме Qпр, равном 1-10% объема порового пространства призабойной зоны пласта горизонтального ствола. Радиус призабойной зоны можно оценить по результатам ранее проведенных гидродинамических исследований. Согласно расчетам, достаточно закачивать пресной воды в объеме от 1 до 10% от порового объема призабойной зоны, т.к. обводнившийся интервал, по данным исследований, соответствует указанным пределам от общей длины горизонтального ствола. Также концентрация ТВЧ менее 40 мг/л не забивает поры пласта, что способствует проникновению пресной воды глубже в пласт.Further, the well is jammed. They cover all the trunks with “blinds”, except for the flooded one. Fresh water is pumped into the well with a salinity of not more than 1.5 g / l and a concentration of HDTV of not more than 40 mg / l in a volume of Q ol equal to 1-10% of the pore volume of the bottomhole formation zone of the horizontal wellbore. The radius of the bottomhole zone can be estimated from the results of previously conducted hydrodynamic studies. According to calculations, it is enough to pump fresh water in a volume of 1 to 10% of the pore volume of the bottomhole zone, because The waterlogged interval, according to research, corresponds to the specified limits of the total length of the horizontal trunk. Also, a concentration of HDTV of less than 40 mg / l does not clog the pores of the formation, which facilitates the penetration of fresh water deeper into the formation.
После закачки объема Qпр проводят выдержку в течение времени t, определенному по лабораторным исследованиям. За это время происходит набухание глинистых составляющих коллектора не менее чем в 2 раза.After injection of the volume Q pr , an exposure is carried out for a time t determined by laboratory tests. During this time, the clay components of the reservoir swell at least 2 times.
Затем закачивают в скважину воду с ТВЧ. Требуемый объем закачки воды с ТВЧ возможно определить пересчетом с керна на реальный пласт пропорционально их размерам. Однако, т.к. длина обводненного интервала в горизонтальном стволе не известна, данный подход будет не точен. Поэтому объем закачки воды с ТВЧ Qтвч определяют по падению приемистости не менее чем в 2 раза от первоначальной, также как наблюдали при лабораторных исследованиях на керне.Then, water with HDTV is pumped into the well. The required volume of water injection with HDTV can be determined by conversion from the core to the real reservoir in proportion to their size. However, since the length of the flooded interval in the horizontal trunk is not known, this approach will not be accurate. Therefore, the volume of water injected with HDTV QHTV is determined by the drop in injectivity not less than 2 times from the original, as was observed in laboratory studies on the core.
Далее закачку прекращают и пускают скважину в эксплуатацию.Next, the injection is stopped and the well is put into operation.
Разработку ведут до полной экономически рентабельной выработки участка.The development is carried out until the full economically viable development of the site.
Результатом внедрения данного способа является повышение степени нефтеизвлечения за счет максимально длительной работы скважины до полного обводнения.The result of the implementation of this method is to increase the degree of oil recovery due to the longest possible operation of the well until complete flooding.
Примеры конкретного выполнения способаExamples of specific performance of the method
Пример 1. Участок нефтяного пласта, представленный терригенным типом коллектора и чисто нефтяной зоной толщиной h=10 м, вскрыт многозабойной горизонтальной скважиной (МЗГС) с тремя открытыми горизонтальными стволами длиной 210 м, 260 м и 305 м.Example 1. The section of the oil reservoir, represented by the terrigenous type of reservoir and a purely oil zone with a thickness of h = 10 m, was opened by a multilateral horizontal well (MZGS) with three open horizontal shafts 210 m, 260 m and 305 m long.
Пласт залегает на глубине 1050 м, проницаемость пласта составляет 830 мД, пористость m=21%, начальное пластовое давление 11 МПа, вязкость воды в пластовых условиях 1,6 мПа·с, вязкость нефти в пластовых условиях 55,1 мПа·с.The formation lies at a depth of 1050 m, the permeability of the formation is 830 mD, the porosity is m = 21%, the initial reservoir pressure is 11 MPa, the viscosity of the water in the reservoir is 1.6 MPa · s, the viscosity of the oil in the reservoir is 55.1 MPa · s.
Радиус призабойной зоны стволов МЗГС оценили по результатам проведенных гидродинамических исследований, радиус составил r=15 м.The radius of the bottomhole zone of the MZGS trunks was estimated by the results of hydrodynamic studies, the radius was r = 15 m.
Пласт разрабатывают заводнением. Закачивают пластовую воду через нагнетательные скважины и отбирают добываемую продукцию через добывающие скважины.The layer is being developed by water flooding. Formation water is pumped through injection wells and produced products are taken through production wells.
В процессе разработки пласта происходит прорыв воды от соседних нагнетательных скважин в горизонтальный ствол добывающей МЗГС. В результате скважина обводняется до 99%.In the process of developing the formation, a breakthrough of water from neighboring injection wells into the horizontal trunk of the producing MZGS occurs. As a result, the well is flooded to 99%.
Поочередным открытием одного ствола и закрытием остальных при работающей скважине определяют обводнившийся горизонтальный ствол. Было установлено, что это ствол длиной L=260 м.By alternately opening one trunk and closing the others while the well is running, a horizontal horizontal waterlogged well is determined. It was found that this is a trunk with a length of L = 260 m.
При бурении скважины был отобран керн пласта. До проведения мероприятий по ограничению водопритока проводят лабораторные исследования на керне.When drilling a well, a core of the formation was selected. Prior to the measures to limit water inflow, laboratory studies on the core are carried out.
В одном из кернов выделяют кусочек глинистого материала. Определяют время t набухания глинистых частиц в 2 раза посредствам контакта данного глинистого материала с пресной водой с минерализацией 0,98 г/л. Время t составило 2 сут.In one of the cores, a piece of clay material is isolated. Determine the time t of the swelling of clay particles in 2 times by contact of the clay material with fresh water with a salinity of 0.98 g / L. Time t was 2 days.
Далее проводят лабораторные исследования на керне по заводнению его водой с концентрацией ТВЧ в пределах 70-200 мг/л. Причем в данном случае используют подтоварную или пластовую воду. Керн имеет длину 4 см и диаметр 3 см. Его предварительно обводняют. ТВЧ, добавляемые в закачиваемую воду, берут с того же пласта, отобранные в процессе добычи продукции скважины и ее очистки. Определяют оптимальную концентрацию ТВЧ в закачиваемой воде, которая приводит к забиванию пор пласта, т.е. его загрязнению в указанных пределах. Во время закачки наблюдают падение приемистости керна в 2 раза от первоначальной, после чего закачку прекращают. Оптимальная концентрация ТВЧ, согласно исследованиям, составила 100 мг/л. В результате лабораторных исследований закачки воды с ТВЧ через керн прокачали объем воды
Далее МЗГС глушат. Закрывают «шторками» все стволы, кроме обводненного. В скважину закачивают пресную воду с минерализацией не более 1,5 г/л и концентрацией ТВЧ 20 мг/л в объеме равном 1-10% объема порового пространства призабойной зоны пласта Qпр=(0,01…0,1)·L·h·2r·m=260·10·2·15·0,21=(0,01…0,1)·16380 м3. Принимают Qпр=0,02·16380=328 м3. Данный объем закачивают за время, не превышающее время t набухания глинистых частиц. Таким образом, приемистость при закачке пресной воды составляет 328/2=164 м3/сут. Закачку ведут в течение 2 суток.Further MZGS jam. They cover all the trunks with “blinds”, except for the flooded one. Fresh water is pumped into the well with a mineralization of not more than 1.5 g / l and a concentration of HDTV of 20 mg / l in a volume equal to 1-10% of the pore volume of the bottom-hole formation zone Q pr = (0.01 ... 0.1) · L · h · 2r · m = 260 · 10 · 2 · 15 · 0.21 = (0.01 ... 0.1) · 16380 m 3 . Take Q pr = 0.02 · 16380 = 328 m 3 . This volume is pumped in a time not exceeding the time t of the swelling of clay particles. Thus, the injectivity during the injection of fresh water is 328/2 = 164 m 3 / day. Download lead within 2 days.
После закачки объема Qпр проводят выдержку в течение времени t=2 сут. За это время происходит набухание глинистых составляющих коллектора не менее чем в 2 раза.After injection of the volume Q pr, hold is carried out for a time t = 2 days. During this time, the clay components of the reservoir swell at least 2 times.
Затем закачивают в скважину воду с ТВЧ, которые берут с того же пласта, отобранные в процессе добычи продукции скважины и ее очистки. Концентрация ТВЧ в закачиваемой воде 100 мг/л, установленная по лабораторным исследованиям. Объем закачки воды с ТВЧ Qтвч определяют по падению приемистости в 2 раза от первоначальной, также как наблюдали при лабораторных исследованиях на керне.Then water with HDTV is pumped into the well, which is taken from the same reservoir, selected during the production of the well and its cleaning. The concentration of HDTV in the injected water is 100 mg / l, as determined by laboratory tests. The volume of water injected with HDTV QHTV is determined by the drop in injectivity 2 times from the original, as was observed in laboratory tests on the core.
По результатам проведенных ранее гидродинамических исследований приемистость q3=100 м3/сут обеспечивается при давлении закачки на забое скважины, равном 15 МПа. Таким образом, закачку ведут с приемистостью q3=100 м3/сут. Через 4 сут. приемистость падает до 50 м3/сут., что свидетельствует о процессе «загрязнения» пласта. Далее закачку прекращают и пускают скважину в эксплуатацию.According to the results of previous hydrodynamic studies, the injectivity q 3 = 100 m 3 / day is provided at an injection pressure at the bottom of the well equal to 15 MPa. Thus, the injection is carried out with an injectivity of q 3 = 100 m 3 / day. After 4 days. injectivity drops to 50 m 3 / day, which indicates the process of "pollution" of the reservoir. Next, the injection is stopped and the well is put into operation.
Разработку ведут до полной экономически рентабельной выработки участка.The development is carried out until the full economically viable development of the site.
Пример 2. Выполняют, как пример 1. Концентрацию ТВЧ применяют равной 70 Example 2. Perform, as example 1. The concentration of the HDTV is applied equal to 70
мг/л.mg / l
Пример 3. Выполняют, как пример 1. Концентрацию ТВЧ применяют равной 200 мг/л.Example 3. Perform, as example 1. The concentration of the HDTV is used equal to 200 mg / L.
В результате разработки, которую ограничили обводнением добывающей скважины до 98%, было добыто с участка 231,8 тыс.т нефти за 34 года разработки, коэффициент извлечения нефти (КИН) составил 0,436. По прототипу при прочих равных условиях скважина обводнилась раньше, было добыто 181,3 тыс.т нефти за 27 лет разработки, КИН составил 0,341. Прирост КИН по предлагаемому способу - 0,095.As a result of the development, which was limited by watering the production well to 98%, 231.8 thousand tons of oil was extracted from the site over 34 years of development, the oil recovery ratio (CIN) was 0.436. According to the prototype, ceteris paribus, the well was watered earlier, 181.3 thousand tons of oil was produced over 27 years of development, the recovery factor was 0.341. The increase in recovery factor by the proposed method is 0.095.
Предлагаемый способ позволяет снизить обводненность добываемой продукции и увеличить нефтеотдачу продуктивного пласта.The proposed method allows to reduce the water content of the extracted products and increase oil recovery of the reservoir.
Применение предложенного способа позволит решить задачу повышения нефтеотдачи терригенного пласта за счет максимально длительной работы скважины до полного обводнения при разработке пласта многозабойными горизонтальными скважинами.The application of the proposed method will allow to solve the problem of increasing oil recovery of the terrigenous reservoir due to the maximum long-term operation of the well until complete flooding during the development of the reservoir with multilateral horizontal wells.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2013150953/03A RU2536895C1 (en) | 2013-11-18 | 2013-11-18 | Development of oil deposit by multihole horizontal wells |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2013150953/03A RU2536895C1 (en) | 2013-11-18 | 2013-11-18 | Development of oil deposit by multihole horizontal wells |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2536895C1 true RU2536895C1 (en) | 2014-12-27 |
Family
ID=53287506
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2013150953/03A RU2536895C1 (en) | 2013-11-18 | 2013-11-18 | Development of oil deposit by multihole horizontal wells |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2536895C1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114427378A (en) * | 2020-09-21 | 2022-05-03 | 中国石油化工股份有限公司 | Method for designing selective water plugging slug of solution-breaking oil reservoir |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2143548C1 (en) * | 1996-08-20 | 1999-12-27 | Открытое акционерное общество "Нефтяная компания Пытьяхнефтеотдача" | Method of development of nonuniform water- encroached oil formations |
US6209644B1 (en) * | 1999-03-29 | 2001-04-03 | Weatherford Lamb, Inc. | Assembly and method for forming a seal in a junction of a multilateral well bore |
RU2175384C1 (en) * | 2000-12-26 | 2001-10-27 | Общество с ограниченной ответственностью Научно-производственное предприятие "Нефтегеотехнология" | Method of development of water-encroached nonuniform oil formations (versions) |
RU2188312C2 (en) * | 2000-04-14 | 2002-08-27 | ОАО "Нефтяная компания "Паритет" | Composition for regulation of oil field development |
RU2199654C2 (en) * | 2000-12-26 | 2003-02-27 | Общество с ограниченной ответственностью Научно-производственное предприятие "Нефтегеотехнология" | Process of development of flooded inhomogeneous oil pool versions) |
RU2394980C1 (en) * | 2009-09-22 | 2010-07-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Procedure for development of oil deposit |
RU2465446C1 (en) * | 2011-06-21 | 2012-10-27 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Method of producing oil in porous fractured reservoirs reducing well product water content |
RU2476665C2 (en) * | 2010-07-19 | 2013-02-27 | Илдус Абудасович Сагидуллин | Isolation method of water influx in well |
RU2480503C1 (en) * | 2011-11-09 | 2013-04-27 | Общество с ограниченной ответственностью "Газпром добыча Ямбург" | Composition for water-isolation works in gas wells |
-
2013
- 2013-11-18 RU RU2013150953/03A patent/RU2536895C1/en active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2143548C1 (en) * | 1996-08-20 | 1999-12-27 | Открытое акционерное общество "Нефтяная компания Пытьяхнефтеотдача" | Method of development of nonuniform water- encroached oil formations |
US6209644B1 (en) * | 1999-03-29 | 2001-04-03 | Weatherford Lamb, Inc. | Assembly and method for forming a seal in a junction of a multilateral well bore |
RU2188312C2 (en) * | 2000-04-14 | 2002-08-27 | ОАО "Нефтяная компания "Паритет" | Composition for regulation of oil field development |
RU2175384C1 (en) * | 2000-12-26 | 2001-10-27 | Общество с ограниченной ответственностью Научно-производственное предприятие "Нефтегеотехнология" | Method of development of water-encroached nonuniform oil formations (versions) |
RU2199654C2 (en) * | 2000-12-26 | 2003-02-27 | Общество с ограниченной ответственностью Научно-производственное предприятие "Нефтегеотехнология" | Process of development of flooded inhomogeneous oil pool versions) |
RU2394980C1 (en) * | 2009-09-22 | 2010-07-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Procedure for development of oil deposit |
RU2476665C2 (en) * | 2010-07-19 | 2013-02-27 | Илдус Абудасович Сагидуллин | Isolation method of water influx in well |
RU2465446C1 (en) * | 2011-06-21 | 2012-10-27 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Method of producing oil in porous fractured reservoirs reducing well product water content |
RU2480503C1 (en) * | 2011-11-09 | 2013-04-27 | Общество с ограниченной ответственностью "Газпром добыча Ямбург" | Composition for water-isolation works in gas wells |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114427378A (en) * | 2020-09-21 | 2022-05-03 | 中国石油化工股份有限公司 | Method for designing selective water plugging slug of solution-breaking oil reservoir |
CN114427378B (en) * | 2020-09-21 | 2024-03-15 | 中国石油化工股份有限公司 | Design method for selective water shutoff slug of disconnected solution oil reservoir |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2533393C1 (en) | Large-volume acid treatment method for carbonate bed | |
RU2578134C1 (en) | Method of developing oil deposits in fractured reservoirs with water oil zones | |
CN104453811A (en) | Microbial enhanced oil recovering method of moderate-high permeability reservoir | |
RU2478164C1 (en) | Development method of oil deposit located above gas deposit and separated from it with non-permeable interlayer | |
RU2513791C1 (en) | Development method of multilayer oil deposit using hydraulic fracturing of formation | |
RU2527429C1 (en) | Development method of oil deposit with horizontal wells | |
RU2599156C1 (en) | Method of interval treatment of bottom hole zone of horizontal well shaft | |
RU2594402C1 (en) | Method for subsequent flooding of stratified reservoir | |
RU2569101C1 (en) | Method of decrease of water inflow to horizontal wells | |
RU2536895C1 (en) | Development of oil deposit by multihole horizontal wells | |
RU2509884C1 (en) | Development method of water-flooded oil deposit | |
RU2504650C1 (en) | Method of development of flooded oil deposit | |
RU2584190C1 (en) | Method of development of multilayer oil deposits | |
RU2534262C1 (en) | Interval treatment method of bottom-hole zone of oil-gas well formations | |
RU2536891C1 (en) | Development of oil deposit by multihole horizontal wells | |
RU2524800C1 (en) | Development of inhomogeneous deposit by inclined and horizontal wells | |
RU2499134C2 (en) | Method of development of oil pool located above gas pool and separated therefrom by impermeable parting | |
RU2494247C1 (en) | Development method of water-flooded oil deposit | |
RU2560018C1 (en) | Water flow isolation technique in uncased horizontal borehole section of producing well | |
RU2599155C1 (en) | Method of treatment of bottom-hole zone of the horizontal shafts of boreholes, opening carbonate collector | |
RU2560763C1 (en) | Method to open and develop multipay field with low poroperm reservoirs | |
RU2592931C1 (en) | Method for development of carbonate reservoir by periodic acid treatment | |
RU2597595C1 (en) | Method of developing oil deposits | |
RU2460874C1 (en) | Development method of non-homogeneous oil formation | |
RU2285794C1 (en) | Well bottom zone treatment method |