PH12021551639A1 - Method for constructing structure - Google Patents

Method for constructing structure

Info

Publication number
PH12021551639A1
PH12021551639A1 PH1/2021/551639A PH12021551639A PH12021551639A1 PH 12021551639 A1 PH12021551639 A1 PH 12021551639A1 PH 12021551639 A PH12021551639 A PH 12021551639A PH 12021551639 A1 PH12021551639 A1 PH 12021551639A1
Authority
PH
Philippines
Prior art keywords
constructing
constructing structure
ground
relates
present
Prior art date
Application number
PH1/2021/551639A
Inventor
Su Min Byun
Jun Seoung Kim
Original Assignee
Su Min Byun
Jun Seoung Kim
Korea Eng & Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Su Min Byun, Jun Seoung Kim, Korea Eng & Construction Co Ltd filed Critical Su Min Byun
Publication of PH12021551639A1 publication Critical patent/PH12021551639A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • E02D29/05Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
    • E02D29/055Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench further excavation of the cross-section proceeding underneath an already installed part of the structure, e.g. the roof of a tunnel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1628Shapes rectangular

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to a method for constructing a structure, the method comprising constructing an underground structure on the ground, and then constructing the structure in the ground by sinking same into the ground.
PH1/2021/551639A 2019-01-07 2019-10-04 Method for constructing structure PH12021551639A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020190001641A KR101960413B1 (en) 2019-01-07 2019-01-07 Structure construction method
PCT/KR2019/013075 WO2020145483A1 (en) 2019-01-07 2019-10-04 Method for constructing structure

Publications (1)

Publication Number Publication Date
PH12021551639A1 true PH12021551639A1 (en) 2022-05-02

Family

ID=66036173

Family Applications (1)

Application Number Title Priority Date Filing Date
PH1/2021/551639A PH12021551639A1 (en) 2019-01-07 2019-10-04 Method for constructing structure

Country Status (7)

Country Link
US (1) US20220098817A1 (en)
JP (1) JP2022517333A (en)
KR (1) KR101960413B1 (en)
CN (1) CN113614315A (en)
PH (1) PH12021551639A1 (en)
SG (1) SG11202107482SA (en)
WO (1) WO2020145483A1 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101960413B1 (en) * 2019-01-07 2019-03-20 김준성 Structure construction method
KR102199641B1 (en) 2019-09-19 2021-01-07 김성수 Construction method of driven pile for newly built structure
KR102113117B1 (en) * 2019-10-22 2020-05-20 김준성 Structure construction method using guide wall
KR102215027B1 (en) 2020-08-31 2021-02-10 김상우 Construction method of structure using ground bearing capacity
CN112502464B (en) * 2020-11-23 2022-07-05 上海建工二建集团有限公司 Reverse construction method for extension basement under existing building
CN115467367B (en) * 2022-08-17 2023-06-16 湖北工业大学 Construction method for actively compensating deformation of underpass operation tunnel in upper engineering construction
KR102522619B1 (en) * 2023-01-26 2023-04-17 주식회사 선공 Upward basement structure demolition method
KR102595013B1 (en) * 2023-02-09 2023-10-26 노경범 Construction Method of Underground Road to Minimize Traffic Control
US11946217B1 (en) * 2023-09-18 2024-04-02 China Railway Tunnel Group Co., Ltd. Top plate jacking device and jacking construction method configured for V-shaped columns

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05247951A (en) * 1992-01-30 1993-09-24 Yuan Hoo Lee Construction method of basement of building and traction device used therefor
JP2688560B2 (en) * 1993-06-29 1997-12-10 戸田建設株式会社 Construction method of underground structure
JP3430376B2 (en) * 1993-12-22 2003-07-28 大成建設株式会社 How to build an underground skeleton
JPH09302683A (en) * 1996-05-11 1997-11-25 Fujikou:Kk How to build a basement
KR100641960B1 (en) * 2005-02-16 2006-11-06 이성우 Formwork for underwater foundations using fiber-reinforced composite panels and construction method of foundations using the same
KR101034398B1 (en) * 2007-06-28 2011-05-16 (주)바로건설기술 Underground structure construction method that combines underground clogging method
CN101418573B (en) * 2008-01-24 2012-09-05 丁慈鑫 Caisson structure and method for smoothly and accurately sinking caisson structure into earth surface
CN101851930B (en) * 2010-01-15 2012-10-03 丁慈鑫 Sinking device of open caisson and sinking method of open caisson with same
JP4942230B1 (en) * 2010-11-29 2012-05-30 賢治 町筋 Submersible method and equipment for submerged method
KR20130061368A (en) 2011-12-01 2013-06-11 정진덕 Structure of retaining wall and construction method for installing underground structures
CN107842046A (en) * 2017-11-27 2018-03-27 杨孝 A kind of strengthening of foundation error-correction structure and the method for strengthening of foundation correction
KR101960413B1 (en) * 2019-01-07 2019-03-20 김준성 Structure construction method

Also Published As

Publication number Publication date
WO2020145483A1 (en) 2020-07-16
KR101960413B1 (en) 2019-03-20
CN113614315A (en) 2021-11-05
JP2022517333A (en) 2022-03-08
SG11202107482SA (en) 2021-08-30
US20220098817A1 (en) 2022-03-31

Similar Documents

Publication Publication Date Title
PH12021551639A1 (en) Method for constructing structure
SA519410568B1 (en) Integrating contextual information into workflow for wellbore operations
MX2020003297A (en) Method and system for performing operations with communications.
WO2019070680A3 (en) Methods of treating immunotherapy-related toxicity using a gm-csf antagonist
MX2020003298A (en) Method and system for performing operations using communications.
WO2019074654A3 (en) Method and system for performing hydrocarbon operations with mixed communication networks
MY188032A (en) Panel interconnectable with similar panels for forming a covering
MY161357A (en) Method of improving the production of a mature gas or oil field
PL3997329T3 (en) Method for constructing a pumped storage power plant in a ground depression, in particular in an open-cast mine
MY179814A (en) Drilling methods and systems with automated waypoint or borehole path updates based on survey data corrections
MX2015017867A (en) Determining geomechanics completion quality.
MX2015009684A (en) System and method for providing a continuous wellbore survey.
WO2018217686A3 (en) Systems and methods for optimizing oil production
EP3695115A4 (en) Underground energy generating method
MX2018000337A (en) Microorganism for producing putrescine or ornithine and method for producing putrescine or ornithine by using same.
EP3876203A4 (en) Map generation system, map generation method, and map generation program
GB2550092A8 (en) Cutting tool
MX2015015819A (en) Systems and methods for displaying wells and their respective status on an electronic map.
SA516380495B1 (en) Apparatus and Method for Continuous Down Hole Sand Screen Fill Removal
WO2018178049A3 (en) Method for determining a drilling plan for a plurality of new wells in a reservoir
WO2015015086A3 (en) Method for adapting a mesh model of a geological subsurface
EP3650520A4 (en) Method for producing coal briquette, and coal briquette produced by same
WO2019197658A3 (en) Heat-insulated precast concrete part
EP3688237A4 (en) Well foundation and method for constructing a well
EP3638877A4 (en) System, method, and composition for fracturing a subterranean formation