RU2016122472A - Стратиграфическая и структурная интерпретация наклонных и горизонтальных стволов скважин - Google Patents
Стратиграфическая и структурная интерпретация наклонных и горизонтальных стволов скважин Download PDFInfo
- Publication number
- RU2016122472A RU2016122472A RU2016122472A RU2016122472A RU2016122472A RU 2016122472 A RU2016122472 A RU 2016122472A RU 2016122472 A RU2016122472 A RU 2016122472A RU 2016122472 A RU2016122472 A RU 2016122472A RU 2016122472 A RU2016122472 A RU 2016122472A
- Authority
- RU
- Russia
- Prior art keywords
- stratigraphic
- dimensions
- reference surface
- well
- power
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V20/00—Geomodelling in general
-
- G—PHYSICS
- G16—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
- G16Z—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
- G16Z99/00—Subject matter not provided for in other main groups of this subclass
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/40—Seismology; Seismic or acoustic prospecting or detecting specially adapted for well-logging
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V5/00—Prospecting or detecting by the use of ionising radiation, e.g. of natural or induced radioactivity
- G01V5/04—Prospecting or detecting by the use of ionising radiation, e.g. of natural or induced radioactivity specially adapted for well-logging
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V9/00—Prospecting or detecting by methods not provided for in groups G01V1/00 - G01V8/00
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/28—Processing seismic data, e.g. for interpretation or for event detection
- G01V1/282—Application of seismic models, synthetic seismograms
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/40—Seismology; Seismic or acoustic prospecting or detecting specially adapted for well-logging
- G01V1/42—Seismology; Seismic or acoustic prospecting or detecting specially adapted for well-logging using generators in one well and receivers elsewhere or vice versa
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/64—Geostructures, e.g. in 3D data cubes
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V3/00—Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation
- G01V3/38—Processing data, e.g. for analysis, for interpretation, for correction
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geophysics (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- General Physics & Mathematics (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- High Energy & Nuclear Physics (AREA)
- Remote Sensing (AREA)
- Acoustics & Sound (AREA)
- Geophysics And Detection Of Objects (AREA)
- Length Measuring Devices With Unspecified Measuring Means (AREA)
- Length-Measuring Devices Using Wave Or Particle Radiation (AREA)
- Analysing Materials By The Use Of Radiation (AREA)
Claims (50)
1. Способ стратиграфического и структурного моделирования ствола скважины, включающий в себя:
получение по меньшей мере данных одной инклинометрии от скважины;
определение поверхности отсчета;
вычисление истинной стратиграфической мощности в трех измерениях с использованием наименьшего расстояния в трех измерениях между поверхностью отсчета и какой-либо точкой вдоль траектории скважины, описываемой измерением формации, и
создание разрезов вдоль проектируемой траектории скважины и трехмерных стратиграфических и структурных моделей с использованием вычисленной истинной стратиграфической мощности в трех измерениях.
2. Способ по п. 1, в котором определение поверхности отсчета включает в себя:
использование данных, выбранных из группы, состоящей из следующих элементов: структурная карта от множества верхних границ или маркеров скважины, картографические данные сейсмического горизонта, произвольная горизонтальная плоскость и произвольная наклонная плоскость.
3. Способ по п. 1, в котором измерение формации, используемое для вычисления истинной стратиграфической мощности в трех измерениях, представляет собой одно или более измерений формации, выбранных из группы, состоящей из следующих элементов: измерения удельного сопротивления, проводимости, звуковых, акустических свойств, плотности, пористости по данным гамма- или нейтронного каротажа, давления, отбор проб пластового флюида, отбор образцов керна и исследования бурового шлама.
4. Способ по п. 1, дополнительно включающий в себя:
базирование одного или более вычислений при бурении на вычисленной истинной стратиграфической мощности в трех измерениях.
5. Способ по п. 1, дополнительно включающий в себя:
подачу команды направленного бурения к оборудованию низа бурильной колонны на основе созданной трехмерной стратиграфической и структурной модели.
6. Способ, включающий в себя следующие этапы:
получение по меньшей мере данных одной инклинометрии от скважины;
определение поверхности отсчета в пределах подземной формации;
вычисление истинной стратиграфической мощности в трех измерениях с использованием наименьшего расстояния в трех измерениях между поверхностью отсчета и какой-либо точкой вдоль траектории скважины, описываемой по меньшей мере данными одной инклинометрии;
создание трехмерной стратиграфической и структурной модели с использованием вычисленной истинной стратиграфической мощности в трех измерениях;
определение того, соответствует ли созданная трехмерная модель траектории скважины, описываемой по меньшей мере данными одной инклинометрии; и, если соответствие является неудовлетворительным,
определение новой поверхности отсчета и повторение этапов (c) и (d) для создания последующей трехмерной стратиграфической и структурной модели.
7. Способ по п. 6, в котором создание трехмерной стратиграфической и структурной модели включает в себя:
получение одного или более измерений формации, выбранных из группы, состоящей из следующих элементов: измерения удельного сопротивления, проводимости, звуковых, акустических свойств, плотности, пористости по данным гамма- или нейтронного каротажа, давления, отбор проб пластового флюида, отбор образцов керна и исследования бурового шлама.
8. Способ по п. 6, кроме того, включающий в себя базирование одного или более вычислений при бурении на вычисленной истинной стратиграфической мощности в трех измерениях.
9. Способ по п. 6, в котором определение того, соответствует ли созданная трехмерная модель траектории скважины, описываемой по меньшей мере данными одной инклинометрии, кроме того, включает в себя определение одного или более сбросов.
10. Способ по п. 6, в котором вычисление истинной стратиграфической мощности в трех измерениях включает в себя:
создание псевдонаправляющей скважины из траектории скважины, описываемой по меньшей мере данными одной инклинометрии, с использованием разделенных панелей вычисленной истинной стратиграфической мощности в трех измерениях (TST3D).
11. Способ по п. 6, в котором определение новой поверхности отсчета включает в себя:
выполнение операции изгиба на поверхности отсчета для улучшения согласования последовательно созданной трехмерной модели и траектории скважины, описываемой по меньшей мере данными одной инклинометрии.
12. Способ по п. 11, кроме того, включающий в себя созданий дерева операций для сохранения альтернативных решений для углов изгиба поверхности отсчета.
13. Способ по п. 11, в котором улучшение согласования последовательно созданной трехмерной модели и траектории скважины, описываемой по меньшей мере данными одной инклинометрии, включает в себя:
получение значения для согласования между данными от последовательно созданной трехмерной модели и данными по меньшей мере одной инклинометрии, которые находятся в пределах одного или более устанавливаемых пользователем ограничений, выбранных из группы, состоящей из следующих элементов: ограничение регионального падения, минимальный предел изгиба, максимальный предел изгиба и метод сопоставления с образцом для нахождения аналогичных реакций каротажной диаграммы.
14. Способ, включающий в себя следующие этапы:
получение по меньшей мере данных одной инклинометрии от скважины;
получение по меньшей мере одного измерения формации;
определение поверхности отсчета с использованием по меньшей мере одного измерения формации и
выполнение следующих этапов:
вычисление истинной стратиграфической мощности в трех измерениях с использованием наименьшего расстояния в трех измерениях между поверхностью отсчета и какой-либо точкой вдоль траектории скважины, описываемой по меньшей мере данными одной инклинометрии;
создание трехмерной стратиграфической и структурной модели с использованием вычисленной истинной стратиграфической мощности в трех измерениях и
определение того, соответствует ли созданная трехмерная модель траектории скважины, описываемой по меньшей мере данными одного одиночного каротажного измерения канала.
15. Способ по п. 14, в котором по меньшей мере одно одиночное каротажное измерение канала представляет собой одно или более из каротажных измерений и исследований скважинным сканером.
16. Способ по п. 14, дополнительно включающий в себя:
подачу команды направленного бурения к оборудованию низа бурильной колонны на основе созданных трехмерных стратиграфических и структурных моделей.
17. Способ по п. 14, в котором определение того, соответствует ли созданная трехмерная модель траектории скважины, описываемой по меньшей мере данными одного одиночного каротажного измерения канала, дополнительно включает в себя:
вычисление каротажной кривой истинной стратиграфической мощности в трех измерениях (TST3D), отображение вычисленной каротажной кривой TST3D,
разделение вычисленной каротажной кривой TST3D на последовательные панели и
корреляцию последовательных панелей для определения возможных сбросов.
18. Способ по п. 14, дополнительно включающий в себя:
повторное определение поверхности отсчета и повторение этапов (a)-(c), при этом определение новой поверхности отсчета включает в себя выполнение операции изгиба на поверхности отсчета для улучшения согласования последовательно созданной трехмерной модели и траектории скважины, описываемой по меньшей мере данными одного одиночного каротажного измерения канала.
19. Способ по п. 18, дополнительно включающий в себя:
создание дерева операций для сохранения альтернативных решений для углов изгиба поверхности отсчета.
20. Способ по п. 6, в котором определение того, соответствует ли созданная трехмерная модель траектории скважины, описываемой измерением формации, кроме того, включает в себя определение одного или более сбросов.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201361901761P | 2013-11-08 | 2013-11-08 | |
US61/901,761 | 2013-11-08 | ||
PCT/US2014/064553 WO2015070022A1 (en) | 2013-11-08 | 2014-11-07 | Stratigraphic and structural interpretation of deviated and horizontal wellbores |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2016122472A true RU2016122472A (ru) | 2017-12-13 |
RU2652172C2 RU2652172C2 (ru) | 2018-04-25 |
Family
ID=53042128
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2016122472A RU2652172C2 (ru) | 2013-11-08 | 2014-11-07 | Стратиграфическая и структурная интерпретация наклонных и горизонтальных стволов скважин |
Country Status (5)
Country | Link |
---|---|
US (1) | US10422924B2 (ru) |
CN (1) | CN105899749B (ru) |
RU (1) | RU2652172C2 (ru) |
SA (1) | SA516371481B1 (ru) |
WO (1) | WO2015070022A1 (ru) |
Families Citing this family (55)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014160741A1 (en) * | 2013-03-27 | 2014-10-02 | Schlumberger Canada Limited | Automatic geosteering and evolutionary algorithm for use with same |
US10920576B2 (en) | 2013-06-24 | 2021-02-16 | Motive Drilling Technologies, Inc. | System and method for determining BHA position during lateral drilling |
WO2015021088A1 (en) * | 2013-08-06 | 2015-02-12 | Schlumberger Canada Limited | Methods for determining a saturation-height function in oil and gas reservoirs |
US10724365B2 (en) * | 2015-05-19 | 2020-07-28 | Weatherford Technology Holdings, Llc | System and method for stress inversion via image logs and fracturing data |
US10732312B2 (en) | 2015-05-20 | 2020-08-04 | Baker Hughes, A Ge Company, Llc | Prediction of formation and stratigraphic layers while drilling |
WO2017007738A1 (en) * | 2015-07-05 | 2017-01-12 | Schlumberger Technology Corporation | Borehole trajectory via multi-component borehole seismic receiver |
CN105064990B (zh) * | 2015-08-18 | 2017-11-28 | 西南石油大学 | 一种依靠水平井三维可视化地层对比的构造建模方法 |
WO2017039676A1 (en) * | 2015-09-03 | 2017-03-09 | Halliburton Energy Services, Inc. | Horizontal reservoir description systems |
US10914859B2 (en) * | 2015-10-28 | 2021-02-09 | Baker Hughes Holdings Llc | Real-time true resistivity estimation for logging-while-drilling tools |
BR112018013099B1 (pt) * | 2016-02-05 | 2022-09-06 | Halliburton Energy Services, Inc. | Método para geodirecionamento otimizado usando modelos geológicos em tempo real e dispositivo transportador de programa não transitório |
CN106127834B (zh) * | 2016-07-05 | 2019-04-02 | 北京金双狐油气技术有限公司 | 精细构造油气藏剖面图方法 |
WO2018031014A1 (en) * | 2016-08-10 | 2018-02-15 | Halliburton Energy Services, Inc. | Horizontal reservoir description systems |
US10724364B2 (en) | 2017-03-06 | 2020-07-28 | Baker Hughes, A Ge Company, Llc | Creation of structural earth formation models |
US11409016B2 (en) * | 2017-03-08 | 2022-08-09 | Landmark Graphics Corporation | Correlating strata surfaces across well logs |
US10838976B2 (en) * | 2017-10-17 | 2020-11-17 | Saudi Arabian Oil Company | Paleo fossil and sedimentary structure data mining and datum for biostratigraphy |
CN108037530B (zh) * | 2017-12-12 | 2019-11-01 | 中国石油天然气集团有限公司 | 构建速度陷阱曲线模式的方法及监控构造畸变现象的方法 |
US11054543B2 (en) * | 2018-03-28 | 2021-07-06 | Devon Energy Corporation | System and method for well cybersteering |
NO20201379A1 (en) | 2018-06-12 | 2020-12-16 | Baker Hughes Holdings Llc | Gas ratio volumetrics for reservoir navigation |
WO2020013812A1 (en) * | 2018-07-10 | 2020-01-16 | Halliburton Energy Services, Inc. | Relative azimuth correction for resistivity inversion |
WO2020068264A1 (en) * | 2018-09-26 | 2020-04-02 | Shell Oil Company | Method for determining a lithologic interpretation of a subterranean environment |
US11867052B1 (en) * | 2018-10-12 | 2024-01-09 | Eog Resources, Inc. | Precision targeting with simulated well logs |
CN109190318B (zh) * | 2018-10-31 | 2022-10-14 | 中国石油化工股份有限公司 | 基于时间度量的斜井井轨迹计算方法 |
EP3938814B1 (en) * | 2019-03-11 | 2024-09-11 | Schlumberger Technology B.V. | Automated facies classification from well logs |
US11920441B2 (en) * | 2019-03-18 | 2024-03-05 | Magnetic Variation Services, Llc | Steering a wellbore using stratigraphic misfit heat maps |
CA3134774A1 (en) * | 2019-03-26 | 2020-10-01 | Drilling Info, Inc. | Determining a landing zone in a subterranean formation |
US11946360B2 (en) | 2019-05-07 | 2024-04-02 | Magnetic Variation Services, Llc | Determining the likelihood and uncertainty of the wellbore being at a particular stratigraphic vertical depth |
CN110107282B (zh) * | 2019-05-30 | 2022-05-20 | 中国石油天然气股份有限公司 | 一种薄层页岩油水平井随钻轨迹控制方法 |
US11561313B2 (en) * | 2019-07-03 | 2023-01-24 | Saudi Arabian Oil Company | Creating seismic depth grids using horizontal wells |
CN110424945B (zh) * | 2019-08-01 | 2022-12-13 | 中国石油天然气股份有限公司大港油田分公司 | 页岩油水平井部署方法及装置 |
CN110441821B (zh) * | 2019-09-03 | 2020-10-09 | 中海石油(中国)有限公司 | 一种基于变解释测网密度的断层快速解释方法 |
US11661843B2 (en) | 2019-10-11 | 2023-05-30 | Schlumberger Technology Corporation | Method and system for determining a lithology of a subterranean formation |
EP3805520B1 (en) | 2019-10-11 | 2024-06-26 | Services Pétroliers Schlumberger | A method and system for determining a lithology of a subterranean formation |
US11560785B2 (en) * | 2020-01-28 | 2023-01-24 | Enverus, Inc. | Determining spacing between wellbores |
CN113901632A (zh) * | 2020-06-22 | 2022-01-07 | 四川页岩气勘探开发有限责任公司 | 一种提高页岩气藏三维地质模型构造精度的多级质控方法 |
US20230243992A1 (en) * | 2020-07-01 | 2023-08-03 | Chevron U.S.A. Inc. | Stratigraphic methods |
CN116034208A (zh) * | 2020-07-27 | 2023-04-28 | 吉奥奎斯特系统公司 | 使用全局和局部机器学习模型的井关联 |
US11947067B2 (en) | 2020-09-16 | 2024-04-02 | Saudi Arabian Oil Company | Systems and methods for developing horizontal hydrocarbon wells |
CN114690252B (zh) * | 2020-12-28 | 2025-05-27 | 中国石油天然气股份有限公司 | 基于阵列感应的测井解释方法、装置、设备及存储介质 |
CN114810047B (zh) * | 2021-01-22 | 2025-02-25 | 中国石油天然气股份有限公司 | 油藏储层中井眼轨迹的确定方法、装置、设备及存储介质 |
CN112727441A (zh) * | 2021-03-11 | 2021-04-30 | 大庆油田有限责任公司 | 一种适用于薄油层水平井油层对比方法 |
CN113049467B (zh) * | 2021-03-12 | 2021-10-22 | 东北石油大学 | 一种模拟不整合汇聚脊控藏机理的装置及方法 |
US11579334B2 (en) | 2021-04-07 | 2023-02-14 | Enverus, Inc. | Determining a wellbore landing zone |
CN115263268A (zh) * | 2021-04-30 | 2022-11-01 | 中国石油天然气股份有限公司 | 铅直厚度参数的确定方法、装置、设备及存储介质 |
CN115478831B (zh) * | 2021-05-31 | 2023-08-22 | 中国石油天然气股份有限公司 | 烃源岩内部油气资源的布井方法及装置 |
CN113643145B (zh) * | 2021-08-17 | 2024-06-25 | 中国石油化工股份有限公司 | 一种页岩气储层水平井多层级控制构造建模 |
WO2023044146A1 (en) * | 2021-09-20 | 2023-03-23 | Schlumberger Technology Corporation | Rapid and realistic three-dimensional stratigraphic model generator conditioned on reference well log data |
US20230175355A1 (en) * | 2021-12-08 | 2023-06-08 | Saudi Arabian Oil Company | Well Location Optimizer for High Inclination Complex Well Trajectories |
CN116411923A (zh) * | 2021-12-31 | 2023-07-11 | 中国石油天然气集团有限公司 | 一种水平井水平段延伸能力预测方法和装置 |
CN114463333B (zh) * | 2022-04-13 | 2022-09-02 | 中国科学院地质与地球物理研究所 | 随钻地质导向实时地层格架智能更新方法与系统 |
US11940589B2 (en) | 2022-06-29 | 2024-03-26 | Landmark Graphics Corporation, Inc. | Analyzing borehole paths using stratigraphic turning points |
US12242013B2 (en) | 2022-09-14 | 2025-03-04 | Schlumberger Technology Corporation | Stratigraphic forward modeling platform and methods of use |
US20240337766A1 (en) * | 2023-04-05 | 2024-10-10 | Saudi Arabian Oil Company | Structural trend predictor for 2d cross sections |
US12345148B1 (en) | 2024-01-02 | 2025-07-01 | Halliburton Energy Services, Inc. | Systems and methods for characterizing a subterranean formation having a formation boundary surface |
CN117934767B (zh) * | 2024-03-22 | 2024-06-11 | 华中科技大学 | 一种三维地质剖面生成方法、装置和地质信息建模系统 |
CN118938351B (zh) * | 2024-10-15 | 2025-05-06 | 山东省地质科学研究院 | 一种基于大数据的深层地热资源勘查方法及系统 |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EG20489A (en) | 1993-01-13 | 1999-06-30 | Shell Int Research | Method for determining borehole direction |
US7596481B2 (en) | 2004-03-16 | 2009-09-29 | M-I L.L.C. | Three-dimensional wellbore analysis and visualization |
US7630872B2 (en) | 2004-09-16 | 2009-12-08 | Schlumberger Technology Corporation | Methods for visualizing distances between wellbore and formation boundaries |
US8875806B2 (en) * | 2004-10-28 | 2014-11-04 | Danny T. Williams | Formation dip geo-steering method |
WO2006053294A1 (en) * | 2004-11-12 | 2006-05-18 | Baker Hughes Incorporated | Method and system for predictive stratigraphy images |
US7502771B2 (en) * | 2006-05-11 | 2009-03-10 | Schlumberger Technology Corporation | Method, system and apparatus for generating decision trees integrated with petro-technical workflows |
US8577660B2 (en) * | 2008-01-23 | 2013-11-05 | Schlumberger Technology Corporation | Three-dimensional mechanical earth modeling |
BRPI0902889A2 (pt) * | 2008-04-10 | 2017-08-29 | Prad Res & Development Ltd | Método para criar um modelo de pseudonúcleo numérico, sistema para criação de um modelo de pseudonúcleo numérico, e sistema para criar um modelo de pseudonúcleo numérico. |
US8452580B2 (en) | 2010-02-26 | 2013-05-28 | Chevron U.S.A. Inc. | Method and system for using multiple-point statistics simulation to model reservoir property trends |
US8793113B2 (en) * | 2010-05-14 | 2014-07-29 | Schlumberger Technology Corporation | Method and apparatus for near well structural modeling based on borehole dips |
BR112013022546A2 (pt) | 2011-03-08 | 2016-12-06 | Landmark Graphics Corp | método e sistema de perfuração de laterais em formações de xisto |
CN102322256A (zh) * | 2011-06-02 | 2012-01-18 | 中国石油天然气股份有限公司 | 水平井着陆导向方法 |
US9645275B2 (en) * | 2011-09-22 | 2017-05-09 | Schlumberger Technology Corporation | Integrated dip from 3D resistivity tool and borehole imaging tool |
CN102425374B (zh) | 2011-11-21 | 2014-07-23 | 中国石油集团钻井工程技术研究院 | 一种井眼轨道控制方法 |
CN103046868B (zh) * | 2012-12-28 | 2014-10-22 | 中国石油集团川庆钻探工程有限公司 | 一种水平井一体化地质导向方法 |
CN103774989B (zh) | 2013-12-10 | 2016-08-17 | 刘俊 | 随钻动态建模待钻井轨迹设计水平井地质导向分析方法 |
CN103993829B (zh) | 2014-05-13 | 2016-02-24 | 中国石油化工股份有限公司 | 一种二维小靶前距水平井的中长半径轨道 |
-
2014
- 2014-11-07 CN CN201480072683.XA patent/CN105899749B/zh not_active Expired - Fee Related
- 2014-11-07 WO PCT/US2014/064553 patent/WO2015070022A1/en active Application Filing
- 2014-11-07 US US14/536,289 patent/US10422924B2/en active Active
- 2014-11-07 RU RU2016122472A patent/RU2652172C2/ru active
-
2016
- 2016-07-12 SA SA516371481A patent/SA516371481B1/ar unknown
Also Published As
Publication number | Publication date |
---|---|
CN105899749B (zh) | 2018-06-08 |
US20150134255A1 (en) | 2015-05-14 |
RU2652172C2 (ru) | 2018-04-25 |
WO2015070022A1 (en) | 2015-05-14 |
US10422924B2 (en) | 2019-09-24 |
CN105899749A (zh) | 2016-08-24 |
SA516371481B1 (ar) | 2019-02-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2016122472A (ru) | Стратиграфическая и структурная интерпретация наклонных и горизонтальных стволов скважин | |
RU2599648C1 (ru) | Обнаружение местоположений границ пласта на основании измерений на нескольких глубинах размещения инструмента в стволе скважины | |
US10853533B2 (en) | Three-dimensional fracture abundance evaluation of subsurface formation based on geomechanical simulation of mechanical properties thereof | |
AU2011356685B2 (en) | Methods and systems regarding models of underground formations | |
CA2907728C (en) | Interactively planning a well site | |
US9260948B2 (en) | Multi-level reservoir history matching | |
US20180321404A1 (en) | Generation of fault displacement vector and/or fault damage zone in subsurface formation using stratigraphic function | |
CN106894761B (zh) | 利用时间域地震体的地质导向模型的地质导向方法 | |
RU2553720C1 (ru) | Системы и способы каротажа азимутальной хрупкости | |
US20180032356A1 (en) | Enhanced Oil Recovery (EOR) Chemical Coreflood Simulation Study Workflow | |
US20160090822A1 (en) | Collision detection method | |
CN105467438B (zh) | 一种基于三模量的泥页岩地应力三维地震表征方法 | |
CN110579802B (zh) | 一种天然气水合物储层物性参数的高精度反演方法 | |
US20160258281A1 (en) | Determining locations of acoustic sources around a borehole | |
RU2012120743A (ru) | Способы определения особенностей пластов, осуществления навигации траекторий бурения и размещения скважин применительно к подземным буровым скважинам | |
CN103675944B (zh) | 一种沉积盆地铀资源勘探的综合地球物理方法 | |
CN106940450B (zh) | 基于时间域地震体的地质导向模型建立方法 | |
US10598817B2 (en) | Local layer geometry engine with work zone generated from buffer defined relative to a wellbore trajectory | |
US10113421B2 (en) | Three-dimensional fracture abundance evaluation of subsurface formations | |
WO2014116948A1 (en) | Hazard avoidance analysis | |
AU2014395122A1 (en) | Improving well survey performance | |
CN113077546B (zh) | 一种面向矿产资源储量估算的搜索椭球体自动设置方法 | |
CN112268923B (zh) | 一种基于测井曲线获取地层热导率的方法 | |
CN111379548A (zh) | 井眼轨迹的确定方法、装置、设备及存储介质 | |
US20170321523A1 (en) | Three-dimensional subsurface formation evaluation using projection-based area operations |