RU2071526C1 - Method of emptying water basins - Google Patents
Method of emptying water basins Download PDFInfo
- Publication number
- RU2071526C1 RU2071526C1 SU914923363A SU4923363A RU2071526C1 RU 2071526 C1 RU2071526 C1 RU 2071526C1 SU 914923363 A SU914923363 A SU 914923363A SU 4923363 A SU4923363 A SU 4923363A RU 2071526 C1 RU2071526 C1 RU 2071526C1
- Authority
- RU
- Russia
- Prior art keywords
- water
- shield
- tunnel
- reservoir
- water level
- Prior art date
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
Изобретение относится к гидростроению и может быть использовано при опорожнении водохранилища. The invention relates to hydraulic engineering and can be used to empty the reservoir.
Известный способ опорожнения водохранилища из а.с. СССР N 1703780, кл. Е 02 В 8/02, 1989 г. A known method of emptying a reservoir from AS USSR N 1703780, class E 02 B 8/02, 1989
Цель изобретения освобождение из под водохранилища плодородных массивов с увеличением выработки гидроэнергии. The purpose of the invention is the release from under the reservoir of fertile massifs with an increase in hydropower generation.
Поставленная цель достигается тем, что на напорной грани плотины выполняют приставку в виде опорной конструкции на всю глубину водохранилища, устанавливают в опорную конструкцию щит, из огороженного приставкой участка откачивают воду, а в огороженном участке ниже минимального уровня воды в водохранилище располагают входное сечение туннельного водовода, на котором последовательно устанавливают гидротурбинные блоки, после чего перед входом в туннельный водовод устанавливают дополнительную приставку со своим щитом и производят подъем щита в опорной конструкции. При этом на обоих берегах устанавливают приставки со щитами, из огороженных приставками участков откачивают воду и выполняют по берегам туннели для пропуска рыбы, при этом входные сечения туннелей располагают ниже минимального уровня воды в водохранилище, после чего внутри каждого огороженного участка перед входом в туннель для пропуска рыбы устанавливают дополнительную приставку со своим щитом. This goal is achieved by the fact that on the pressure side of the dam a prefix is made in the form of a supporting structure to the entire depth of the reservoir, a shield is installed in the supporting structure, water is pumped out of the section enclosed by the prefix, and an inlet section of the tunnel conduit is located in the fenced area below the minimum water level, on which the hydroturbine blocks are installed sequentially, after which, before entering the tunnel conduit, an additional console with its shield is installed and hoisted shield in the supporting structure. At the same time, prefixes with shields are installed on both banks, water is pumped out from the sections enclosed by the prefixes and tunnels for letting fish pass along the banks, while the input sections of the tunnels are located below the minimum water level in the reservoir, after which inside each fenced area before entering the tunnel for passing fish install an additional prefix with their shield.
Предлагаемый способ поясняется чертежом. The proposed method is illustrated in the drawing.
На чертеже изображена в плоскостном виде плотина 1 с гидротурбинными блоками 2, на напорной грани плотины 1 выполняют приставку 3 в виде опорной конструкции, в которую устанавливают щит 4, на всю глубину водохранилища, из огражденного приставкой 3 участка 5 откачивают воду, а в огражденном участке ниже минимального уровня воды в водохранилище располагают входное сечение туннельного водовода 6, на котором последовательно устанавливают гидротурбинные блоки 7, после чего перед входом в туннельный водовод 6 устанавливают дополнительную приставку 8 со своим щитом 9 и производят подъем щита 4 в приставке 3. При этом на обоих берегах устанавливают приставки 3 со щитами 4, из огороженных участков 5 откачивают воду и выполняют по берегам туннели 6 для пропуска рыбы, при этом входные сечения туннелей 6 располагают ниже минимального уровня воды в водохранилище, после чего внутри каждого огороженного участка 5 перед входом в туннель 6 для пропуска рыбы устанавливают дополнительно приставку 8 со своим щитом 9. The drawing shows in a planar form a dam 1 with hydraulic turbine units 2, on the pressure side of the dam 1 a prefix 3 is made in the form of a supporting structure into which the shield 4 is installed, the entire depth of the reservoir is pumped out of the section 3 enclosed by the prefix 3, and water is pumped out in the enclosed section below the minimum water level in the reservoir there is an inlet section of the tunnel conduit 6, on which the turbine blocks 7 are sequentially installed, after which an additional bailiff is installed before entering the tunnel conduit 6 at 8 with their shield 9, and lift the shield 4 in the prefix 3. At the same time, prefixes 3 with shields 4 are installed on both banks, water is pumped out of the fenced sections 5 and tunnels 6 are run along the shores to allow fish to pass, while the input sections of the tunnels 6 are below the minimum water level in the reservoir, after which inside each fenced area 5 in front of the entrance to the tunnel 6 for the passage of fish install an additional prefix 8 with its shield 9.
Использование способа опорожнения водохранилища осуществляется следующим образом. Using the method of emptying the reservoir is as follows.
При открытых щитах 4 работают гидротурбины 2, а при открывании щитов 9 в дополнительных приставках 8 течение воды проходит по последовательно установленным гидротурбинным блокам 7, в туннеле 6 согласно увеличенного количества установленных последовательно гидротурбинных блоков 7 увеличивается вырабатывание гидроэнергии. По рыбоходным туннелям 6 рыба свободно может проходить по течению и против течения воды. With open shields 4, hydraulic turbines 2 work, and when the shields 9 are opened in additional consoles 8, the water flows through successively installed hydroturbine blocks 7, in the tunnel 6, according to the increased number of hydroturbine blocks 7 installed in series, the generation of hydropower increases. In the fish passage tunnels 6, the fish can freely pass upstream and downstream of the water.
Это экологически и экономически является эффективным. It is environmentally and economically effective.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU914923363A RU2071526C1 (en) | 1991-02-05 | 1991-02-05 | Method of emptying water basins |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU914923363A RU2071526C1 (en) | 1991-02-05 | 1991-02-05 | Method of emptying water basins |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2071526C1 true RU2071526C1 (en) | 1997-01-10 |
Family
ID=21567445
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU914923363A RU2071526C1 (en) | 1991-02-05 | 1991-02-05 | Method of emptying water basins |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2071526C1 (en) |
-
1991
- 1991-02-05 RU SU914923363A patent/RU2071526C1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР N 1703780, кл. E 02 B 8/02, 1989. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS5644466A (en) | Wave energy absorptive device installed to for breakwater | |
RU2071526C1 (en) | Method of emptying water basins | |
CN109853492B (en) | Gate valve pipeline type fish passing method | |
CN209669806U (en) | A kind of hydraulic engineering ecological protection slope | |
US2169249A (en) | Method of and means for effecting downstream migration of fish about dams | |
RU2088724C1 (en) | Hydroelectric power plant and its construction method | |
Liscom | Orifice placement in gatewells of turbine intakes for bypassing juvenile fish around dams | |
JPS6352232B2 (en) | ||
RU2088723C1 (en) | Method for controlling unstable river channels | |
CN218990088U (en) | Adjustable fish passage | |
SU619565A1 (en) | Turbine watercourse | |
SU881185A2 (en) | Method of erecting dam-like hydraulic structures | |
JPS57137652A (en) | Hydraulic turbine equipment | |
RU2182945C2 (en) | Construction process for small hydroelectric power plants | |
SU933866A1 (en) | Water flow energy dampener | |
JPS5729717A (en) | Steel check dam with slit | |
SU522303A1 (en) | Water intake facility | |
RU2023806C1 (en) | Hydroelectric power station | |
RU2222711C2 (en) | Hydroelectric power plant | |
SU64825A1 (en) | Dam intake | |
RU2113612C1 (en) | Hydraulic-turbine mounting trough | |
JPS646344B2 (en) | ||
SU582357A1 (en) | River water inlet with frontal intake | |
SU1562393A1 (en) | Spillway | |
SU746029A1 (en) | Turbine water line water intake |