RU2289685C1 - Method for extracting reservoirs of highly viscous oil or bitumen - Google Patents
Method for extracting reservoirs of highly viscous oil or bitumen Download PDFInfo
- Publication number
- RU2289685C1 RU2289685C1 RU2005116589/03A RU2005116589A RU2289685C1 RU 2289685 C1 RU2289685 C1 RU 2289685C1 RU 2005116589/03 A RU2005116589/03 A RU 2005116589/03A RU 2005116589 A RU2005116589 A RU 2005116589A RU 2289685 C1 RU2289685 C1 RU 2289685C1
- Authority
- RU
- Russia
- Prior art keywords
- bitumen
- vertical
- borehole
- drilling
- oil
- Prior art date
Links
- 239000010426 asphalt Substances 0.000 claims abstract description 34
- 238000005553 drilling Methods 0.000 claims abstract description 15
- 238000000034 method Methods 0.000 claims abstract description 13
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 12
- 238000000605 extraction Methods 0.000 claims abstract description 9
- 229920006395 saturated elastomer Polymers 0.000 claims abstract description 7
- 229920002401 polyacrylamide Polymers 0.000 claims abstract description 6
- 239000002826 coolant Substances 0.000 claims description 23
- 239000003921 oil Substances 0.000 claims description 20
- 238000004519 manufacturing process Methods 0.000 claims description 14
- 230000015572 biosynthetic process Effects 0.000 claims description 9
- 238000005755 formation reaction Methods 0.000 claims description 9
- 238000009826 distribution Methods 0.000 claims description 3
- 238000005086 pumping Methods 0.000 claims description 3
- 239000000295 fuel oil Substances 0.000 claims 2
- 238000004080 punching Methods 0.000 claims 1
- 238000010438 heat treatment Methods 0.000 abstract description 7
- 230000000694 effects Effects 0.000 abstract description 2
- 239000000126 substance Substances 0.000 abstract description 2
- 230000003247 decreasing effect Effects 0.000 abstract 1
- 238000011084 recovery Methods 0.000 abstract 1
- 230000000638 stimulation Effects 0.000 abstract 1
- 239000011229 interlayer Substances 0.000 description 8
- 239000010410 layer Substances 0.000 description 7
- 238000002347 injection Methods 0.000 description 5
- 239000007924 injection Substances 0.000 description 5
- 239000002562 thickening agent Substances 0.000 description 4
- 239000002360 explosive Substances 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 239000012530 fluid Substances 0.000 description 2
- 238000010793 Steam injection (oil industry) Methods 0.000 description 1
- 239000007864 aqueous solution Substances 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 230000004941 influx Effects 0.000 description 1
- 239000000155 melt Substances 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
Abstract
Description
Предложение относится к нефтедобывающей промышленности, в частности к разработке нефтяных месторождений, и может быть использовано при добыче высоковязких нефтей(ВВН) и битума путем теплового воздействия на пласт.The proposal relates to the oil industry, in particular to the development of oil fields, and can be used in the extraction of highly viscous oils (BBH) and bitumen by thermal action on the reservoir.
Известен способ добычи ВВН и битума [см. пат. RU №2232263, кл. 7 Е 21 В 43/24 от 27.05.02, опубл. БИ 19 от 10.07.04], включающий бурение вертикальной скважины, спуск и цементирование эксплуатационной колонны с последующей перфорацией, спуск насосно-компрессорных труб и штангового насоса, герметизацию затрубного пространства, например пакером, закачку в скважину теплоносителя и отбор нефти, при этом забой вертикального ствола скважины располагают ниже подошвы нефтяного пласта, его забой - выше водонефтяного контакта, а боковой ствол обсаживают незацементированным щелевидным хвостовиком, при этом закачку теплоносителя ведут в боковой ствол, а отбор нефти из вертикального ствола скважины штанговым насосом, установленным на забое.A known method for the extraction of explosives and bitumen [see US Pat. RU No. 2232263, class 7 E 21 B 43/24 of 05.27.02, publ. BI 19 dated 10.07.04], including drilling a vertical well, launching and cementing a production string followed by perforation, lowering tubing and a sucker rod pump, sealing the annulus, for example, with a packer, pumping coolant into the well and taking oil, while bottoming up the wellbore is located below the bottom of the oil reservoir, its bottom is above the oil-water contact, and the sidetrack is planted with an uncemented slit-like liner, while the coolant is injected into the side ox, and the selection of oil from a vertical wellbore with a rod pump installed on the bottom.
Закачку теплоносителя в боковой ствол осуществляют по насосно-компрессорным трубам и чередуют с отбором нефти из вертикального ствола, при этом пакер в затрубном пространстве устанавливают ниже устья бокового ствола.The coolant is pumped into the sidetrack via tubing and is alternated with the selection of oil from the vertical trunk, while the packer is installed in the annulus below the mouth of the sidetrack.
Способ позволяет увеличить добычу ВВН и битума за счет увеличения темпа закачки теплоносителя.The method allows to increase the production of explosives and bitumen by increasing the rate of injection of coolant.
Недостатком этого способа является то, что при низкой приемистости продуктивного пласта и высоком темпе закачки теплоносителя происходит прорыв его в водоносный пропласток, т.е. происходит потеря тепла, что снижает прогрев продуктивного пласта, следовательно, и добычу ВВН или битума. К тому же, учитывая, что битумо- и ВВН-насыщенные породы битумных месторождений представляют из себя слабосцементированную структуру, по мере нагрева будет происходить разрушение породы в горизонтальной части ствола скважины, т.к. цементирующим веществом в нем является битум, который в процессе теплового воздействия расплавляется. Из-за того, что боковой ствол не цементируется, возможен прорыв пара по затрубному пространству бокового ствола к вертикальному стволу обсадной колонны, что может привести к нежелательным последствиям, в частности к нарушению целостности цементного камня на участке зарезки бокового ствола и уходу пара за область воздействия.The disadvantage of this method is that with a low injectivity of the reservoir and a high rate of coolant injection, it breaks into the aquifer, i.e. heat loss occurs, which reduces the heating of the reservoir, and consequently, the production of explosives or bitumen. In addition, given that bitumen- and VVN-saturated rocks of bitumen deposits are a poorly cemented structure, as the heating occurs, rock will be destroyed in the horizontal part of the wellbore, because the cementitious substance in it is bitumen, which melts during thermal exposure. Due to the fact that the sidetrack is not cemented, steam breakthrough through the annular space of the sidetrack to the vertical casing stem is possible, which can lead to undesirable consequences, in particular, to the disruption of the integrity of the cement stone in the sidetracking section and the steam leaving the impact area .
Наиболее близким по технической сущности и достигаемому результату к предлагаемому является способ теплового вытеснения нефти из горизонтальной скважины [см. пат. RU №2067168, кл. Е 21 В 43/24 от 05.01.94 г, опубл. БИ 27 от 27.09.96], заключающийся в том, что в пробуренную скважину спускают перфорированную обсадную колонну, цементируют затрубное пространство до горизонтального ствола, устанавливают в обсадную колонну насосно-компрессорные трубы, цементируют их в обсадной колонне с помощью пакера, по насосно-компрессорным трубам подают теплоноситель, а продукцию транспортируют по кольцевому межтрубному пространству, при этом перфорацию обсадной колонны осуществляют по кольцевым образующим в оконечной части за пакером и в начале горизонтального участка непосредственно зацементированным затрубным пространством, теплоноситель подают в оконечную часть обсадной колонны за пакер, а продукцию отбирают через перфорацию обсадной колонны в начале горизонтального участка.The closest in technical essence and the achieved result to the proposed is a method of thermal displacement of oil from a horizontal well [see US Pat. RU No. 2067168, class E 21 B 43/24 from 05.01.94 g, publ. BI 27 from 09/27/96], consisting in the fact that a perforated casing is lowered into the drilled well, the annulus is cemented to the horizontal well, tubing is installed in the casing, and cemented in the casing using a packer, according to the tubing the coolant is supplied to the pipes, and the products are transported along the annular annulus, while the casing is perforated along the annular generators in the end part behind the packer and at the beginning of the horizontal section directly cemented annulus, the coolant is fed to the end of the casing string for the packer, and the products are taken through the perforation of the casing string at the beginning of the horizontal section.
Известный способ позволяет производить добычу высоковязкой нефти (ВВН) или битума тепловым воздействием на продуктивный пласт и вытеснение ее через горизонтальную скважину.The known method allows the production of highly viscous oil (BBH) or bitumen by thermal exposure to the reservoir and displacing it through a horizontal well.
Недостатком способа является то, что не происходит глубокого прогрева продуктивного пласта, кроме того, тепло от подаваемого по насосно-компрессорным трубам (НКТ) теплоносителя через поднимаемую ВВН или битум передается на нагрев горных пород за обсадной колонной, происходит потеря тепла. К тому же приток добываемой жидкости может осуществляться только в режиме фонтанирования.The disadvantage of this method is that there is no deep heating of the reservoir, in addition, heat from the coolant supplied through the tubing through a raised BBH or bitumen is transferred to the rock heating behind the casing, heat is lost. In addition, the flow of produced fluid can be carried out only in the gushing mode.
Решаемая техническая задача состоит в повышении нефтеодачи продуктивного пласта за счет увеличения глубины прогрева и снижения тепловых потерь.The technical problem to be solved is to increase the oil production of the reservoir by increasing the depth of heating and reducing heat loss.
Поставленная задача решается предлагаемым способом разработки месторождений высоковязких нефтей или битума, включающим бурение горизонтальной скважины, спуск обсадной перфорированной колонны, цементирование и перфорацию, спуск насосно-компрессорных труб, их центрирование с помощью пакера, закачку теплоносителя и отбор высоковязкой нефти или битума.The problem is solved by the proposed method for the development of high-viscosity oil or bitumen deposits, including drilling a horizontal well, running a perforated casing, cementing and perforating, running tubing, centering it using a packer, pumping coolant and selecting highly viscous oil or bitumen.
Новым является то, что сначала бурят вертикальную скважину, затем производят исследование коллекторских и тепловых свойств вскрытых бурением пластов, выделяют битумонасыщенные и водонасыщенные пропластки, после чего из вертикальной скважины производят бурение бокового горизонтального ствола так, чтобы он вскрыл промежуточный водоносный пропласток в разрезе битумного пласта - наполовину распространения локального водоносного пропластка, боковой ствол цементируют до верхнего битуминозного пропластка, затем в боковой ствол спускают перфорированную обсадную колонну, причем перфорацию проводят так, что число перфорационных отверстий увеличивают по мере удаления от вертикального ствола скважины, а вертикальный ствол скважины перфорируют в зонах вскрытых бурением битуминозных пропластков, насосно-компрессорные трубы спускают в вертикальную скважину, центрируют пакером, установленным ниже участка зарезки бокового ствола, закачку теплоносителя производят в горизонтальный ствол, а отбор высоковязкой нефти или битума по вертикальному стволу, при этом после выработки продуктивной зоны между вертикальным и боковым стволом, в боковой ствол последовательно закачивают оторочку полиакриламида в объеме 0,1 от объема прогретой продуктивной зоны и воды, причем воду закачивают до появления загустителя в вертикальном стволе скважины, после чего возобновляют закачку теплоносителя в боковой ствол, производят добычу высоковязкой нефти или битума, затем переходят к закачке теплоносителя через вертикальный ствол скважины и боковой горизонтальный ствол для обеспечения добычи из соседних добывающих скважинах.What is new is that first a vertical well is drilled, then the reservoir and thermal properties of the layers exposed by drilling are studied, bitumen-saturated and water-saturated layers are extracted, after which a lateral horizontal well is drilled from a vertical well so that it reveals an intermediate aquifer in the section of the bitumen formation - half the distribution of the local aquifer, the lateral trunk is cemented to the upper bituminous interlayer, then lowered into the lateral trunk perforated casing, and the perforation is carried out so that the number of perforations increases as you move away from the vertical wellbore, and the vertical wellbore is perforated in the areas exposed by drilling bituminous layers, tubing is lowered into the vertical well, centered with a packer installed below the cut-off area the sidetrack, the coolant is injected into the horizontal barrel, and the selection of high-viscosity oil or bitumen along the vertical barrel, while after production of the productive zone between the vertical and lateral bore, a rim of polyacrylamide is sequentially pumped into the lateral trunk in the amount of 0.1 of the volume of the heated productive zone and water, and water is pumped until a thickener appears in the vertical wellbore, after which the coolant is pumped back into the lateral bore, production high-viscosity oil or bitumen, then they transfer to the coolant injection through the vertical wellbore and horizontal lateral well to ensure production from neighboring producing wells.
Совокупность отличительных признаков позволяет обеспечить высокий темп нагнетания теплоносителя в пласт, избежать проблемы кольматации пор, аккумулировать тепло в пропластке и избежать тепловые потери, т.к. водоносный пропласток с лучшими тепловыми свойствами (1,45-2,5 Вт/(м·К)) будет внутри битуминозного пропластка с низкими тепловыми свойствами порядка (0,6-1,30 Вт/(м·К)), уменьшать вязкостное соотношение между разогретым битумом и вытесняющим загустителем, перераспределить влияние теплоносителя в зоны, ранее неохваченные тепловым воздействием, увеличить тем самым глубину прогрева продуктивного пласта и его нефтеодачу.The set of distinguishing features allows us to ensure a high rate of coolant injection into the reservoir, to avoid the problem of pore clogging, to accumulate heat in the interlayer and to avoid heat loss, because aquifer with the best thermal properties (1.45-2.5 W / (m · K)) will be inside the bituminous layer with low thermal properties of the order (0.6-1.30 W / (m · K)), reduce the viscosity the ratio between the heated bitumen and the displacing thickener, redistribute the influence of the coolant in the areas previously not covered by the thermal effect, thereby increasing the depth of heating of the productive formation and its oil production.
Из патентной и научно-технической литературы нам неизвестна заявляемая совокупность отличительных признаков, следовательно, заявляемый способ разработки месторождений ВВН или битума отвечает критерию изобретения «изобретательский уровень»From the patent and scientific and technical literature we do not know the claimed combination of distinctive features, therefore, the claimed method of developing deposits of VVN or bitumen meets the criteria of the invention "inventive step"
На фиг.1 показана характеристика коллекторских и тепловых свойств вскрытых бурением пластов.Figure 1 shows the characteristics of the reservoir and thermal properties exposed by drilling formations.
На фиг.2 представлена схема осуществления предлагаемого способа.Figure 2 presents a diagram of the implementation of the proposed method.
Способ осуществляется в следующей последовательности (совмещен с примером конкретного выполнения).The method is carried out in the following sequence (combined with an example of a specific implementation).
На Мордово-Кармальском месторождении пробурили вертикальную скважину 1 (см. фиг.2), которую цементировали от забоя 2 до устья 3, вскрывая при этом всю толщу продуктивного пласта 4, проводили исследование коллекторских и тепловых свойств по разрезу пласта 4. Выделили в пределах продуктивного пласта 4 битуминозные 5 и 6 и водоносные 7 пропластки и по гидродинамическим и геофизическим данным определяли интервал распространения водоносного пропластка 7. Как видно из характеристики пласта (см. фиг.1), в пределах битуминозного встречается водоносный пропласток 7 с хорошими тепловыми и фильтрационными свойствами. Теплопроводность данного пропластка изменяется от 1,3 до 1,331 Вт/(м·К), проницаемость составляет 0,86·10-12 м2(Дарси) при толщине 2,5 м. Причем данный пропласток находится в толще битумного пласта с теплопроводностью 0,7 Вт/(м·К) вышележащего 5 при толщине 3,5 м, и нижележащего 6 относительно водоносного 7 пропластка с теплопроводностью 0,5-0,6 Вт/(м·К) и толщиной 4,6 м. По данным геофизических исследований интервал распространения водоносной линзы составляет 30 м.A
Из вертикального ствола скважины 1 забурили боковой горизонтальный ствол 8 так, чтобы вскрыл промежуточный, расположенный между битуминозными пропластками 5 и 6 водоносный пропласток 7 наполовине его распространения (15 м от вертикального ствола скважины 1), затем производят его цементирование, причем цементировали до верхнего битуминозного пропластка 5, после чего в него спустили перфорированную обсадную колонну 8'' с увеличением числа перфорационных отверстий 9 по мере удаления от вертикального ствола скважины 1. Вертикальный ствол скважины 1 перфорировали 10 в зонах вскрытых бурением битуминозных пропластков 5 и 6 и спустили насосно-компрессорные трубы (НКТ) 11, снабженные пакером 12, установленным ниже интервала зарезки бокового ствола 8, для герметизации затрубного пространства 13 между НКТ 11, обсадной колонной 8 и насосом 14. По затрубному пространству 13 подавали теплоноситель пар в боковой ствол 8, а по вертикальному стволу скважины 1 производили отбор ВВН или битума.From the
Закачку теплоносителя производили имеющимся парогенератором с производительностью 4 т/сут. Изменение температуры пласта в зоне вертикального ствола скважины произошло на 5 сутки после начала закачки пара, что говорит о эффективности способа. Получен промышленный приток битума с дебитом 10 т/сут. Работа скважины в таком режиме продолжалась в течение 2 месяцев, затем в добывающий вертикальный ствол стал прорываться пар. После прорыва теплоносителя в вертикальный ствол скважины 1, что свидетельствовало о выработке продуктивной зоны между вертикальным и боковым стволами 1 и 8 соответственно, в боковой ствол 8 последовательно закачивали оторочку загустителя полиакриламида с концентрацией 0,5% в водном растворе, в объеме 0,1-ой прогретой зоны и воды, причем воду закачали до появления загустителя в вертикальном стволе скважины 1, после чего возобновили закачку теплоносителя (пара) в боковой ствол 8, добычу ВВН или битума производили до минимально допустимого рентабельного уровня - 0,5 т/сут, затем перешли к закачке теплоносителя (пара) через вертикальный ствол скважины 1 и боковой горизонтальный ствол 8.The coolant was pumped with an existing steam generator with a capacity of 4 tons / day. A change in the temperature of the formation in the zone of the vertical wellbore occurred on the 5th day after the start of steam injection, which indicates the effectiveness of the method. Received industrial influx of bitumen with a flow rate of 10 tons / day. Well operation in this mode continued for 2 months, then steam began to break into the producing vertical wellbore. After the coolant broke through into the
В результате проведенных работ было отмечено увеличение дебита в близлежащих скважинах в среднем на 1,5 т/сут.As a result of the work, an increase in production rate in nearby wells was noted by an average of 1.5 tons / day.
Технико-экономическая эффективность предлагаемого способа разработки месторождений высоковязких нефтей и битума складывается за счет повышения нефтеодачи битумного пласта и снижения тепловых потерь по сравнению с прототипом.The technical and economic efficiency of the proposed method for the development of deposits of high viscosity oils and bitumen is formed by increasing the oil production of the bitumen formation and reducing heat loss compared to the prototype.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2005116589/03A RU2289685C1 (en) | 2005-06-01 | 2005-06-01 | Method for extracting reservoirs of highly viscous oil or bitumen |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2005116589/03A RU2289685C1 (en) | 2005-06-01 | 2005-06-01 | Method for extracting reservoirs of highly viscous oil or bitumen |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2289685C1 true RU2289685C1 (en) | 2006-12-20 |
Family
ID=37666854
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2005116589/03A RU2289685C1 (en) | 2005-06-01 | 2005-06-01 | Method for extracting reservoirs of highly viscous oil or bitumen |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2289685C1 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2442883C1 (en) * | 2010-08-27 | 2012-02-20 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Method for development of high-viscosity oil reserves |
RU2443853C1 (en) * | 2010-09-03 | 2012-02-27 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Development method of oil deposit with oil-water zones |
RU2445452C1 (en) * | 2010-08-31 | 2012-03-20 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Development method of high-viscosity oil deposit and bitumens, and device for heat displacement of product from horizontal wells |
RU2542070C1 (en) * | 2013-12-06 | 2015-02-20 | Общество с ограниченной ответственностью "РН-УфаНИПИнефть" (ООО "РН-УфаНИПИнефть") | Double-hole well operation method |
RU2599995C1 (en) * | 2015-10-29 | 2016-10-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method of high-viscosity oil pool development by a system of wells with side horizontal shafts (shs) |
RU2630830C1 (en) * | 2016-03-22 | 2017-09-13 | Юрий Вениаминович Зейгман | Well for development of oil formation |
EA036665B1 (en) * | 2016-11-28 | 2020-12-07 | Республиканское Унитарное Предприятие "Производственное Объединение "Белоруснефть" | Method for development of an isolated lithologically or tectonically screened heterogeneous oil-saturated reservoir |
-
2005
- 2005-06-01 RU RU2005116589/03A patent/RU2289685C1/en not_active IP Right Cessation
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2442883C1 (en) * | 2010-08-27 | 2012-02-20 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Method for development of high-viscosity oil reserves |
RU2445452C1 (en) * | 2010-08-31 | 2012-03-20 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Development method of high-viscosity oil deposit and bitumens, and device for heat displacement of product from horizontal wells |
RU2443853C1 (en) * | 2010-09-03 | 2012-02-27 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Development method of oil deposit with oil-water zones |
RU2542070C1 (en) * | 2013-12-06 | 2015-02-20 | Общество с ограниченной ответственностью "РН-УфаНИПИнефть" (ООО "РН-УфаНИПИнефть") | Double-hole well operation method |
RU2599995C1 (en) * | 2015-10-29 | 2016-10-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method of high-viscosity oil pool development by a system of wells with side horizontal shafts (shs) |
RU2630830C1 (en) * | 2016-03-22 | 2017-09-13 | Юрий Вениаминович Зейгман | Well for development of oil formation |
EA036665B1 (en) * | 2016-11-28 | 2020-12-07 | Республиканское Унитарное Предприятие "Производственное Объединение "Белоруснефть" | Method for development of an isolated lithologically or tectonically screened heterogeneous oil-saturated reservoir |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3692111A (en) | Stair-step thermal recovery of oil | |
CA1070611A (en) | Recovery of hydrocarbons by in situ thermal extraction | |
US7422063B2 (en) | Hydrocarbon recovery from subterranean formations | |
RU2295030C1 (en) | Method for extracting layer-zone-wise heterogeneous formation of highly viscous oil or bitumen | |
US7621326B2 (en) | Petroleum extraction from hydrocarbon formations | |
CA1158155A (en) | Thermal recovery of viscous hydrocarbons using arrays of radially spaced horizontal wells | |
US5215149A (en) | Single horizontal well conduction assisted steam drive process for removing viscous hydrocarbonaceous fluids | |
RU2287677C1 (en) | Method for extracting oil-bitumen deposit | |
RU2363839C1 (en) | Procedure for development of high viscous oil deposits | |
RU2582529C1 (en) | Development method of layer-by-zonal heterogeneous superviscous oil or bitumen | |
RU2582251C1 (en) | Development method of layer-by-zonal heterogeneous superviscous oil or bitumen | |
RU2667099C2 (en) | Method of improved gravitational drainage in hydrocarbon formation | |
RU2231635C1 (en) | Method of thermal development of deposits of solid hydrocarbons | |
RU2289685C1 (en) | Method for extracting reservoirs of highly viscous oil or bitumen | |
RU2506417C1 (en) | Development method of high-viscosity oil deposit | |
CA2899805C (en) | Dewatering lean zones with ncg injection using production and injection wells | |
RU2097536C1 (en) | Method of developing irregular multiple-zone oil deposit | |
RU2225942C1 (en) | Method for extraction of bituminous deposit | |
CA2911615C (en) | Method of enhanced oil recovery from lateral wellbores | |
RU2693055C1 (en) | Method for development of high-viscosity oil deposit with water-saturated zones | |
RU2506418C1 (en) | Method for oil deposit development at late stage | |
RU2803344C1 (en) | Method for developing superviscous oil deposits | |
RU2289684C1 (en) | Method for extracting reservoirs of highly viscous oil or bitumen | |
RU2803347C1 (en) | Method for developing superviscous oil deposits | |
RU2237804C1 (en) | Method for extracting deposits of highly viscous oils and bitumens by slanted-horizontal wells |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20090602 |