NO984239L - Procedure for mounting a floating offshore structure - Google Patents
Procedure for mounting a floating offshore structureInfo
- Publication number
- NO984239L NO984239L NO984239A NO984239A NO984239L NO 984239 L NO984239 L NO 984239L NO 984239 A NO984239 A NO 984239A NO 984239 A NO984239 A NO 984239A NO 984239 L NO984239 L NO 984239L
- Authority
- NO
- Norway
- Prior art keywords
- component
- hull
- submerged
- spar hull
- spar
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/02—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
- E02B17/027—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto steel structures
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B77/00—Transporting or installing offshore structures on site using buoyancy forces, e.g. using semi-submersible barges, ballasting the structure or transporting of oil-and-gas platforms
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/02—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
- E02B17/021—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
- E02B17/024—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform shock absorbing means for the supporting construction
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0039—Methods for placing the offshore structure
- E02B2017/0043—Placing the offshore structure on a pre-installed foundation structure
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Transportation (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- Earth Drilling (AREA)
- Wind Motors (AREA)
- Foundations (AREA)
- Revetment (AREA)
Abstract
En fremgangsmåte angår sammenføring av overbygningen på en flytende offshore konstruksjon som f.eks. et Spar skrog, sammenføyning av komponentene for et Spar skrog (10) og en kombinasjon eller varianter av disse prosedyrer. Generelt sett utføres installasjonen som følger: På stedet der sammenføring skal finne sted, blir Spar skrog- komponenten (10) reist opp, utstyrt med styringer og anordninger som er nødvendig for å utføre en styrt nedsenkning av Spar skrogkomponenten (10) og den blir nedsenket til en på forhånd bestemt dybde under vannflaten slik at det fremkommer et nullvannplan- område. Den andre komponent (26) som skal føres sammen med toppen av Spar skroget (10) bringes til å flyte over den neddykkede Spar skrogkomponent (10). Dypgåendet for den neddykkede Spar skrogkomponent (10) reduseres inntil de to komponenter (10,26) kommer i fullt anlegg.One method concerns the joining of the superstructure to a floating offshore structure, e.g. a Save hull, joining the components of a Save hull (10) and a combination or variants of these procedures. In general, the installation is carried out as follows: At the point where merging is to take place, the Spar hull component (10) is raised, equipped with controls and devices necessary to perform a controlled immersion of the Spar hull component (10) and it is submerged. to a predetermined depth below the water surface so that a zero-water plane area appears. The second component (26) to be joined with the top of the Spar hull (10) is caused to float over the submerged Spar hull component (10). The draft of the submerged Spar hull component (10) is reduced until the two components (10,26) come into full operation.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US93146197A | 1997-09-16 | 1997-09-16 |
Publications (2)
Publication Number | Publication Date |
---|---|
NO984239D0 NO984239D0 (en) | 1998-09-14 |
NO984239L true NO984239L (en) | 1999-03-17 |
Family
ID=25460807
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO984239A NO984239L (en) | 1997-09-16 | 1998-09-14 | Procedure for mounting a floating offshore structure |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP0908382A3 (en) |
AU (1) | AU8517998A (en) |
BR (1) | BR9803458A (en) |
FI (1) | FI981967A0 (en) |
NO (1) | NO984239L (en) |
OA (1) | OA10876A (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6135673A (en) * | 1998-06-19 | 2000-10-24 | Deep Oil Technology, Incorporated | Method/apparatus for assembling a floating offshore structure |
US6565286B2 (en) * | 2001-08-10 | 2003-05-20 | Spartec, Inc. | Method for fabricating and assembling a floating offshore structure |
US9086057B2 (en) | 2010-01-21 | 2015-07-21 | The Abell Foundation, Inc. | Ocean thermal energy conversion cold water pipe |
KR102052726B1 (en) | 2010-01-21 | 2019-12-06 | 더 아벨 파운데이션, 인크. | Ocean thermal energy conversion power plant |
US8899043B2 (en) | 2010-01-21 | 2014-12-02 | The Abell Foundation, Inc. | Ocean thermal energy conversion plant |
US9151279B2 (en) | 2011-08-15 | 2015-10-06 | The Abell Foundation, Inc. | Ocean thermal energy conversion power plant cold water pipe connection |
KR102317701B1 (en) | 2012-10-16 | 2021-10-25 | 더 아벨 파운데이션, 인크. | Heat exchanger including manifold |
GB2538275B (en) | 2015-05-13 | 2018-01-31 | Crondall Energy Consultants Ltd | Floating production unit and method of installing a floating production unit |
CN114313127B (en) * | 2022-01-13 | 2024-03-26 | 东北石油大学 | Assembled FRP concrete combined guy cable tower type damping platform group and construction method thereof |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3572041A (en) * | 1968-09-18 | 1971-03-23 | Shell Oil Co | Spar-type floating production facility |
NO151209C (en) * | 1976-05-20 | 1985-02-27 | Doris Dev Richesse Sous Marine | FOREIGN BUILDINGS AND PROCEDURE FOR ITS MANUFACTURING |
FR2400086A1 (en) * | 1977-08-08 | 1979-03-09 | Sea Tank Co | Mounting of maritime platform on hollow base with legs - includes submerging base using winches for elevating once platform is floated over |
DK46186A (en) * | 1985-02-01 | 1986-08-02 | Conoco Uk Ltd | PROCEDURE AND EQUIPMENT FOR THE ASSEMBLY OF A OFFSHORE PLATFORM COVER AND PARTS |
US4702321A (en) | 1985-09-20 | 1987-10-27 | Horton Edward E | Drilling, production and oil storage caisson for deep water |
NO872009L (en) * | 1987-05-14 | 1988-11-15 | Norwegian Contractors | PROCEDURE FOR AA INSTALLING A LIQUID BODY ON A SEA. |
FR2720086B1 (en) * | 1991-01-15 | 1996-07-26 | Doris Engineering | Method for installing a device for protection against swell and device resulting from the implementation of this method. |
NO302284B1 (en) * | 1993-12-10 | 1998-02-16 | Aker Norwegian Contractors As | Procedure for immersion and installation on the seabed of a storage tank for petroleum products |
US5558467A (en) | 1994-11-08 | 1996-09-24 | Deep Oil Technology, Inc. | Deep water offshore apparatus |
US5609442A (en) * | 1995-08-10 | 1997-03-11 | Deep Oil Technology, Inc. | Offshore apparatus and method for oil operations |
-
1998
- 1998-09-14 OA OA9800167A patent/OA10876A/en unknown
- 1998-09-14 FI FI981967A patent/FI981967A0/en unknown
- 1998-09-14 NO NO984239A patent/NO984239L/en not_active Application Discontinuation
- 1998-09-15 BR BR9803458-8A patent/BR9803458A/en not_active Application Discontinuation
- 1998-09-15 EP EP98307473A patent/EP0908382A3/en not_active Withdrawn
- 1998-09-16 AU AU85179/98A patent/AU8517998A/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
NO984239D0 (en) | 1998-09-14 |
FI981967A0 (en) | 1998-09-14 |
BR9803458A (en) | 2002-07-09 |
EP0908382A3 (en) | 1999-08-11 |
OA10876A (en) | 2001-10-05 |
EP0908382A2 (en) | 1999-04-14 |
AU8517998A (en) | 1999-04-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
PT1150881E (en) | SHIP OF WORK | |
SE8303345L (en) | LIQUID DRILLING PLATFORM | |
NO984239L (en) | Procedure for mounting a floating offshore structure | |
EP0741822A4 (en) | Tension leg platform and method of installation therefor | |
NO883235D0 (en) | LIQUID TID WATER POWER STATION FOR APPLICATION IN SEA OR ELECTRIC STREAMS FOR AA GETTING ENERGY. | |
KR830002151A (en) | How to use tide buoyancy energy | |
GB2353766A (en) | Spar construction method | |
SE8302157L (en) | OFFSHORE CONSTRUCTION | |
NO20062140L (en) | Method of constructing a semi-submersible vessel using dry dock mounting | |
SE9002998L (en) | FLOATING ROERBRO | |
FR2400086A1 (en) | Mounting of maritime platform on hollow base with legs - includes submerging base using winches for elevating once platform is floated over | |
SU1384468A1 (en) | Floating drilling platform | |
JPH01280111A (en) | Surface treatment of underwater structure | |
JPS55145510A (en) | Floating water collector | |
GB2286169A (en) | An off-shore mooring and method of installing same | |
BR9713117A (en) | anchor for anchoring floating structures at sea. | |
JPS5568915A (en) | Water-intake device of oceanic structure | |
JPS57107989A (en) | Mooring gear for intermediate buoy | |
SE9103426L (en) | BRIDGE WITH LIFT POWER | |
FR2352109A1 (en) | Seagoing oil rig support structure and deck - constructed by floating the fully equipped deck onto the submerged support structure before towing into position (NO 14.12.77) | |
DK0901542T3 (en) | Liquid drainage system for a surface of a solid support | |
JPS57201427A (en) | Side connection work for caissons on sea surface | |
NO941823L (en) | Method and apparatus for transporting an object to a place under water | |
JPS62291306A (en) | Oceanic waves modulator | |
SE8501209D0 (en) | NIVAREGLERINGSANORDNING |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FC2A | Withdrawal, rejection or dismissal of laid open patent application |