교각 상단의 짧은 슬라이드웨이 거더 상에 세그먼트 강 거더를 건립하기 위한 방법 Download PDFInfo
- Publication number
- KR20220051851A KR20220051851A KR1020227010234A KR20227010234A KR20220051851A KR 20220051851 A KR20220051851 A KR 20220051851A KR 1020227010234 A KR1020227010234 A KR 1020227010234A KR 20227010234 A KR20227010234 A KR 20227010234A KR 20220051851 A KR20220051851 A KR 20220051851A
- Authority
- KR
- South Korea
- Prior art keywords
- girder
- girders
- pier
- segment steel
- segment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 208
- 239000010959 steel Substances 0.000 title claims abstract description 208
- 238000000034 method Methods 0.000 title claims abstract description 40
- 238000006073 displacement reaction Methods 0.000 claims abstract description 19
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 46
- 230000005484 gravity Effects 0.000 claims description 10
- 230000002265 prevention Effects 0.000 claims description 8
- 239000008400 supply water Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 15
- 238000004364 calculation method Methods 0.000 description 5
- 230000003068 static effect Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/268—Composite concrete-metal
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/30—Metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
단계 S1, 제1세그먼트 강 거더(21) 상에, 조정 가능한 무게를 갖는 균형추(1)를 제공하는 단계;
단계 S2, 제1세그먼트 강 거더(21)를 교각 상단의 짧은 슬라이드웨이 거더(3) 상의 미리 구성된 제1포지션에 고정시키는 단계;
단계 S3, 제2세그먼트 강 거더(22)를 리프팅하고, 제1세그먼트 강 거더(21)와 제2세그먼트 강 거더(22)를 연결하여 제1일체형 강 거더를 형성하는 단계;
단계 S4, 목표 하중이 제1일체형 강 거더에 적용되도록 균형추(1)를 조정한 다음, 제1일체형 강 거더를 미리 구성된 변위로 변위시키는 단계;
단계 S5, 상기 단계 S3 및 단계 S4를 반복하고, 후속하여 복수의 세그먼트 강 거더를, 제1일체형 강 거더에 연결된 모든 세그먼트 강 거더가 교각 상단의 짧은 슬라이드웨이 거더 상에서 전도에 대한 전체적인 저항을 가질 때까지 제1일체형 강 거더와 연속적으로 연결하는 단계; 및
단계 S6, 건립된 세그먼트 강 거더 모두의 개개의 양측 상에 나머지 세그먼트 강 거더를 건립시키는 단계를 포함한다. 이 방법은 거더 건립을 위해 균형추 및 슬라이딩 동작을 사용하며, 시공 프로세스는 안전하고 신뢰할 수 있다.
Description
도 2는 본 발명의 실시예에서 교각 상단의 짧은 슬라이드웨이 거더의 구조도이다.
도 3은 본 발명의 실시예에서 교각 상단의 짧은 슬라이드웨이 거더 상에 제2세그먼트 강 거더를 건립시키는 개략도이다.
도 4은 본 발명의 실시예에서 교각 상단의 짧은 슬라이드웨이 거더 상에 제3세그먼트 강 거더를 건립시키는 개략도이다.
도 5는 본 발명의 실시예에서 교각 상단의 짧은 슬라이드웨이 거더 상에 건립된 처음 3개의 세그먼트 강 거더의 구조도이다.
도 6은 본 발명의 실시예에서 교각 상단의 짧은 슬라이드웨이 거더 상에 나머지 강 거더를 정적 건립시키는 개략도이다.
1- 균형추; 21- 제1세그먼트 강 거더; 22- 제2세그먼트 강 거더; 23- 제3세그먼트 강 거더; 3- 교각 상단의 짧은 슬라이드웨이 거더; 31- 종방향 거더; 32- 고정 슬라이딩 시트; 33- 평활한 강판; 34- 앵커 거더; 35- 종방향 트랙션 디바이스; 36- 이동 가능한 슬라이딩 시트; 37- 트랙션 라인; 38- 임시 패드; 41- 교각; 42- 브래킷.
Claims (10)
- 교각 상단의 짧은 슬라이드웨이 거더 상에 세그먼트 강 거더를 건립하기 위한 방법으로서,
상기 방법은,
S1, 제1세그먼트 강 거더(21) 상에, 조정 가능한 무게를 갖는 균형추(1)를 제공하는 단계;
S2, 제1세그먼트 강 거더(21)를 교각 상단의 짧은 슬라이드웨이 거더(3) 상의 미리 설정된 제1포지션으로 하강시키는 단계 ― 교각 상단의 짧은 슬라이드웨이 거더(3)의 길이는 제1세그먼트 강 거더(21) 및 그의 양측 상의 2개의 세그먼트 강 거더의 길이의 합보다 짧음 ―;
S3, 제2세그먼트 강 거더(22)를 리프팅하고, 제1세그먼트 강 거더(21)와 제2세그먼트 강 거더(22)를 맞대어 건립된 제1일체형 강 거더를 형성하는 단계;
S4, 제1일체형 강 거더가 미리 설정된 변위를 위해 교각 상단의 짧은 슬라이드웨이 거더(3)를 따라 이동할 때 균형추(1)의 목표 하중을 미리 계산하고; 제1일체형 강 거더가 목표 하중에 대해 조정되도록 균형추(1)를 조정한 다음, 제1일체형 강 거더를 미리 설정된 변위로 이동시키는 단계;
S5, 상기 S3 및 S4를 반복하고, 복수의 세그먼트 강 거더를, 제1일체형 강 거더에 맞대어진 모든 세그먼트 강 거더가 교각 상단의 짧은 슬라이드웨이 거더(3) 상에서 전체적인 전도 방지 능력을 가질 때까지 제1일체형 강 거더와 연속적으로 맞대는 단계; 및
S6, 건립된 세그먼트 강 거더 모두의 개개의 양측 상에 나머지 세그먼트 강 거더를 건립시키는 단계를 포함하는, 방법. - 제1항에 있어서,
제2세그먼트 강 거더(22), 제1세그먼트 강 거더(21) 및 제3세그먼트 강 거더(23)가 교각 상단의 짧은 슬라이드웨이 거더(3) 상에 연속적으로 배열될 때, 교각 상단의 짧은 슬라이드웨이 거더(3)의 길이는 제2세그먼트 강 거더(22)와 제3세그먼트 강 거더(23) 사이의 무게 중심 거리보다 더 짧은, 방법. - 제1항에 있어서,
상기 S2는 구체적으로,
제1세그먼트 강 거더(21)를 미리 설정된 높이로 리프팅한 다음, 균형추(1)를 사용하여 제1세그먼트 강 거더(21)를 수평 상태로 조정하는 단계; 및
제1세그먼트 강 거더(21)를 교각 상단의 짧은 슬라이드웨이 거더(3) 상의 제1포지션으로 낙하시키는 단계를 포함하는, 방법. - 제1항에 있어서,
상기 교각 상단의 짧은 슬라이드웨이 거더(3)는 교각(41) 및 교각(41) 옆의 브래킷(42)의 상단에 위치되고;
상기 교각 상단의 짧은 슬라이드웨이 거더(3)는,
종방향 거더(31) ― 상기 종방향 거더(31)는 교각(41)의 양측 상에 배열되고, 브래킷(42)의 상단 상에 수평으로 배열됨 ―;
고정 슬라이딩 시트(32) ― 상기 고정 슬라이딩 시트(32)는 종방향 거더(31)의 외부 단부 상에 배열되고 세그먼트 강 거더를 지지하도록 구성됨 ―;
평활한 강판(33) ― 상기 평활한 강판(33)은 짧은 슬라이드웨이로서의 역할을 하도록 상기 교각(41)의 상단 상에 고정적으로 배열됨 ―; 및
슬라이딩 조립체 ― 상기 슬라이딩 조립체는 종방향 거더(31)와 고정적으로 연결된 고정 부분, 및 평활한 강판(33) 상에서 이동하도록 세그먼트 강 거더를 구동시키도록 구성된 이동 부분을 포함 ―를 포함하는, 방법. - 제4항에 있어서,
상기 고정 부분은,
앵커 거더(34) ― 상기 앵커 거더(34)는 종방향 거더(31)의 내부 단부 상에 배열되고, 상기 앵커 거더(34)의 커맨드 높이는 고정 슬라이딩 시트(32)의 높이보다 더 낮음 ―; 및
종방향 트랙션 디바이스(35) ― 상기 종방향 트랙션 디바이스(35)는 상기 앵커 거더(34) 상에 배열됨 ―를 포함하고,
상기 이동 부분은,
이동 가능한 슬라이딩 시트(36) ― 상기 슬라이딩 시트(36)는 평활한 강판(33) 상에 배치되고 트랙션 라인(37)을 통해 종방향 트랙션 디바이스(35)와 연결됨 ―를 포함하는, 방법. - 제5항에 있어서,
상기 S2 이전에, 종 방향 거더(31) 상의 미리 설정된 위치에 임시 패드(38)를 배치하고, 이동 가능한 슬라이딩 시트(36)를 미리 설정된 위치로 이동시키는 단계를 더 포함하는, 방법. - 제5항에 있어서,
상기 종방향 트랙션 디바이스(35)는 잭이고, 상기 트랙션 라인(37)은 강 스트랜드인, 방법. - 제5항에 있어서,
상기 이동 가능 슬라이딩 시트(36)는 상기 제1세그먼트 강 거더(21)와 스폿 용접되는, 방법. - 제1항에 있어서,
상기 균형추(1)는 상기 제1세그먼트 강 거더(21) 상에 자유롭게 배치된 복수의 물 저장 용기이고, 상기 물 저장 용기의 무게는 물 저장 능력에 따라 조정되고; 모든 물 저장 용기의 무게 중심은 제1세그먼트 강 거더(21)의 무게 중심과 동일 평면 상에 있는, 방법. - 제9항에 있어서,
상기 물 저장 용기의 하단에는 물 유출 밸브가 제공되고;
상기 물 저장 능력에 따라 물 저장 용기의 무게를 조정하는 특정 방법은, 물 저장 능력을 증가시키기 위해 물 저장 용기에 물을 공급하기 위해 물 펌프를 사용하고; 그리고 물 저장 능력을 감소시키기 위해 물을 배출하기 위해 물 배출 밸브를 사용하는 단계를 포함하는, 방법.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910934860.5 | 2019-09-29 | ||
CN201910934860.5A CN110629677B (zh) | 2019-09-29 | 2019-09-29 | 墩顶短滑道梁上架设节段钢梁的方法 |
PCT/CN2020/098665 WO2021057145A1 (zh) | 2019-09-29 | 2020-06-29 | 墩顶短滑道梁上架设节段钢梁的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20220051851A true KR20220051851A (ko) | 2022-04-26 |
KR102635982B1 KR102635982B1 (ko) | 2024-02-08 |
Family
ID=68973598
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020227010234A Active KR102635982B1 (ko) | 2019-09-29 | 2020-06-29 | 교각 상단의 짧은 슬라이드웨이 거더 상에 세그먼트 강 거더를 건립하기 위한 방법 |
Country Status (7)
Country | Link |
---|---|
JP (1) | JP7276599B2 (ko) |
KR (1) | KR102635982B1 (ko) |
CN (1) | CN110629677B (ko) |
AU (1) | AU2020352698B2 (ko) |
GB (1) | GB2603424B (ko) |
MA (1) | MA56285B1 (ko) |
WO (1) | WO2021057145A1 (ko) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116815648A (zh) * | 2023-04-13 | 2023-09-29 | 中铁四局集团有限公司 | 一种利旧滑道梁滑道板的调平控制方法 |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110629677B (zh) * | 2019-09-29 | 2021-01-26 | 中铁大桥局集团有限公司 | 墩顶短滑道梁上架设节段钢梁的方法 |
CN114016422B (zh) * | 2021-11-23 | 2023-11-03 | 中铁大桥局集团有限公司 | 一种钢梁架设方法 |
CN114214967A (zh) * | 2021-12-25 | 2022-03-22 | 中交路桥建设有限公司 | 一种山区高墩大跨度无支架钢箱梁顶推安装方法 |
CN114687295B (zh) * | 2022-04-26 | 2024-03-19 | 石家庄铁道大学 | 循环浮运桥位架设简支钢梁的施工方法 |
CN114808752B (zh) * | 2022-04-27 | 2023-09-05 | 中交路桥建设有限公司 | 钢桁梁双顶托举顶推安装方法 |
CN114808740A (zh) * | 2022-05-27 | 2022-07-29 | 山东省路桥集团有限公司 | 一种首孔梁架设施工的方法 |
CN120042138B (zh) * | 2025-04-25 | 2025-06-24 | 保利长大工程有限公司 | 一种钢桁梁拼装结构及拼装工艺 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101996819B1 (ko) * | 2018-07-18 | 2019-07-05 | 에스오씨기술지주 주식회사 | 카운트웨이트 및 중간횡레일을 이용한 숏 거더 런칭 시스템 및 이를 이용한 거더 시공방법 |
Family Cites Families (37)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5115539A (ja) * | 1974-07-29 | 1976-02-07 | Nippon Kokan Kk | Hashigetakasetsukoho |
JPS6038488B2 (ja) * | 1978-07-07 | 1985-09-02 | オイレス工業株式会社 | 橋梁の押し出し架設工法 |
JPS5536553A (en) * | 1978-09-06 | 1980-03-14 | Nippon Kogen Concrete | Method of installing truss beam by pushinggout |
DE3124038C2 (de) * | 1981-06-19 | 1985-03-07 | Philipp Holzmann Ag, 6000 Frankfurt | Verfahren und Vorrichtung zum Herstellen von Bauwerken wie Brücken unter Verwendung von Beton-Fertigteilträgern |
JPS62189206A (ja) * | 1986-02-17 | 1987-08-19 | 株式会社 宮地鐵工所 | 橋の構築方法 |
JP4264470B2 (ja) * | 1997-02-19 | 2009-05-20 | 株式会社横河ブリッジ | 橋桁部材の架設方法および架設装置 |
JP2003105719A (ja) * | 2001-10-01 | 2003-04-09 | Nichiei Kensetsu:Kk | パッケージ化による一括架設工法に用いる地組装置 |
JP3885554B2 (ja) * | 2001-10-31 | 2007-02-21 | 鹿島建設株式会社 | 橋梁の押出し工法 |
JP2005171638A (ja) * | 2003-12-11 | 2005-06-30 | Oriental Construction Co Ltd | コンクリート桁の張出し架設工法における変位調整方法 |
KR100730234B1 (ko) * | 2006-03-07 | 2007-06-19 | 오창열 | 횡방향 추진을 통한 교량 상부구조 긴급 교체 시스템 |
JP5214371B2 (ja) * | 2008-08-26 | 2013-06-19 | 株式会社Ihiインフラシステム | 構造物 |
CN201574357U (zh) * | 2009-10-13 | 2010-09-08 | 武汉通联路桥机械技术有限公司 | 移动模架梳形梁自动平衡机构 |
KR101415908B1 (ko) * | 2012-04-03 | 2014-07-09 | 원대연 | 복합트러스 거더교 가설을 위한 압출공법 |
JP6025544B2 (ja) * | 2012-12-14 | 2016-11-16 | 株式会社Ihiインフラシステム | 橋梁の架設方法 |
RU2514331C1 (ru) * | 2012-12-14 | 2014-04-27 | Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" | Способ монтажа балки жесткости вантового моста |
TWI564452B (zh) * | 2014-12-03 | 2017-01-01 | 財團法人國家實驗研究院 | 輕量便橋系統及其建造方法 |
CN104480862B (zh) * | 2014-12-03 | 2016-04-20 | 中铁大桥局集团有限公司 | 一种斜拉桥边跨钢桁梁的架设方法 |
JP6514882B2 (ja) * | 2014-12-03 | 2019-05-15 | 大成建設株式会社 | 橋桁の架設工法 |
CN105088959B (zh) * | 2015-08-21 | 2017-04-12 | 中交武汉港湾工程设计研究院有限公司 | 一种钢桁梁节点自适应连续顶推系统 |
CN105648914B (zh) * | 2015-12-30 | 2017-05-24 | 海波重型工程科技股份有限公司 | 一种中小型钢桁系杆拱桥的施工方法 |
CN206173812U (zh) * | 2016-10-21 | 2017-05-17 | 金华职业技术学院 | 一种桥梁新型连续梁施工滑移装置 |
CN206783181U (zh) * | 2017-01-16 | 2017-12-22 | 宜宾市远平机械制造有限公司 | 一种配重可移动的新型塔吊 |
CN107165051B (zh) * | 2017-05-15 | 2018-09-18 | 中铁三局集团线桥工程有限公司 | 高架站单双线箱梁架设施工方法 |
CN107503296A (zh) * | 2017-08-31 | 2017-12-22 | 中国十九冶集团有限公司 | 贝雷桥就位方法 |
CN107905122A (zh) * | 2017-11-10 | 2018-04-13 | 秦皇岛优益重工科技有限公司 | 一种t型梁双梁并联横移架设工艺 |
CN207775734U (zh) * | 2017-12-12 | 2018-08-28 | 中交第二公路工程局有限公司 | 一种单悬臂拼装的平衡调节装置 |
CN108103953B (zh) * | 2018-03-09 | 2019-10-15 | 中国铁建大桥工程局集团有限公司 | 适用于高墩大跨度钢桁梁桥双滑块顶推施工方法 |
CN207974016U (zh) * | 2018-03-09 | 2018-10-16 | 陕西华山路桥集团有限公司 | 一种钢桁架顶推支撑系统 |
CN109778700B (zh) * | 2019-01-15 | 2020-07-24 | 中铁一局集团有限公司 | 一种跨越既有道路的现浇槽形梁三点滑移顶推施工方法 |
CN109629458B (zh) * | 2019-01-23 | 2020-11-27 | 腾达建设集团股份有限公司 | 桥梁悬臂施工的体系转换方法 |
CN109944170A (zh) * | 2019-05-06 | 2019-06-28 | 重庆建工市政交通工程有限责任公司 | 高墩连续梁边跨现浇段及合龙段一体化施工体系及施工方法 |
KR102120757B1 (ko) * | 2019-05-13 | 2020-06-10 | 에스오씨기술지주 주식회사 | 카운트웨이트 및 중간횡레일을 이용한 숏 거더 런칭 시스템 및 이를 이용한 거더 시공방법 |
CN210288140U (zh) * | 2019-07-03 | 2020-04-10 | 桂林电子科技大学 | 一种简易的预制桥面板吊装台车 |
CN110258293A (zh) * | 2019-07-22 | 2019-09-20 | 中铁大桥局集团有限公司 | 斜拉桥钢桁梁主塔墩顶架设施工方法 |
JP7172916B2 (ja) * | 2019-08-20 | 2022-11-16 | Jfeエンジニアリング株式会社 | 橋梁上部工撤去工法 |
CN110644378A (zh) * | 2019-09-04 | 2020-01-03 | 中国一冶集团有限公司 | 合拢段施工的配重卸载自动调节系统及其施工调节方法 |
CN110629677B (zh) * | 2019-09-29 | 2021-01-26 | 中铁大桥局集团有限公司 | 墩顶短滑道梁上架设节段钢梁的方法 |
-
2019
- 2019-09-29 CN CN201910934860.5A patent/CN110629677B/zh active Active
-
2020
- 2020-06-29 AU AU2020352698A patent/AU2020352698B2/en active Active
- 2020-06-29 GB GB2205842.4A patent/GB2603424B/en active Active
- 2020-06-29 JP JP2022514756A patent/JP7276599B2/ja active Active
- 2020-06-29 KR KR1020227010234A patent/KR102635982B1/ko active Active
- 2020-06-29 WO PCT/CN2020/098665 patent/WO2021057145A1/zh active Application Filing
- 2020-06-29 MA MA56285A patent/MA56285B1/fr unknown
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101996819B1 (ko) * | 2018-07-18 | 2019-07-05 | 에스오씨기술지주 주식회사 | 카운트웨이트 및 중간횡레일을 이용한 숏 거더 런칭 시스템 및 이를 이용한 거더 시공방법 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116815648A (zh) * | 2023-04-13 | 2023-09-29 | 中铁四局集团有限公司 | 一种利旧滑道梁滑道板的调平控制方法 |
Also Published As
Publication number | Publication date |
---|---|
JP2022550266A (ja) | 2022-12-01 |
GB202205842D0 (en) | 2022-06-08 |
MA56285A1 (fr) | 2023-06-28 |
AU2020352698B2 (en) | 2024-03-14 |
AU2020352698A1 (en) | 2022-03-24 |
GB2603424A (en) | 2022-08-03 |
JP7276599B2 (ja) | 2023-05-18 |
KR102635982B1 (ko) | 2024-02-08 |
CN110629677A (zh) | 2019-12-31 |
CN110629677B (zh) | 2021-01-26 |
GB2603424B (en) | 2023-07-05 |
MA56285B1 (fr) | 2023-12-29 |
WO2021057145A1 (zh) | 2021-04-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20220051851A (ko) | 교각 상단의 짧은 슬라이드웨이 거더 상에 세그먼트 강 거더를 건립하기 위한 방법 | |
CN108222482A (zh) | 门式自适应伸缩液压爬升平台系统及其爬升方法 | |
CN207048306U (zh) | 滑模柔性平台 | |
CN110541556B (zh) | 附着式升降脚手架及爬升方法 | |
CN104310165A (zh) | 一种导轨式附着方式施工升降机及其施工方法 | |
KR100681661B1 (ko) | 러더 혼 탑재 전용 서포트 타워 | |
CN114803882A (zh) | 自爬升起重机 | |
CN110565937A (zh) | 一种门式整体提升钢平台 | |
CN102083734A (zh) | 巨型起重机 | |
CN212356206U (zh) | 一种用于钢梁架桥机的起重小车 | |
CN111778875A (zh) | 一种滚轮式撑脚、桥梁转体系统及施工方法 | |
CN114855631B (zh) | 多横梁钢索塔安装方法 | |
CN114197889B (zh) | 一种楼层装配节提升装置 | |
CN214384059U (zh) | 一种混凝土施工现场的防护挡板自动升降装置 | |
CN211257773U (zh) | 一种门式整体提升钢平台 | |
CN113914225A (zh) | 一种大吨位牵索挂篮主桁架纵向滑移竖向提升施工方法 | |
CN115288204A (zh) | 一种深基坑肥槽内地下室外墙防水施工方法 | |
CN211472188U (zh) | 一种用于中低速磁浮轨道梁组装的工装 | |
CN111620225A (zh) | 一种用于钢梁架桥机的起重小车 | |
CN217460582U (zh) | 大体积基础底板浇筑的溜槽装置 | |
CN117513764B (zh) | 安装位置低于滑移轨道的滑移方法 | |
RU2259453C2 (ru) | Способ сооружения резервуаров с купольной крышей методом подращивания и устройство для его осуществления | |
CN219098539U (zh) | 一种大型升船机平台用吊装装置 | |
CN110258358B (zh) | 采用吊推支架施工变高度钢梁的方法 | |
CN119434164B (zh) | 靠船构件吊模安装装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PA0105 | International application |
Patent event date: 20220328 Patent event code: PA01051R01D Comment text: International Patent Application |
|
PA0201 | Request for examination | ||
PG1501 | Laying open of application | ||
E902 | Notification of reason for refusal | ||
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20231030 Patent event code: PE09021S01D |
|
E701 | Decision to grant or registration of patent right | ||
PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20240112 |
|
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20240206 Patent event code: PR07011E01D |
|
PR1002 | Payment of registration fee |
Payment date: 20240206 End annual number: 3 Start annual number: 1 |
|
PG1601 | Publication of registration |