MX2017015000A - Pruebas de formacion de fractura llena de hidrocarburos antes de la fracturacion de esquisto. - Google Patents
Pruebas de formacion de fractura llena de hidrocarburos antes de la fracturacion de esquisto.Info
- Publication number
- MX2017015000A MX2017015000A MX2017015000A MX2017015000A MX2017015000A MX 2017015000 A MX2017015000 A MX 2017015000A MX 2017015000 A MX2017015000 A MX 2017015000A MX 2017015000 A MX2017015000 A MX 2017015000A MX 2017015000 A MX2017015000 A MX 2017015000A
- Authority
- MX
- Mexico
- Prior art keywords
- hydrocarbon
- formation testing
- rate
- testing before
- intended
- Prior art date
Links
- 239000004215 Carbon black (E152) Substances 0.000 title abstract 3
- 229930195733 hydrocarbon Natural products 0.000 title abstract 3
- 150000002430 hydrocarbons Chemical class 0.000 title abstract 3
- 230000015572 biosynthetic process Effects 0.000 title 1
- 238000013480 data collection Methods 0.000 abstract 2
- 239000012530 fluid Substances 0.000 abstract 2
- 238000000034 method Methods 0.000 abstract 1
- 230000000638 stimulation Effects 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/008—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
- E21B43/267—Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/01—Devices for supporting measuring instruments on drill bits, pipes, rods or wirelines; Protecting measuring instruments in boreholes against heat, shock, pressure or the like
- E21B47/017—Protecting measuring instruments
- E21B47/0175—Cooling arrangements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
- E21B47/07—Temperature
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- Geophysics (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Geophysics And Detection Of Objects (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
- Measuring Fluid Pressure (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
Abstract
La presente invención se refiere a un método para determinar la presencia de fracturas naturales llenas de hidrocarburos con extensión lateral suficiente en un pozo en el que se pretende realizar la estimulación por fracturación hidráulica. Después de la perforación de un intervalo, se bombea un fluido en el pozo y se recolecta una traza de respuesta de presión. El fluido se bombea a una velocidad que es menor de la velocidad de bombeo para el trabajo de fracturación propuesto y la velocidad de recolección de datos es mayor de la velocidad de recolección de datos para el trabajo de fracturación propuesto. Los elementos característicos se identifican en la traza de respuesta de presión cuyo valor y combinación indican la presencia o ausencia de fracturas naturales llenas de hidrocarburos con extensión lateral suficiente en el intervalo.
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB1509576.3A GB2539001B (en) | 2015-06-03 | 2015-06-03 | Improvements in or relating to hydrocarbon production from shale |
GB1509579.7A GB2539002B (en) | 2015-06-03 | 2015-06-03 | Improvements in or relating to hydrocarbon production from shale |
GB1513655.9A GB2539056A (en) | 2015-06-03 | 2015-08-03 | Improvements in or relating to injection wells |
PCT/GB2016/051624 WO2016193732A1 (en) | 2015-06-03 | 2016-06-02 | Hydrocarbon filled fracture formation testing before shale fracturing |
Publications (1)
Publication Number | Publication Date |
---|---|
MX2017015000A true MX2017015000A (es) | 2018-11-09 |
Family
ID=54063072
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MX2017015001A MX2017015001A (es) | 2015-06-03 | 2016-06-02 | Fracturacion de caudal bajo inducida termicamente. |
MX2017015000A MX2017015000A (es) | 2015-06-03 | 2016-06-02 | Pruebas de formacion de fractura llena de hidrocarburos antes de la fracturacion de esquisto. |
MX2017014999A MX2017014999A (es) | 2015-06-03 | 2016-06-02 | Herramienta de medicion de presion del fondo de pozo con una velocidad de muestreo alta. |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MX2017015001A MX2017015001A (es) | 2015-06-03 | 2016-06-02 | Fracturacion de caudal bajo inducida termicamente. |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MX2017014999A MX2017014999A (es) | 2015-06-03 | 2016-06-02 | Herramienta de medicion de presion del fondo de pozo con una velocidad de muestreo alta. |
Country Status (9)
Country | Link |
---|---|
US (3) | US10570729B2 (es) |
EP (3) | EP3303768B1 (es) |
CN (3) | CN108076649A (es) |
AU (3) | AU2016272530A1 (es) |
CA (3) | CA2986313A1 (es) |
EA (3) | EA037344B1 (es) |
GB (1) | GB2539056A (es) |
MX (3) | MX2017015001A (es) |
WO (3) | WO2016193732A1 (es) |
Families Citing this family (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2546335B (en) | 2016-01-18 | 2021-08-04 | Equinor Energy As | Method and apparatus for pressure integrity testing |
GB2553356A (en) * | 2016-09-05 | 2018-03-07 | Geomec Eng Ltd | Improvements in or relating to geothermal power plants |
CA3045295A1 (en) | 2016-11-29 | 2018-06-07 | Nicolas P. Roussel | Methods for shut-in pressure escalation analysis |
WO2018217201A1 (en) | 2017-05-24 | 2018-11-29 | Halliburton Energy Services, Inc. | Methods and systems for characterizing fractures in a subterranean formation |
GB2565034B (en) * | 2017-05-24 | 2021-12-29 | Geomec Eng Ltd | Improvements in or relating to injection wells |
WO2019217762A1 (en) * | 2018-05-09 | 2019-11-14 | Conocophillips Company | Measurement of poroelastic pressure response |
CN108708713B (zh) * | 2018-05-28 | 2019-08-09 | 成都威尔普斯石油工程技术服务有限公司 | 一种生产井产剖测井的测量工艺 |
CN108643892B (zh) * | 2018-07-09 | 2021-08-20 | 中海艾普油气测试(天津)有限公司 | 一种测试用井下数据短传装置及其控制方法 |
CN108952663B (zh) * | 2018-08-15 | 2019-10-18 | 中国石油大学(北京) | 采用间歇压裂方式产生复杂缝网的现场压裂方法 |
CN109359376B (zh) * | 2018-10-10 | 2020-12-22 | 北京科技大学 | 水力压裂裂缝在页岩储层天然裂缝界面扩展判识方法 |
CN109184654B (zh) * | 2018-10-16 | 2020-04-10 | 中国石油大学(北京) | 裂缝扩展模式识别方法和装置 |
US10982535B2 (en) | 2019-09-14 | 2021-04-20 | HanYi Wang | Systems and methods for estimating hydraulic fracture surface area |
CN110750918A (zh) * | 2019-11-07 | 2020-02-04 | 中国石油大学(北京) | 一种二氧化碳压裂过程中井筒温度的预测方法 |
CN113027429A (zh) * | 2019-12-09 | 2021-06-25 | 天津大港油田圣达科技有限公司 | 一种用于监测水平井压裂液返排率的示踪技术 |
CN112943226A (zh) * | 2019-12-11 | 2021-06-11 | 天津大港油田圣达科技有限公司 | 油水示踪剂评价水平井分段压裂效果及各段油水贡献方法 |
CN112943227A (zh) * | 2019-12-11 | 2021-06-11 | 天津大港油田圣达科技有限公司 | 镧系络合物分段压裂示踪技术 |
CN111271043B (zh) * | 2020-03-18 | 2021-09-21 | 捷贝通石油技术集团股份有限公司 | 一种油气井地应力扩容改造增产方法 |
WO2022173971A1 (en) * | 2021-02-10 | 2022-08-18 | Conocophillips Company | Automated initial shut-in pressure estimation |
CN115247554B (zh) * | 2021-04-27 | 2024-05-28 | 中国石油天然气股份有限公司 | 一种降温增脆多步压裂方法 |
CN113216947B (zh) * | 2021-05-17 | 2023-01-13 | 中国石油大学(华东) | 基于监测井分布式光纤应变监测的水平井压裂过程裂缝高度确定方法 |
CN116856895B (zh) * | 2023-07-06 | 2024-06-18 | 安徽井上天华科技有限公司 | 一种基于高频压力裂缝监测边缘计算数据处理方法 |
US12259345B1 (en) | 2023-11-15 | 2025-03-25 | Southwest Petroleum University | Method for determining reasonable soaking time of shale oil/gas well |
CN117252127B (zh) * | 2023-11-15 | 2024-01-23 | 西南石油大学 | 一种页岩气井合理焖井时间的确定方法 |
Family Cites Families (42)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2952449A (en) | 1957-02-01 | 1960-09-13 | Fmc Corp | Method of forming underground communication between boreholes |
US3285342A (en) | 1964-01-08 | 1966-11-15 | Dow Chemical Co | Well fracturing |
US3501201A (en) | 1968-10-30 | 1970-03-17 | Shell Oil Co | Method of producing shale oil from a subterranean oil shale formation |
US3732728A (en) * | 1971-01-04 | 1973-05-15 | Fitzpatrick D | Bottom hole pressure and temperature indicator |
GB2050467B (en) | 1979-06-07 | 1983-08-03 | Perlman W | Fracturing subterranean formation |
US4549608A (en) | 1984-07-12 | 1985-10-29 | Mobil Oil Corporation | Hydraulic fracturing method employing special sand control technique |
US4660643A (en) * | 1986-02-13 | 1987-04-28 | Atlantic Richfield Company | Cold fluid hydraulic fracturing process for mineral bearing formations |
US4802144A (en) * | 1986-03-20 | 1989-01-31 | Applied Geomechanics, Inc. | Hydraulic fracture analysis method |
US4798244A (en) * | 1987-07-16 | 1989-01-17 | Trost Stephen A | Tool and process for stimulating a subterranean formation |
US4858130A (en) * | 1987-08-10 | 1989-08-15 | The Board Of Trustees Of The Leland Stanford Junior University | Estimation of hydraulic fracture geometry from pumping pressure measurements |
US4834181A (en) | 1987-12-29 | 1989-05-30 | Mobil Oil Corporation | Creation of multi-azimuth permeable hydraulic fractures |
GB8907525D0 (en) * | 1989-04-04 | 1989-05-17 | British Petroleum Co Plc | Hydraulic impedance test method |
US5170378A (en) * | 1989-04-04 | 1992-12-08 | The British Petroleum Company P.L.C. | Hydraulic impedance test method |
US5070457A (en) * | 1990-06-08 | 1991-12-03 | Halliburton Company | Methods for design and analysis of subterranean fractures using net pressures |
US5887657A (en) * | 1995-02-09 | 1999-03-30 | Baker Hughes Incorporated | Pressure test method for permanent downhole wells and apparatus therefore |
CA2525065C (en) * | 1997-05-02 | 2008-12-23 | Sensor Highway Limited | Wellbores utilizing fiber optic-based sensors and operating devices |
CA2240580C (en) | 1998-06-12 | 2001-01-16 | Roman Anthony Bilak | Apparatus and method for subterranean injection of slurried wastes |
US6986282B2 (en) * | 2003-02-18 | 2006-01-17 | Schlumberger Technology Corporation | Method and apparatus for determining downhole pressures during a drilling operation |
US20060201674A1 (en) | 2005-03-10 | 2006-09-14 | Halliburton Energy Services, Inc. | Methods of treating subterranean formations using low-temperature fluids |
US7389185B2 (en) | 2005-10-07 | 2008-06-17 | Halliburton Energy Services, Inc. | Methods and systems for determining reservoir properties of subterranean formations with pre-existing fractures |
US7798224B2 (en) | 2006-07-03 | 2010-09-21 | Schlumberger Technology Corporation | Rheology controlled heterogeneous particle placement in hydraulic fracturing |
US8412500B2 (en) | 2007-01-29 | 2013-04-02 | Schlumberger Technology Corporation | Simulations for hydraulic fracturing treatments and methods of fracturing naturally fractured formation |
RU2383727C2 (ru) | 2007-11-30 | 2010-03-10 | Шлюмберже Текнолоджи Б.В. | Способ проверки работы нефтяной скважины, работающей с использованием технологии гидравлического разрыва пласта |
BRPI0810900A2 (pt) * | 2007-12-21 | 2016-07-19 | Prad Res & Dev Ltd | sistema para medição de sinais acústicos em uma região anular, método para medição de sinais acústicos em uma região anular, sistema para medição de sinais acústicos em uma parede de furo perfurado, método para medição de sinais acústicos em uma parede de furo perfurado, sistema para medição de sinais acústicos no interior de uma ferramenta de interior de poço, e método para medição de energia acústica em propagação no interior de uma ferramenta de interior de poço. |
AU2009279407A1 (en) * | 2008-08-08 | 2010-02-11 | Altarock Energy, Inc. | Method for testing an engineered geothermal system using one stimulated well |
US8607870B2 (en) | 2010-11-19 | 2013-12-17 | Schlumberger Technology Corporation | Methods to create high conductivity fractures that connect hydraulic fracture networks in a well |
BR112013017767A2 (pt) | 2010-12-22 | 2016-10-11 | Maurice B Dusseault | processo de injeção multi-estácio para produção de recurso aperfeiçoada a partir de xisto |
US10001003B2 (en) | 2010-12-22 | 2018-06-19 | Maurice B. Dusseault | Multl-stage fracture injection process for enhanced resource production from shales |
EP2527586A1 (en) | 2011-05-27 | 2012-11-28 | Shell Internationale Research Maatschappij B.V. | Method for induced fracturing in a subsurface formation |
WO2013050989A1 (en) | 2011-10-06 | 2013-04-11 | Schlumberger Technology B.V. | Testing while fracturing while drilling |
US20130197810A1 (en) | 2012-01-27 | 2013-08-01 | Allan Kayser Haas | Monitoring of drinking water aquifers during possible contamination operations |
US9920607B2 (en) | 2012-06-26 | 2018-03-20 | Baker Hughes, A Ge Company, Llc | Methods of improving hydraulic fracture network |
US8985213B2 (en) | 2012-08-02 | 2015-03-24 | Halliburton Energy Services, Inc. | Micro proppants for far field stimulation |
US9366122B2 (en) * | 2012-08-22 | 2016-06-14 | Baker Hughes Incorporated | Natural fracture injection test |
WO2014055273A1 (en) | 2012-10-04 | 2014-04-10 | Texas Tech University System | Method for enhancing fracture propagation in subterranean formations |
GB2528006A (en) | 2013-04-05 | 2016-01-06 | Baker Hughes Inc | Method of increasing fracture network complexity and conductivity |
CN105683330B (zh) | 2013-09-11 | 2019-01-22 | 沙特阿拉伯石油公司 | 用于非常规储层的使用固体酸的碳酸盐基浆料压裂 |
US9611737B2 (en) * | 2013-09-17 | 2017-04-04 | Husky Oil Operations Limited | Method for determining regions for stimulation along a wellbore within a hydrocarbon formation, and using such method to improve hydrocarbon recovery from the reservoir |
WO2015168417A1 (en) * | 2014-04-30 | 2015-11-05 | Schlumberger Technology Corporation | Geological modeling workflow |
US10175374B2 (en) * | 2014-06-04 | 2019-01-08 | Halliburton Energy Services, Inc. | Fracture treatment analysis based on distributed acoustic sensing |
US20170123089A1 (en) * | 2014-06-04 | 2017-05-04 | Halliburton Energy Services, Inc. | Determining a completion design based on seismic data |
US10385686B2 (en) * | 2014-10-28 | 2019-08-20 | Eog Resources, Inc. | Completions index analysis |
-
2015
- 2015-08-03 GB GB1513655.9A patent/GB2539056A/en not_active Withdrawn
-
2016
- 2016-06-02 EP EP16736548.5A patent/EP3303768B1/en active Active
- 2016-06-02 CA CA2986313A patent/CA2986313A1/en not_active Abandoned
- 2016-06-02 US US15/573,997 patent/US10570729B2/en active Active
- 2016-06-02 MX MX2017015001A patent/MX2017015001A/es unknown
- 2016-06-02 EA EA201792188A patent/EA037344B1/ru not_active IP Right Cessation
- 2016-06-02 WO PCT/GB2016/051624 patent/WO2016193732A1/en active Application Filing
- 2016-06-02 EA EA201792190A patent/EA036110B1/ru not_active IP Right Cessation
- 2016-06-02 CN CN201680030129.4A patent/CN108076649A/zh active Pending
- 2016-06-02 WO PCT/GB2016/051621 patent/WO2016193729A1/en active Application Filing
- 2016-06-02 CA CA2986356A patent/CA2986356A1/en not_active Abandoned
- 2016-06-02 WO PCT/GB2016/051625 patent/WO2016193733A1/en active Application Filing
- 2016-06-02 US US15/574,695 patent/US10641089B2/en not_active Expired - Fee Related
- 2016-06-02 AU AU2016272530A patent/AU2016272530A1/en not_active Abandoned
- 2016-06-02 AU AU2016272529A patent/AU2016272529A1/en not_active Abandoned
- 2016-06-02 EP EP16736550.1A patent/EP3303771A1/en not_active Withdrawn
- 2016-06-02 CN CN201680030159.5A patent/CN107923237A/zh active Pending
- 2016-06-02 EA EA201792189A patent/EA201792189A1/ru unknown
- 2016-06-02 AU AU2016272526A patent/AU2016272526A1/en not_active Abandoned
- 2016-06-02 CN CN201680030166.5A patent/CN107923239A/zh active Pending
- 2016-06-02 CA CA2986355A patent/CA2986355A1/en not_active Abandoned
- 2016-06-02 US US15/576,832 patent/US10570730B2/en active Active
- 2016-06-02 EP EP16736551.9A patent/EP3303769A1/en not_active Withdrawn
- 2016-06-02 MX MX2017015000A patent/MX2017015000A/es unknown
- 2016-06-02 MX MX2017014999A patent/MX2017014999A/es unknown
Also Published As
Publication number | Publication date |
---|---|
EA201792188A1 (ru) | 2018-05-31 |
US20180306029A1 (en) | 2018-10-25 |
GB2539056A (en) | 2016-12-07 |
CA2986356A1 (en) | 2016-12-08 |
EP3303768B1 (en) | 2020-05-27 |
US20180135395A1 (en) | 2018-05-17 |
EA036110B1 (ru) | 2020-09-29 |
EP3303768A1 (en) | 2018-04-11 |
US10570730B2 (en) | 2020-02-25 |
EA201792189A1 (ru) | 2018-05-31 |
MX2017014999A (es) | 2018-11-09 |
MX2017015001A (es) | 2018-11-09 |
CA2986313A1 (en) | 2016-12-08 |
WO2016193729A1 (en) | 2016-12-08 |
WO2016193733A1 (en) | 2016-12-08 |
EP3303769A1 (en) | 2018-04-11 |
US10641089B2 (en) | 2020-05-05 |
US20180266227A1 (en) | 2018-09-20 |
CA2986355A1 (en) | 2016-12-08 |
CN107923239A (zh) | 2018-04-17 |
AU2016272526A1 (en) | 2017-12-07 |
CN108076649A (zh) | 2018-05-25 |
AU2016272529A1 (en) | 2017-12-07 |
AU2016272530A1 (en) | 2017-12-07 |
EP3303771A1 (en) | 2018-04-11 |
US10570729B2 (en) | 2020-02-25 |
EA037344B1 (ru) | 2021-03-16 |
CN107923237A (zh) | 2018-04-17 |
GB201513655D0 (en) | 2015-09-16 |
EA201792190A1 (ru) | 2018-05-31 |
WO2016193732A1 (en) | 2016-12-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MX2017015000A (es) | Pruebas de formacion de fractura llena de hidrocarburos antes de la fracturacion de esquisto. | |
SA518400682B1 (ar) | تصدع هيدروليكي في تكوينات غير تقليدية غنية بالكيروجين | |
GB2506793A (en) | System and method for performing wellbore fracture operations | |
GB2528184A (en) | System and method for characterization of downhole measurement data for borehole stability prediction | |
WO2018035400A3 (en) | Method for determining characteristics of a network of hydraulic fractures | |
GB2545144A (en) | Apparatus and method using measurements taken while drilling to map mechanical boundaries and mechanical rock properties along a borehole | |
MX366825B (es) | La fracturacion hidraulica con reaccion exotermica. | |
MX2016012504A (es) | Tratamiento de pozos. | |
MX388483B (es) | Método para el diseño mejorado de la altura de fractura hidráulica en una formación de roca laminada subterránea. | |
GB2535346A (en) | Methods for enhancing propped fracture conductivity | |
MX361400B (es) | Micro apuntalantes para estimulacion de campo lejano. | |
MX387900B (es) | Metodo para el diseño de pozos de produccion y pozos de inyeccion. | |
WO2016085454A8 (en) | Optimizing hydraulic fracturing in a subterranean formation | |
GB2541306A (en) | Forming multilateral wells | |
MX365203B (es) | Un método de incremento de eficiencia en la operación de fracturación hidráulica. | |
MX2014012103A (es) | Mejoramiento de la conductividad de fracturas apuntaladas. | |
WO2015030930A3 (en) | Systems and mehtods for artificial lift via a downhole piezoelectric pump | |
MY165012A (en) | System and method for improved propped fracture geometry for high permeability reservoirs | |
GB2547128A (en) | Determining depth of loss zones in subterranean formations | |
MX2019012643A (es) | Cuantificacion del volumen de un yacimiento y limite de presion de bomba. | |
MX2016009138A (es) | Sistema y metodologia para el tratamiento de pozos. | |
WO2014204709A3 (en) | Fracturing fluid composition and method of using same in geological formations | |
GB2554209A (en) | Providing communication between wellbores through directional hydraulic fracturing | |
GB2566619A (en) | Hydraulic fracturing system and method | |
SA516371568B1 (ar) | نظام وطريقة لتجهيز بئر |