[go: up one dir, main page]

RU2013130767A - METHOD FOR PRODUCING HOT-ROLLED PIPES - Google Patents

METHOD FOR PRODUCING HOT-ROLLED PIPES Download PDF

Info

Publication number
RU2013130767A
RU2013130767A RU2013130767/02A RU2013130767A RU2013130767A RU 2013130767 A RU2013130767 A RU 2013130767A RU 2013130767/02 A RU2013130767/02 A RU 2013130767/02A RU 2013130767 A RU2013130767 A RU 2013130767A RU 2013130767 A RU2013130767 A RU 2013130767A
Authority
RU
Russia
Prior art keywords
mill
diameter
mandrel
caliber
pipe
Prior art date
Application number
RU2013130767/02A
Other languages
Russian (ru)
Other versions
RU2564194C2 (en
Inventor
Александр Игоревич Грехов
Дмитрий Владимирович Овчинников
Надежда Тахировна Тихонцева
Сергей Валерьевич Липнягов
Дмитрий Васильевич Гурков
Игорь Владимирович Мишкин
Валентин Сергеевич Гончаров
Алексей Владимирович Ступин
Игорь Николаевич Новожилов
Владимир Леонидович Устьянцев
Original Assignee
Открытое акционерное общество "Синарский трубный завод" (ОАО "СинТЗ")
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Открытое акционерное общество "Синарский трубный завод" (ОАО "СинТЗ") filed Critical Открытое акционерное общество "Синарский трубный завод" (ОАО "СинТЗ")
Priority to RU2013130767/02A priority Critical patent/RU2564194C2/en
Publication of RU2013130767A publication Critical patent/RU2013130767A/en
Application granted granted Critical
Publication of RU2564194C2 publication Critical patent/RU2564194C2/en

Links

Landscapes

  • Control Of Metal Rolling (AREA)
  • Metal Rolling (AREA)

Abstract

Способ производства горячекатаных труб диаметром 114 мм из непрерывно-литой заготовки диаметром 150 и 156 мм, включающий прошивку заготовки, прокатку трубы, калибровку отличающийся тем, что прокатку трубы осуществляют в двух последовательно расположенных станах продольной прокатки в валках с многогранными калибрами с числом граней больше 6-ти и высотой калибра первого стана больше высоты калибра второго стана на 1-2 мм, при этом прокатку ведут на коротких оправках, которые имеют наружные диаметры, равные наружному диаметру оправки первого стана или наружный диаметр оправки второго стана на 1-2 мм меньше наружного диаметра оправки первого стана с вытяжкой в первом стане µ=1,1-1,5 и µ=1,05-1,15 во втором стане, а калибровку трубы с вытяжкой µ=1,1-1,3 выполняют в калибровочном стане с диаметром калибра в последней клети 114,0-117,0 мм.A method of manufacturing hot rolled pipes with a diameter of 114 mm from a continuously cast billet with a diameter of 150 and 156 mm, including piercing the billet, rolling the pipe, and calibrating, characterized in that the pipe is rolled in two consecutive longitudinal rolling mills in multi-faceted rolls with more than 6 faces and the height of the caliber of the first mill is greater than the height of the caliber of the second mill by 1-2 mm, while rolling is carried out on short mandrels that have outer diameters equal to the outer diameter of the mandrel of the first st on or the outer diameter of the mandrel of the second mill is 1-2 mm less than the outer diameter of the mandrel of the first mill with an extract in the first mill µ = 1.1-1.5 and µ = 1.05-1.15 in the second mill, and the calibration of the pipe with extractor µ = 1.1-1.3 is performed in a calibration mill with a caliber diameter of 114.0-117.0 mm in the last stand.

Claims (1)

Способ производства горячекатаных труб диаметром 114 мм из непрерывно-литой заготовки диаметром 150 и 156 мм, включающий прошивку заготовки, прокатку трубы, калибровку отличающийся тем, что прокатку трубы осуществляют в двух последовательно расположенных станах продольной прокатки в валках с многогранными калибрами с числом граней больше 6-ти и высотой калибра первого стана больше высоты калибра второго стана на 1-2 мм, при этом прокатку ведут на коротких оправках, которые имеют наружные диаметры, равные наружному диаметру оправки первого стана или наружный диаметр оправки второго стана на 1-2 мм меньше наружного диаметра оправки первого стана с вытяжкой в первом стане µ=1,1-1,5 и µ=1,05-1,15 во втором стане, а калибровку трубы с вытяжкой µ=1,1-1,3 выполняют в калибровочном стане с диаметром калибра в последней клети 114,0-117,0 мм. A method of manufacturing hot rolled pipes with a diameter of 114 mm from a continuously cast billet with a diameter of 150 and 156 mm, including piercing the billet, rolling the pipe, and calibrating characterized in that the pipe is rolled in two consecutive longitudinal rolling mills in multi-faceted rolls with more than 6 faces and the height of the caliber of the first mill is greater than the height of the caliber of the second mill by 1-2 mm, while rolling is carried out on short mandrels that have outer diameters equal to the outer diameter of the mandrel of the first st on or the outer diameter of the mandrel of the second mill is 1-2 mm less than the outer diameter of the mandrel of the first mill with an extract in the first mill µ = 1.1-1.5 and µ = 1.05-1.15 in the second mill, and the calibration of the pipe with extractor µ = 1.1-1.3 is performed in a calibration mill with a caliber diameter of 114.0-117.0 mm in the last stand.
RU2013130767/02A 2013-07-04 2013-07-04 Hot-rolled tube manufacturing method RU2564194C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2013130767/02A RU2564194C2 (en) 2013-07-04 2013-07-04 Hot-rolled tube manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2013130767/02A RU2564194C2 (en) 2013-07-04 2013-07-04 Hot-rolled tube manufacturing method

Publications (2)

Publication Number Publication Date
RU2013130767A true RU2013130767A (en) 2015-01-10
RU2564194C2 RU2564194C2 (en) 2015-09-27

Family

ID=53279106

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2013130767/02A RU2564194C2 (en) 2013-07-04 2013-07-04 Hot-rolled tube manufacturing method

Country Status (1)

Country Link
RU (1) RU2564194C2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19941163A1 (en) * 1999-08-24 2001-03-01 Sms Demag Ag Speed control method to minimize internal polygon formation
RU2332271C1 (en) * 2006-11-20 2008-08-27 ОАО "Синарский трубный завод" Method of manufacturing solid-drawn hot-rolled pipes

Also Published As

Publication number Publication date
RU2564194C2 (en) 2015-09-27

Similar Documents

Publication Publication Date Title
MX379189B (en) METHOD FOR PRODUCING SEAMLESS METAL TUBE.
MX352221B (en) Seamless metal tube fabrication method, mandrel mill, and auxiliary tools.
MX2015000609A (en) Seamless metal tube fabrication method and fabrication apparatus.
SA519402540B1 (en) Rolling mill for rolling hollow or, in all cases, concave rod-shaped bodies
RU2008115395A (en) METHOD FOR PRODUCING SEAMLESS HOT DEFORMED PIPES OF LARGE AND MEDIUM DIAMETERS IN PIPELINE PLANTS WITH PILGRIM MILLS
MY168686A (en) Method for producing seamless hot-rolled pipes in continuous pipe rolling mills
EA201100924A1 (en) METHOD OF MANUFACTURING SEAMLESS PIPES ON THE VARIETY OF THREE WALKING MILL
EA200802416A1 (en) A ROLLED MILL WITH A SUPPORTED MOTOR, INTENDED FOR SEAMLESS PIPES
RU2013130767A (en) METHOD FOR PRODUCING HOT-ROLLED PIPES
EA201690242A1 (en) METHOD OF MANUFACTURING EXHAUSTED SEAMING SEAMLESS HOT-ROLLED STEEL PIPES
WO2011030273A3 (en) Plant for rolling tubes
RU2006140948A (en) METHOD FOR PRODUCING SEAMLESS HOT-ROLLED PIPES
MX336959B (en) Mandrel mill and method for manufacturing seamless pipe.
EA201200813A1 (en) PIPING INSTALLATION
UA84256U (en) Method of production of pipes in plant with pilger mills
RU2015103864A (en) Method for preparing hot rolled steel rolling for cold rolling
RU2014131874A (en) METHOD FOR LONGITUDINAL ROLLING OF PIPES
RU2013143940A (en) METHOD FOR PRODUCING SEAMLESS HOT DEFORMED PIPES WITH A DIAMETER FROM 273 TO 630 mm ON PIPELINE PLANTS WITH PILGRIM MILLS
UA92532U (en) Pipe-rolling plant
UA88265U (en) Method of pipe rolling on plant with pilger rolling mill
UA88524U (en) Rolling method of pipes on pipe-rolling plant with pilger mills
UA86284U (en) Method of hot pilger rolling pipes
UA88197U (en) Rolling method for pipes on pipe-rolling plant with pilger rolling mills
RU2011135107A (en) UNIT FOR PRODUCING SEAMLESS PIPES
RU2013114952A (en) METHOD FOR ROLLING PIPES ON A REDUCING-STRETCHING MACHINE