RU2002127100A - METHOD FOR DRIVING MINING DRAINAGE IN DISTURBED AND WATERWATED ARRAY - Google Patents

METHOD FOR DRIVING MINING DRAINAGE IN DISTURBED AND WATERWATED ARRAY

Info

Publication number
RU2002127100A
RU2002127100A RU2002127100/03A RU2002127100A RU2002127100A RU 2002127100 A RU2002127100 A RU 2002127100A RU 2002127100/03 A RU2002127100/03 A RU 2002127100/03A RU 2002127100 A RU2002127100 A RU 2002127100A RU 2002127100 A RU2002127100 A RU 2002127100A
Authority
RU
Russia
Prior art keywords
wells
drainage
drilled
layer
cement
Prior art date
Application number
RU2002127100/03A
Other languages
Russian (ru)
Other versions
RU2249699C2 (en
Inventor
Вениамин Анатольевич Хямяляйнен
Сергей Леонидович Понасенко
Иван Александрович Поддубный
Леонид Павлович Понасенко
Владимир Алексеевич Жеребцов
Original Assignee
ОАО "Кузбасский научно-исследовательский институт шахтного строительства
Filing date
Publication date
Application filed by ОАО "Кузбасский научно-исследовательский институт шахтного строительства filed Critical ОАО "Кузбасский научно-исследовательский институт шахтного строительства
Priority to RU2002127100/03A priority Critical patent/RU2249699C2/en
Priority claimed from RU2002127100/03A external-priority patent/RU2249699C2/en
Publication of RU2002127100A publication Critical patent/RU2002127100A/en
Application granted granted Critical
Publication of RU2249699C2 publication Critical patent/RU2249699C2/en

Links

Claims (2)

1. Способ проходки дренажных выработок в неустойчивом обводненном массиве горных пород, включающий возведение перемычки, предварительное упрочнение горного массива по трассе выработки путем бурения продольных и наклонных скважин и нагнетания в эти скважины упрочняющих цементационных растворов, разрушение и уборку горной массы под защитой породоцементной оболочки, возведение постоянной крепи, последующее упрочнение приконтурного массива цементационными растворами через скважины, пробуренные перпендикулярно оси выработки, отличающийся тем, что с отставанием от забоя бурят дополнительную систему скважин через тампонажный слой для вскрытия дренажного слоя.1. A method of sinking drainage workings in an unstable flooded massif of rocks, including the construction of a bridge, preliminary hardening of the rock mass along the production route by drilling longitudinal and deviated wells and injection of reinforcing cement mortars into these wells, destruction and cleaning of the rock mass under the protection of the cement-cement sheath, erection lining, subsequent hardening of the near-surface array with cementing mortars through wells drilled perpendicular to the axis of production, distinguishing Take into account that, with a lag behind the bottom, an additional system of wells is drilled through the grouting layer to open the drainage layer. 2. Способ по п.1, отличающийся тем, что дренажные скважины бурят за радиус эффективного тампонажного слоя, за которого создают дополнительный дренажный слой с повышенной проницаемостью либо путем гидроразрыва пород либо с помощью камуфлетного взрывания.2. The method according to claim 1, characterized in that the drainage wells are drilled for the radius of the effective grouting layer, for which an additional drainage layer with increased permeability is created either by hydraulic fracturing of rocks or by means of camouflage blasting.
RU2002127100/03A 2002-10-10 2002-10-10 Method for driving draining mines in broken and watered massif RU2249699C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2002127100/03A RU2249699C2 (en) 2002-10-10 2002-10-10 Method for driving draining mines in broken and watered massif

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2002127100/03A RU2249699C2 (en) 2002-10-10 2002-10-10 Method for driving draining mines in broken and watered massif

Publications (2)

Publication Number Publication Date
RU2002127100A true RU2002127100A (en) 2004-04-20
RU2249699C2 RU2249699C2 (en) 2005-04-10

Family

ID=35611983

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2002127100/03A RU2249699C2 (en) 2002-10-10 2002-10-10 Method for driving draining mines in broken and watered massif

Country Status (1)

Country Link
RU (1) RU2249699C2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060964A (en) * 2014-05-30 2014-09-24 丁涛 Pit grouting and water blocking method for protecting groundwater environment
RU2677722C1 (en) * 2018-02-26 2019-01-21 Евгений Илдарович Нургалиев Tamping method of marginal rocks massif of mines bridges
RU2679212C1 (en) * 2018-04-19 2019-02-06 Евгений Илдарович Нургалиев “bridge-cement curtain” consolidating isolation system construction method
CN110685744B (en) * 2019-11-18 2021-11-09 内蒙古上海庙矿业有限责任公司 Arrangement mode of water detection and drainage hole series
CN113530598B (en) * 2021-07-12 2023-11-24 中陕核工业集团二一八大队有限公司 Uranium exceeding tunnel water treatment process

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1252507A1 (en) * 1985-01-09 1986-08-23 Новосибирский Ордена Трудового Красного Знамени Институт Инженеров Железнодорожного Транспорта Drainage of lining
SU1352067A1 (en) * 1985-09-03 1987-11-15 Специализированное производственное геологическое объединение по тампонажным и геологоразведочным работам "Спецтампонажгеология" Method of isolating vertical mine workings from subsoil water inflow
SU1295001A1 (en) * 1985-10-03 1987-03-07 Центральный Научно-Исследовательский И Проектно-Конструкторский Институт Проходческих Машин И Комплексов Для Угольной,Горной Промышленности И Подземного Строительства Method of driving mine workings
SU1439249A1 (en) * 1986-05-15 1988-11-23 Специализированное производственное геологическое объединение по тампонажным и геологоразведочным работам Method of protecting and supporting mine working in water-bearing rocks
SU1666775A1 (en) * 1989-03-31 1991-07-30 В.Ф.Илюшин Draining device of water engineering turnnel
RU2011830C1 (en) * 1991-11-26 1994-04-30 Кузнецкий научно-исследовательский институт "Кузниишахтострой" Method for shaft sinking
RU2077638C1 (en) * 1994-01-10 1997-04-20 Владимир Николаевич Карфидов Method for cutting mine working and concurrent forming communication profile and device for implementing the same

Similar Documents

Publication Publication Date Title
RU2407879C1 (en) Construction method of well of small diametre
RU2392434C1 (en) Method to provide for stability of high ledges
RU2002127100A (en) METHOD FOR DRIVING MINING DRAINAGE IN DISTURBED AND WATERWATED ARRAY
RU2059073C1 (en) Method for development of mineral deposits
RU2076923C1 (en) Method of formation of flagging screen in water-encroached rocks
SU1352067A1 (en) Method of isolating vertical mine workings from subsoil water inflow
RU2382166C1 (en) Method of drilling-in
RU2249699C2 (en) Method for driving draining mines in broken and watered massif
RU2095574C1 (en) Method for construction of mine shafts in watered unstable rocks
RU2152507C1 (en) Method of insulating water-development strata
RU2160838C2 (en) Method of prevention of earthquakes in potassium rock salt mines
RU2395691C2 (en) Method for strengthening of hydraulic stowage massif surfaces
SU1726766A1 (en) Method of erecting waterproofing dike in mine drifts
RU97100403A (en) METHOD FOR STRENGTHENING BREEDS WITH BARS IN MINING
RU1830417C (en) Method of hydro-isolation and consolidation of mountain-mass while tunneling
SU1550157A1 (en) Tunnel construction method
SU1710699A1 (en) Drill hole plugging-back method
SU1453022A1 (en) Method of driving mine working
SU1070312A1 (en) Method of constructing a plugging pad
SU977836A1 (en) Method of erecting bridge in mine working
RU2278267C1 (en) Vertical excavation liquidation method
SU983269A1 (en) Method of lowering water level in open mines
SU1372069A1 (en) Method of preventing gas-dynamic manifestations
SU1578407A1 (en) Method of restoring mine workings
SU1461966A1 (en) Mine working construction method